WORKING SUMMARY

I have working in the Oil & gas industry for 18years including marine repair , Engineering &
contraction.My starting position was a welder,welding technician,QAQC inspector piping & structure
& Third party inspection

EDUCATION

1990 ~ 1995 : Sek. Keb. Taman Johor Jaya 2, Johor Bahru, Johor

Page 1 of 13
RESUME
1996 ~ 2000 : Sek. Men. Taman Johor Jaya 2, Johor Bahru, Johor

2001 ~ 2002 : Welding Fabrication Technology at Institute Mara Johor Bahru

2002 ~ 2003 : Mara PETRONAS Institute, Jasin, Melaka.

PERSONAL COURSE

20th Oct 2014 : Cswip 3.1 Welding Inspector Course at Cyberjaya, KualaLumpur.

15th May 2014 : CIDB MOCA Oil and Gas at Pulau Indah Yard, Selangor

03rd Aug 2009 : Cswip 3.1 Welding Inspection Course, Hotel Selesa, Pasir Gudang.

16th July 2008 : PCN Radiographic Interpretation Level 2 at PUPASTRI

05th Aug 2008 : PCN Welding Inspection Course, PUSPATRI, P.Gudang , Johor

19th Sept 2003 : Piping System / Basic Fire Fighting (CPR) at IKM Jasin, Melaka.

15th Mac 2003 : LNG Ship repair Program 2004-Quality Control (Marine Terminology)

10th Jan 2003 : Trainee Tradesman at Malaysia Shipyard & Engineering (MSE)

01st Oct 2001 : Building Wirering Installation at CIDB, Johor Bahru.

07th Aug 2019 : AESP (E4A6ACF5)

WORKING EXPERIENCE

1. Period Date 1 August 2019 to present


Position QC Engineer
Company STS EDAC Engineering Sdn Bhd
Project Petronas Rapid Project
Client Petronas
Location; Pengerang , Johor
2. Period Date October 2018 to May 2019 (8 month)
Position QA/QC Piping Line checker
Company Gee Project Consulting International
(WZS MISI Setia Oil & Gas Sdn.Bhd)
Project Petronas Rapid Project Package 4
Client Petronas & Petrofac
Location; Pengerang Gate 2, Johor

3. Period Date August 2018 To September 2018 (1 month)


Position QA/QC Pressure vessel

Page 2 of 13
RESUME
Company First Oil Engineering Sdn Bhd
Project FLOUR RAPID Project
Client Petronas Carigali
Location; ATB MMHE Pasir Gudang, Johor
4. Period Date July 2016 to June 2017 (1 yrs.)
Position QA/QC Structure & Sub structure
Company First Oil Engineering Sdn Bhd
Project Sepat A Substructure Project
Client Petronas Carigali
Location; MMHE Pasir Gudang, Johor
5. Period Date March 2016 to July 2016 (5 month)
Position Inspector (On behalf TKK) Overhead Crane
Company Bureau Veritas (M) Sdn Bhd
Project LNGT7 Bintulu
Client Petronas Carigali
Location; Simpang Renggam, Johor
6. Period Date Jan2016 to March 2016
Position Inspector (On behalf ITT)
Company SteelCon Engineering Sdn Bhd
Project Toji Osiyo LCC-Reformer Package Tajikistan
Client ITT CH SA LUGANO-SWITZERLAND / Danghara Refinery
Location; Nilai 2, Negeri Sembilan.
7. Period Date October 2015 to December 2015
Company Bureau Veritas Sdn Bhd
Position Inspector on Behalf of Hyundai Heavy Industries (HHI)
Fabrication Heat Exchanger
Project Baronia CPP-B Project
Client HHI & Petronas Carigali
Location ;Pasir Gudang, Johor
8. Period Date August 2015 to October 2015

Position Mechanical Inspector on Behalf of HESS


Company Bureau Veritas Sdn Bhd
Project Bergading CPP-B Project
Client Carigali HESS
Location :Pasir Gudang, Johor
9. Period Date March 2015 to July 2015 (5mth)
Position QA/QC Piping/Line checker
Company Tuah Effect Engineering / Rotary
Project XSBR Power Plant
Client Synthomer
Location Kluang,Johor
10. Period Date Feb 2014 to Oct 2014 (8mth)
Position QA/QC Structure (RFSB 1809)
Company Tabung Haji Heavy Engineering

