DAILY QUALITY INS

TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010406P-EP00002 EPTCO Utility 13.00 WIT Hold Point Hold Point

2 RFI-PIP010404M-EP00002 EPTCO Utility 14.00 WIT Hold Point Hold Point

RFI-PIP010505M-EP00002
3 EPTCO Utility 15.00 WIT Hold Point Hold Point

4 RFI-SST000103M-MSS00001 MEINDO TAR SHELTER 14.00 WIT Witness Witness

5 RFI-SST010101M-MSS00001 MEINDO NEW MCB 10.00 WIT Witness Witness

6 RFI-CIV000505M-BP00674 BPP Utility 07.00 WIT Review Review

7 RFI-CIV010501M-BP00674 BPP Utility 07.00 WIT Witness Witness

8 RFI-CIV010502M-BP00674 BPP Utility 07.00 WIT Witness Witness

9 RFI-CIV010503M-BP00958 BPP Utility 07.00 WIT Witness Witness

10 RFI-WLD000401M-BP00442 BPP Utility 08.00 WIT Surveillance Surveillance

11 RFI-PAI010102M-PM00005 PMM-JO TAR SHELTER MEINDO 03.00 PM Witness Witness


12 RFI-WLD000304M-PM00002 PMM-JO Laydown Train 3 09.00 AM Review Review

13 RFI-CIV-0004-01M-US00187 USI Batching Plant 09:00 Witness Witness

14 RFI-CIV-0004-01M-US00188 USI Batching Plant 09:00 Witness Witness

15 RFI-CIV-0203-06M-US00497 USI Batching Plant 15:00 Witness Witness

16 RFI-CIV-0203-06M-US00498 USI Batching Plant 15:00 Witness Witness

17 RFI-CIV020303M-MC00039 MEINDO L03 North Part 15.00 WIT Surveillance Surveillance

18 RFI-CIV020305M-MC00033 MEINDO ORF 15.00 WIT Witness Witness

19 RFI-CIV021202M-MB00055 MEINDO LCR-03 10.00 WIT Witness Surveillance

20 RFI-CIV021202M-MB00056 MEINDO TAR SHELTER 09.00 WIT Witness Surveillance


21 RFI-CIV020305M-MB00039 MEINDO TAR SHELTER 14.00 WIT Witness Witness

22 RFI-CIV020304M-MB00044 MEINDO TAR SHELTER 09.30 WIT Witness Witness

23 RFI-CIV020102M-MB00034 MEINDO NEW MCB 14.30 WIT Witness Witness

24 RFI-CIV000101M-PP00027 PP CSTS QC OFFICE 14.00 Review Review

25 RFI-CIV020102M-PP00063 PP Utility 10.30 Witness Witness

26 RFI-CIV020701M-PP00080 PP UTILITY 08.30 Hold Witness

27 RFI-CIV020701M-PP00081 PP UTILITY, 08.45 Hold Witness

28 RFI-CIV020701M-PP00082 PP Utility 10.30 Hold Witness

29 RFI-CIV020304M-PP00422 PP Utility 09.15 Witness Witness

30 RFI-CIV020305M-PP00409 PP Utility 14.00 Witness Witness

31 RFI-CIV020701M-PP00083 PP Train 3 10.00 Hold Witness

32 RFI-CIV020701M-PP00084 PP Train 3 09.00 Hold Witness

33 RFI-CIV010401M-LC00098 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness
34 RFI-CIV010402M-LC00122 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

35 RFI-CIV010403M-LC00122 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

36 RFI-CIV010404M-LC00123 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

37 RFI-CIV020305M-LC00750 LCI Flare Area 08.00 WIT Witness Witness

38 RFI-CIV020305M-LC00751 LCI Flare Area 14.00 WIT Witness Witness

39 RFI-CIV020305M-LC00752 LCI Hauling Road 7 10.00 WIT Witness Witness

40 RFI-CIV020305M-LC00753 LCI Hauling Road 7 09.00 WIT Witness Witness

41 RFI-CIV020101M-LC00485 LCI Hauling Road 7 10.00 WIT Witness Witness

42 RFI-CIV020303M-LC00368 LCI Hauling Road 7 14.00 WIT Surveillance Surveillance

43 RFI-CIV020305M-LC00754 LCI Hauling Road 8 08.30 WIT Witness Witness

Layer 3: 09.00
WIT
44 RFI-CIV020102M-LC00508 LCI Hauling Road 8 Witness Witness
Layer 4: 15.00
WIT

45 RFI-CIV020303M-LC00369 LCI Hauling Road 8 14.00 WIT Surveillance Surveillance

46 RFI-CIV020305M-LC00755 LCI Hauling Road 8 09.30 WIT Witness Witness

47 RFI-CIV020305M-LC00756 LCI Hauling Road 6 08.30 WIT Witness Witness

48 RFI-CIV020305M-LC00757 LCI Hauling Road 6 09.30 WIT Witness Witness

49 RFI-CIV020305M-LC00758 LCI Landfill 10.00 WIT Witness Witness

50 RFI-CIV020305M-LC00759 LCI Landfill 10.00 WIT Witness Witness

51 RFI-CIV020305M-LC00760 LCI Landfill 09.45 WIT Witness Witness


52 RFI-CIV020701M-LC00092 LCI IWMF 08.30 WIT Witness Witness

53 RFI-CIV020101M-LC00486 LCI Flare Area 10.00 WIT Witness Witness

54 RFI-CIV020304M-MD00006 MDI Jetty Construction 08.30 AM Witness Witness

55 RFI-CIV010704M-MD00048 MDI Jetty Construction 09.00 AM Witness Witness

56 RFI-CIV010704M-MD00051 MDI Jetty Construction 10.00 AM Witness Witness

57 RFI-CIV010704M-MD00048 MDI Jetty Construction 10.00 AM Review Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-TEP-1150102-H03-001A-5F-0301 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed


2 IKM-TEP5500-QAC-MEL-RFI-163 IKM Accommodation Type-E10 (5500POB) - SC 2 07.00 WIT Witness
3 IKM-TEP5500-QAC-MEL-RFI-164 IKM Accommodation Type-E10 (5500POB) - SC 2 08.00 WIT Witness
4 IKM-TEP5500-QAC-MEL-RFI-165 IKM Accommodation Type-E10 (5500POB) - SC 2 09.00 WIT Witness
5 IKM-TEP5500-QAC-MEL-RFI-388 IKM Accommodation Type-E10 (5500POB) - SC 2 10.00 WIT Witness
6 IKM-TEP5500-QAC-MEL-RFI-168 IKM Accommodation Type-E10 (5500POB) - SC 2 11.00 WIT Witness
7 IKM-TEP5500-QAC-MEL-RFI-421 IKM Kitchen Dining ( 5500 POB )- SC2 11.00 WIT Witness
8 IKM-TEP5500-QAC-MEL-RFI-422 IKM Kitchen Dining ( 5500 POB )- SC2 11.00 WIT Witness
9 IKM-TEP5500-QAC-MEL-RFI-423 IKM Kitchen Dining ( 5500 POB )- SC2 11.00 WIT Witness

10 LCI-CIV-0203-03M-1067 LCI Access Road 4 10.00 WIT Surveillance

11 LCI-LCI-009-02M-1068 LCI Hauling Road 2 08.30 WIT Witness

12 LCI-LCI-009-02M-1069 LCI Hauling Road 2 07.00 WIT Witness

13 LCI-CIV-0203-05M-1070 LCI Hauling Road 1 09.30 WIT Witness

14 LCI-CIV-0201-01M-1071 LCI Access Road 9 14.30 WIT Witness

15 LCI-CIV-0201-02M-1072 LCI Access Road 9 15.00 WIT Witness

16 LCI-CIV-0213-01M-1073 LCI Flare Area 14.00 WIT Witness


INSPECTION SCHEDULE 31-Dec-18

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Muristoni / Mico P&ID’s Conformity checks report for process Subsystem New Complete

Inspection before pressure test :


Muristoni / Mico - Pre-test punch listing New Complete
- Release for pressure test

Muristoni / Mico Piping pressure testing New Complete

Verification of calibration for measurement tools and inspection equipment which to be used for erection and
Daniel New Complete
installation activities

Daniel Bolt tightening inspection and testing (Demonstration bolt pre tensioning) New Continue

NANDA Check and verify compliance with project requirement of precast piles delivered at site New Complete

NANDA Check before to proceed with driving of precast pile New Complete

NANDA Pile driving inspection report New Complete

NANDA Pile Final nspection Report New Complete

Muristoni / Mico Visual inspection of the welded joints New Complete

DFT Equpiment
SN: - UE17320
Hudaya New Cancelled No Permit T
-PC17882 (Probe)
DFT Check For Top Coat and Final Inspection
Muristoni / Mico Consumable Certificate Handling & Consumable Control Procedure New Complete

Verifycation and Visual Chek


Iwan Rahmat New Complete
Fine Aggregate Shipment #3 PT CBSP ( Organic Impurity)

David Zulfikar / Alfan Abraham Verifycation and Visual Chek New Complete
Bangun Cement Type V

Test Sample Cylinder : Type


Iwan Rahmat 3 Tr (32 Mpa) 7 Days for Coloum Main Compressor 053-Table Top-MR A1/C1/053 MR A/B 1/6 - Train 3 New Complete
3Tr (32 Mpa) 7 Days for PC3 Block 5 093-PRK-31002 TB D/E 28/29/30 F 28/29/30 TB D/E/F 27/28 - Train 3

Test Sample Cylinder : Type


P.4.1 (21 Mpa) 28 Days for Trial Production FA CBSP + CA USI - BP 2
Iwan Rahmat New Complete
P.7.1 (32 Mpa) 28 Days for Trial Production FA CBSP + CA USI - BP 2
P.8.1 (35 Mpa) 28 Days for Trial Production FA CBSP + CA USI - BP 2

Inspection during delivering fresh lean concrete :


Nanda / Edy New Cancelled No suplay concr
-Check the lean concrete quality during delivery

Inspection during delivering fresh structural concrete:


Ulfa Check the concrete quality during delivery New Cancelled No Concrete
Document review of batch ticket
Material sampling

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Edy / Nanda New Cancelled Rebar crossties not yet
- Size/length
- Packing for mobilization

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Ulfa / Dian New Complete
- Size/length
- Packing for mobilization
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Ulfa / Dian New Complete
Document review of batch ticket
Material sampling

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa / Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

In-situ Density / Compaction Test:


Ulfa / Dian New Complete
 Inspection execution and location of test (Sand Cone)

Edy CHECK AND VERIFY TOPOGRAPHIC CERTIFICATE FOR AUTOLEVEL ( 1 UNIT )'CSTS QC OFFICE New Cancelled No Confirmation

Insitu Density/ Compaction test :


Novi New Complete
Inspection execution and location of test (backfill area LCR ) axis A-B , LOCAL CONTROL ROOM

Hudaya Inspection after concrete protective coating application for pedstal ,Boiler A New Complete PARTIA

Hudaya Inspection after concrete protective coating application for pedstal Boiler B New Complete PARTIA

Hudaya Inspection after concrete protective coating application for STG-1 New Complete PARTIA

Novi Check before concrete delivering/placement for pedestal P-1, Boiler A New Cancelled Cleanning

Novi Inspection during delivering structural concrete for pedestral P-1, Boiler A New Cancelled Cleanning

Hudaya Inspection after concrete protective coating application for pile cap,PC3A-D-28/29/30, E-28/29/30, F-28/29/30 New Complete PARTIA

Inspection after concrete protective coating application for tie beam ,TB-D/E-28, D/E-29, D/E-30, E/F-28, E/F-
Hudaya New Complete PARTIA
29,E/F-30

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius / Dian New Cancelled No Driling Ac
Pile No : P 32
Pile No : P 26
Check borehole after completion of drilling activities
Quantity : Piles
Yulius / Dian Pile No : P 36 New Cancelled No Driling Ac
Pile No : P 32
Pile Nobefore
Check : P 26 reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 36
Yulius / Dian New Cancelled No Driling Ac
Pile No : P 32
Pile No : P 26
Check the structural concrete quality during delivery (Quantity : Piles)
Pile No : P 36
Yulius / Dian New Cancelled No Driling Ac
Pile No : P 32
Pile No : P 26

Inspection during delivery fresh Structural Concrete


Yulius / Dian New Cancelled No Concrete
• U-Ditch for Access Road to Flare area (Slab section), STA 0+080 radius to 0+140 ~ 0+280 ,Left side

Inspection during delivery fresh Structural Concrete


Yulius / Dian New Cancelled No Concrete
• U-Ditch for Access Road to Flare area (Slab section), STA 0+040 radius to 0+140 ~ 0+202 ,Right side

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• Joint Box Culvert (Wall section), left and right side at Hauling Road 7 (permanent sect) (BC 26)

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• U-Ditch for Hauling Road 7, (Slab section), STA 0+130 ~ 0+190, Right side

Inspection of Subgrade for General site preparation


Dian /Iwan /Yulius New Cancelled Area Not R
• U-Ditch for Hauling Road 7, Right side, STA 0+210~ 0+250

Inspection during delivery Lean Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• U-Ditch for Hauling Road 7, Right side, STA 0+210~ 0+250

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• U-Ditch for Hauling Road 8 STA 0+060 ~0+100 (Wall section), Left side

In-situ Density / Compaction Test


• Backfill layer 3
Dian /Iwan /Yulius New Cancelled High Moisture
• Backfill layer 4
for U-Ditch at Hauling Road 8, Left side, STA 0+320 ~ 0+335

Inspection during delivery Lean Concrete


Dian /Iwan /Yulius New Complete
• U-Ditch for Hauling Road 8, Left side, STA 0+100~ 0+127

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• U-Ditch for Hauling Road 8 STA 0+170 ~0+180 (Wall section), Right side

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• Joint Box Culvert (Wall section), left and right side at Hauling Road 6, STA 2+600 South Side (BC 22)

Inspection during delivery fresh Structural Concrete


Dian /Iwan /Yulius New Cancelled No Concrete
• Joint Box Culvert at Hauling Road 6, STA 2+640, South Side (Wall Section) (BC 23)

Inspection during delivery fresh Structural Concrete


Ulfa New Complete
• Control Box no. 6 & 7 (Wall section)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No Concrete
• Tie Beam of Fence (part 1)
Inspection during delivery fresh Structural Concrete
Ulfa New Cancelled No Concrete
• Foudation for Fence Part 2 (85 pcs)
Final Inspection :
Inspection after concrete protective coating application for Precast Box Culvert No.65 (2 NOS (1WX1H) at IWMF
Hudaya New Complete
(Top Culvert)

Inspection of Subgrade for General site preparation


Yulius / Dian New Cancelled Need Soil Testing for
• (Joint inspection finish subgrade) for Hand Over (Part 2) STA 0+100 ~ 0+140 (Pipe Rack)

Transition Block Type II Grid 2


Field Inspection : Check before concrete
Delivery/placement :
- Pour lean concrete status
- formwork & reinforcement vertical and horizontal levels
Ruhyan Harahap - steel bars New Complete
- anchor bolts
- embedment, pockets, holes, joints, chamfer, mesh, etc.
- quantity, diameter/size, shape
- Locations(Coordinates/elevation)
- concrete cover thickness

L01-JET2-TRESTLEPIL-43G
Ruhyan Harahap New Cancelled High Wa
Survey Check before to proceed with driving of steels piles
L01-JET2-TRESTLEPIL-43G
Inspection and record driving steel pile :
Ruhyan Harahap New Cancelled High Wa
Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded.
(rebound)
'L01-JET2-TRESTLEPIL-43G
Ruhyan Harahap New Cancelled High Wa
Final Inspection - As built ECC Record
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Nurul Huda Pipe Pressure Test New Complete


Yatmico Inspections and checks AFTER energizing the electrical installation New Complete
Yatmico Inspections and checks before energizing the electrical installation : Section A, Section B New Complete
Yatmico Inspections and checks before energizing the electrical installation : Section D New Complete
Yatmico Inspections and checks before energizing the electrical installation : Section C New Complete
Yatmico Inspections and checks before energizing the electrical installation : Earth Resistance New Complete
Yatmico Inspection and checks Before Energizing the Electrical Instalation : Insullation & Contuiity Test ( PP 1 ) New Complete
Yatmico Inspection and checks Before Energizing the Electrical Instalation : Insullation & Contuiity Test ( PP 2 ) New Complete
Yatmico Inspection and checks Before Energizing the Electrical Instalation : Insullation & Contuiity Test ( PP AC1 ) New Complete
Inspection during delivery fresh Lean concrete
Dian /Iwan /Yulius • Subgrade for Joint box RCP Culvert at Access Road 4 STA 1+600 New Cancelled No Concrete

Inspection during delivering Concrete V-Ditch with geocell


Dian /Iwan /Yulius • Hauling Road 2 STA 0+780~0+840 (South side) New Cancelled No Concrete

Inspection during delivering Concrete V-Ditch with geocell


Dian /Iwan /Yulius • Hauling Road 2 STA 0+790~0+860 (North side) New Cancelled No Concrete

Inspection during delivery fresh Structure concrete


Dian /Iwan /Yulius • JB HR 1 (Slab Sect) STA 0+210 South West side New Cancelled No Concrete

Inspection of Subgrade layer before laying fill material


Dian /Iwan /Yulius • Access Road 9, STA 0+680 ~ 0+820 New Cancelled No Concrete

In-situ Density / Compaction Test (Field CBR test)


Dian /Iwan /Yulius • Access Road 9, STA 0+680 ~ 0+820 New Cancelled No Concrete

Field inspection : Check before concrete delivering /placement


Yulius • Precast Duct Bank at HR 3 (3 pcs) New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

No Permit To Work
No suplay concrete by USI

No Concrete Supply

Rebar crossties not yet finish instalation


No Confirmation By QC PT.PP

PARTIAL

PARTIAL

PARTIAL

Cleanning Area

Cleanning Area

PARTIAL

PARTIAL

No Driling Activities
No Driling Activities

No Driling Activities

No Driling Activities

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply

Area Not Ready

No Concrete Supply

No Concrete Supply

High Moisture Content

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply
Need Soil Testing for bacfill material

High Waves

High Waves

High Waves
REASON

REASON

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply

No Concrete Supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010504M-EP00002 EPTCO Utility 08.00 WIT Witness Witness

2 RFI-PIP010502M-EP00151 EPTCO ORF Area 14.00 WIT Witness Witness

3 RFI-PIP010503M-EP00151 EPTCO ORF Area 15.00 WIT Witness Witness

4 RFI-CIV020304M-PP00423 PP Utility 09.00 WIT Witness Witness

5 RFI-CIV020305M-PP00410 PP Utility 09.30 WIT Witness Witness

6 RFI-CIV020303M-PP000241 PP UTILITY 08.45 WIT Suveillance Suveillance

7 RFI-CIV020101M-PP000225 PP UTILITY 8.30 WIT Witness Witness

8 RFI-CIV020102M-PP00064 PP Train 3 10.00 WIT Witness Witness

9 RFI-PIP010402M-PP0017 PP UTILITY 08.00 WIT Witness Witness

10 RFI-PIP010403M-PP00018 PP UTILITY 09.00 WIT Witness Witness

11 RFI-CIV000505M-BP00675 BPP Utility 07.00 WIT Review Review

12 RFI-CIV010501M-BP00675 BPP Utility 07.00 WIT Witness Witness


13 RFI-CIV010502M-BP00675 BPP Utility 07.00 WIT Witness Witness

14 RFI-CIV010503M-BP00959 BPP Utility 07.00 WIT Witness Witness

15 RFI-WLD000401M-BP00443 BPP Utility 08.00 WIT Surveillance Surveillance

16 RFI-PAI010102M-PM00007 PMM-JO TAR SHELTER MEINDO 08.30 AM Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1
INSPECTION SCHEDULE 1-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Mico/Muristoni As Built and Cover Inspection New Complete

