PURANDHAR POWER VISION

Quotation Date : 11 Nov 2019

3 kw Solar Net Metering System


Sr. No. Descriptipon Make Warrenty Qty Rate Amount
330watt Polycrystalline Silicon Goldi 10 yers,25 years
1 PV Module Green/Vikram/Wolt/Adani/Eq performance 9 7260 65340
uivalent warrenty
2.1 Grid Tie Inverter 3KW Ksolare / Powerone 5 years 1 25000 25000
2.2 Grid Tie Inverter 3KW SOFAR 7 years 0 26000 0
2.3 ACDB/DCDB PHOENIX 1 7000 7000
Structure for 3 KW; fiting with MS/GI Standard
3 1 24000 24000
all accessories
4 Lightening Arrestor rigid Pure Copper 1 3000 3000
5 Earthing Electrode copper rod 3 3000 9000
5.1 Earth Pit depends on soil condition digging or bore 3 1000 3000
6 3 earthings GI Strip 35 mtr *3=105mtr 130 13650
Solar DC Cable & conduit laying Polycab/standard ;4 Sqmm
7 50 mtr 48 2400
Installation of system Fitting
Charges of panel and its
5 structure; Lifting,Cabeling & 1 12000 12000
Installation by engineer
AC Cable ; from solar inverter Polycab/standard ;3core
6 30 65 1950
to Net Meter
166340
Note:
1.Solar Module Mounting Structure (Galvanised Iron) charges are for standard if any elevation required then charges will changes at
actual.
2. GST(Extra): 5% on 70% of the Total system cost and 18% on remaining 30% of the Total system cost
3. If Load increases required charges extra
4. Above items are tentetive it may vary after clients exct rquirement,site situation.

Thank You For Your Business!


Dhanesh Gaikwad
9850123182 Email:puranadhar@gmail.com