Page 3 of 13
RESUME
Project Bertam Topside
Client Lundin Petroleum
Location Pulau Indah Yard, Selangor Darul Ehsan
11. Period Date Jan 2010 to October 2011 (1 yrs 10mth)
Position QA/QC Structure
Company First Oil Engineering Sdn Bhd
Project Kinabalu Topside
Client PETRONAS CariGali
Location MMHE, Pasir Gudang
12. Period Date May2010 to December2010 (7mth)
Position QA/QC Structure
Company Trylon Engineering Sdn Bhd
Project Gumusut Kakap FPS Project
Client Sabah Shell Petroleum Corporation (SSPC)
Location MMHE,Pasir Gudang
13. Period Date July2008 to May2010 (2yrs)
Position Welding Supervisor
Company Sime Darby Engineering Sdn Bhd
Project Kinabalu (KNAG-B) Jacket
Client Petronas CariGali
Location Pasir Gudang, Johor
14. Period date July2008 to July2009 (1yrs)
Position Welding Technician
Company Sime Darby Engineering Sdn Bhd
Project Kumang & Tangga Barat (MLDP-A /LHDP-A/KUJT-A/F9JT-A Platform)
Client Petronas CariGali Sdn Bhd
Location Sime Darby Engineering Sdn.Bhd,Pasir Gudang
15. Date period May 2008 to July2008 (3mth)
Position QA/QC Hull / Marine
Company Marine Conversion & Heavy Engineering (MMHE)
Project FPSO RUBY
Client Malaysia International Shipping Corporation (MISC)
Location MMHE, Pasir gudang
16. Date period Jan 2008 to May 2008 (5mth)

Page 4 of 13
RESUME
Position QA/QC Piping/structure
Company Carimin Engineering Sdn Bhd
Project B11K-A Topside & Jacket
Client Sarawak Shell Berhad (SSB)
Location MMHE, Pasir Gudang
17. Date period Mac 2007 to Jan 2008 (9mth)
Position QA/QC Piping
Company Multitask Engineering Sdn Bhd
Project Mopu Storage Tank Project
Client Single Buoy Mooring (SBM)
Location MMHE, Pasir Gudang
18. Date period May 2006 to Jan 2007 (7mth)
Position QA/QC Piping
Company Sri Paka Engineering Sdn Bhd
Project Fabrication T10 Drilling and T11 Drilling
Client Tioman Smigdiv
Location MMHE, Pasir Gudang
19. Date period Jan 2003 to April 2006 (3yrs 4mth)
Position Trainee Marine/Hull QC inspector
Company Malaysia Shipyard & Engineering Sdn Bhd
Hull Construction Department / Ship Repair Dept
Project/Ship Cargo Ship, Supertanker Ship, Tanker Ship, Contena Cargo Ship
FPSO, FSO
Client America Bureau of Shipping (ABS),Lyord Registered (LR),Bureau VERITAS (BV)

WORKING EXPERIENCE IN TPI

1. Date period April 2010


Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed / inspection hydrotest Christmas trees for Bongkok project
Client Carigali HESS
Location FMC Technologies, Gelang patah
2. Date period May 2008

