Progress Report for the Month of June - 2019 of Sub Division No. 1, LMD Colony of QC&I Division No.

7, Karimnagar.
District : Karimnagar Category: EPC

No. of tests to be
Total QC Total quantity
Progress during the month in Crores/ No. of inspections conducted / actual
Certificat executed during
Agreement Expenditure details during the month tests conducted by
es upto the month in Cum
Value/ Revised Extention of QC Staff
Package No., & Name of Executing last
S. No Name of Work Agreement time granted Remarks
Agency Circle month/
Value (In up to
During
Crores)

Concrete
Concrete
the

Balance
Up to During the

Soil

Soil
Cumulative month AEE DEE EE
last Month Month

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Pkg No.2 IFFC


IFFC - Pkg-2: MMR R/S canal from E.O.T up to CC for structures of
Circle,
1 km.17.750 to 36.700 and including 135.09 124.41 10.68 135.09 0.00 43 / 1 3 1 - 110 2200 1 / 2 1 / 1 distributories is in
Engineering Project LMD
Thotapally online reservoir 31/12/2019 progress.
(India) Ltd. Colony.

IFFC - Pkg-3:MMR L/S canal from Pkg No.3


IFFC Protection lining and CC
Km. 0/0 to 14.600 and R/S canal
Circle, for structures & E.W. for
2 from Km36.700/37.000 to Km 67.14 31/12/2017 44.67 1.66 46.33 20.81 34 / 1 7 3 - 620 - 2 / 4 0 / 0
LMD canal sectioning is in
64.250 ( Beyond Thotapally Raghva & BVSR (JV) Colony. progress
Reservoir) in Karimnagar.

Package No.5
1.Pump house, Surgepool
IFFC
excavation, CC for tunnel
IFFC - Pkg-5 : Lift from Thotapally Circle,
3 366.26 31/03/2019 1.82 5.12 6.94 359.32 1 / 1 8 6 2 640 - 2 / 4 0 / 0 bed lining, Vertical
Reservoir to Gouravelly Reservoir. LMD
M/s.MEIL. shafts(3No's) excavation
Colony.
is in progress.

Package No.6
Raising Embankment,
IFFC
Weir Body wall, SLRB
IFFC - Formation of Gouravelly Circle,
4 583.274 28/12/2019 396.61 0.00 396.61 186.66 27 / 0 13 10 2 1882 735786 4 / 6 48 / 52 Sub Structure, Rock toe
Reservoir M/s. BVSR LMD
and revetment work is in
Construction, P.LTD Colony.
progress.

IFFC - Pkg 7 : Gouravelly Right side Package No.7 IFFC


canal km.0.00 to 47.725 and left side Circle,
5 166.88 31/12/2017 91.51 0.00 91.51 75.37 63 / 0 0 0 - 0 0 0 / 0 0 / 0 No work is in progress.
Canal from Km.0.00 to 14.325 in LMD
Karimnagar Dist. M/s. SEL GKC JV. Colony.

IFFC-Pkg -8 IFFC
IFFC - Pkg-8 : Construction of
Circle, Work Stand Still due to
6 Gandipally Reservoir with allied 50.00 31/12/2017 23.91 0.00 23.91 26.09 27 / 0 0 0 - 0 0 0 / 0 0 / 0
Ratna & MEIL & KBL LMD Re-Engineering.
works
(JV) Colony.

PCLIS-Pkg-8
Electro-Mechanical Works
of Unit-6 & 7 are in
Kaleshwara
Kaleshwaram Progress.
7 4900.39 m Circle 30/09/2017 4137.96 11.05 4149.01 751.39 84 / 1 20 6 2 0 0 0 / 0 0 / 0
Project-DR.BRAPCSS Pkg-8 MEIL-SEW-MAYTAS- (Inner Top cover of Unit-
LMD, KNR
BHEL (CONSORTIUM) 7&shaft Combined
alignment of Unit-6)

Pages}
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Total 4820.90 28.51 4849.40 1419.64 279 / 4 51 26 6 3252 737986 9 / 16 49 / 53

Asst. Executive Engineer, Deputy Executive Engineer,


QC &I. Sub Division No.1, QC &I. Sub Division No.1,
LMD Colony, Karimnagar LMD Colony, Karimnagar

Pages}
Progress Report for the Month of June - 2019 of Sub Division No. 1, LMD Colony of QC&I Division No. 7, Karimnagar.