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31009/R00
Mico/Muristoni 082-WF-31010/R00 New Cancelled Due to no Permit (PH
082-WF-31011/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31009/R00
Mico/Muristoni New Cancelled Due to no Permit (PH
082-WF-31010/R00
082-WF-31011/R00

Novi Check before concrete delivering/placement for P-3, P-50, Boiler A New Cancelled Cleanin

Novi Inspection during delivering structural concrete for P-30, P-50, Boiler A New Cancelled Cleanin

Novi Inspection during delivering fresh lean concrete, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, E-3, F-2, F-3 New Cancelled Survey Report N

Novi Inspection of subgrade and grade layer before laying fill material, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, New Cancelled Survey Report n
E-3, F-2, F-3
Edy/Nanda nsitu Density/ Compaction test : New Cancelled Soil Condititi
Inspection execution and location of test blok 4
Mico Check joint and assembly preparation pipe, line '187-DC-31545/UOO New Complete

Mico Check heating blanket application and curing time, Line '187-DC-31545/UOO New Cancelled Not enough the Time due t

NANDA Check and verify compliance with project requirement of precast piles delivered at site New Complete

NANDA Check before to proceed with driving of precast pile New Complete
NANDA Pile driving inspection report New Complete

NANDA Pile Final nspection Report New Complete

Muristoni / Mico Visual inspection of the welded joints New Complete

Hudaya DFT Check for Top Coat and Final Visual Inspection New Cancelled No Perm
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

Due to no Permit (PH Not Working )

Due to no Permit (PH Not Working )

Cleaning

Cleaning

Survey Report No Availebel

Survey Report not Avelebel

Soil Conditition wet

Not enough the Time due to pp worked a half day


No Permit
REASON

REASON
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV010401M-LC00099 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

2 RFI-CIV010402M-LC00123 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

3 RFI-CIV010403M-LC00123 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

4 RFI-CIV010404M-LC00124 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

5 RFI-CIV020101M-LC00487 LCI Hauling Road 7 10.00 WIT Witness Witness

6 RFI-CIV020305M-LC00765 LCI Hauling Road 8 08.30 WIT Witness Witness

7 RFI-CIV020102M-LC00509 LCI Hauling Road 8 15.00 WIT Witness Witness

8 RFI-CIV020305M-LC00766 LCI Hauling Road 8 09.30 WIT Witness Witness

9 RFI-CIV020305M-LC00767 LCI Hauling Road 6 08.30 WIT Witness Witness


10 RFI-CIV020305M-LC00768 LCI Hauling Road 6 09.30 WIT Witness Witness

11 RFI-CIV020101M-LC00488 LCI Hauling Road 6 10.00 WIT Witness Witness

12 RFI-CIV020303M-LC00371 LCI Hauling Road 6 14.00 WIT Surveillance Surveillance

13 RFI-CIV020305M-LC00770 LCI Landfill 10.00 WIT Witness Witness

14 RFI-CIV020305M-LC00771 LCI Landfill 09.45 WIT Witness Witness

15.00 WIT
15 RFI-CIV020101M-LC00490 LCI Pipe and Access to Jetty Area Witness Witness

15.30 WIT
16 RFI-CIV020102M-LC00510 LCI Pipe and Access to Jetty Area Witness Witness

17 RFI-CIV020307M-LC00056 LCI Access Road 7 08.00 WIT Witness Witness

10.00 WIT
18 RFI-CIV020102M-LC00511 LCI Access Road 7 Witness Witness
14.00 WIT

19 RFI-CIV021304M-LC00054 LCI Road to Existing Camp 15.30 WIT Witness Witness

20 RFI-CIV020304M-MD00008 MDI Jetty Construction 08.30 AM Witness Witness

21 RFI-CIV020305M-MD00007 MDI Jetty Construction 09.00 AM Witness Witness

22 RFI-CIV010704M-MD00049 MDI Jetty Construction 09.00 AM Witness Witness


23 RFI-CIV010705M-MD00052 MDI Jetty Construction 10.00 AM Witness Witness

24 RFI-CIV010706M-MD00049 MDI Jetty Construction 10.00 AM Review Witness

25 RFI-CIV020305M-MD00008 MDI Jetty Construction 10.00 AM Witness Witness

26 RFI-CIV021401M-MD00013 MDI Jetty Construction 01.30 PM Review Witness

27 RFI-CIV-0203-06M-US00499 USI Batching Plant 15:00 Witness Witness

28 RFI-CIV-0203-06M-US00500 USI Batching Plant 15:00 Witness Witness

29 RFI-CIV020303M-MC00040 MEINDO L03 North Part 15.00 WIT Surveillance Surveillance

30 RFI-CIV020304M-MB00025 MEINDO ORF 10.00 WIT Witness Witness

31 RFI-CIV020305M-MC00034 MEINDO ORF 15.00 WIT Witness Witness

32 RFI-CIV000102M-MP00007 MEINDO Flare 09.00 WIT Witness Witness

33 RFI-CIV020102M-MB00035 MEINDO NEW MCB 10.00 WIT Witness Witness


34 RFI-CIV010503M-MP00288 MEINDO ORF 08.00 WIT Witness Witness
35 RFI-CIV010503M-MP00289 MEINDO ORF 08.00 WIT Witness Witness
36 TEP-TGH-RFI-00212 CSTS DDT LAYDOWN & BOF LAYDOWN 09.30 WIT Witness Witness
37 TEP-TGH-RFI-00211 CSTS TTP SHELTER 09.00 WIT Witness Witness
38 RFI-PIP010502M-EP00152 EPTCO ORF Area 14.00 WIT Witness Witness

39 RFI-PIP010503M-EP00152 EPTCO ORF Area 15.00 WIT Witness Witness

40 RFI-WLD000303M-PM00002 PMMJO TAR SHELTER MEINDO 02.00 PM Witness Witness

41 RFI-WLD000604M-PM00005 PMMJO TAR SHELTER MEINDO 09.00 AM Review Review

42 RFI-PAI010101M-PM00007 PMMJO TRAIN 3 MODULE 4 08.30 AM Witness Surveillance

43 RFI-CIV000405M-PP00004 PP Train 3 08.38 Witness Witness

44 RFI-CIV020304M-PP00424 PP Utility, 14.00 Witness Witness

45 RFI-CIV020305M-PP00411 PP Utility 15.30 Witness Witness

46 RFI-CIV020101M-PP000226 PP UTILITY 14.30 Witness Witness

47 RFI-CIV020701M-PP00085 PP Utility 16.00 Hold Witness

48 RFI-CIV020307M-PP00080 PP Utility 08.45 Witness Witness

49 RFI-CIV020307M-PP00081 PP Utility 09.15 Witness Witness

50 RFI-CIV020102M-PP00065 PP Train 3 10.00 Witness Witness

51 RFI-CIV020701M-PP00086 PP Train 3 13.30 Hold Witness


52 RFI-CIV020701M-PP00087 PP Train 3 14.00 Hold Witness

53 RFI-CIV020307M-PP00082 PP Train 3 14.30 Witness Witness

54 RFI-CIV020305M-LC00761 LCI Flare Area 08.00 WIT Witness Witness

55 RFI-CIV020305M-LC00762 LCI Flare Area 14.00 WIT Witness Witness

56 RFI-PIP010403M-PP00019 PP UTILITY 09.00 WIT Witness Witness

57 RFI-CIV020307M-MB00028 MEINDO NEW MCB 10.00 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 LCI-LCI-009-02M-1074 LCI Hauling Road 2 07.00 WIT Witness N/A

2 LCI-LCI-009-02M-1075 LCI Hauling Road 2 08.30 WIT Witness N/A

3 LCI-CIV-0203-05M-1076 LCI Hauling Road 1 09.30 WIT Witness N/A

4 LCI-CIV-0201-02M-1077 LCI Access Road 9 15.00 WIT Witness N/A

5 LCI-CIV-0201-01M-1078 LCI Access Road 9 14.30 WIT Witness N/A

6 IKM-TEP5500-QAC-MEL-RFI-169 IKM Accommodation Type-E11 (5500POB) - SC 2 07.00 Witness N/A


7 IKM-TEP5500-QAC-MEL-RFI-170 IKM Accommodation Type-E11 (5500POB) - SC 2 08.00 Witness N/A
8 IKM-TEP5500-QAC-MEL-RFI-171 IKM Accommodation Type-E11 (5500POB) - SC 2 09.00 Witness N/A
9 IKM-TEP5500-QAC-MEL-RFI-389 IKM Accommodation Type-E11 (5500POB) - SC 2 10.00 Witness N/A
10 IKM-TEP5500-QAC-MEL-RFI-174 IKM Accommodation Type-E11 (5500POB) - SC 2 11.00 Witness N/A

11 LCI-CIV-0213-02M-1079 LCI Flare Area 09.00 WIT Witness N/A

RFI-TEP-1168784-H03-0002-1B-
12 PT. BPK SubCont 2
0301
INSPECTION SCHEDULE 2-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Survey report before to proceed with driving steel casing/drilling activities


Yulius Quantity : Pile New Complete
Pile No : P 30
Pile No : P 26
Check borehole after completion of drilling activities
Quantity : Piles
Yulius Pile No : P 36 New Complete
Pile No : P 32
Pile No : P 26
Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 36
Yulius New Complete
Pile No : P 32
Pile No : P 26

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 36
Yulius New Complete
Pile No : P 32
Pile No : P 26

Inspection of Subgrade for General site preparation


Suyatman / Iwan Rahmat New Complete
• U-Ditch for Hauling Road 7, Right side, STA 0+210~ 0+280

Inspection during delivery fresh Structural Concrete


Suyatman / Iwan Rahmat New Complete
• U-Ditch for Hauling Road 8 STA 0+060 ~0+100 (Wall section), Left side

In-situ Density / Compaction Test


Suyatman / Iwan Rahmat • Backfill layer 3 New Complete
for U-Ditch at Hauling Road 8, Left side, STA 0+320 ~ 0+335
Inspection during delivery fresh Structural Concrete
Suyatman / Iwan Rahmat New Complete
• U-Ditch for Hauling Road 8 STA 0+170 ~0+180 (Wall section), Right side

Inspection during delivery fresh Structural Concrete


Suyatman / Iwan Rahmat New Cancelled No Concrete
• Joint Box Culvert (Wall section), left and right side at Hauling Road 6, STA 2+600 South Side (BC 22)
Inspection during delivery fresh Structural Concrete
Suyatman / Iwan Rahmat New Cancelled No Concrete
• Joint Box Culvert at Hauling Road 6, STA 2+640, South Side (Wall Section) (BC 23)

Inspection of Subgrade for General site preparation


Suyatman / Iwan Rahmat • U-Ditch for Hauling Road 6, Right side, STA 2+660 Radius to 2+640 New Complete
• U-Ditch for Hauling Road 6, Right side, STA 2+610 Radius to 2+630

Inspection during delivery Lean Concrete


Suyatman / Iwan Rahmat • U-Ditch for Hauling Road 6, Right side, STA 2+660 Radius to 2+640 New Complete
• U-Ditch for Hauling Road 6, Right side, STA 2+610 Radius to 2+630
Inspection during delivery fresh Structural Concrete
Ulfa New Cancelled No Concrete
• Tie Beam of Fence (part 1)
Inspection during delivery fresh Structural Concrete
Ulfa New Cancelled No Concrete
• Foudation for Fence Part 2 (85 pcs)
Inspection of Subgrade for Pipe and Access to Jetty Area sheet 04
Yulius • TP-7 , Layer New Complete

In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius • TP-7 , Layer New Complete

Finishing Inspection :
Suyatman / Iwan Rahmat Check completeness of Structural concrete works prior to proceed with backfilling activities New Cancelled No Rea
• Drainage U-Ditch at Access Road 7, Right side, STA 0+090~ 0+140 (Inside road)

In-situ Density / Compaction


• Backfill layer 1
Suyatman / Iwan Rahmat New Cancelled No Rea
• Backfill layer 2
for Drainage U-Ditch at Access Road 7, Right side, STA 0+090~ 0+140 (Inside road)

Finishing Inspection Precast:


Hudaya Check completeness of structural concrete works and check the ID & Date marking New
• PC Box Culvert no 92 (BC1x1) at Road to Existing Camp

Pocket Slab Grid 1 to Grid 0


Field Inspection : Check before concrete
Delivery/placement :
- Pour lean concrete status
- formwork & reinforcement vertical and horizontal levels
Ruhyan Harahap - steel bars New Complete
- anchor bolts
- embedment, pockets, holes, joints, chamfer, mesh, etc.
- quantity, diameter/size, shape
- Locations(Coordinates/elevation)
- concrete cover thickness

Pocket Slab Grid 1 to Grid 0


Inspection during delivering fresh structural concrete :
Ruhyan Harahap - Check the concrete quality dring delivery New On going On goin
- Document review of batch ticket
- Material sampling

L01-JET2-TRESTLEPIL-43G
Ruhyan Harahap New Complete
Survey Check before to proceed with driving of steels piles
L01-JET2-TRESTLEPIL-43G
Inspection and record driving steel pile :
Ruhyan Harahap New Complete
Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded.
(rebound)
'L01-JET2-TRESTLEPIL-43G
Ruhyan Harahap New Complete
Final Inspection - As built ECC Record

Pocket Slab Grid 1 to Grid 0


Inspection during delivering fresh structural concrete :
Ruhyan Harahap - Check the concrete quality dring delivery New On going On goin
- Document review of batch ticket
- Material sampling

Precast I Beam (3 nos), Headstock (3 nos), Road Slab (24 nos)


Physical verification of prefabricated Precast :
Ruhyan Harahap a. Verification of marking,identification,traceability and confirm acceptance of material,IRN review New Complete
b. Precast ID, Dimension, Test Report, Date of Cast
- verified cast in item/embedded item : anchor, dowel bar, etc

Test Sample Cylinder : Type


Iwan Rahmat MD2 (21 Mpa) 28 Days for Trial Production Material CBSP - BP 1 New Complete
3Tr (32 Mpa) 28 Days for Trial Production Material CBSP - BP 2
Test Sample Cylinder : Type
Iwan Rahmat New Complete
P.7.1 (32 Mpa) 7 Days for Table Top PR Compressor FDN 053-TableTop-A/B 1/6 (Footing) - Train 3
Inspection during delivering fresh lean concrete :
Edy New Complete
-Check the lean concrete quality during delivery

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa New Complete
Document review of batch ticket
Material sampling

Yulius Check and verify project Benchmarks before commencement of the project works New Complete

In-situ Density / Compaction Test:


Ulfa New Complete
 Inspection execution and location of test (FDT)
Ulfa Pile Final Inspection Report New Complete
Ulfa Pile Final Inspection Report New Complete
Dafid /Alfan TEP-TGH-MRR-01317-MATERIAL PURCHASING CONCRETE INSTANT New Complete
Dafid /Alfan TEP-TGH-MRR-01284-ELECTRICAL CATHODIC PROTECTION New Complete
Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31009/R00
Mico / Muristoni 082-WF-31010/R00 New Complete
082-WF-31011/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31009/R00
Mico / Muristoni New Complete
082-WF-31010/R00
082-WF-31011/R00

Daniel Review ( R ) New Complete


Welding Equipment & Measurement Devices Calibration Register

Review ( R )
Muristoni New Complete
Execution of NDT on Welded Joints and Results Evaluation

Witness ( W )
Hudaya Checking of Painting application: New Complete Continue Tomorrow V
- Surface preparation & primer application C044,C036,C037,C020,C022

Edy Check and verify compliance with project requirements for Nitocote PE-135 New Complete Documen Not

Novi Check before concrete delivering/placement for P-3, P-50, P-1, Boiler B New Complete

Novi Inspection during delivering structural concrete for P-30, P-50, P-1, Boiler A New Complete

Novi Inspection of subgrade and grade layer before laying fill material, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, New Cancelled No Progresss by C
E-3, F-2, F-3

Hudaya Inspection after concrete protective coating application for STG-1,STG-1 West & South New Complete

Novi Check completeness of structural works for (surface only), Boiler A New Complete

Novi Check completeness of structural works for ( surface only ), Boiler B New Complete

Edy Insitu Density/ Compaction test : New Complete


Inspection execution and location of test 23-28/ D- E- F

Hudaya Inspection after concrete protective coating application for pile cap, Axis PC3 G-F-23/24/25 New Complete
Hudaya Inspection after concrete protective coating application for agru inlead T-02, Agru Inlade T-02 New Complete

Edy Check completeness of structural works for agru area inled T-02, agru inled T-02 New Complete

Inspection during delivery fresh Structural Concrete


Suyatman / Iwan Rahmat New Complete RFI Not Sign by CSTS and CPY, b
• U-Ditch for Access Road to Flare area (Slab section), STA 0+080 radius to 0+150 ,Left side

Inspection during delivery fresh Structural Concrete


Suyatman / Iwan Rahmat New Complete RFI Not Sign by CSTS and CPY, b
• U-Ditch for Access Road to Flare area (Slab section), STA 0+040 radius to 0+140 ~ 0+202 ,Right side

Mico Check heating blanket application and curing time, Line '187-DC-31545/UOO New Complete

Ulfa Finising Inspection : New Complete


Check Completeness of structural concrte works prior to proceed with backfilling activities for all item's Foundation
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Inspection during delivering Concrete V-Ditch with geocell


Dian • Hauling Road 2 STA 0+790~0+860 (North side) New Cancelled No Concrete

Inspection during delivering Concrete V-Ditch with geocell


Dian • Hauling Road 2 STA 0+780~0+840 (South side) New Cancelled No Concrete

Inspection during delivery fresh Structure concrete


Dian • JB HR 1 (Slab Sect) STA 0+210 South West side New Cancelled No Concrete

In-situ Density / Compaction Test (Field CBR test)


Dian • Access Road 9, STA 0+680 ~ 0+820 New Complete

Inspection of Subgrade layer before laying fill material


Dian • Access Road 9, STA 0+680 ~ 0+820 New Complete

Yatmiko Inspections and checks AFTER energizing the electrical installation New Complete
Yatmiko Inspections and checks before energizing the electrical installation : Section A, Section B New Complete
Yatmiko Inspections and checks before energizing the electrical installation : Section D New Complete
Yatmiko Inspections and checks before energizing the electrical installation : Section C New Complete
Yatmiko Inspections and checks before energizing the electrical installation : Earth Resistance New Complete
Inspection during delivery fresh Structural Concrete
Yulius • Precast Duct Bank at HR3 (3 pcs) New Complete

Insulation Resistance and continuity test of cable New Complete


RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

No Concrete Supply
No Concrete Supply

No Concrete Supply

No Concrete Supply

No Ready

No Ready

On going
On going
Continue Tomorrow Visual Primer Cat

Documen Not Complete

No Progresss by Contruction
RFI Not Sign by CSTS and CPY, but at Field we got concrete

RFI Not Sign by CSTS and CPY, but at Field we got concrete
REASON

REASON

No Concrete Supply

No Concrete Supply

No Concrete Supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00501 USI Batching Plant 09:00 Witness Witness

2 RFI-CIV-0203-06M-US00502 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV-0203-06M-US00503 USI Batching Plant 15:00 Witness Witness