Page 5 of 13
RESUME
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed / inspection WPQT/ WQT & hydrotest Riser 16” for Cilipadi project
Client Sarawak shell berhad
Location Ramunia Fabrication, Teluk ramunia.
3. Date period May 2008
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection Hydrotest & Dimensional Inspection for TUBING HANGER
BODY, TC-1A-EMS-LR, 13.505 BOWL, 2 7/8 JFE BEAR (6.4 PPF) BOX THD,
COMPOSITE BLOCK VALVE, ASSY, S2S, 2 9/16 5K, W/ HYDR ACTD UP
MASTER(S)
Client CPOC CARIGALI-PTTEPI OPERATING COMPANY SDN.BHD
Location FMC Wellhead Equipment, Nusa Jaya
4. Date period May 2008
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection WPQT & WQT for BONGKOT FIELD DEVELOPMENT
PROJECT PHASE 4A
Client HYUNDAI HEAVY INDUSTRIES (HHI, KOREA)
Location TMA JOY, Pasir Gudang
5. Date period May 2008
Position Third party inspector (on behalf of HESS)
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection fabrication of Gas Dehydration Glycol Regeneration
Package for BESAR Project
Client Carigali HESS
Location ATB MMHE, Pasir Gudang
6. Date period Mac 2008
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection WPQT/WQT Piping/Structure & Mechanical Testing
Cladding material for Tapis R Project
Client ExxonMobil
Location MMHE, Pasir Gudang

Page 6 of 13
RESUME
7. Date period April 2013
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection WPQT/WQT& fabrication riser pipe/hydrotest for Damar
A&B Project
Client ExxonMobil
Location MMHE, Pasir Gudang
8. Date period April 2013
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection WPQT/WQT & fabrication Topside structure for Telok A&B
Project
Client ExxonMobil
Location MMHE, Pasir Gudang
9. Date period April 2013
Position Third party inspector
Company Bureau VERITAS (M) Sdn. Bhd
Project Witnessed/Inspection Pedestal Crane Load Tes/Statict for F12 Project
Client Sarawak Shell Berhad
Location MMHE, Pasir Gudang
10. Date period April 2013
Position Third party inspector
Company Inter Pacific Technical Service (IPTS)
Project Witnessed/Inspection Rubber lining Heat Exchanger for Arab Saudi Project
Client Murphy Oïl
Location Organos, Pasir Gudang
11. Date period November 2013
Position Client Respective
Company Velosi Sdn Bhd
Project Witnessed/Inspection of Pipe rolled Material for BELUM Project
Client Murphy Oil
Location EEW, Pasir Gudang
12. Date period November 2013
Position Third party inspector

Page 7 of 13
RESUME
Company Velosi Sdn Bhd
Project Witnessed/Inspection Monorail Trolley Hoist 10MT & Padestal Crane for Malikai
Project
Client Sabah Shell Berhad
Location MMHE, Pasir Gudang
13. Date period May 2013
Position Third party inspector
Company Velosi Sdn Bhd
Project Witnessed/Inspection Dimensional & Hydrotest SHOE, FLOAT, ADCO, 9-5/8
VAM TOP 43.5-53.5 LBS/FT, L-80 TYPE 1, 4-1/4 SUPER SEAL II VALVE, ADCO
REF NUM: 0514135019 & COLLAR, FLOAT, ADCO SET, 9-5/8 TENARIS HYDRIL
BLUE 43.5-53.5 LBS/FT, L-80 TYPE 1, REF NUM: 0514255009 D00651887 / A
Client ADCO Abu Dhabi
Location Hallirburton, Senai
14. Date period December 2014
Position Third party inspector
Company Velosi Sdn Bhd
Project Witnessed/Inspection Material for Gorgon Project
Client Chevron Autralia
Location Galperti Manufacturing (Malaysia) Sdn Bhd
15. Date period December 2014
Position Third party inspector
Company Velosi Sdn Bhd
Project Witnessed/Inspection Factory Acceptance Test (FAT) Pre-Shipment-& Static
Test Monorail Trolley Hoist for Malikai EPC TLP Project
Client Sabah Shell Petroleum Company Limited
Location Excell Lift, Selangor
16. Date period December 2015
Position Third party inspector (on behalf of HESS)
Company Bureau Veritas Sdn Bhd
Project Witnessed/inspection PMI Testing & Final inspection R pressure Gauge
HYDRAULIC POWER UNIT HPU for Bergading Project
Client Hyundai Heavy industries (HHI) North Malay Basin Bergading SPP & WHP
EPCIC Project
Location PROFESSIONAL TESTING SDN BHD, Seri Alam, Johor