District : Karimnagar Category: NON EPC


Total No. of Total quantity No. of tests to be
Progress during the month in Crores/ QC inspections executed conducted / actual
Agreement Expenditure details during the during the tests conducted by
Certific
Package No., Value/ month month in Cum QC Staff
Extention of ates
S. Agreement Value Revised Executing
Name of Work time granted upto last Remarks
No (In Crores) & Name Agreement Circle
up to month/
of Agency Value (In

Cumulative
During

Concrete

Concrete
Balance
crores) Up to

Dy.EE
During the

AEE

Soil

Soil
last EE
the Month month
Month

1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19

13
Flood flow canal from SRSP phase-II
- Construction of Link Canal from Link Canal
IFFCC Circle,
Canal Lining is in
1 Km.0.00 (MMR R / S Canal @ Km 101.65 LMD, 15/11/2017 101.53 0.00 101.53 0.12 31 / 0 8 4 - 1200 - 3 / 5 0 / 0
36.125 i.e. end of package-II) to Km M/S.SMSL – Progress
Karimnagar.
6.900 SRRCIPL(JV)

SRSP- Stage- I- Modernisation of


SRSP-Stage-I
Main Canal from Km. 146.000 to
GVC-IV, Canal lining in
2 Km. 191.000 of Kakatiya Main Canal M/s Kaveri 98.30 18/01/2019 50.04 9.50 59.54 38.75 4 / 1 9 5 1 1150 - 3 / 6 0 / 0
in below LMD, SRSP(Phase-II) LMD Colony progress.
Engineering Projects
Private Ltd.
Kakatiya Canal- Modernisation of
SRSP-Stage-I
Main Canal from Km. 191.000 to
Km. 234.000 of Kakatiya Main Canal CCH, Causeway apron work
3 99.60
Hanamkonda
25/02/2019 41.33 0.76 42.09 57.50 2 / 1 4 3 1 1184 - 3 / 4 0 / 0 is in progress.
in below LMD, SRSP-I (Phase-II) M/s SKR-SRC-
SLEC(JV)

SRSP - Stage-I - Providing stone


SRSP-Stage-I
pitching, plastering to chute drains on
LF and RF earth dam from (-)22.00
to 119.00 and 140.00 to 325.00 and
GVC-IV, Civil works are in
4 drilling 76mm dia (NX) core holes in M/s Swapna Projects 5.79 14/09/2018 2.38 0.00 2.38 3.41 1 / 0 - - - 0 0 0 / 0 0 / 0
foundation holes in Gallery of Prof. LMD Colony Progress
Private Limited,
G. V. Sudhakar Rao Lower Manair Hyderabad
Dam, Karimnagar Dist.

TOTAL 195.28 10.26 205.54 99.79 38 / 2 21 12 2 3534 0 17 / 15 0 / 0

Asst. Executive Engineer, Deputy Executive Engineer,

Page 3 of 12
QC &I. Sub Division No.1, QC &I. Sub Division No.1,
LMD Colony, Karimnagar LMD Colony, Karimnagar

Page 4 of 12
Progress Report for the Month of May - 2019 of Sub Division No. 1, LMD Colony of QC& I Division No. 7, Karimnagar.
District : Karimnagar Category: Minor Irrigation

Total quantity
Total QC No. of tests to be
Agreement Date of Progress(Expenditure) during the No. of inspections executed
Package No., Certificates conducted / actual tests
Value/ Revised Executing Completion/ month in Crores during the month during the
S. Agreement Value upto last conducted by QC Staff
Name of Work Agreement Circle/ Extended month in Cum Remarks
No (In Crores) & Name month/
Value (In Division Date of
of Agency During the
crores) Completion