4 RFI-PIP010502M-EP00153 EPTCO ORF Area 07.30 WIT Witness Witness

5 RFI-PIP010503M-EP00153 EPTCO ORF Area 09.00 WIT Witness Witness


6 RFI-PIP010502M-EP00154 EPTCO Utility 07.30 WIT Witness Witness

7 RFI-PIP010503M-EP00154 EPTCO Utility 09.30 WIT Witness Witness

8 RFI-CIV020401M-MD00005 MDI Jetty Construction 08.00 AM Witness Witness

9 RFI-CIV021202M-MD00008 MDI Jetty Construction 08.30 AM Witness Surveillance

10 RFI-CIV010704M-MD00050 MDI Offshore Jetty Construction 09.00 AM Witness Witness

11 RFI-MDI-TEP-00001 MDI Offshore Jetty Construction 09.00 AM Surveillance Surveillance

12 RFI-CIV010703M-MD00032 MDI Offshore Jetty Construction 10.00 AM Witness Witness

13 RFI-CIV010705M-MD00053 MDI Offshore Jetty Construction 10.00 AM Witness Witness

14 RFI-CIV010706M-MD00050 MDI Offshore Jetty Construction 10.00 AM Review Witness

15 RFI-CIV021402M-MD00016 MDI Jetty Construction 02.00 PM Witness Surveillance

16 RFI-WLD000601M-MD00009 MDI Jetty Construction 02.00 PM Surveillance Surveillance

17 RFI-CIV021402M-MD00017 MDI Jetty Construction 03.00 PM Witness Surveillance

18 RFI-CIV020305M-PP00412 PP Train 3 14.00 Witness Witness

19 RFI-CIV020304M-PP00425 PP Train 3 14.30 Witness Witness


20 RFI-PIP010402M-PP0018 PP TRAIN 3 09.00 Review Review

21 RFI-PIP010403M-PP00020 PP TRAIN 3 10.00 Witness Witness

22 RFI-CIV020304M-PP00426 PP Train 3 13.30 Witness Witness

23 RFI-CIV020307M-PP00083 PP UTILITY 10.00 Witness Witness

24 RFI-CIV020102M-PP00064 PP Utility 08.30 Witness Witness

25 RFI-CIV020101M-PP000227 PP UTILITY 14.00 Witness Witness

26 RFI-CIV020303M-PP000243 PP UTILITY 14.30 Witness Witness

27 RFI-CIV020701M-PP00088 PP UTILITY 15.00 Hold Witness

28 RFI-CIV020304M-PP00427 PP Utility 14.30 Witness Witness

29 RFI-CIV020305M-PP00413 PP UTILITY 15.00 Witness Witness

30 RFI-CIV020102M-PP00067 PP Train 3 10.00 Witness Witness

31 RFI-CIV020307M-PP00084 PP TRAIN 3 08.30 Witness Witness

32 RFI-CIV020304M-PP00428 PP Train 3 08.30 Witness Witness

33 RFI-CIV020305M-PP00414 PP Train 3 08.45 Witness Witness

34 RFI-CIV020304M-PP00429 PP Train 3 09.30 Witness Witness

35 RFI-CIV020305M-PP00415 PP Train 3 10.00 Witness Witness

36 RFI-PIP010403M-PP00021 PP UTILITY 10.00 Witness Witness

37 RFI-PIP010402M-PP0019 PP UTILITY 10.00 Witness Witness

38 TEP-TGH-RFI-00213 CSTS TTP SHELTER 09.00 WIT Witness Witness


39 RFI-CIV020102M-MB00036 MEINDO NEW MCB 14.00 WIT Witness Witness

40 RFI-CIV020701M-MB00030 MEINDO LCR-03 09.00 WIT Witness Witness


41 RFI-CIV021202M-MB00057 MEINDO LCR-03 14.00 WIT Witness Surveillance

42 RFI-CIV021202M-MB00058 MEINDO TAR SHELTER 10.00 WIT Witness Surveillance

43 RFI-CIV020303M-MB00043 MEINDO NEW MCB 13.30 WIT Hold Witness

44 RFI-CIV020101M-MB00025 MEINDO NEW MCB 10.00 WIT Witness Witness

45 RFI-CIV020304M-MB00045 MEINDO LCR-03 15.00 WIT Witness Witness

46 RFI-CIV030901M-MB00004 MEINDO TAR SHELTER 15.00 WIT Witness Witness

47 RFI-CIV000407M-MB00001 MEINDO TAR SHELTER 09.30 WIT Witness Witness

48 RFI-SST010102M-MSS00002 MEINDO TAR SHELTER 09.00 WIT Witness Witness

49 RFI-CIV021103M-MC00011 MEINDO L03 North Part 10.00 WIT Witness Witness

50 RFI-CIV021104M-MC00011 MEINDO L03 North Part 10.00 WIT Witness Witness

51 RFI-CIV00000M-MB00000 MEINDO LCR-03 14.00 WIT Witness Witness

52 RFI-WLD000604M-PM00006 PMM-JO TAR SHELTER 02.00 PM Witness Witness


53 RFI- - PM0004 PMM-JO Train 3- Module 4 08.00 AM Hold Witness

54 RFI-CIV020102M-LC00513 LCI Landfill 09.30 WIT Witness Witness

55 RFI-CIV010401M-LC00100 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

56 RFI-CIV010402M-LC00124 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

57 RFI-CIV010403M-LC00124 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

58 RFI-CIV010404M-LC00125 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

59 RFI-CIV020304M-LC00215 LCI Hauling Road 8 10.00 WIT Witness Witness

60 RFI-CIV020304M-LC00216 LCI Hauling Road 8 08.30 WIT Witness Witness

61 RFI-CIV020102M-LC00514 LCI Hauling Road 8 15.00 WIT Witness Witness

62 RFI-CIV020101M-LC00491 LCI Hauling Road 6 09.15 WIT Witness Witness

63 RFI-CIV020303M-LC00372 LCI Hauling Road 6 09.30 WIT Surveillance Surveillance

64 RFI-CIV020305M-LC00779 LCI Hauling Road 6 09.30 WIT Witness Witness


65 RFI-CIV020305M-LC00780 LCI Hauling Road 7 09.00 WIT Witness Witness

66 RFI-CIV020304M-LC00217 LCI Hauling Road 6 09.00 WIT Witness Witness

67 RFI-PAI010102M-PM00008 PMMJO TRAIN 3 MODULE 4 08.30 AM Witness Witness

68 RFI-CIV-0004-01M-US00190 USI Batching Plant 14.00 WIT Witness Witness


69 RFI-CIV020304M-PP00418 PP Train 3 14.00 WIT Witness Witness
70 RFI-CIV020304M-PP00419 PP Train 3 14.00 WIT Witness Witness

71 RFI-CIV020304M-PP00416 PP Train 3 14.00 WIT Witness Witness

72 RFI-CIV020304M-PP00417 PP Train 3 14.00 WIT Witness Witness

73 RFI-CIV020304M-PP00431 PP Train 3 9.30 WIT Witness Witness

74 RFI-CIV020304M-PP00432 PP Train 3 9.00 WIT Witness Witness

75 RFI-CIV020304M-PP00433 PP Train 3 9.30 WIT Witness Witness

76 RFI-CIV020304M-PP00430 PP Train 3 9.00 WIT Witness Witness

77 RFI-CIV020305M-LC00774 LCI Flare Area 08.00 WIT Witness Witness

78 RFI-CIV020305M-LC00775 LCI Hauling Road 8 10.30 WIT Witness Witness

79 RFI-CIV020305M-LC00777 LCI Hauling Road 6 08.30 WIT Witness Witness

80 RFI-CIV020305M-LC00778 LCI Hauling Road 6 09.30 WIT Witness Witness

81 RFI-PAI010101M-PM00007 PMMJO TRAIN 3 MODULE 4 08.30 AM Witness Surveillance


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-BSB-BUM-013 Buma Subcontractor Camp-2 14.00 PM Surveillance -

2 RFI-QR-BSB-BUM-014 Buma Subcontractor Camp-2 14.00 PM Surveillance -

3 RFI-QR-TCW-BUM-1083 Buma Construction Camp Area 14.30 PM Surveillance -


4 RFI-QR-TCW-BUM-1084 Buma Buma Laydown Area 15.00 PM Surveillance -

5 IKM-TEP5500-QAC-MEL-RFI-175 IKM Accommodation Type-E12 (5500POB) - SC 2 07.00 Witness N/A

6 IKM-TEP5500-QAC-MEL-RFI-176 IKM Accommodation Type-E12 (5500POB) - SC 2 08.00 Witness N/A

7 IKM-TEP5500-QAC-MEL-RFI-177 IKM Accommodation Type-E12 (5500POB) - SC 2 09.00 Witness N/A

8 IKM-TEP5500-QAC-MEL-RFI-390 IKM Accommodation Type-E12 (5500POB) - SC 2 10.00 Witness N/A

9 IKM-TEP5500-QAC-MEL-RFI-180 IKM Accommodation Type-E12 (5500POB) - SC 2 11.00 Witness N/A

10 LCI-CIV-0201-02M-1081 LCI Access Road 9 14.00 WIT Witness N/A

11 LCI-LCI-009-02M-1082 LCI Hauling Road 2 07.00 WIT Witness N/A

12 LCI-LCI-009-02M-1083 LCI Hauling Road 2 08.30 WIT Witness N/A

13 LCI-CIV-0203-05M-1084 LCI Hauling Road 1 09.30 WIT Witness N/A

RFI-TEP-1168784-H03-0002-1B-
14 PT. BPK Kitchen Area
0302
RFI-TEP-1168784-H03-0002-1B-
15 PT. BPK Kitchen Area
0303
INSPECTION SCHEDULE 3-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for Pedestal Boiler A P51A/51B/51C Boiler B P30 - Utility
P.7.1 (32 Mpa) 7 Days for Bored Pile A5 - Utility
Iwan Rahmat P.7.1 (32 Mpa) 7 Days for Bored Pile P38 - Kali Kabora Flare New Complete
P.7.1 (32 Mpa) 7 Days for Wall Drainage STA 2+580~560 (Right Side) - HR 6
P.7.1 (32 Mpa) 7 Days for Slab Drainage STA 0+160~0+210 (Right Side) - HR 7
P.7.1 (32 Mpa) 7 Days for Slab Drainage STA 0+260~0+937,47 Right Side - Flare

Test Sample Cylinder : Type


MD2 (21 Mpa) 28 Days for Trial Production Material CBSP - BP 1
3Tr (32 Mpa) 28 Days for Trial Production Material CBSP - BP 1
Iwan Rahmat MD4 (35 Mpa) 28 Days for Trial Production Material CBSP - BP 1 New Complete
MD2 (21 Mpa) 28 Days for Trial Production Material CBSP - BP 2
3Tr (32 Mpa) 28 Days for Trial Production Material CBSP - BP 2
MD4 (35 Mpa) 28 Days for Trial Production Material CBSP - BP 2

Test Sample Cylinder : Type


Iwan Rahmat New Complete
P.7.1 (32 Mpa) 7 Days for Water Tank FDN - Utility

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31009/R00
Mico / Muristoni New Complete
082-WF-31010/R00
082-WF-31011/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31009/R00
Mico / Muristoni New Complete
082-WF-31010/R00
082-WF-31011/R00
Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico / Muristoni New Complete
Temporary Spool For Hydrotest

Visual Inspection of Butt Fusion Welding For Line Number :


Mico / Muristoni New Complete
Temporary
Grouting Spool For
Bearing BlockHydrotest
Type I Grid 4
Main Item grouting: Checks before delivery & placement of mixed grout:
 status of chipped & soaked prepared foundation
Ruhyan Harahap  surface under erected base plate or equipment, formwork vertical & horizontal levels, joints, shape,
New Complete
Transition
 clearanceBlock Type base
between 7 & Type
plate8and
at Grid 1
foundation top, chamfers, etc.
Check andMaterial
 Cement verify cutting and bending of reinforce rebar including:
for grouting
Ruhyan Harahap  bending shape New Complete
 Size/length
 Packing for mobilization

L01-JET2-TRESTLE-PIL-43J
Ruhyan Harahap
Survey Check before to proceed with driving of steels piles
New Postpone (Lifting Troub

Ruhyan Harahap Sea Water Resistivity Sampling for Cathodic Protection New On Going

L01-JET2-TRESTLE-PIL-43J
Ruhyan Harahap PDA Test of Pile
New Postpone (Lifting Troub

L01-JET2-TRESTLEPIL-43J
Inspection and record driving steel pile :
Ruhyan Harahap Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded.
New Postpone (Lifting Troub
(rebound)
'L01-JET2-TRESTLEPIL-43J
Ruhyan Harahap Final Inspection - As built ECC Record
New Postpone (Lifting Troub

Precast Headstock Grid N3 (Install Headstock to Steel Pile)


Inspection on Precast Installation
Ruhyan Harahap Check Position of Precast: Horizontal, vertical and Elevation New On Going
Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection

Precast Headstock Grid N3


Fit-up and preparation inspection of the to be welded joints:
Ruhyan Harahap  Welding machine calibration period New On Going
 Fit-up (root gap, alignment, cleanliness, etc.)
 Matrix box

Precast Road Slab GL1 to GL2 (1 nos) & GL2 to GL3 (1 nos)
Inspection on Precast Installation
Check Position of Precast: Horizontal, vertical and Elevation
Ruhyan Harahap New On Going
Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection

Edy Inspection during delivering structural concrete for Pile cap, PC3 Axis-E-9/10/11, Axis D-D- New Complete
9/10/11

Edy Check before concrete delivering/placement for Pedestal , PC3-E-29 New Complete
Mico Check joint and assembly preparation pipe, line '187-DO-31520C/TO New Complete

Mico Check heating blanket application and curing time, Line '187-DO-31520C/TO New Continue

Edy Check before concrete delivering/placement for tie beam, TB-D/E-9, TB-D/E-10, TB-D/E-11 New Complete

Novi Check completeness of structural works for surface portable tank New Complete

Insitu Density/ Compaction test :


Novi Inspection execution and location of test (backfill area LCR ) as A-B , LOCAL CONTROL New Complete
ROOM
Novi Inspection of subgrade and grade layer before laying fill material, A-1, A-2, B-1, B-2, B-3, C-2, C- New Cancelled Area Not Ready
3, D-2, D-3, E-2, E-3, F-2, F-3

Novi Inspection during delivering fresh lean concrete, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, New Cancelled Area Not Ready
E-3, F-2, F-3

Hudaya Inspection after concrete protective coating application for ( horizontal surface ), BOILER B New Complete

Novi Check before concrete delivering/placement for P- 4, Boiler A New Complete

Novi Inspection during delivering structural concrete for P-4 , BOILER A New Complete

Edy/ Nanda Insitu Density/ Compaction test : New Complete


Inspection execution and location of test 23-28/ D-E-F

Edy Check completeness of structural works for ( surface only ) Tie beam, TB-D-27/28, E-27/28, F- New Complete
27/28

Edy Check before concrete delivering/placement for Pedestal , PC3-E-29 New Complete

Edy Inspection during delivering structural concrete for pedestal, PC3-E29 New Cancelled No Concrete

Edy Check before concrete delivering/placement for Pedestal , PC3-E-28 New Complete

Edy Inspection during delivering structural concrete for pedestal, PC3-E28 New Cancelled No Concrete

Mico Check heating blanket application and curing time, LINE '187-DC-31526/U00 New Continue

Mico Check joint and assembly preparation pipe, Line'187-DC-31526/UOO New Complete

Alfan / Dafid TEP-TGH-MRR-01342 - Anchor Bolt 3nd Batch New Complete


In-situ Density / Compaction Test:
Ulfa New Cancelled Still under preparatio
 Inspection execution and location of test (Sand Cone)
Final Inspection :
Hudaya New Complete
- Inspection after concrete protective coating application
Check and verify cutting and bending of Reinforce rebar including:
- bending shape
Edy/ Nanda New Complete
- Size/length
- Packing for mobilization

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Ulfa - Size/length
New Complete
- Packing for mobilization

Inspection during delivering fresh lean concrete:


Ulfa  Check the lean concrete quality during delivery
New Complete

Inspection of subgrade
Field inspection: Check and grade
before layer before
concrete
Ulfa New Complete
laying fill material.
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Edy/ Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
Water tightness
 concrete covertest of plumbing fixtures and
thickness
Ulfa water
 etc. distribution piping downstream of the New Cancelled No permit ava
isolation valve and within the building

Dafid Check and verify compliance with project requirement of joint filer New Complete

Daniel / Darmawan Inspection of Main structure installation New Continue

Inspection after Cutting:


Edy/ Nanda  Check the length of PC wire New Complete
 Check the bending angle of PC wire
Finishing inspection:
 Check completeness of pile inside
Edy/ Nanda reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work
Edy/ Nanda Hand Over From PP to Meindo New Complete

Due to Quality Observation card


Muristoni Execution of NDT on Welded Joints and Result Evaluation New Cancelled (electrode Issue) and to be
1. Verify Foundation release and Measurement of Anchor Bolt Condition location and elevation
(Pedestal GL,D,E,F (24&24)
Daniel / Darmawan 2.Check level of Shim Padding ( Pedestal GL D,E,F (24&24) New Complete
3.Check location of Embedded item (N/A)
Equipmet Serial Number Use for Inspection
Auto Level Serial Number WP 050455

In-situ Density / Compaction Test PRP test) ;


Ulfa Backfill Layer 2 for HDPE Pipeline at Landfill Line no. New Complete

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius New Complete
Pile No : P 22
Pile No : P 26

Check borehole after completion of drilling activities


Quantity : Piles
Yulius Pile No : P 30 New Complete
Pile No : P 26
Pile No : P 22

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 30
Yulius New Complete
Pile No : P 26
Pile No : P 22

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 30
Yulius New Complete
Pile No : P 26
Pile No : P 22

Field Inspection before Concrete Placement


Suyatman / Iwan / Dian New Complete
• U-Ditch for Hauling Road 8 STA 0+100 ~0+127 (Slab section), Left side
Field Inspection before Concrete Placement
Suyatman / Iwan / Dian New Complete
• U-Ditch for Hauling Road 8 STA 0+300 ~0+363 (Wall section), Right side
In-situ Density / Compaction Test
Suyatman / Iwan / Dian • Backfill layer 4 New Complete
for U-Ditch at Hauling Road 8, Left side, STA 0+320 ~ 0+335

Inspection of Subgrade for General site preparation


Suyatman / Iwan / Dian • U-Ditch for Hauling Road 6, Left side, STA 2+595~2+600 New Complete

Inspection during delivery Lean Concrete


Suyatman / Iwan / Dian New Complete
• U-Ditch for Hauling Road 6, Left side, STA 2+595~2+600

Inspection during delivery fresh Structural Concrete


Suyatman / Iwan / Dian New Complete RFI not Sign by CSTS and C
• U-Ditch for Hauling Road 6 STA 2+535 ~2+560 (Wall section), Right side
Inspection during delivery fresh Structural Concrete
Suyatman / Iwan / Dian New Complete RFI not Sign by CSTS and C
• Joint Box Culvert (Wall section), left and right side at Hauling Road 7 (permanent sect) (BC 26)

Field Inspection before Concrete Placement


Suyatman / Iwan / Dian New Complete
• U-Ditch for Hauling Road 8 STA 2+535 ~2+560 (Wall section), Right side

DFT Equipment
SN: - UE17320
Hudaya - PC17882 (Probe) New Complete
Witness ( W )
DFT Check For Primer Coat

Dafid Super Plasticizer SIKA Sikamen NN New Complete


Edy Inspection During Delivering for Pile Cap PC-1C AS C-10 New Complete
Edy Inspection During Delivering for Pile Cap PC-2C AS C-7/8 New Complete

Edy Inspection During Delivering for Pile Cap PC-1A AS A-10 New Complete

Edy Inspection During Delivering for Pile Cap PC-1B AS B-10 New Complete

Edy CHECK BEFORECONCRETE DELIVERING /PLACEMENT FPOR PILECAP PC-1B AS B-10 New Complete

Edy CHECK BEFORECONCRETE DELIVERING /PLACEMENT FPOR PILECAP PC-1C AS C-10 New Complete

Edy CHECK BEFORECONCRETE DELIVERING /PLACEMENT FPOR PILECAP PC-2C AS C-7/8 New Complete

Edy CHECK BEFORECONCRETE DELIVERING /PLACEMENT FPOR PILECAP PC-1A AS A-10 New Complete

Inspection during delivery fresh Structural Concrete


Suyatman • • U-Ditch for Access Road to Flare area (Slab section), STA 0+150 ~ 0+250 ,Left side New Complete

Inspection during delivery fresh Structural Concrete


Suyatman • U-Ditch for Hauling Road 8 STA 0+100 ~0+127 (Slab section), Left side New Complete

Inspection during delivery fresh Structural Concrete


Suyatman • Joint Box Culvert (Wall section), left and right side at Hauling Road 6, STA 2+600 South Side (BC 22) New Complete