Page 8 of 13
RESUME
17. Date period December 2015
Position Inspector (on behalf of HESS)
Company Bureau Veritas Sdn Bhd
Project Witnessed/inspection Assembly / Fit-up of Partition plate to tube sheet/fit-up &
welding nozzle neck to flange / Final Inspection of header box assembly /
Welding visual inspection / PWHT
HYDRAULIC POWER UNIT HPU.
Fresh Water Storage Tank
Pre-Inspection Meeting for Hydraulic Power Unit
Deionized Water Storage Tank for North Malay Basin Bergading SPP & WHP
EPCIC Project
Client Hyundai Heavy industries (HHI)
Location MMHE, Johor
18. Date period October 2015
Position Third party inspector
Company Bureau Veritas Sdn Bhd
Project Witnessed/inspection Painting/Dimensional inspection of Fabrication water gate
for EPM – HIDROITUANGO Project
Client INGETEC, Colombia
Location MMHE ATB, Johor
19. Date period October 2015
Position Third party inspector (on behalf of HHI)
Company Bureau Veritas Sdn Bhd
Project Witnessed/Inspection Fit Up Inspection Heat Exchanger Header Box & Pipe
Rolling Material UNS S31803, Stage Discharge Cooler, Lube Oil Cooler for
Boronia Project
Client Hyundai Heavy Engineering (HHI)
Location Sime Darby Joy Industries, Johor

Scope of Works Structure

 To conduct quality control inspection as per ITP, Prepare WQT for new welders
 Prepare MDR & others QC Documents
 Liaise with third party inspection.

Page 9 of 13
RESUME
 Read an inspection Test Plan (ITP), Procedures & Specification of client/project before start any
inspection or fabrication.
 Check/inspect material verification inspection or invite client to be inspecting dimensional, size,
type and condition must be free from defect and segregation band and witnessed UT inspection
for lamination check & Mill certificate with refer IFC drawing before cut to fabrication.
 Check/inspect Fit Up Inspection or invite client to be inspect joint reparation, bevel, gap,
alignment, welding process is are following welding procedures specification
 (WPS) welding sequence sketch, welder pass must be qualified, consumable, tack weld and
cleanliness of work area is maintained.
 Monitoring pre-heating and inter pass temperature and welding current is correct.
 Check/inspect visual inspection or invite client to be inspect/marking this joint must be free
from surface defect porosity, undercut, spatter, hydrogen crack and distortion. Monitoring
grinding or cleaning before proceed to non-destructive inspection MPI, UT or RT depends on
client specification and procedures.
 Documentation / Final Document.
Scope of work QC Engineer

 Create a Specific Welding repair procedure activities piping,structure & Mechanical,Hydrotest


procedure,Method of statement procedures
 Monitor / witness QA/QC activities related to Piping / pipelines and Hydro testing / Pneumatic
Testing of erected piping systems.
 Prepare Welding Procedure Specifications and Conduct Procedure Qualification Tests, Welder
Qualification Tests and Mechanical testing of test specimens.
 Monitor / witness QA/QC activities related to Piping / pipelines and Hydro testing / Pneumatic
Testing of erected piping systems
 Prepare & maintain Field-Tested Summaries and related quality control documentation for all
field-tested materials.
 Track QC testing requirements
 Prepare & maintain Field-Tested Summaries and related quality control documentation for all
field-tested materials.
 Monitoring and administering the QA/QC Plan / Program and ensuring incorporated materials on
construction projects are in compliance with the plans and specifications.
 Review fabrication / erection, documents and work quality in terms of specification,
workmanship and other variables as indicated in project documents and as per requirements of
QC standard operating procedures and Customer specification

Page 10 of 13
RESUME
 To perform maintenance Heat Ex-changer,tube bundle & cleaning tube activities with hydro-
jetting & Final inspection
 To perform & witness Boroscope inspection
Scope of Works Piping