Balance
Up to During month
Cumula Concre
last the AEE Dy.EE EE Soil Concrete Soil
tive te
Month Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MI-MK-Phase-III-MTB,
M. T. B.
Kothapalli(V), Karimnagar(M), Irrigation
Work Stand
1 Karimnagar District M/s KRMR 3.23 Circle, 15/11/2017 1.41 0.00 1.41 1.82 1 / 0 1 0 - 0 0 0 / 0 0 / 0 Still.
Constructions, Karimnagar
Hyderabad
MI-MK-Phase-II-MTB,
Manakondur (V&M), Karimnagar M. T. B. Irrigation
2 District. 4.68 Circle, 30/04/2018 3.11 0.00 3.11 1.57 4 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Sri.K.Prabhakar Karimnagar
Reddy
MI-MK-Phase-II-MTB,Huzurabad
M. T. B. Irrigation
(V&M), in Karimnagar District
3 2.74 Circle, 16/02/2018 1.94 0.00 1.94 0.80 1 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Sri.G.Swamy Reddy. Karimnagar

MI- Check dam/ Anicut across


Check Dam Irrigation
Kaluvala Vagu near Work stand
4 2.03 Circle, 22/09/2017 1.56 0.00 1.56 0.47 2 / 0 0 0 - 0 0 0 / 0 0 / 0 still.
Laxmakkapally(V), Veenavanka(M), Karimnagar
Karimnagar District Sri. S.Ravinder.
MI- Check dam/ Anicut across
Kaluvala Vagu near Check Dam Irrigation
5 Veenavanka(V&M), Karimnagar 1.54 Circle, 22/09/2017 1.18 0.00 1.18 0.36 2 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
District Sri.T.Subba Rao. Karimnagar

MI- Check dam/ Anicut across


Check Dam Irrigation
Kaluvala Vagu near
6 2.34 Circle, 22/09/2017 1.71 0.00 1.71 0.63 2 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Pothireddypally(V), Veenavanka(M), Sri. Kota Laxma Karimnagar
Karimnagar District Reddy
MI- Check dam/ Anicut across
Check Dam Irrigation
Kaluvala Vagu near
7 1.86 Circle, 19/09/2017 0.68 0.00 0.68 1.18 1 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Ramakrishnapur(V), Sri.K.Prabhakar Karimnagar
Veenavanka(M), Karimnagar District Reddy.

Page 5 of 12
Total quantity
Total QC No. of tests to be
Agreement Date of Progress(Expenditure) during the No. of inspections executed
Package No., Certificates conducted / actual tests
Value/ Revised Executing Completion/ month in Crores during the month during the
S. Agreement Value upto last conducted by QC Staff
Name of Work Agreement Circle/ Extended month in Cum Remarks
No (In Crores) & Name month/
Value (In Division Date of
of Agency During the
crores) Completion

Balance
Up to During month
Cumula Concre
last the AEE Dy.EE EE Soil Concrete Soil
tive te
Month Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MI- Check dam/ Anicut across Local
Check Dam Irrigation
stream near Mallial(V),
8 0.64 Circle, 19/09/2017 0.20 0.00 0.20 0.44 1 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Jammikunta(M), Karimnagar Karimnagar
Thanniru Anjaiah
District
MI- Check dam/ Anicut across Local
Check Dam
stream near Patharlapalli vagu near Irrigation
9 0.87 Circle, 19/09/2017 0.48 0.00 0.48 0.39 1 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
Patharlapalli(V), Jammikunta(M), M/s Poorna Karimnagar
Karimnagar District Constructions.
MI- Check dam/ Anicut across
Manair Vagu near Korkal Check Dam Irrigation
10 (V),Veenavanka(M), Karimnagar 10.39 Circle, 27/04/2019 7.61 0.00 7.61 2.78 2 / 0 3 1 - 621 28000 2 / 4 2 / 3 Work standstill.
District Sri.K. Bala Narsimha Karimnagar
Reddy.
MI- Check dam/ Anicut across
Manair Vagu near Vilasagar Check Dam
(V),Jammikunta (M), Karimnagar Irrigation
11 District 10.57 Circle, 19/05/2019 9.24 0.00 9.24 1.33 3 / 0 0 0 - 0 0 6 / 7 0 / 0 Work standstill.
M/s. BLG Projects Karimnagar
Ltd..