Inspection during delivery fresh Structural Concrete


Suyatman • Joint Box Culvert at Hauling Road 6, STA 2+640, South Side (Wall Section) (BC 23) New Complete

Witness ( W )
Hudaya Checking of Painting application: New Complete
- Surface preparation & primer application (C036, C044, C037, C020, C022)
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Plumbing System Inspection of Waste Water New Complete


Pouring Concrete for Slab of Shelter Foundation of Bottling Station Building (Refilling Gallon and
Dian New Complete
Gallon Sanitazion Area)
Dian Precast Installation of Lighting Pole Foundation New Complete
Dian Pouring Concrete for Precast of Lighting Pole Foundation New Complete

Yatmiko Inspections and checks AFTER energizing the electrical installation New Complete

Yatmiko Inspections and checks before energizing the electrical installation : Section A, Section B New Complete

Yatmiko Inspections and checks before energizing the electrical installation : Section D New Complete

Yatmiko Inspections and checks before energizing the electrical installation : Section C New Complete

Yatmiko Inspections and checks before energizing the electrical installation : Earth Resistance New Complete

In-situ Density / Compaction Test (Field CBR test and Sandcone Test)
Suyatman / Iwan / Dian • Access Road 9, STA 0+680 ~ 0+820, Part 2 (Center Line and Left side) New Complete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman / Iwan / Dian • Hauling Road 2 STA 0+790~0+860 (North side) New Cancelled No Concrete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman / Iwan / Dian • Hauling Road 2 STA 0+780~0+840 (South side) New Cancelled No Concrete

Inspection during delivery fresh Structure concrete


Suyatman / Iwan / Dian • JB HR 1 (Slab Sect) STA 0+210 South West side New Cancelled No Concrete

Resistance test and continuity of earthing New Complete

Insulation Resistance and continuity test of cable New Complete


RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
(Lifting Trouble Issue)

(Lifting Trouble Issue)

(Lifting Trouble Issue)

(Lifting Trouble Issue)


Area Not Ready Inspection

Area Not Ready Inspection

No Concrete Supply

No Concrete Supply

Still under preparation/ construction


No permit available yet

Due to Quality Observation card from caompany still open


(electrode Issue) and to be before perform MPI
RFI not Sign by CSTS and CPY , but got conctrete
RFI not Sign by CSTS and CPY , but got conctrete
REASON

REASON

No Concrete Supply

No Concrete Supply

No Concrete Supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV010704M-MD00050 MDI Offshore Jetty Construction 09.00 AM Witness Witness

2 RFI-CIV010703M-MD00032 MDI Offshore Jetty Construction 10.00 AM Witness Witness

3 RFI-CIV010705M-MD00053 MDI Offshore Jetty Construction 10.00 AM Witness Witness

4 RFI-CIV010706M-MD00050 MDI Offshore Jetty Construction 10.00 AM Review Witness

5 RFI-MDI-TEP-00002 MDI Offshore Jetty Construction 11.00 AM Surveillance Surveillance


6 RFI-CIV-0203-06M-US00504 USI Batching Plant 09:00 Witness Witness

7 RFI-CIV-0203-06M-US00505 USI Batching Plant 15:00 Witness Witness

8 TEP-TGH-RFI-00214 CSTS NEW LAYDOWN 08.30 WIT Witness Witness

9 RFI-PIP010502M-EP00155 EPTCO ORF Area 07.30 WIT Witness Witness

10 RFI-PIP010503M-EP00155 EPTCO ORF Area 09.00 WIT Witness Witness

11 RFI-PAI010102M-PM0009 PMM-JO TAR SHELTER MEINDO 02.00 WIT Witness Witness

12 RFI-CIV021101M-PP00074 PP UTILITY 10.30 Witness Witness

13 RFI-CIV021102M-PP00065 PP UTILITY 10.00 Witness Witness

14 RFI-CIV021103M-PP00087 PP UTILITY 10.30 Witness Witness

15 RFI-PIP010402M-PP0020 PP TRAIN 3 08.00 Review Review

16 RFI-PIP010403M-PP00022 PP TRAIN 3 10.00 Witness Witness

17 RFI-CIV020304M-PP00430 PP Train 3 07.00 Witness Witness

18 RFI-CIV020305M-PP00420 PP Train 3 07.00 Witness Witness

19 RFI-CIV020101M-PP000229 PP UTILITY 14.00 Witness Witness

20 RFI-CIV020303M-PP000245 PP UTILITY 14.30 Witness Witness

21 RFI-CIV020101M-PP000230 PP UTILITY 15.00 Witness Witness

22 RFI-CIV020303M-PP000246 PP UTILITY 15.30 Witness Witness

23 RFI-CIV020701M-PP00089 PP UTILITY 15.00 Hold Witness


24 RFI-CIV020304M-PP00431 PP Utility 15.00 Witness Witness

25 RFI-CIV020305M-PP00421 PP Utility 15.30 Witness Witness

26 RFI-CIV020102M-PP00068 PP Train 3 10.00 Witness Witness

27 RFI-CIV021202M-PP00353 PP TRAIN 3 08.45 Witness Witness

28 RFI-CIV020303M-PP000244 PP Train 3 08.00 Witness Witness

29 RFI-CIV020101M-PP000228 PP TRAIN 3 08.00 Witness Witness

30 RFI-CIV010401M-LC00101 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

31 RFI-CIV010402M-LC00125 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

32 RFI-CIV010403M-LC00125 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness
33 RFI-CIV020304M-LC00218 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

34 RFI-CIV010404M-LC00126 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

35 RFI-CIV020305M-LC00782 LCI Hauling Road 8 09.00 WIT Witness Witness

36 RFI-CIV020305M-LC00783 LCI Hauling Road 6 08.30 WIT Witness Witness

37 RFI-CIV020305M-LC00784 LCI Hauling Road 6 08.30 WIT Witness Witness

38 RFI-CIV020304M-LC00219 LCI Hauling Road 6 15.30 WIT Witness Witness

39 RFI-CIV020305M-LC00785 LCI Hauling Road 6 16.00 WIT Witness Witness

40 RFI-CIV020102M-LC00515 LCI Landfill 10.00 WIT Witness Witness

41 RFI-CIV020305M-LC00789 LCI Landfill 10.00 WIT Witness Witness

42 RFI-CIV020101M-LC00492 LCI Train 3 15.00 WIT Witness Witness

43 RFI-CIV020307M-LC00057 LCI Road to Existing Camp 15.00 WIT Witness Witness

44 RFI-CIV020102M-LC00516 LCI IWMF 16.00 WIT Witness Witness

45 RFI-CIV020102M-MB00037 MEINDO TAR SHELTER 09.00 WIT Witness Witness

46 RFI-CIV020102M-MB00038 MEINDO NEW MCB 14.00 WIT Witness Witness


47 RFI-CIV020305M-MB00040 MEINDO LCR-03 10.00 WIT Witness Witness

48 RFI-ELE033601P-ME00004 MEINDO LCR-03 07.30 WIT Hold Witness

49 RFI-CIV020303M-MC00041 MEINDO L03 North Part 09.00 WIT Surveillance Surveillance

50 RFI-CIV020303M-MC00042 MEINDO Flare 14.00 WIT Surveillance Surveillance

51 RFI-CIV020304M-MB00028 MEINDO L03 North Part 14.30 WIT Witness Witness

52 RFI-CIV020304M-MB00029 MEINDO L03 North Part 09.00 WIT Witness Witness


53 RFI-CIV020304M-MB00030 MEINDO Flare 15.00 WIT Witness Witness

54 RFI-CIV020101M-MC00023 MEINDO L03 North Part 09.00 WIT Witness Witness

55 RFI-CIV021103M-MC00012 MEINDO L03 North Part 10.00 WIT Witness Witness

56 RFI-CIV021104M-MC00012 MEINDO L03 North Part 10.00 WIT Witness Witness

57 RFI-CIV021202M-MC00022 MEINDO ORF 10.00 WIT Witness Surveillance

58 RFI-CIV020307M-MC00003 MEINDO ORF 10.00 WIT Hold Witness

59 RFI-CIV010402M-MP00022 MEINDO TRAIN 3 10.00 WIT Witness Witness

60 RFI-CIV010403M-MP00014 MEINDO TRAIN 3 14.00 WIT Witness Witness

61 RFI-CIV020305M-PP00421 PP TRAIN 3 08.00 WIT Witness Witness

62 RFI-CIV020305M-PP00422 PP TRAIN 3 08.00 WIT Witness Witness


63 RFI-CIV020305M-LC00788 LCI Flare Area 08.00 WIT Witness Witness

64 RFI-CIV010404M-MP00030 MEINDO TRAIN 3 15.00 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1085 Buma BOF Area 08.00 AM Surveillance -


2 RFI-QR-TCW-BUM-1086 Buma CWAA Area 09.00 AM Surveillance -
3 RFI-QR-TCW-BUM-1087 Buma Buma Laydown Area 15.00 PM Surveillance -

4 IKM-TEP5500-QAC-CIF-RFI-262 IKM Accommodation Type-D4 (5500POB) - SC 1 09.00 Witness N/A

5 IKM-TEP5500-QAC-CIF-RFI-263 IKM Accommodation Type-D5 (5500POB) - SC 1 09.00 Witness N/A

6 IKM-TEP5500-QAC-CIF-RFI-264 IKM Accommodation Type-D6 (5500POB) - SC 2 09.00 Witness N/A

RFI-TEP-1168784-H03-0002-1B-
7 PT. BPK Sub Cont 2
0304
RFI-TEP-1168784-H03-0002-1B-
8 PT. BPK New Ware House
0305
RFI-TEP-1168784-H03-0002-1B-
9 PT. BPK New Ware House
0306
RFI-TEP-1168784-H03-0002-1B-
10 PT. BPK New Ware House
0307

11 LCI-LCI-009-02M-1086 LCI Hauling Road 2 08.30 WIT Witness

12 LCI-LCI-009-02M-1087 LCI Hauling Road 2 07.00 WIT Witness

13 LCI-CIV-0203-05M-1088 LCI Hauling Road 1 09.30 WIT Witness

13 LCI-LCI-009-01M-1090 LCI Hauling Road 2 08.15 WIT Witness


13 LCI-LCI-009-02M-1091 LCI Hauling Road 2 08.30 WIT Witness

13 LCI-CIV-0201-01M-1092 LCI Flare Area 14.30 WIT Witness

13 LCI-CIV-0201-02M-1093 LCI Flare Area 15.00 WIT Witness


INSPECTION SCHEDULE 4-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

L01-JET2-TRESTLE-PIL-43J
Ruhyan Harahap New Complete
Survey Check before to proceed with driving of steels piles

L01-JET2-TRESTLE-PIL-43J
Ruhyan Harahap New Complete
PDA Test of Pile

L01-JET2-TRESTLEPIL-43J
Inspection and record driving steel pile :
Ruhyan Harahap New Complete
Check and record the blows number necessary to reach: set per 10 blow and drop height of ram
to be recorded. (rebound)

L01-JET2-TRESTLEPIL-43J
Ruhyan Harahap New Complete
Final Inspection - As built ECC Record

Ruhyan Harahap Sea Water Resistivity Sampling for Cathodic Protection - Low Tide New Complete
P.7.1 (32 Mpa) 28 Days for TAR Paving - TAR Shelter
P.7.1 (32 Mpa) 7 Days for Pile 093-PRK-31002 PHT D11/18, E 15/16, D 17/18 - Train 3
Iwan Rahmat P.7.1 (32 Mpa) 7 Days for PC2 E 15/16 D 17/18 - Train 3 New Complete
Test
P.7.1Sample Cylinder
(32 Mpa) 7 Days: Type
for PC1 E 14 + PHT PC2 E 15/16 - Train 3
P.7.1 (32
(32 Mpa) 7 Days forSPD
Mpa) 7 Days for FDN
Bored - Utility
Pile P44/34 - Jetty Const
P.7.1 (32 Mpa) 7 Days for KO Drum - TrainSTA
(32 Mpa) 7 Days for Slab Drainage 3 0+230~0+202 - HR8 Flare
Iwan Rahmat New Complete
P.7.1 (32 Mpa) 7 Days for 186-PRK-31009 Line H/I/J-07/08 PHT Beam Pile Cap - Train 3
P.7.1 (32 Mpa) 7 Days for S+G FDN - Utility
Dafid / Alfan TEP-TGH-MRR-01310- SS Pack - D ( EMBEDED PLATE ) New Complete

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico / Muristoni 082-WF-31016/R00 New Complete
082-WF-31019/R00

Visual Inspection of Butt Fusion Welding For Line Number :


Mico / Muristoni 082-WF-31016/R00 New Complete
082-WF-31019/R00

Hudaya Visual Inspection & DFT Final Coat New Complete RF.1 Only CT2 No Acc

Novi Release confirmation of pile : Check and verify coordinate of pile, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, New Complete
E-3, F-2, F-3

Novi Inspection before cutting: Check marking point for pile crushing level, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, New Complete
E-2, E-3, F-2, F-3

Novi Check the length and bending of pc wire, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, E-3, F-2, F-3 New Complete

Mico Check joint and assembly preparation pipe, Line'187-DO-31521/T00 New Complete

Mico Check heating blanket application and curing time, LINE '187-DO-31521/T00 New Complete

Edy Check before concrete delivering/placement for pile cap , PC2 D-15/16 New Complete

Edy Inspection during delivering structural concrete for Pile cap, PC2 D-15/16 New Complete

Inspection of subgrade and grade layer before laying fill material, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2,
Novi New Complete
E-3, F-2, F-3

Novi Inspection during delivering fresh lean concrete, A-1, A-2, B-1, B-2, B-3, C-2, C-3, D-2, D-3, E-2, E-3, F-2, F-3 New Cancelled Concerete not

Novi Inspection of subgrade and grade layer before laying fill material, LCR AS A/B New Complete

Novi Inspection during delivering fresh lean concrete,LCR AS A/B New Cancelled Concerete not

Hudaya Inspection after concrete protective coating application for boiler A, BOILER A New Complete P51A/51B/51
Novi Check before concrete delivering/placement for pedestal, Boiler B P-1 New Cancelled Area Not R

Novi Inspection during delivering structural concrete for Pedestal, Boiler B P-1 New Cancelled Area Not R

Insitu Density/ Compaction test :


Edy/Nanda New Complete
Inspection execution and location of test 23-28/ D-E-F

Edy/Nanda Check and verify cutting bending for Pile Cap, P2 D-15/16 New Complete

Edy Inspection during delivering fresh lean concrete , PR ( filter house ) New Complete

Edy Inspection of subgrade and grade layer before laying fill material , PR filter house New Complete
Survey report before to proceed with driving steel casing/drilling activities
Quantity : Pile
Yulius Pile No : P 18 New Complete
Check
Pile Noborehole
: P 28 after completion of drilling activities
Quantity
Pile No : P: 24Piles
Yulius Pile No : P 22 New Complete
Pile
CheckNobefore
: P 18 reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile
Pile No :: P
No P 28
22
Yulius New Complete
Pile No : P 18
Pile No : P 28
• Pile No : Type
Yulius • Pile No : Type New Complete
• Pile No : Type
• Pile No : Type
Check the structural concrete quality during delivery (Quantity : Piles)
Yulius Pile No : P 22 New Complete RFI not Signed off by CSTS and
Pile No : P 18

Inspection during delivery fresh Structural Concrete


Suyatman / Dian New Cancelled SIMOP WITH LIFTING A
• U-Ditch for Hauling Road 8 STA 0+300 ~0+369 (Wall section), Right side
Inspection during delivery fresh Structural Concrete
Suyatman / Dian • Joint Box Culvert (Wall section), left and right side at Hauling Road 6, STA 2+600 South Side (BC New Cancelled Doble R
22)
Inspection during delivery fresh Structural Concrete
Suyatman / Dian New Complete
• U-Ditch for Hauling Road 6 STA 2+585 ~12+595 (Wall section), Left side
Field Inspection before Concrete Placement
Suyatman / Dian • U-Ditch for Hauling Road 6 STA 2+610 ~2+630 (Slab section), Right side New Complete
• U-Ditch for Hauling Road 6 STA 2+640 ~2+660 (Slab section), Right side

Inspection during delivery fresh Structural Concrete


Suyatman / Dian • U-Ditch for Hauling Road 6 STA 2+610 ~2+630 (Slab section), Right side New Complete
• U-Ditch for Hauling Road 6 STA 2+640 ~2+660 (Slab section), Right side
In-situ Density / Compaction Test PRP test) ;
Ulfa Backfill Layer 2 for HDPE Pipeline at Landfill Line no. New Cancelled High Moisture

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No Concrete
• Tie Beam of Fence (part 1)

Inspection of Subgrade before laying fill material


Suyatman / Dian New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 1), Line no.
Finishing Inspection :
Check completeness of Structural concrete works prior to proceed with backfilling activities
Suyatman / Dian New Complete
• PC Box Culvert no 92 (BC1x1) at Road to Existing Camp
In-situ Density / Compaction Test Sand Cone test)
Backfill TOP Layer
Suyatman / Dian New Continue
for Precast Box Culvert No.65 (2 NOS (1WX1H) at IWMF

In-situ Density / Compaction Test:


Ulfa New Cancelled High Moisture
 Inspection execution and location of test (PRP)

In-situ Density / Compaction Test:


Ulfa  Inspection execution and location of test (Sand Cone)
New Cancelled High Moisture
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Nanda New Cancelled
Document review of batch ticket
Material sampling

Yatmiko Visual inspection and dimensional check (conduit for Electrical cables for lighting) New Complete

Inspection during delivering fresh lean concrete :


Nanda New Complete
-Check the lean concrete quality during delivery
Inspection during delivering fresh lean concrete :
Yulius New Complete No Concrete Supply
-Check the lean concrete quality during delivery

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Edy / Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Edy / Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Yulius  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Edy / Nanda Inspection for subgrade and grade layer before laying fill material New Complete

Inspection after Cutting:


Edy / Nanda  Check the length of PC wire New Complete
 Check the bending angle of PC wire

Finishing inspection:
 Check completeness of pile inside
Edy / Nanda reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization

Finishing Inspection:
Ulfa Check completeness of structural concrete works prior to New Complete
proceed with backfilling activities for all item’s foundation

Check borehole After completion of drilling


Edy / Nanda New Complete
activities

Check before reinforcing cage & structural concrete


Edy / Nanda New Complete
placement

Edy Inspection during delievring structural concrete pedestal PC3-E29 New Complete

Edy Inspection during delievring structural concrete pedestal PC3-F/29 New Complete Done ( No plannin
Inspection during delivery fresh Structural Concrete
Suyatman New Complete
• U-Ditch for Access Road to Flare area (Slab section), STA 0+080 radius to 0+250~ 0+280 ,Left side

Check the structural concrete quality during delivery


Edy / Nanda New Complete Done ( No plannin
(batch ticket)
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Pouring Concrete for Slab of Pinger Pier, Section 5 at Bulk Offloading Facility New Complete
Dian Pouring Concrete for Drainage New Complete
Dian Pouring Concrete for Precast of Lighting Pole Foundation New Complete

Dian Field inspection: Check before concrete delivery / placement: New Complete

Dian Field inspection: Check before concrete delivery / placement: New Complete

Inspections and checks before energizing the electrical installation : Insulation and Continuity Test
Yatmiko New Cancelled Wrong Item no for elec
for SDP

Yatmiko Insulation Resistance and continuity test of cable New Complete

Yatmiko Visual Inspection check of Gen Set New Complete

Yatmiko Visual Inspection check of Switchgear New Complete

Yatmiko Insulation Resistance and continuity test of Equipment 440-SWG-30401 New Complete