 Review/Approval of Inspection & Test Plan/s, Quality Control procedures, Method statement/s,
Welding Procedures
 Monitoring / Witnessing all the Welding, Fabrication & Erection related activities as per client
approved Inspection & Test Plans/Quality Control procedures.
 Inspection of incoming materials and reviewing test certificate as per code
 Inspection of piping materials identification as per isometric drawings.
 Witnessing of activities like PQR, Welder’s qualification Tests, Mechanical testing and preparation
of PQR records and WQT certificates.
 Stage wise inspection before, during and after fabrication.
 Review of radiography films, Witnessing of UT, MPI, DPI, Hardness, PWHT and review of test
reports.
 Review of Daily Welding reports & Welding Pipe book.
 Witnessing of Weld repair activities as per client approved WPS.
 Line walk and Punch List preparation before Hydro Test
 Review of Hydro test packages
 Witnessing of Hydro testing, Pneumatic testing as per client approved procedures.
 Verification of Reinstatement of Piping systems after completion of all hydro testing activities
 Verification Mechanical completion Package.
 Issue of Non- conformance reports & verification of Corrective/Preventive action
 Liaison with client inspectors for inspections of Hold and Witness Point.
 Witnessing / Inspection of Tie-In and Hot Tap welding activities.
 Witnessed Refinery Maintenance & shut down Inspection of vessel, column, Heat ex-changer &
Piping Hot tap.
 Final Documentation
Scope of Works Welding Technician

 Check/inspect/conduct welding procedures qualification test (WPQT) to take welding parameter


check/calculation,
 welding current, voltage current, travel speed and heat input. Conduct Welding Qualification
Test (WQT)

Page 11 of 13
RESUME
 Check/inspect/surveillance/monitoring/record randomly for all welding activities fabrication at
site for control repair rate
 To be inspect and calibrate welding machine, quiver, holding and baking oven electrode
 Randomly check welding joint process for welding parameter record.
 Witnessed/inspection NDT inspection MT or PT and RT or UT and mechanical testing (bend test,
charpy test, tensile test, CTOD, impact or corrosion test.
 Full monitoring/Witnessed/inspection hydro static test for riser, pipe and vessel for high
pressure, holding time and pressure release and reviewed the decoder chart.
 Full monitoring/Witness of Hydro static Test and Gas Test of composite block valve, spool body,
tubing hanger, gate valve, wellhead etc. as per applicable QCP / ITP.
 Check/inspect/conduct welding procedures qualification test (WPQT) to take welding parameter
check/calculation, welding current, voltage current, travel speed and heat input. Conduct
Welding Qualification Test (WQT)
 Check/inspect/surveillance/monitoring/record randomly for all welding activities fabrication at
site for control repair rate
 To be inspect and calibrate welding machine, quiver, holding and baking oven electrode
 Randomly check welding joint process for welding parameter record.
 Witnessed/inspection NDT inspection MT or PT and RT or UT and mechanical testing (bend test,
charpy test, tensile test, CTOD, impact or corrosion test.
 Full monitoring/Witnessed/inspection hydro static test for riser, pipe and vessel for high
pressure, holding time and pressure release and reviewed the decoder chart.
 Full monitoring/Witness of Hydro static Test and Gas Test of composite block valve, spool body,
tubing hanger, gate valve, wellhead etc. as per applicable QCP / ITP.

Reference Person

Name Position Company Mobile No

1. Mr. Mansor Osman Branch Manager Bureau Veritas (M) Sdn Bhd 013 774 3032
2. Mr.Boridah Lead QAQC WSZ Misi Setia Oil & Gas 016-202 9456
3. Mr. Azhar Atan Welding Superintendant Sime Darby Engineering 017-770 3799
4. Mr. Hafiz Rosly Coordinator First Oil Engineering 012 399 5930
5. Mr Amran Abdullah Coordinator Bureau Veritas (M) Sdn Bhd 012-379 1871

Page 12 of 13
RESUME
6. Mr Raja Deanhawari Coordinator Bureau Veritas (M) Sdn Bhd 016-976 3135
7. Mrs. Adibah Hashim Coordinator The Velosi Group 013-549 7796
8. Mr.Syafiee Coordinator Inter Pasific Technical Service 012-214 5889
9. Mr.Royiem Sarhim Coordinator Tabung Haji Heavy Engineering 019-666 7576

Page 13 of 13

Das könnte Ihnen auch gefallen