MI- Check dam/ Anicut across


Manair Vagu near Vavilala Check Dam Irrigation
12 (V),Jammikunta (M), Karimnagar 8.07 Circle, 02/01/2019 9.10 0.00 9.10 -1.03 3 / 0 0 0 - 0 0 0 / 0 0 / 0 Work standstill.
District M/s. BLG Projects Karimnagar
Ltd..
MI-Construction of Check Dam cum
SLRB across Nagnoor Vagu near Check Dam Irrigation
13 Nagnoor(V), Karimnagar (M), 11.32 Circle, 01/07/2018 0.00 0.00 0.00 11.32 0 / 0 4 0 - 0 0 0 / 0 0 / 0 Work standstill.
Karimnagar District M/s. PDR Karimnagar
Construction
MINOR IRRIGATION 38.23 0.00 38.23 22.05 23 / 0 8 1 0 621 28000 8 / 11 2 / 3

Asst. Executive Engineer, Deputy Executive Engineer,


QC &I. Sub Division No.1, QC &I. Sub Division No.1,

Page 6 of 12
Total quantity
Total QC No. of tests to be
Agreement Date of Progress(Expenditure) during the No. of inspections executed
Package No., Certificates conducted / actual tests
Value/ Revised Executing Completion/ month in Crores during the month during the
S. Agreement Value upto last conducted by QC Staff
Name of Work Agreement Circle/ Extended month in Cum Remarks
No (In Crores) & Name month/
Value (In Division Date of
of Agency During the
crores) Completion

Balance
Up to During month
Cumula Concre
last the AEE Dy.EE EE Soil Concrete Soil
tive te
Month Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
LMD Colony, Karimnagar LMD Colony, Karimnagar

Page 7 of 12
Abstract for Progress of works of Quality Control & Inspection Sub Division No. 1, LMD Colony for the Month of June - 2019

District : Karimnagar

No. of inspections during the


Total No.of works Total No.of works in progress Total QC Certificates issued
Proposed month
for total
S. payment
Category of the work Remarks
No during the
month in
Up to Crores
During
EPC Non EPC Total EPC Non EPC Total last Cumulative AEE Dy.EE EE Total
the Month
Month

One certificate was


1 Major Irrigation 7 4 11 5 4 9 317 6 323 38.77 72 38 8 118 Superseaded (Thotapally
LIS LSCC No.2)

2 Medium Irrigation - - - - - - - - - - - - - -

3 Minor Irrigation - 13 13 - - - 23 0 23 0.00 8 1 0 9

4 TSIDC - - - - - - - - - - - - -

TOTAL 7 17 24 5 4 9 340 6 346 38.77 80 39 8 127

Asst. Executive Engineer, Deputy Executive Engineer,


QC &I, Sub Division No. 1, QC &I. Sub Division No.1,
LMD Colony, Karimnagar LMD Colony, Karimnagar

Page 8 of 12
Report of abstract for details of progress of works of Quality Control & Inspection Sub-division No.1, LMD Colony for the month of June - 2019
District : Karimnagar

No.of tests to be
Total Quantity conducted/actual tests
Progress during the month/ Expenditure Total QC Certificates No. of inspections during
executed during the conducted by QC staff
Detail(in Crores) issued the month
month in Cum
Total no of
S. Total No. Concrete Soil
Category works in Remarks
No of works
progress

Cumulative

conducted

conducted

conducted
conducted
Concrete

actually

actually
Balance
Up to Up to
During During the

to be

to be
Soil
last last AEE Dy.EE EE
the Month Month
Month Month

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Major Irrigation
i EPC works 7 5 4820.90 28.51 4849.40 1419.64 279 4 51 26 6 3252 737986 9 16 49 53
ii Non-EPC works 4 4 195.28 10.26 205.54 99.79 38 2 21 12 2 3534 0 17 15 0 0
2 Medium Irrigation - - - - - - - - - - - - - - - -