Inspection during delivering Concrete V-Ditch with geocell


Dian • Hauling Road 2 STA 0+780~0+840 (South side) New Complete

Inspection during delivering Concrete V-Ditch with geocell


Dian • Hauling Road 2 STA 0+790~0+860 (North side) New Complete

Inspection during delivery fresh Structure concrete


Dian • JB HR 1 (Slab Sect) STA 0+210 South West side New Complete

Pre Pour Installation V-Ditch with geocell


Dian • Hauling Road 2 STA 0+880~1+000 (South side) New Cancelled No Concrete
Inspection during delivering Concrete V-Ditch with geocell
Dian • Hauling Road 2 STA 0+880~1+000 (South side) New Cancelled No Concrete

Inspection of Subgrade layer before laying fill material


Yulius/Dian • Access Road to Flare, STA 0+080 ~ 0+140 (Part 2) New Complete

In-situ Density / Compaction Test (Field CBR test)


Yulius/Dian • Subgrade layer at Access Road to Flare, STA 0+080 ~ 0+140 (Part 2) New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
RF.1 Only CT2 No Access (Acaffolding)

Concerete not Aviailable

Concerete not Aviailable

P51A/51B/51C/P6/P9
Area Not Ready

Area Not Ready


RFI not Signed off by CSTS and CPY but we got concrete

SIMOP WITH LIFTING Aktiviti ( Mamoet)

Doble RFI

High Moisture Content

No Concrete Supply

High Moisture Content

High Moisture Content


Done ( No planning RFI today )
Done ( No planning RFI today )
REASON

REASON

Wrong Item no for electrical (Under Civil )

No Concrete Supply
No Concrete Supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV010604M-BP00007 BPP Utility 13.30 WIT Witness Witness

2 RFI-CIV010604M-BP00006 BPP Trian 3 13.30 WIT Witness Witness

3 RFI-WLD000303M-BP00029 BPP CSTS Office 08.00 WIT Witness Witness

4 RFI-CIV-0004-01M-US00191 USI Batching Plant 09:00 Witness Witness

5 RFI-CIV-0203-06M-US00506 USI Batching Plant 15:00 Witness Witness

6 RFI-CIV-0203-06M-US00507 USI Batching Plant 15:00 Witness Witness

7 RFI-CIV010701M-MD00009 MDI Jetty Construction 08.00 AM Witness Witness


8 RFI-CIV020304M-MD00007 MDI Jetty Construction 08.00 AM Witness Witness

9 RFI-CIV020304M-MD00010 MDI Jetty Construction 08.15 AM Witness Witness

10 RFI-CIV020305M-MD00009 MDI Jetty Construction 08.30 AM Witness Witness

11 RFI-CIV020305M-MD00010 MDI Jetty Construction 08.30 AM Witness Witness

12 RFI-CIV010704M-MD00051 MDI Offshore Jetty Construction 09.00 AM Witness Witness

13 RFI-CIV010705M-MD00054 MDI Offshore Jetty Construction 09.00 AM Witness Witness

14 RFI-CIV010706M-MD00051 MDI Offshore Jetty Construction 09.00 AM Review Witness

15 TEP-TGH-RFI-00220 CSTS TTP SHELTER 09.00 WIT Witness Witness

16 RFI-PIP010502M-EP00156 EPTCO ORF Area 07.30 WIT Witness Witness

17 RFI-PIP010503M-EP00156 EPTCO ORF Area 09.00 WIT Witness Witness

18 TEP-TGH-RFI-00219 CSTS EARLY LAYDOWN (CABLE AREA) 08.00 WIT Witness Witness

19 RFI-WLD000604M-PM00007 PMMJO TAR SHELTER MEINDO 09.00 AM Review Review

20 RFI-PIP010406P-EP00003 EPTCO Trian 3 07.30 WIT Witness Witness

21 RFI-CIV020307M-PP00085 PP TRAIN 3 08.00 Hold Witness

22 RFI-CIV020307M-PP00086 PP TRAIN 3 08.30 Hold Witness


23 RFI-CIV020701M-PP00090 PP TRAIN 3 08.45 Hold Witness

24 RFI-CIV020701M-PP00091 PP TRAIN 3 09.00 Hold Witness

25 RFI-CIV020701M-PP00092 PP TRAIN 3 09.30 Hold Witness

26 RFI-CIV020701M-PP00093 PP Train 3 09.45 Hold Witness

27 RFI-CIV020701M-PP00094 PP TRAIN 3 10.30 Hold Witness

28 RFI-CIV020701M-PP00095 PP TRAIN 3 10.45 Hold Witness

29 RFI-CIV020701M-PP00096 PP TRAIN 3 13.00 Hold Witness

30 RFI-CIV020701M-PP00098 PP Utility 13.00 Hold Witness

31 RFI-CIV020701M-PP00099 PP Utility 13.00 Hold Witness

32 RFI-CIV020701M-PP00100 PP TRAIN 3 13.00 Hold Witness

33 RFI-CIV020701M-PP00101 PP TRAIN 3 13.00 Hold Witness

34 RFI-CIV020304M-PP00434 PP TRAIN 3 10.00 Witness Witness

35 RFI-CIV020304M-PP00435 PP TRAIN 3 10.30 Witness Witness

36 RFI-CIV020305M-PP00424 PP TRAIN 3 10.30 Witness Witness


37 RFI-CIV020305M-PP00425 PP TRAIN 3 13.00 Witness Witness

38 RFI-CIV021202M-PP00355 PP Train 3 14.00 Witness Witness

39 RFI-CIV020304M-PP00436 PP Train 3 14.30 Witness Witness

40 RFI-CIV020305M-PP00424 PP TRAIN 3 15.00 Witness Witness

41 RFI-CIV021202M-PP00356 PP Traine 3 15.00 Witness Witness

42 RFI-CIV020304M-PP00437 PP Traine 3 15.30 Witness

43 RFI-CIV020305M-PP00425 PP Traine 3 16.00 Witness Witness

44 RFI-CIV020701M-PP00097 PP TRAIN 3 10.00 Hold Witness

45 RFI-PIP010402M-PP0021 PP UTILITY 08.30 Review Review

46 RFI-PIP010403M-PP00023 PP UTILITY 08.30 Review Review

47 RFI-CIV020304M-PP00438 PP UTILITY 10.00 Witness Witness


48 RFI-CIV020102M-PP00069 PP Utility 09.00 Witness Witness
49 RFI-CIV020305M-PP00426 PP UTILITY 14.00 Witness Witness
50 RFI-CIV020102M-PP00070 PP Utility 09.30 Witness Witness

51 RFI-CIV010401M-LC00102 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness
52 RFI-CIV010402M-LC00126 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

53 RFI-CIV010403M-LC00126 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

54 RFI-CIV010404M-LC00127 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

55 RFI-CIV020101M-LC00493 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

56 RFI-CIV020102M-LC00517 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness

57 RFI-CIV020305M-LC00790 LCI Hauling Road 8 09.00 WIT Witness Witness

58 RFI-CIV020305M-LC00791 LCI Hauling Road 7 09.00 WIT Witness Witness

59 RFI-CIV020303M-LC00374 LCI Hauling Road 7 14.00 WIT Surveillance Surveillance

60 RFI-CIV020304M-LC00220 LCI Hauling Road 6 08.00 WIT Witness Witness

61 RFI-CIV020305M-LC00792 LCI Hauling Road 6 09.00 WIT Witness Witness

62 RFI-CIV020101M-LC00494 LCI Pipe and Access to Jetty Area 09.00 WIT Witness Witness

63 RFI-CIV020101M-LC00495 LCI Access Road 8 09.00 WIT Witness Witness

64 RFI-CIV020303M-LC00375 LCI Access Road 8 10.00 WIT Surveillance Surveillance


65 RFI-CIV020305M-LC00793 LCI Landfill 10.00 WIT Witness Witness

66 RFI-CIV020305M-LC00794 LCI Landfill 09.45 WIT Witness Witness

67 RFI-CIV020102M-LC00518 LCI Landfill 16.00 WIT Witness Witness

68 RFI-CIV020101M-LC00496 LCI Train 3 15.00 WIT Witness Witness

69 RFI-CIV020102M-LC00519 LCI Train 3 16.00 WIT Witness Witness

70 RFI-CIV020101M-LC00497 LCI Utility 14.00 WIT Witness Witness

71 RFI-CIV020102M-LC00520 LCI Utility 14.30 WIT Witness Witness

72 RFI-CIV020102M-MB00039 MEINDO NEW MCB 10.00 WIT Witness Witness

73 RFI-CIV020102M-MB00040 MEINDO TAR SHELTER 09.00 WIT Witness Witness

74 RFI-CIV020305M-MB00041 MEINDO TAR SHELTER 10.00 WIT Witness Witness

75 RFI-CIV020305M-MB00042 MEINDO TAR SHELTER 11.00 WIT Witness Witness


76 RFI-CIV020304M-MB00046 MEINDO TAR SHELTER 09.00 WIT Witness Witness
77 RFI-CIV020304M-MB00047 MEINDO TAR SHELTER 10.30 WIT Witness Witness

78 RFI-CIV030901M-MB00005 MEINDO TAR SHELTER 14.00 WIT Witness Witness

79 RFI-CIV021202M-MB00059 MEINDO TAR SHELTER 09.30 WIT Witness Surveillance

80 RFI-CIV020305M-MB00043 MEINDO NEW MCB 11.00 WIT Witness Witness

81 RFI-CIV020304M-MB00048 MEINDO NEW MCB 10.00 WIT Witness Witness

82 RFI-CIV000101M-MP0008 MEINDO MATOA 09.00 WIT Witness Witness

83 RFI-CIV020701M-MC00002 MEINDO ORF 10.00 WIT Hold Witness

84 RFI-CIV000404M-MC00004 MEINDO ORF 10.00 WIT Hold Witness

85 RFI-CIV021202M-MC00023 MEINDO ORF 10.00 WIT Witness Surveillance


86 RFI-CIV021104M-MC00013 MEINDO ORF 10.00 WIT Witness Witness

87 RFI-CIV021104M-MC00014 MEINDO ORF 10.00 WIT Witness Witness

88 RFI-CIV020303M-MC00044 MEINDO Flare 14.00 WIT Surveillance Surveillance

89 RFI-CIV020304M-MC00032 MEINDO ORF 14.00 WIT Witness Witness

90 RFI-CIV020304M-MC00033 MEINDO ORF 14.00 WIT Witness Witness

91 RFI-CIV020305M-MC00036 MEINDO ORF 15.00 WIT Witness Witness


92 RFI-CIV020305M-MC00037 MEINDO ORF 15.00 WIT Witness Witness

93 RFI-SST010101M-MSS00002 MEINDO NEW MCB 09.00 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

RFI-TEP-1168784-H03-0002-1B-
1 PT. BPK Sub Cont 2 08:00 Witness Witness
0308
RFI-TEP-1168784-H03-0002-1B-
2
0309 PT. BPK New Ware House 08:15 Witness Witness
RFI-TEP-1168784-H03-0002-1B-
3 PT. BPK New Ware House 09:15 Witness Witness
0310
RFI-TEP-1168784-H03-0002-1B-
4 PT. BPK Kitchen Area Genset Station 02:30 Witness Witness
0311

5 LCI-CIV-0213-02M-1094 LCI Flare Area 09.00 WIT Witness Witness

6 LCI-LCI-009-02M-1095 LCI Hauling Road 2 08.30 WIT Witness Witness


Accommodation Type-E13 (5500POB) -
7 IKM-TEP5500-QAC-MEL-RFI-181 IKM 07.00 Witness N/A
SC 2
Accommodation Type-E13 (5500POB) -
8 IKM-TEP5500-QAC-MEL-RFI-182 IKM 08.00 Witness N/A
SC 2
Accommodation Type-E13 (5500POB) -
9 IKM-TEP5500-QAC-MEL-RFI-183 IKM 09.00 Witness N/A
SC 2
Accommodation Type-E13 (5500POB) -
10 IKM-TEP5500-QAC-MEL-RFI-186 IKM 10.00 Witness N/A
SC 2
Accommodation Type-B1 (5500POB) -
11 IKM-TEP5500-QAC-MEL-RFI-232 IKM 11.00 Witness N/A
CC
Accommodation Type-B1 (5500POB) -
12 IKM-TEP5500-QAC-MEL-RFI-233 IKM 11.00 Witness N/A
CC
INSPECTION SCHEDULE 5-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Nanda Impledance test on pile Check integrity of Concreting New Complete

Nanda Impledance test on pile Check integrity of Concreting New Complete

Muristoni Measurement Devices Calibration verification New Complete

Verifycation and Visual Check :


David Zulfikar New Complete
Sika P1 21R

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 28 Days for Paving Tar - TAR Shelter
P.7.1 (32 Mpa) 7 Days for Landfill Area - Lanfill
Iwan Rahmat P.7.1 (32 Mpa) 7 Days for Bored Pile Flare P40 - Jetty Conts New Complete
P.4.1 (21 Mpa) 7 Days for Wall Drainage STA 0+335~2+959 Left Side - HR 6
P.4.1 (21 Mpa) 7 Days for Boiler B - Utility
P.7.1 (32 Mpa) 7 Days for Bore Pile T03-034 - Train 3

Test Sample Cylinder : Type


Iwan Rahmat New Complete
PACKRETE (35 Mpa) 28 Days for Pocket Slab Grade 2/3 - Jetty 2
Steel Piles 1400mmOD x 22mm (1 nos) & 1100mmODx19mm (2 nos)
Checking the steel piles material
a. Pile Fabrication No
Ruhyan Harahap b. Check Pile Type
New Complete
c. Pile marking clearly identified
d. Check Factory Conformity Certification.
Pocket Slab at Grid 2
 steelinspection:
Field bars Check before concrete delivery/placement:
Ruhyan Harahap 
 poured bolts
anchor lean concrete status New Complete

 embedment, pockets, holes,vertical
formwork & reinforcement joints, and
chamfer, mesh,levels
horizontal etc.
 quantity,
 steel bars diameter/size, shape
Ruhyan Harahap 
 locations(Coordinates/elevation)
anchor bolts New Complete

 concrete
embedment, cover thickness
pockets, holes, joints, chamfer, mesh, etc.
 etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
Transition Block Type VII & Type VIII at Grid 1
 concrete during
Inspection cover thickness
delivering fresh structural concrete:
Ruhyan Harahap  etc. the concrete quality during delivery
Check New Complete
Document review of batch ticket
Material sampling
Pocket Slab at Grid 2
Inspection during delivering fresh structural concrete:
Ruhyan Harahap Check the concrete quality during delivery New Complete
Document review of batch ticket
Material sampling

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Ruhyan Harahap Survey check before to proceed with driving of steel piles
New On Going

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Inspection and record driving steel pile :
Ruhyan Harahap Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded.
New On Going
(rebound)

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Ruhyan Harahap Final Inspection - As built ECC Record
New On Going

Alfan / Dafid TEP-TGH-MRR-01342-Type "H"-1 Diameter - 1 " Length 655 mm Fluoro Carbon qty 12EA New Complete

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31011/R00
Mico/ Muristoni 082-WF-31016/R00 New Complete
082-WF-31019/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31011/R00
Mico/ Muristoni New Complete
082-WF-31016/R00
082-WF-31019/R00

David / Yatmiko TEP-TGH-MRR-01318-HV CABLE New Complete

Review ( R )
Muristoni Execution of NDT on Welded Joints and Results Evaluation
New Complete

Muristoni P&ID'S Conformity checks report for process Subsystem New Cancelled Only Interna

Iwan /Suyatman /Nanda Check completeness of structural works for surface only pedestal, PC3 D-28, D-29, D-30 New Complete

Iwan /Suyatman /Nanda Check completeness of structural works for surface only pedestal, PC3-E-30 New Complete
Hudaya Inspection after concrete protective coating application for tie beam, TB F-27/28 New Complete

Hudaya Inspection after concrete protective coating application for pedstal , PC3 - D-28, D-30 New Complete

Hudaya Inspection after concrete protective coating application for pedestal, PC3 E-30 New Complete

Hudaya Inspection after concrete protective coating application for tie beam, TB-E-F-30, TB-D-E-30 New Complete

Hudaya Inspection after concrete protective coating application for pile cap, PC3-E-28, E-29, E-30 New Complete Side Wa

Hudaya Inspection after concrete protective coating application for pile cap, PC3-F-28, F-29, F-30 New Complete Side Wa

Hudaya Inspection after concrete protective coating application for pile cap, PC3-D-28, D-29, D-30 New Complete Side Wa

Hudaya Inspection after concrete protective coating application for pile cap, for Boiler A New Complete West Side Wa

Hudaya Inspection after concrete protective coating application for pile cap, For Boiler B New Complete Floor Par

Hudaya Inspection after concrete protective coating application for pile cap, D23 New Complete Nort and East S

Hudaya Inspection after concrete protective coating application for pile cap, E23 New Complete Nort and West

Iwan /Suyatman /Nanda Check before concrete delivering/placement for Pedestal , PC3 AXIS E-28 New Complete

Iwan /Suyatman /Nanda Check before concrete delivering/placement for Pedestal , PC3 AXIS F-29, F-30 New Complete

Iwan /Suyatman /Nanda Inspection during delivering structural concrete for pedestal, PC3 AXIS-E-28 New Complete
Iwan /Suyatman /Nanda Inspection during delivering structural concrete for pedestal, PC3 AXIS F-29, F-30 New Complete

Iwan /Suyatman /Nanda Check and verify cutting bending for Pile cap, PC1 AXIS F-14 New Complete

Iwan /Suyatman /Nanda Check before concrete delivering/placement for pile cap, PC1 Axis f-14 New Complete

Iwan /Suyatman /Nanda Inspection during delivering structural concrete for pile cap, PC1 AXIS F-14 New Complete

Iwan /Suyatman /Nanda Check and verify cutting bending for Pile cap, PC2 Axis F-15/16 New Complete

Iwan /Suyatman /Nanda Check and verify cutting bending for Pile cap, PC2 Axis F-15/16 New Complete

Iwan /Suyatman /Nanda Inspection during delivering structural concrete for pile cap , PC2 Axis F-15/16 New Complete

Hudaya Inspection after concrete protective coating application , PC1 F-27 New Complete Pedestal &

Mico Check joint and assembly preparation pipe, Line'187-DC-31553/U00 New Complete

Mico Check heating blanket application and curing time, Line'187-DC-31553/U00 New Complete

Novi Check before concrete delivering/placement for Boiler B P-1, Boiler B P-1 New Cancelled Area Not R

Novi Insitu Density/ Compaction test : New Cancelled Area Not R


Inspection execution and location of test ( backfill boiler A ), BOILER A
Novi Inspection during delivering structural concrete for Boiler B P-1, Boiler B P-1 New Cancelled Area Not R

Novi Insitu Density/ Compaction test : New Cancelled Area Not R


Inspection execution and location of test ( backfill boiler B ), BOILER B

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 24 New Complete
Pile No : P 20
Pile No : P 16
Check borehole after completion of drilling activities
Quantity : Piles
Pile No : P 28
Yulius New Complete
Pile No : P 24
Pile No : P 20
Pile No : P 16

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 28
Yulius Pile No : P 24 New Complete
Pile No : P 20
Pile No : P 16

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 28
Yulius Pile No : P 24 New Complete
Pile No : P 20
Pile No : P 16

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius • TP , Layer 4 New Complete

In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius New Complete
• TP , Layer 4

Inspection during delivery fresh Structural Concrete


Suyatman / Dian New Complete
• U-Ditch for Hauling Road 8 STA 0+300 ~0+369 (Wall section), Right side

Inspection during delivery fresh Structural Concrete


Suyatman / Dian New Complete
• U-Ditch for Hauling Road 7, (Slab section), STA 0+130 ~ 0+190, Right side
Inspection during delivery Lean Concrete
Suyatman / Dian New Complete
• U-Ditch for Hauling Road 7, Right side, STA 0+210~ 0+280

Field Inspection before Concrete Placement


Suyatman / Dian New Complete
• U-Ditch for Hauling Road 6 STA 2+595 ~2+600 (Slab section), Left side

Inspection during delivery fresh Structural Concrete


Suyatman / Dian New Complete
• U-Ditch for Hauling Road 6 STA 2+595 ~2+600 (Slab section), Left side

Inspection of subgrade/grade before laying fill material (Soil Stripping)


Yulius New Complete
• Pipe & Access to Jetty Area Sheet 02 STA

Inspection of subgrade for General site preparation


Suyatman / Dian New Cancelled Not Rea
• PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600

Inspection during delivery Lean Concrete


Suyatman / Dian New Cancelled Not Rea
• Subgrade for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600
Inspection during delivery fresh Structural Concrete
Ulfa New Cancelled No Concrete
• Tie Beam of Fence (part 1)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No Concrete
• Foudation for Fence Part 2 (85 pcs)
In-situ Density / Compaction Test PRP test) ;
Ulfa Backfill Layer 2 for HDPE Pipeline at Landfill Line no. New

Inspection of Subgrade before laying fill material


Suyatman / Dian New Cancelled Not Rea
• Sand Bedding Elevation (Under HDPE Pipe) (Part 1), Line no.

In-situ Density / Compaction Test ;


Suyatman / Dian New Cancelled Not Rea
Sand Bedding Elevation (Under HDPE Pipe) (Part 1), Line no.

Inspection of Subgrade before laying fill material


Novi New Complete
• Crank mat, Utility , TP 1

In-situ Density / Compaction Test ;


Novi Inspection of Subgrade before laying fill material New Complete
• Crank mat, Utility , TP 1
In-situ Density / Compaction Test:
Ulfa New Complete
 Inspection execution and location of test (Sand Cone)
In-situ Density / Compaction Test:
Ulfa New Complete
 Inspection execution and location of test (PRP)

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa /Dian / Suyatman New Cancelled No Concrete
Document review of batch ticket
Material sampling

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa /Dian / Suyatman New Cancelled No Concrete
Document review of batch ticket
Material sampling
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa /Dian / Suyatman  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
horizontal levels
 steel bars
Ulfa /Dian / Suyatman  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity,
Water diameter/size,
tightness shape fixtures and
test of plumbing
Ulfa /Dian / Suyatman  locations(Coordinates/elevation)
water distribution piping downstream of the New Complete
 concrete
isolation cover
valve thickness
and within the building
 etc.
Check and verify cutting and bending of Reinforce rebar including:
- bending shape
Ulfa /Dian / Suyatman New Complete
- Size/length
- Packing for mobilization

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa /Dian / Suyatman New Cancelled No Concrete
Document review of batch ticket
Material sampling

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa /Dian / Suyatman  anchor bolts New Cancelled Still Under Con
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Dian Check and verify Tropographic instrument certificate before tropographic work New

Final Inspection:
Hudaya  Inspection after concrete protective coating New Complete
application

Ulfa Check and verify compliance with project requirement of embedment materials New Complete

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization
Finishing inspection:
 Check completeness of pile inside
Ulfa reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Finishing inspection:
 Check completeness of pile inside
Ulfa reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Inspection during delivering fresh lean concrete :


Yulius New Cancelled No Concrete
-Check the lean concrete quality during delivery

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Cancelled Still Under Con
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa New Cancelled No Concrete
Document review of batch ticket
Material sampling
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Ulfa New Cancelled No Concrete
Document review of batch ticket
Material sampling
Daniel / Darmawan Bolt tightening inspection and testing (Demonstration bolt pre tensioning) New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Yatmico Inspection check of Distribution Panel New Complete

Yatmico Insulation Resistance test of busbar equipment New Complete

Yatmico Resistance test and continuity earthing to equipment New Complete

Yatmico Visual Inspection check of Generator Installation New Complete


Inspection during delivery fresh Structural Concrete
Yulius • Precast Duct Bank at HR3 (2 pcs) New Cancelled No Concrete
Inspection during delivering Concrete V-Ditch with geocell
Dian • Hauling Road 2 STA 0+800~1+000 (South side) New Cancelled No Concrete

Yatmico Inspections and checks AFTER energizing the electrical installation New Complete

Yatmico Inspections and checks before energizing the electrical installation : Section A, Section B New Complete

Yatmico Inspections and checks before energizing the electrical installation : Section D New Complete

Yatmico Inspections and checks before energizing the electrical installation : Earth Resistance New Complete

Not ready for inspection due t


Yatmico Inspection and checks Before Energizing the Electrical Instalation : Insullation & Contuiity Test JB & MCB New Cancelled going

Not ready for inspection due t


Yatmico Inspection and checks Before Energizing the Electrical Instalation : Insullation & Contuiity Test SDP New Cancelled going
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Only Internal Eptco
Side Wall

Side Wall

Side Wall

West Side Wall Partial

Floor Partial

Nort and East Side Wall

Nort and West Side Wall


Pedestal & Floor

Area Not Ready

Area Not Ready

Area Not Ready

Area Not Ready


Not Ready

Not Ready
No Concrete Supply

No Concrete Supply

Not Ready

Not Ready

No Concrete Supply

No Concrete Supply
No Concrete Supply

Still Under Construction


No Concrete Supply

Still Under Construction

No Concrete Supply
No Concrete Supply
REASON

REASON

No Concrete Supply

No Concrete Supply

Not ready for inspection due to some installation is on


going

Not ready for inspection due to some installation is on


going
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00509 USI Batching Plant 15:00 Witness Witness

2 RFI-CIV-0203-06M-US00510 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV010704M-MD00051 MDI Offshore Jetty Construction 09.00 AM Witness Witness

4 RFI-CIV010705M-MD00054 MDI Offshore Jetty Construction 09.00 AM Witness Witness

5 RFI-CIV010706M-MD00051 MDI Offshore Jetty Construction 09.00 AM Review Witness


6 RFI-CIV000409M-MD00012 MDI Jetty Construction 10.00 AM Witness Witness

7 RFI-CIV000409M-MD00013 MDI Jetty Construction 10.00 AM Witness Witness

8 RFI-CIV020307M-MD00007 MDI Jetty Construction 02.00 PM Review Review

9 RFI-WLD000603M-MD00011 MDI Jetty Construction 02.00 PM Surveillance Surveillance

10 RFI-WLD000604M-MD00012 MDI Jetty Construction 02.00 PM Review Review

11 RFI-CIV021402M-MD00018 MDI Jetty Construction 02.30 PM Witness Surveillance

12 RFI-CIV000201M-MB00003 MEINDO ORF 09.00 WIT Hold Witness

13 RFI-CIV020303M-MC00045 MEINDO Flare 14.00 WIT Surveillance Surveillance

14 RFI-CIV000101M-LC00024 LCI LCI Office 08.00 WIT Witness Witness

15 RFI-CIV000101M-LC00025 LCI LCI Office 08.00 WIT Witness Witness

16 RFI-CIV000202M-LC00031 LCI BOF 10.00 WIT Witness Witness

17 RFI-CIV020101M-LC00497 LCI Train 3 14.30 WIT Witness Witness

18 RFI-CIV020101M-LC00498 LCI Train 3 13.30 WIT Witness Witness


19 RFI-CIV020102M-LC00520 LCI Train 3 14.00 WIT Witness Witness

20 RFI-CIV020101M-LC00499 LCI Access Road 8 09.00 WIT Witness Witness

21 RFI-WLD000604M-PM00008 PMMJO TAR SHELTER MEINDO 09.00 AM Review Review


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 IKM-TEP5500-QAC-MEL-RFI-188 IKM Accommodation Type-E14 (5500POB) - SC 2 07.00 Witness N/A

2 IKM-TEP5500-QAC-MEL-RFI-391 IKM Accommodation Type-E13 (5500POB) - SC 2 08.00 Witness N/A


INSPECTION SCHEDULE 6-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for Pedesdtal PC3 D28/29/30, E30 093-PRK-31002 - Train 3
P.7.1 (32 Mpa) 7 Days for Acid Gas Absorber Foundation 023-T-31001 - Train 3
Yulius P.7.1 (32 Mpa) 28 Days for Main Piperask Line ABC 5/6 Axis A5/6-Axis B5/7-Axis C5/8 - Train 3 New Complete
P.7.1 (32 Mpa) 28 Days for Compressor Shelter PC2 Axis B2/3 PC1 Axis A-A/1 053-SHL-31001 A/B - Train 3
P.7.1 (32 Mpa) 28 Days for Axis A4 PRK 31001 - Train 3

Test Sample Cylinder : Type


Yulius P.8.1 (35 Mpa) 56 Days for Trial Mix Marine 1.5% NN New Complete

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Ruhyan Harahap New Complete
Survey check before to proceed with driving of steel piles

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Inspection and record driving steel pile :
Ruhyan Harahap New Complete
Check and record the blows number necessary to reach: set per 10 blow and drop height of ram
to be recorded. (rebound)

L01-JET2-TRESTLE-PIL-43K & L01-JET2-TRESTLE-PIL-43K1


Ruhyan Harahap New Complete
Final Inspection - As built ECC Record
Precast Road Slab (13 nos)
Ruhyan Harahap Check and verify compliance with Project properties requirements other concrete/civil material New Complete
used in the Project.
Fibreboard Shett 20mm
Ruhyan Harahap Check and verify compliance with Project properties requirements other concrete/civil material New Complete
used in the Project.
Trasition Block Type I Grid 2 , Finishing Inspection:
Ruhyan Harahap Check completeness of structural concrete works prior to proceed with backfilling activities for all New Postpone Safety Is
item’s foundation

L01-JET2-TRESTLE-PIL-N3E & L01-JT2-TRESTLE-PIL-N3G


Visual inspection of the welded joints:
Ruhyan Harahap New Postpone
 Weld profile
Dimensional accuracyPresence of Welders’ stamps, Joint Number, Material and Dwg Marking.

L01-JET2-TRESTLE-PIL-N3E & L01-JT2-TRESTLE-PIL-N3G


Ruhyan Harahap New Postpone
Execution of NDT on welded joints and results evaluation
Precast I-Beam TB-1 & TB2 Grid 3 to Grid 4
Inspection on Precast Installation
Check Position of Precast: Horizontal, vertical and Elevation
Ruhyan Harahap New Complete
Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection
Check, verify sieve material (site excavated or imported borrow pit material) to be used under the foundation of
main items & general backfilling area:
Ulfa  Soil sampling (e.g. Quarry/borrow pit test to be New Complete
provided))
 Review of material properties certificate

Inspection during delivering fresh lean concrete :


Yulius New Complete
-Check the lean concrete quality during delivery

Verification of Laboratorium Equipment


Yulius New Complete
• Sieve Sets no. 3", 2½", 2", 1½", 1", ¾", ⅜", No.4, 10, 20, 40, 60, 100, 140, 200

Verification of Laboratorium Equipment


Yulius • Speedy Gauge (S/N. 205575) New Complete
• Force Gauge cap. 300kN (S/N. 973548)

Verification material received at Site


Yulius New Complete
• Sub-Base Material, source from Quarry PT. Berkah Batu Banawa (Shipment #4)

Inspection of Subgrade for General site preparation


Putu Gede New Complete
• (Under HDPE Pipe) (Part 2), Line no.

Inspection of Subgrade before laying fill material


Putu Gede New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 1), Line no.
In-situ Density / Compaction Test ;
Putu Gede New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 1), Line no.

Inspection of subgrade for General site preparation


Suyatman / Dian New Complete
• PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600

Review ( R )
Muristoni Execution of NDT on Welded Joints and Results Evaluation
New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Yatmiko Inspections and checks before energizing the electrical installation : Section A , B New Complete

Yatmiko Inspections and checks before energizing the electrical installation : Section C New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Safety Issue
REASON

REASON
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00511 USI Batching Plant 09:00 Witness Witness

2 RFI-CIV-0203-06M-US00512 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV010603M-BP00051 BPP Utility 08.00 WIT Witness Witness

4 RFI-WLD000601M-PM00005 PMM-JO TAR SHELTER (MEINDO) 09.00 WIT Surveillance Surveillance

5 RFI-PAI010102M-PM000010 PMM-JO TAR SHELTER (MEINDO) 02.00 PM Witness Witness

6 RFI-CIV020102M-PP00072 PP Utility 14.30 WIT Witness Witness


7 RFI-CIV020102M-PP00074 PP Utility 14.30 WIT Witness Witness

8 RFI-CIV020307M-PP00087 PP Utility 08.30 WIT Hold Witness

9 RFI-CIV021102M-PP00066 PP Train 3 10.00 WIT Surveillance Surveillance

10 RFI-CIV021102M-PP00105 PP Train 3 10.00 WIT Surveillance Surveillance

11 RFI-CIV021202M-PP00357 PP Train 3 14.00 WIT Witness Witness

12 RFI-CIV021202M-PP00358 PP Train 3 10.30 WIT Witness Witness

13 RFI-CIV021103M-PP00088 PP Train 3 10.30 WIT Witness Witness

14 RFI-CIV021101M-PP00078 PP Train 3 08.30 WIT Witness Witness

15 RFI-PIP010502M-EP00157 EPTCO ORF Area 07.30 WIT Witness Witness

16 RFI-PIP010503M-EP00157 EPTCO ORF Area 09.00 WIT Witness Witness

17 RFI-PIP010502M-EP00158 EPTCO Train 3 07.30 WIT Witness Witness

18 RFI-PIP010503M-EP00158 EPTCO Train 3 09.00 WIT Witness Witness


19 RFI-PIP010502M-EP00159 EPTCO Utility 07.30 WIT Witness Witness

20 RFI-PIP010503M-EP00159 EPTCO Utility 09.00 WIT Witness Witness

21 TEP-TGH-RFI-00221 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

22 TEP-TGH-RFI-00222 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

23 TEP-TGH-RFI-00223 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

24 TEP-TGH-RFI-00223 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

25 RFI-WLD000603M-MD00011 MDI Jetty Construction 07.00 AM Surveillance Surveillance

26 RFI-WLD000604M-MD00012 MDI Jetty Construction 07.00 AM Review Review

27 RFI-CIV0201402M-MD00019 MDI Jetty Construction 08.00 AM Witness Surveillance

28 RFI-CIV020307M-MD00007 MDI Jetty Construction 08.10 AM Review Review

29 RFI-CIV020401M-MD00006 MDI Jetty Construction 08.30 AM Witness Witness

30 RFI-CIV010704M-MD00052 MDI Offshore Jetty Construction 10.00 AM Witness Witness

31 RFI-CIV010705M-MD00055 MDI Offshore Jetty Construction 10.00 AM Witness Witness

32 RFI-CIV010706M-MD00052 MDI Offshore Jetty Construction 10.00 AM Review Witness

33 RFI-CIV010401M-LC00103 LCI Pipe and Access to Jetty Area Witness Witness

07.30 WIT
34 RFI-CIV010402M-LC00127 LCI Pipe and Access to Jetty Area Witness Witness

07.45 WIT

35 RFI-CIV010403M-LC00127 LCI Pipe and Access to Jetty Area Witness Witness

08.15 WIT

36 RFI-CIV010404M-LC00128 LCI Pipe and Access to Jetty Area Witness Witness

08.30 WIT

37 RFI-CIV020101M-LC00500 LCI Witness Witness


Pipe and Access to Jetty Area 15.30 WIT
38 RFI-CIV020102M-LC00521 LCI Witness Witness
Pipe and Access to Jetty Area 16.00 WIT
39 RFI-CIV020303M-LC00376 LCI Surveillance Surveillance
Access Road 8 09.00 WIT
40 RFI-CIV020305M-LC00795 LCI Witness Witness
Landfill 10.00 WIT
41 RFI-CIV020305M-LC00796 LCI Witness Witness
Landfill 09.45 WIT

42 RFI-CIV020102M-LC00522 LCI Witness Witness


Landfill 16.00 WIT
43 RFI-CIV020101M-LC00501 LCI Witness Witness
Train 3 16.00 WIT
44 RFI-CIV020102M-LC00523 LCI Witness Witness
Train 3 16.30 WIT

45 RFI-PIP010402M-PP00021 PP Train 3 09.00 WIT Witness Witness

46 RFI-PIP010403M-PP00023 PP Train 3 10.00 WIT Witness Witness

47 RFI-CIV020304M-PP00439 PP Train 3 07.00 WIT Witness Witness

48 RFI-CIV020305M-PP00427 PP Train 3 08.00 WIT Witness Witness


49 RFI-CIV020304M-PP00440 PP Train 3 08.00 WIT Witness Witness

50 RFI-CIV020305M-PP00428 PP Train 3 10.00 WIT Witness Witness

51 RFI-CIV020101M-PP00231 PP Train 3 08.00 WIT Witness Witness

52 RFI-CIV020303M-PP00247 PP Train 3 13.00 WIT Witness Witness

53 RFI-CIV020304M-PP00441 PP Utility 08.00 WIT Witness Witness

54 RFI-CIV020305M-PP00429 PP Utility 10.00 WIT Witness Witness

55 RFI-CIV020304M-PP00442 PP Utility 14.30 WIT Witness Witness

56 RFI-CIV020305M-PP00430 PP Utility 09.00 WIT Witness Witness

57 RFI-CIV020102M-PP00075 PP Train 3, 09.30 WIT Witness Witness

58 RFI-CIV020102M-MB00041 MEINDO TAR SHELTER 09.00 WIT Witness Witness

59 RFI-CIV021202M-MB00060 MEINDO NEW MCB 09.30 WIT Witness Surveillance

60 RFI-CIV020304M-MB00049 MEINDO NEW MCB 10.00 WIT Witness Witness

61 RFI-CIV020305M-MB00044 MEINDO TAR SHELTER 11.00 WIT Witness Witness

62 RFI-CIV020305M-MB00045 MEINDO TAR SHELTER 10.00 WIT Witness Witness


63 RFI-CIV020305M-MB00046 MEINDO TAR SHELTER 10.00 WIT Witness Witness

64 RFI-CIV010603M-MP00122 MEINDO ORF 08.00 WIT Review Review

65 RFI-CIV010603M-MP00123 MEINDO FLARE 13.00 WIT Review Review

66 RFI-CIV021202M-MC00024 MEINDO ORF 10.00 WIT Witness Surveillance

67 RFI-CIV021202M-MC00025 MEINDO ORF 10.00 WIT Witness Surveillance

68 RFI-CIV020101M-MC00025 MEINDO L03 North Part 14.00 WIT Witness Witness


69 RFI-CIV020101M-MC00026 MEINDO L03 North Part 15.00 WIT Witness Witness

70 RFI-CIV021104M-MC00015 MEINDO ORF 10.00 WIT Witness Witness

71 RFI-CIV021102M-MC00017 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

72 RFI-CIV021102M-MC00018 MEINDO L03 North Part 15.00 WIT Surveillance Surveillance

73 RFI-CIV021101M-MC00020 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

74 RFI-CIV021101M-MC00021 MEINDO L03 North Part 15.00 WIT Surveillance Surveillance

75 RFI-CIV020305M-MC00039 MEINDO ORF 15.00 WIT Witness Witness

76 RFI-CIV020305M-MC00040 MEINDO ORF 15.00 WIT Witness Witness

77 RFI-CIV020305M-MC00041 MEINDO ORF 15.00 WIT Witness Witness

78 RFI-CIV020304M-MB00034 MEINDO L03 North Part 14.00 WIT Witness Witness


79 RFI-CIV020304M-MB00035 MEINDO L03 North Part 15.00 WIT Witness Witness

80 RFI-CIV020304M-MB00036 MEINDO ORF 14.00 WIT Witness Witness

81 RFI-CIV020304M-MB00037 MEINDO ORF 14.00 WIT Witness Witness

82 RFI-CIV020303M-MC00046 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

83 RFI-CIV020303M-MC00047 MEINDO L03 North Part 15.00 WIT Surveillance Surveillance

84 RFI-CIV020701M-PP00102 PP Train 3 08.00 WIT Hold Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1088 Buma Batching Plant Area 08.00 AM Surveillance -


2 RFI-QR-TCW-BUM-1089 Buma Batching Plant Area 08.00 AM Surveillance -
3 RFI-QR-TCW-BUM-1090 Buma Warehaouse Area 09.00 AM Surveillance -