3 Minor Irrigation works 13 0 38.23 0.00 38.23 22.05 23 0 8 1 0 621 28000 8 11 2 3

4 TSIDC - - - - - - - - - - - - - - - -
TOTAL 24 9 5054 38.77 5093 1541 340 6 80 39 8 7407 765986 34 42 51 56

Asst. Executive Engineer, Deputy Executive Engineer,


QC &I. Sub Division No.1, QC &I. Sub Division No.1,
LMD Colony, Karimnagar LMD Colony, Karimnagar

Page 9 of 12
Statement showing the Quality Conrol Audit Reports
Circle:QC&I Circle Hanmakonda Month : Jun-19
Division:QC&I Division No:7 Karimnagar
Sub-Division: QC & I Sub-Division:1, LMD Colony.
No. of Inspections / Dimensional checks by Remarks/Defects notified with
No. of Tests Conducted
the QC Staff with date description
Soil / Concrete / Others ATRs
Un
No. of tests to No. of received
attended Deduction
Name of Work with Package No be conducted tests on the
S.No No. of tests During the Remarks/ s made (in Remarks
and Agreement Details EE DEE AEE/AE Total executed as per conducted Cumulative Remarks/
conducted month Defects Rs)
quantity code/manual/ by Defects
by QC Staff notified
circulars Constructi
etc., on Staff
1 2 3 4 5 6 7 8 9 10
IFFC - Pkg-2: MMR R/S canal from
1 km.17.750 to 36.700 and including 27 4,22,27 2200 / 110 2/7 2/7 1/2 Nil - - - -
Thotapally online reservoir

IFFC - Pkg-3:MMR L/S canal from


Km. 0/0 to 14.600 and R/S canal from
4,6,12,14,19,21,2
2 Km36.700/37.000 to Km 64.250 12,14,27 0 / 620 0/14 0/14 0/4 Nil - - - -
( Beyond Thotapally Reservoir) in 7
Karimnagar.

IFFC - Pkg-5 : Lift from Thotapally 3,12,14,22,24, 3,4,12,14,19,22,2


3 12,27 0 / 640 0/13 0/13 0/4 Nil - - - -
Reservoir to Gouravelly Reservoir. 27 4,27
01,04,06,09,11,1
IFFC - Formation of Gouravelly 1,4,6,12,14,17
4
Reservoir
12,27 4,17,19,22,24,25, 735786 / 1882 492/38 507/44 52/6 Nil - - -
,20,22,24,27
27,29

1,3,4,7,10,11,12,
Kaleshwaram Project- DR.BRAPCSS 10,20,21,25, 13,14,17,18,20,2
5 10,21 0 / 0 0/0 0/0 0/0 Nil - - - -
Pkg-8 29 1,22,24,25,26,
27,28,29
Flood flow canal from SRSP phase-II -
Construction of Link Canal from
3,4,6,12,14,19,22
6 Km.0.00 (MMR R / S Canal @ Km 3,12,22,27 0 / 1200 0/30 0/30 0/5 Nil - - - -
36.125 i.e. end of package-II) to Km ,27
6.900
SRSP- Stage- I - Modernisation of
Main Canal from Km. 146.000 to Km. 2,4,7,11,13,18,21
7
191.000 of Kakatiya Main Canal in
7 2,7,11,21,26 0 / 1150 0/25 0/25 0/6 Nil - - - -
,26,28
below LMD, SRSP (Phase-II)
Kakatiya Canal - Modernisation of
Main Canal from Km. 191.000 to Km.
8
234.000 of Kakatiya Main Canal in
7 2,7,21 2,7,13,21 0 / 1184 0/25 0/25 0/4 Nil - - - -
below LMD, SRSP-I (Phase-II)

Page 10 of 12
SRSP - Stage-I - Providing stone
pitching, plastering to chute drains on
LF and RF earth dam from (-)22.00 to
119.00 and 140.00 to 325.00 and
9
drilling 76mm dia (NX) core holes in
0 0 0 0 / 0 0/0 0/0 0/0 Nil - - - -
foundation holes in Gallery of Prof. G.
V. Sudhakar Rao Lower Manair Dam,
Karimnagar Dist.

Page 11 of 12
Asst. Executive Engineer, Dy Executive Engineer,
QC&I Sub Divn No 1, QC&I Sub Divn No 1,
LMD Colony LMD Colony

Page 12 of 12