4 LCI-CIV-0213-02M-1096 LCI Flare Area 09.00 WIT Witness Witness

5 LCI-LCI-009-02M-1097 LCI Hauling Road 2 08.30 WIT Witness Witness

6 LCI-CIV-0203-04M-1098 LCI Camp Accsess Road 10.00 WIT Witness Witness

7 LCI-CIV-0203-05M-1099 LCI Camp Accsess Road 13.30 WIT Witness Witness

8 IKM-TEP5500-QAC-MEL-RFI-187 IKM Accommodation Type-E14 (5500POB) - SC 2 07.00 WIT Witness N/A

9 IKM-TEP5500-QAC-MEL-RFI-189 IKM Accommodation Type-E14 (5500POB) - SC 2 08.00 WIT Witness N/A


INSPECTION SCHEDULE 7-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for Tar Slab - TAR Shelter
P.7.1 (32 Mpa) 7 Days for Control Box - Landfill
P.7.1 (32 Mpa) 28 Days for Main Pipe Rask Block 5 Pile Cap Line C/E/F 28/30 Axix E28/29/30 PHT ile Cap3A Axis E28/29/30
Pile Cap 3A Axis D 28/29/30- Train 3
Iwan Rahmat P.7.1 (32 Mpa) 28 Days for Pedestal Block 3 D/E/F 19 - Train 3 New Complete
P.7.1 (32 Mpa) 28 Days for LCR 20 Pile Cap Line B1/B7 A1/A16 - Utility
P.7.1 (32 Mpa) 28 Days for Bored Pile 72 - Jetty Const
P.7.1 (32 Mpa) 28 Days for PHT Portbel Tank - Utility
P.7.1 (32 Mpa) 28 Days for Pedestal Boiler 2 P18/19/22/23/32/30- Utility

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 28 Days for PHT Portable Tank - Utility
Iwan Rahmat P.7.1 (32 Mpa) 28 Days for Pedestal Boiler 2 P18/19/22/23/32/30- Utility New Complete

Nanda Pile Load test Report : Check and Verify the PDA Test Preformed New Complete

Fit-up and preparation Inspection of the to be welded joints :


Daniel/ Darmawan New Cancelled
-Fit Up (root gap , alignment cleanliness , etc)

Hudaya Visual Inspection & DFT Final Coat New Cancelled Watermark Sti

Insitu Density / Compaction Test :


Novi New Cancelled Area Not R
Inspection executing and location of Boiler , Boiler-A
Insitu Density / Compaction Test :
Novi New Complete
Inspection executing and location of Boiler , STG1

Novi Check completeness of structural works for pilecap , STG-2 New Complete

Gede Putu Inspection before cutting : Check marking Point for pile crushing level , PC3B as E/F-2 New Complete

Gede Putu CHECK COMPLETENESS OF PILE INSIDE REINFORCEMENT , PC3B as E/F-2 New Complete

Gede Putu Check and verify cutting bending for Pilecap, PC3B as E/F-2 New Complete

Gede Putu Check and Verify Cutting Bending for PHT ,PC3B as E/F- 2 New Complete

Gede Putu Check the length and Bending fo PC wire , PC3B as E/F- 2 New Complete

Gede Putu Release confirmation of Pile : check and Verify Coordinate of Pile , PC3B as E/F-2 New Complete

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31011/R00
Muristoni 082-WF-31016/R00 New Complete
082-WF-31019/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31011/R00
Muristoni New Complete
082-WF-31016/R00
082-WF-31019/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico 082-WF-31008/T00 New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31008/T00
Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico 082-WF-31771/U00 New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31771/U00

Dafid / Alfan TEP-TGH-MRR-01330-HDPE PIPES New Complete

Dafid / Alfan TEP-TGH-MRR-013301-HDPE PIPES New Complete

Dafid / Alfan TEP-TGH-MRR-013302-HDPE PIPES New Complete

Dafid / Alfan TEP-TGH-MRR-013303-HDPE PIPES (3rd MTO + 3rd MTO CVST) New Complete

L01-JET2-TRESTLE-PIL-N3E & L01-JT2-TRESTLE-PIL-N3G


Visual inspection of the welded joints:
Ruhyan Harahap  Weld profile New Complete
Dimensional accuracyPresence of Welders’ stamps, Joint Number, Material and Dwg Marking.

L01-JET2-TRESTLE-PIL-N3E & L01-JT2-TRESTLE-PIL-N3G


Ruhyan Harahap Execution of NDT on welded joints and results evaluation New Complete
Precast Road Slab Grid 3 to Grid 4
Inspection on Precast Installation
Check Position of Precast: Horizontal, vertical and Elevation
Ruhyan Harahap Check the Connection to main structure New Complete
Check for Elastomeric rubber Pad
Grout Placement Inspection

Trasition Block Type I Grid 2 , Finishing Inspection:


Ruhyan Harahap Check completeness of structural concrete works prior to proceed with backfilling activities for all item’s foundation New Complete

Mechanical Grout for Coupler M Type at Grid 3


Main Item grouting: Checks before delivery & placement of mixed grout:
 status of chipped & soaked prepared foundation
Ruhyan Harahap  surface under erected base plate or equipment, formwork vertical & horizontal levels, joints, shape, New Complete
 clearance between base plate and foundation top, chamfers, etc.
 Cement Material for grouting

L01-JET2-TRESTLE-PIL-44D
Ruhyan Harahap Survey check before to proceed with driving of steel piles New Postpone High Tid

L01-JET2-TRESTLE-PIL-44D
Ruhyan Harahap Inspection and record driving steel pile : New Postpone High Tid
Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded. (rebound)

L01-JET2-TRESTLE-PIL-44D
Ruhyan Harahap Final Inspection - As built ECC Record New Postpone High Tid

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 16 New Complete
Pile No : P 10
Pile No : P 6
Check borehole after completion of drilling activities
Quantity : Piles
Pile No : P 20
Yulius New Complete
Pile No : P 16
Pile No : P 10
Pile No : P 6

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 20
Yulius Pile No : P 16 New Complete
Pile No : P 10
Pile No : P 6

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 20
Yulius Pile No : P 16 New Complete
Pile No : P 10
Pile No : P 6

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius • TP 8 , Layer 5 New Complete

In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius New Complete
• TP 8 , Layer 5
Inspection during delivery Lean Concrete
Suyatman / Dian New Complete
• Subgrade for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600
Inspection during delivery fresh Structural Concrete
Ulfa New Complete
• Tie Beam of Fence (part 1)
Inspection during delivery fresh Structural Concrete
Ulfa New Complete
• Foudation for Fence Part 2 (85 pcs)
In-situ Density / Compaction Test PRP test) ;
Ulfa Backfill Layer 2 for HDPE Pipeline at Landfill Line no. New Complete

Inspection of Subgrade before laying fill material


Gede Putu/ Suyatman New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.
In-situ Density / Compaction Test ;
Gede Putu/ Suyatman New Complete
Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

Mico Check joint and assembly preparation pipe , line 187-DO-31508 New Complete

Mico Check heating blanket application and curri ng time, line 187-DO-31508 New Complete

Gede Putu Check before concrete delivering/placement for pile cap, PC2 D-15/16 New Complete

Gede Putu Inspection during delivering structural concrete for pile cap , PC2 D-15/16 New Complete
Gede Putu Check before concrete delivering/placement for pedestal, PC3A D-28 (PD-5) New Complete

Gede Putu Inspection during delivering structural concrete for pedestal, PC3A D-28 (PD-5) New Csncelled No Concrete

Gede Putu Inspection of subgrade and grade layer before laying fill material, FHVS PR New Complete

Gede Putu Inspection during delivering fresh lean concrete, FHVS PR New Complete

Novi Check before concrete delivering/placement for pedestal, Boiler B New Complete

Novi Inspection during delivering structural concrete for pedestal, Boiler B New Complete

Novi Check before concrete delivering/placement for pile cap, STG 3 New Cancelled Area Not Ready on Progr

Novi Inspection during delivering structural concrete for pile cap , STG 3 New Cancelled Area Not Ready on Progr

Gede Putu Insitu Density/ compaction test : Inspection excecution and location of test backfill New Complete

In-situ Density / Compaction Test:


Ulfa New Complete
 Inspection execution and location of test (PRP)
Check and verify cutting and bending of Reinforce rebar including:
- bending shape
Dian New Complete
- Size/length
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Dian  anchor bolts New Cancelled
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Dian New Complete
Document review of batch ticket
Material sampling

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Dian New Complete
Document review of batch ticket
Material sampling
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Dian New Complete
Document review of batch ticket
Material sampling
Pile load test report
Ulfa New Complete
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)

Pile load test report


Yulius New Complete
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization

Nanda Inspection for subgrade and grade layer before laying fill material New Complete
Nanda Inspection for subgrade and grade layer before laying fill material New Complete

Finishing inspection:
 Check completeness of pile inside
Ulfa reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Nanda Check marking point for Pile crushing level New Complete

Nanda Check marking point for Pile crushing level New Complete

Nanda Check and verify coordinate of pile New Complete

Nanda Check and verify coordinate of pile New Complete

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa Document review of batch ticket
New Cancelled No Concrete
Material sampling

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa Document review of batch ticket
New Cancelled No Concrete
Material sampling

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa Document review of batch ticket
New Cancelled No Concrete
Material sampling

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Cancelled still under con
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Cancelled still under con
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh lean concrete :


Nanda New Complete
-Check the lean concrete quality during delivery

Inspection during delivering fresh lean concrete :


Nanda New Complete
-Check the lean concrete quality during delivery

Hudaya Inspection after concrete Protective Coating Application for pile Cap F-27 New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Check Coordinate Position of Mobile Batching Plant Foundation New Complete
Dian Excavation Inspection of Mobile Batching Plant Foundation New Complete
Dian Precast Installation of Lighting Pole Foundation New Complete

Inspection during delivery fresh Structural Concrete


Yulius • Precast Duct Bank at HR3 (2 pcs) New Cancelled No Concrete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman / Dian • Hauling Road 2 STA 0+800~1+000 (South side) New Cancelled No Concrete

Suyatman / Dian Field inspection: Check before concrete placement New Complete
• Joint Box at Camp Access Road STA 0+270 ~ 0+300 (Slab Section) Right & Left side

Inspection during delivery fresh structure Concrete


Suyatman / Dian New Cancelled No Concrete
• Joint Box (Slab Section at Camp Access Road STA 0+270 ~ 0+300

Yatmiko / Abdul Gani Inspections and checks AFTER energizing the electrical installation New Complete

Yatmiko / Abdul Gani Inspections and checks before energizing the electrical installation : Section A, Section D New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

Watermark Still Repair

Area Not Ready


High Tide

High Tide

High Tide
No Concrete Supply

Area Not Ready on Progress by Construction

Area Not Ready on Progress by Construction


No Concrete Supply

No Concrete Supply

No Concrete Supply
still under construction

still under construction


REASON

REASON

No Concrete Supply

No Concrete Supply

No Concrete Supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010502M-EP00160 EPTCO ORF Area 07.30 WIT Witness Witness

2 RFI-PIP010503M-EP00160 EPTCO ORF Area 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00161 EPTCO Train 3 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00161 EPTCO Train 3 09.00 WIT Witness Witness

5 RFI-CIV-0203-06M-US00514 USI Batching Plant 15:00 Witness Witness


6 RFI-CIV-0004-01M-US00192 USI Batching Plant 09:00 Witness Witness

7 RFI-CIV010604M-BP00009 BPP Train 3 08.30 WIT Witness Witness

8 RFI-CIV010704M-MD00052 MDI Offshore Jetty Construction 08.00 AM Witness Witness

9 RFI-CIV010705M-MD00055 MDI Offshore Jetty Construction 08.00 AM Witness Witness

10 RFI-CIV010706M-MD00052 MDI Offshore Jetty Construction 08.00 AM Review Witness

11 RFI-CIV010704M-MD00053 MDI Offshore Jetty Construction 10.00 AM Witness Witness

12 RFI-CIV010705M-MD00056 MDI Offshore Jetty Construction 10.00 AM Witness Witness

13 RFI-CIV010706M-MD00053 MDI Offshore Jetty Construction 10.00 AM Review Witness

14 RFI-CIV021202M-MD00009 MDI Jetty Construction 04.00 PM Witness Surveillance

15 RFI-CIV010401M-LC00104 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

16 RFI-CIV010402M-LC00128 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness
17 RFI-CIV010403M-LC00128 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

18 RFI-CIV010404M-LC00129 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness
09.00 WIT
19 RFI-CIV020305M-LC00797 LCI Landfill Witness Witness
13.30 WIT

20 RFI-CIV020305M-LC00798 LCI Hauling Road 6 09.00 WIT Witness Witness

21 RFI-CIV020307M-LC00058 LCI Hauling Road 6 08.00 WIT Witness Witness

22 RFI-CIV020102M-LC00524 LCI Hauling Road 6 15.00 WIT Witness Witness

23 RFI-CIV020101M-LC00502 LCI Flare Area 10.00 WIT Witness Witness

24 RFI-CIV020102M-LC00525 LCI Flare Area 10.15 WIT Witness Witness

25 RFI-CIV020701M-LC00093 LCI Road to Existing Camp 15.30 WIT Witness Witness

26 TEP-TGH-RFI-00225 CSTS TTP SHELTER 09.00 WIT Witness Witness

27 RFI-CIV020304M-PP00443 PP Train 3 08.00 Witness Witness

28 RFI-CIV020304M-PP00444 PP Train 3 09.00 Witness Witness

29 RFI-CIV020305M-PP00431 PP Train 3 08.00 Witness Witness


30 RFI-CIV020305M-PP00432 PP Train 3 10.00 Witness Witness
31 RFI-CIV020307M-PP00088 PP Train 3 14.00 Hold Witness
32 RFI-PIP010402M-PP00023 PP Train 3 09.00 Witness Witness
33 RFI-PIP010403M-PP00025 PP Train 3 10.00 Witness Witness
34 RFI-PIP010402M-PP00024 PP Utility 09.00 Witness Witness
35 RFI-PIP010403M-PP00026 PP Utility 10.00 Witness Witness
36 RFI-CIV020701M-PP00103 PP Utility 08.15 Hold Witness
37 RFI-CIV020701M-PP00104 PP Utility 10.00 Hold Witness
38 RFI-CIV020701M-PP00105 PP Utility 10.30 Hold Witness
39 RFI-CIV020102M-PP00076 PP Utility 09.15 Witness Witness
40 RFI-CIV020102M-PP00077 PP Utility 10.00 Witness Witness
41 RFI-CIV020304M-PP00445 PP Utility 14.00 Witness Witness
42 RFI-CIV020305M-PP00433 PP Utility 15.00 Witness Witness

43 RFI-CIV020102M-PP00078 PP Train 3 14.00 Witness Witness

44 RFI-CIV020102M-PP00079 PP Train 3 15.00 Witness Witness

45 RFI-CIV021202M-PP00359 PP Train 3 13.30 Witness Surveillance

46 RFI-CIV020304M-PP00446 PP Train 3 14.00 Witness Witness

47 RFI-CIV020305M-PP00444 PP Train 3 15.00 Witness Witness

48 RFI-SST010101M-PM00001 PMM-JO TAR SHELTER MEINDO 02.00 PM Hold Witness

49 RFI-PAI010102M-PM000011 PMM-JO TAR SHELTER MEINDO 02.00 WIT Witness Witness

ONSHORE PIPELINE
50 RFI-CIV000505M-MP00283 MEINDO 08.00 WIT Review Review
( HDD)

ONSHORE PIPELINE
51 RFI-CIV010501M-MP00283 MEINDO 08.00 WIT Witness Witness
( HDD)

ONSHORE PIPELINE
52 RFI-CIV010502M-MP00283 MEINDO 08.00 WIT Witness Witness
( HDD)

ONSHORE PIPELINE
53 RFI-CIV010503M-MP00291 MEINDO 08.00 WIT Witness Witness
( HDD)

ONSHORE PIPELINE
54 RFI-WLD000401M-MP00279 MEINDO 08.00 WIT Surveillance Surveillance
( HDD)

ONSHORE PIPELINE
55 RFI-CIV010603M-MP00124 MEINDO 08.00 WIT Review Review
( HDD)

56 RFI-CIV021202M-MC00026 MEINDO ORF 10.00 WIT Witness Surveillance

57 RFI-CIV021202M-MC00027 MEINDO ORF 10.00 WIT Witness Surveillance

58 RFI-CIV021202M-MC00028 MEINDO ORF 10.00 WIT Witness Surveillance


59 RFI-CIV020304M-MC00038 MEINDO ORF 14.00 WIT Witness Witness

60 RFI-CIV020305M-MC00042 MEINDO ORF 15.00 WIT Witness Witness

61 RFI-CIV021103M-MC00013 MEINDO L03 North Part 14.00 WIT Witness Witness

62 RFI-CIV021104M-MC00016 MEINDO L03 North Part 10.00 WIT Witness Witness

63 RFI-CIV021104M-MC00017 MEINDO ORF 10.00 WIT Witness Witness

64 RFI-CIV000404M-MC00005 MEINDO ORF 10.00 WIT Hold Witness

65 RFI-CIV020102M-MB00043 MEINDO TAR SHELTER 10.00 WIT Witness Witness

66 RFI-CIV021202M-MB00061 MEINDO NEW MCB 08.00 WIT Witness Surveillance


67 RFI-CIV020304M-MB00050 MEINDO NEW MCB 08.30 WIT Witness Witness

68 RFI-CIV020305M-MB00047 MEINDO TAR SHELTER 09.00 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1092 Buma BOF Area 08.00 AM Surveillance -


2 RFI-QR-TCW-BUM-1093 Buma Company and Contractor Camp Area 14.00 PM Surveillance -
3 RFI-QR-FG-BUM-115 Buma Warehaouse Area 09.00 AM Surveillance -

4 LCI-CIV-0213-02M-1102 LCI Flare Area 09.00 WIT Witness Witness

5 LCI-CIV-0203-05M-1103 LCI Camp Access Road 10.00 WIT Witness Witness

6 LCI-CIV-0203-04M-1104 LCI Hauling Road 1 08.00 WIT Witness Witness

7 LCI-LCI-009-02M-1105 LCI Hauling Road 2 08.00 WIT Witness Witness

8 LCI-LCI-009-02M-1106 LCI Hauling Road 2 08.30 WIT Witness Witness

9 LCI-CIV-0203-04M-1107 LCI Flare Area 14.00 WIT Witness Witness


INSPECTION SCHEDULE 8-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31010/R00
Muristoni 082-WF-31019/R00 New Complete
082-WF-31102/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31010/R00
Muristoni New Complete
082-WF-31019/R00
082-WF-31102/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico 082-WF-31008/T00 New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31008/T00

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 28 Days for Main Pipe Rask Block 3 Pile Cap+PHT Line CEF A17/18/19 -
Train 3
Iwan Rahmat P.7.1 (32 Mpa) 28 Days for STG Foundation STG 1 - Utility New Complete
P.7.1 (32 Mpa) 28 Days for Paving - TAR Shelter
P.7.1 (32 Mpa) 28 Days for Bored Pile 68 - Jetty Const
P.7.1 (32 Mpa) 28 Days for Bored Pile 69 - Jetty Const
Verifycation and Visual Check
Iwan Rahmat Fine Aggregate Shipment #17 Ex. Ampana New Complete
1. Organik Impurity

Nanda Impledance test on Pile Check Integrity of concreting New Complete

Ali Anofia L01-JET2-TRESTLE-PIL-44D New Complete


Ruhyan Harahap Survey check before to proceed with driving of steel piles

Ali Anofia L01-JET2-TRESTLE-PIL-44D


Inspection and record driving steel pile : New Complete
Ruhyan Harahap Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded. (rebound)

Ali Anofia L01-JET2-TRESTLE-PIL-44D New Complete


Ruhyan Harahap Final Inspection - As built ECC Record

Ali Anofia L01-JET2-TRESTLE-PIL-44E New Postpone


Not enough time pile dri
Ruhyan Harahap Survey check before to proceed with driving of steel piles 2019

Ali Anofia L01-JET2-TRESTLE-PIL-44E Not enough time pile dri


Inspection and record driving steel pile : New Postpone
Ruhyan Harahap Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded. (rebound) 2019

Ali Anofia L01-JET2-TRESTLE-PIL-44E New Postpone


Not enough time pile dri
Ruhyan Harahap Final Inspection - As built ECC Record 2019
Transition Block Type 1 Grid 3
Ali Anofia Check and verify cutting and bending of reinforce rebar including:
 bending shape New Complete
Ruhyan Harahap  Size/length
 Packing for mobilization

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 14 New Complete
Pile No : P 6
Pile No : P 2

Check borehole after completion of drilling activities


Quantity : Piles
Yulius Pile No : P 14 New Complete
Pile No : P 6
Pile No : P 2
Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 14
Yulius New Complete
Pile No : P 6
Pile No : P 2
Check the structural concrete quality during delivery (Quantity : Piles)
Pile No : P 14
Yulius New Complete
Pile No : P 6
Pile No : P 2
Inspection during delivery fresh Structural Concrete
Ulfa New Complete
• Foudation for Fence Part 3 (36 pcs)
Inspection during delivery fresh Structural Concrete
Suyatman / Dian New Cancelled No concrete
• JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side
Finishing Inspection :
Suyatman / Dian Check completeness of Structural concrete works prior to proceed with backfilling activities New Done (actual inspection ST
•In-situ
Drainage U-Ditch
Density at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+595 HR 6 (Inside road)
/ Compaction Complete
• Backfill layer 1
Suyatman / Dian New Cancelled Not ready for tested (still c
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+595 HR 6 (Inside
road)
Inspection of Subgrade for General site preparation
Yulius New Complete
• Construction Access STA 0+100 ~ 0+140 (Pipe Rack)
In-situ Density / Compaction
Yulius New Complete
• Construction Access STA 0+100 ~ 0+140 (Pipe Rack) (PRP Test)
Final Inspection :
Inspection after concrete protective coating application for PC Box Culvert no 92 (BC1x1) at Road
Hudaya to Existing Camp
New Complete

Alfan TEP-TGH-MRR-01315- TEMPLATE FOR INTERNAL LOT 111 VESSEL New Complete

Gede Putu Check before concrete delivering/placement for pht & pile cap, axis A-7/8 PC2A New Complete

Gede Putu Check before concrete delivering/placement for pedestal, axis B-16 PC3 New Complete

Gede Putu Inspection during delivering structural concrete for pile cap, axis A-7/8 PC2A New Complete
Gede Putu Inspection during delivering structural concrete for pedestal, axis B-16 PC3 New Complete
Gede Putu Check completeness of structural works for pedestal, PC3 axis F-28 New Complete
Mico Check joint and assembly preparation pipe, Line 187-DO-31518/T00 New Complete
Mico Check heating blanket application and curing time, Line 187-DO-31518/T00 New Complete
Mico Check joint and assembly preparation pipe, Line 187-DO-31553 New Complete
Mico Check heating blanket application and curing time, Line 187-DO-31553 New Complete
Hudaya Inspection after concrete protective coating application for pile cap, Boiler A & Utility, Boiler B New Complete Pedest
Hudaya Inspection after concrete protective coating application for pile cap, STG 2 New Complete Allpile cap si
Hudaya Inspection after concrete protective coating application for pile cap, Portable Water tank New Complete Allpile cap si
Insitu Density/ Compaction test :
Novi New Complete
Inspection execution and location of test , Boiler A & Utility, Boiler B
Insitu Density/ Compaction test :
Novi New Complete
Inspection execution and location of test , STG 1
Novi Check before concrete delivering/placement for pile cap, STG 3 New Complete
Novi Inspection during delivering structural concrete for pile cap, STG 3 New Cancelled Concerete not

Insitu Density/ Compaction test :


Suyatman New Cancelled Not ready for tested (still const
Inspection execution and location of test, D/E/F-26/27

Insitu Density/ Compaction test :


Suyatman New Complete
Inspection execution and location of test, D/E/F-28/29/30

Gede Putu Check and verify cutting bending for tie beam, tie beam D-14/15 & D/E-15 & D/E-16 New Complete

Gede Putu Check before concrete delivering/placement for tie beam, tie beam D-14/15 & D/E-15 & D/E-16 New Complete

Gede Putu Inspection during delivering structural concrete for tie beam, tie beam D-14/15 & D/E-15 & D/E-16 New Complete

Daniel / Darmawan Bolts tightening inspection and testing New Complete

Hudaya Visual Inspection & DFT Final Coat New Complete CT 02 (PARTIAL TO

Ulfa Check and verify compliance with project requirement of precast piles delivered at site New Cancelled Still Under Pre

Ulfa Check before to proceed with driving of precast pile New Cancelled Still Under Pre

Pile driving inspection report


Ulfa New Cancelled Still Under Pre

Ulfa Pile Final nspection Report New Cancelled Still Under Pre

Muristoni Visual inspection of the welded joints New Cancelled Still Under Pre

Pile load test report


Ulfa New Cancelled Still Under Pre
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)
Check and verify cutting and bending of reinforce
rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization
Check and verify cutting and bending of reinforce
rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa New Complete
Document review of batch ticket
Material sampling

Inspection after Cutting:


Nanda  Check the length of PC wire New Complete
 Check the bending angle of PC wire

Finishing inspection:
 Check completeness of pile inside
Nanda reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Finishing inspection:
 Check completeness of pile inside
Ulfa reinforcement according to position and New Complete
elevation of reinforcement prior to proceed to
foundation work

Ulfa Check and verify compliance with project requirement of embedment materials New Complete

In-situ Density / Compaction Test:


Dian New Cancelled
 Inspection execution and location of test (PRP)

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Dian New Complete
- Size/length
- Packing for mobilization
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Dian New Complete
Document review of batch ticket
Material sampling
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Pouring Concrete for Slab of Pinger Pier, Section 6 at Bulk Offloading Facility New Complete
Dian Pouring Concrete for Slab of Pinger Pier, Section 6 at Bulk Offloading Facility New Complete
Dian Pouring Concrete for Slab of Pinger Pier, Section 6 at Bulk Offloading Facility New Complete

Inspection during delivery fresh Structural Concrete


Yulius • Precast Duct Bank at HR3 (2 pcs) New Complete

Inspection during delivery fresh structure Concrete


Suyatman • Joint Box (Slab Section at Camp Access Road STA 0+270 ~ 0+300 New
Complete
Field inspection: Check before concrete placement
Suyatman • JB HR 1 (Wall Sect) STA 0+210 South West side New
Complete
Inspection during delivering Concrete V-Ditch with geocell
Suyatman • Hauling Road 2 STA (South side) New
Complete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman • Hauling Road 2 STA (South side) New Cancelled No concrete

Field inspection: Check before concrete placement


Yulius • Precast Duct Bank at HR3 (2 pcs) New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Not enough time pile drive,postpone to 9 jan
2019

Not enough time pile drive,postpone to 9 jan


2019

Not enough time pile drive,postpone to 9 jan


2019
No concrete supply

Done (actual inspection STA 0+335 to STA 0+575)

Not ready for tested (still construction progress)

Pedestal
Allpile cap side wall
Allpile cap side wall
Concerete not Available

Not ready for tested (still construction progress), layer-6

CT 02 (PARTIAL TO COMPLETED)

Still Under Preparation

Still Under Preparation

Still Under Preparation

Still Under Preparation

Still Under Preparation

Still Under Preparation


REASON

REASON

No concrete supply
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-TNK010106M-AJ0001 ANTAJAYA Utility 09.00 WIT Review Review

2 RFI-TNK010105M-AJ0001 ANTAJAYA Utility 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00162 EPTCO ORF Area 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00162 EPTCO ORF Area 09.00 WIT Witness Witness

5 RFI-PIP010502M-EP00163 EPTCO Utility 07.30 WIT Witness Witness

6 RFI-PIP010503M-EP00163 EPTCO Utility 09.00 WIT Witness Witness

7 RFI-PIP010502M-EP00164 EPTCO Train 3 07.30 WIT Witness Witness

8 RFI-PIP010503M-EP00164 EPTCO Train 3 09.00 WIT Witness Witness


9 RFI-PIP010404M-EP00003 EPTCO Train 3 10.00 WIT Hold Point Hold Point

RFI-PIP010505M-EP00003
10 EPTCO Train 3 15.00 WIT Hold Point Hold Point

11 RFI-CIV-0203-06M-US00515 USI Batching Plant 15:00 Witness Witness

12 RFI-CIV-0203-06M-US00516 USI Batching Plant 15:00 Witness Witness

13 RFI-CIV-0203-06M-US00517 USI Batching Plant 15:00 Witness Witness

14 RFI-CIV-0203-06M-US00518 USI Batching Plant 15:00 Witness Witness

15 RFI-CIV-0203-06M-US00519 USI Batching Plant 15:00 Witness Witness

16 RFI-CIV020304M-MD00011 MDI Jetty Construction 09.00 AM Witness Witness

17 RFI-CIV010704M-MD00053 MDI Offshore Jetty Construction 10.00 AM Witness Witness


18 RFI-CIV010705M-MD00056 MDI Offshore Jetty Construction 10.00 AM Witness Witness

19 RFI-CIV010706M-MD00053 MDI Offshore Jetty Construction 10.00 AM Review Witness

20 RFI-CIV021202M-MD00010 MDI Jetty Construction 10.00 AM Witness Surveillance

21 RFI-CIV020305M-MD00011 MDI Jetty Construction 11.00 AM Witness Witness

22 TEP-TGH-RFI-00229 CSTS TTP SHELER 09.00 WIT Witness Witness

23 TEP-TGH-RFI-00215 CSTS NEW LAYDOWN 09.30 WIT Witness Witness

24 TEP-TGH-RFI-00230 CSTS TTP SHELER 09.00 WIT Witness Witness

25 RFI-CIV020102M-MB00044 MEINDO TAR SHELTER 10.00 WIT Witness Witness

26 RFI-CIV020304M-MC00042 MEINDO ORF 14.00 WIT Witness Witness


27 RFI-CIV020305M-MC00046 MEINDO ORF 15.00 WIT Witness Witness

ONSHORE PIPELINE
28 RFI-CIV000505M-MP00284 MEINDO 08.00 WIT Review Review
( HDD)

ONSHORE PIPELINE
29 RFI-CIV010501M-MP00284 MEINDO 08.00 WIT Witness Witness
( HDD)
ONSHORE PIPELINE
30 RFI-CIV010502M-MP00284 MEINDO 08.00 WIT Witness Witness
( HDD)
ONSHORE PIPELINE
31 RFI-CIV010503M-MP00292 MEINDO 08.00 WIT Witness Witness
( HDD)
ONSHORE PIPELINE
32 RFI-WLD000401M-MP00280 MEINDO 08.00 WIT Surveillance Surveillance
( HDD)

ONSHORE PIPELINE
33 RFI-CIV010603M-MP00125 MEINDO 08.00 WIT Review Review
( HDD)

34 RFI-SST010101M-MSS00003 MEINDO NEW MCB 09.30 WIT Witness Witness

35 RFI-SST010102M-MSS00003 MEINDO NEW MCB 09.00 WIT Witness Witness

36 RFI-CIV010401M-LC00105 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

37 RFI-CIV010402M-LC00129 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

38 RFI-CIV010403M-LC00129 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

39 RFI-CIV010404M-LC00130 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

09.00 WIT
40 RFI-CIV020305M-LC00799 LCI Landfill Witness Witness
13.30 WIT
41 RFI-CIV020304M-LC00221 LCI Hauling Road 8 10.00 WIT Witness Witness

42 RFI-CIV020305M-LC00800 LCI Hauling Road 8 10.30 WIT Witness Witness

43 RFI-CIV020305M-LC00801 LCI Hauling Road 6 09.00 WIT Witness Witness

08.00 WIT
44 RFI-CIV020102M-LC00526 LCI Hauling Road 6 09.00 WIT Witness Witness
10.00 WIT

45 RFI-CIV020307M-LC00059 LCI Hauling Road 6 08.00 WIT Witness Witness

46 RFI-CIV021304M-LC00055 LCI Hauling Road 6 08.00 WIT Witness Witness

47 RFI-CIV021101M-PP00075 PP Train 3 08.00 Surveillance Surveillance

48 RFI-CIV021102M-PP00067 PP Train 3 09.00 Surveillance Surveillance

49 RFI-CIV021103M-PP00089 PP Train 3 10.00 Witness Witness

50 RFI-CIV021104M-PP00141 PP Train 3 13.30 Witness Witness

51 RFI-CIV021104M-PP00142 PP Train 3 14.00 Witness Witness

52 RFI-CIV021104M-PP00143 PP Train 3 14.15 Witness Witness

53 RFI-CIV021202M-PP00360 PP Train 3 14.30 Witness Surveillance

54 RFI-CIV021202M-PP00361 PP Train 3 14.45 Witness Surveillance

55 RFI-CIV021202M-PP00362 PP Train 3 15:00 Witness Surveillance

56 RFI-CIV021202M-PP00363 PP Train 3 15.15 Witness Surveillance

57 RFI-CIV021202M-PP00364 PP Train 3 15.30 Witness Surveillance

58 RFI-CIV021202M-PP00365 PP Train 3 15.45 Witness Surveillance


59 RFI-PIP010403M-PP00027 PP Utility 10.00 Witness Witness
60 RFI-PIP010403M-PP00028 PP Utility 10.30 Witness Witness
61 RFI-PIP010402M-PP00025 PP Utility 09.30 Witness Witness

62 RFI-CIV020304M-PP00447 PP Train 3 13.30 Witness Witness


63 RFI-CIV020304M-PP00448 PP Train 3 13.30 Witness Witness

64 RFI-CIV020305M-PP00445 PP Train 3 14.00 Witness Witness

65 RFI-CIV021202M-PP00366 PP Train 3 08.00 Witness Surveillance

66 RFI-CIV021202M-PP00367 PP Train 3 08.30 Witness Surveillance

67 RFI-CIV020304M-PP00449 PP Train 3 09.00 Witness Witness

68 RFI-CIV020304M-PP00450 PP Train 3 09.00 Witness Witness

69 RFI-CIV020305M-PP00446 PP Train 3 10.00 Witness Witness

70 RFI-CIV020305M-PP00447 PP Train 3 10.00 Witness Witness

71 RFI-CIV020304M-PP00451 PP Train 3 16.15 Witness Witness

72 RFI-CIV020305M-PP00448 PP Train 3 16.45 Witness Witness

73 RFI-CIV020101M-PP000232 PP Train 3 07.30 Witness Witness

74 RFI-CIV020101M-PP000233 PP Train 3 07.45 Witness Witness

75 RFI-CIV020303M-PP000248 PP Train 3 08.00 Surveillance Surveillance

76 RFI-CIV020303M-PP000249 PP Train 3 08.30 Surveillance Surveillance

77 RFI-CIV020102M-PP00073 PP Utility 08.30 Witness Surveillance


78 RFI-CIV020102M-PP00080 PP Utility 15.00 Witness Surveillance

79 RFI-CIV020102M-PP00081 PP Train 3 10.00 Witness Surveillance

80 RFI-CIV020102M-PP00082 PP Train 3 10.00 Witness Surveillance

81 RFI-CIV020304M-PP00452 PP Utility 10.00 Witness Witness

82 RFI-CIV020305M-PP00449 PP Utility 14.00 Witness Witness

83 RFI-CIV020701M-PP00106 PP Utility 09.15 Hold Point Witness


84 RFI-PIP010402M-PP00026 PP Train 3 10.00 Witness Witness

85 RFI-CIV020701M-PP00107 PP Train 3 09.30 Hold Point Witness

86 RFI-CIV020701M-PP00108 PP Utility 10 Hold Point Witness

87 RFI-PIP010403M-PP00029 PP Train 3 14.00 Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-BSB-BUM-015 BUMA Buma Laydown Area 08.00 AM Witness


2 RFI-QR-TCW-BUM-1094 Buma Batching Plant Area 09.00 AM Surveillance -
3 RFI-QR-TCW-BUM-1095 Buma Company and Contractor Camp Area 14.30 PM Surveillance -

4 RFI-QR-BSB-BUM-016 Buma Subcontractor Camp-1 14.00 PM Surveillance -

5 RFI-QR-BPF-BUM-00157 Buma Batching Plant Area 09.00 AM Surveillance -


6 RFI-TEP-1150102-H03-001B-1.2H-0302 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed -
7 RFI-TEP-1150102-H03-001B-1.2E-0303 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed -
8 RFI-TEP-1150102-H03-001B-1.2E-0304 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed -
9 RFI-TEP-1150102-H03-001B-1.2H-0305 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed -

10 LCI-LCI-009-01M-1108 LCI Hauling Road 2 08.00 WIT Witness N/A

11 LCI-LCI-009-02M-1109 LCI Hauling Road 2 08.15 WIT Witness N/A

12 LCI-CIV-0201-02M-1110 LCI Train 3 12.00 WIT Witness N/A

13 LCI-LCI-009-02M-1111 LCI Hauling Road 1 08.15 WIT Witness N/A

14 LCI-CIV-0201-01M-1112 LCI Utility 16.00 WIT Witness N/A

15 LCI-CIV-0201-02M-1113 LCI Utility 16.30 WIT Witness N/A

16 IKM-TEP5500-QAC-MEL-RFI-426 IKM WASHING HOUSE(SC2) 07.00 Witness N/A

17 IKM-TEP5500-QAC-MEL-RFI-427 IKM WASHING HOUSE(SC2) 08.00 Witness N/A


18 IKM-TEP5500-QAC-MEL-RFI-428 IKM LAUNDRY(SC2) 13.30 Witness N/A

19 IKM-TEP5500-QAC-MEL-RFI-429 IKM LAUNDRY(SC2) 14.30 Witness N/A


20 IKM-TEP5500-QAC-MEL-RFI-430 IKM LAUNDRY(SC2) 13.00 Witness N/A
INSPECTION SCHEDULE 9-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Verification of the site delivered fabrication material (qty and Type) and Visual according to
Dafid New Complete
Drawing and Review IRN (Annular Plate Desalinated Tank, Qty 12 Sheets)

Welding Material Check: ( Calibration validity of welding machine, Availibility of functioning


Muristoni New Cancelled Not Ready for I
quivers, Topography instrument)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31003/R00
Muristoni 082-WF-31011/R00 New Complete
082-WF-31019/R00
082-WF-31575/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31003/R00
Muristoni 082-WF-31011/R00 New Complete
082-WF-31019/R00
082-WF-31575/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Muristoni 082-WF-31771/U00 New Complete
082-WF-31120/U00

Visual Inspection of Butt Fusion Welding For Line Number :


Muristoni 082-WF-31771/U00 New Complete
082-WF-31120/U00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico New Complete
082-WF-31008/T00

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31008/T00
Inspection before pressure test :
Mico - Pre-test punch listing New Complete
- Release for pressure test

Mico Piping pressure testing New Complete

Test Sample Cylinder : Type


3Tr (32 Mpa) 28 Days for Coloum Table Top MR c/6 Axis A6 -Train 3
3Tr (32 Mpa) 28 Days for Coloum LCR - Train 3
3Tr (32 Mpa) 28 Days for Pedestal Main Pipe Rask (093-PRK-31001) PC-3A Axis A11/12- Train 3
Iwan Rahmat/ Felix Sirait 3Tr (32 Mpa) 28 Days for Bored Pile (093-PRK-31001-T03-35) - Train 3
New Complete
3Tr (32 Mpa) 28 Days for Main Pipe Rask Pile Cap + PHT C.17/18/19 - Train 3
3Tr (32 Mpa) 28 Days for Pile Cap (053-SHL-31001 A/B) PCI Compressor Shelter B/B1 - Train 3

3Tr (32 Mpa) 28 Days for Bored Pile P74/P70 - Jetty Const
Iwan Rahmat/ Felix Sirait 3Tr (32 Mpa) 28 Days for Paving - TAR Shelter New Complete
3Tr (32 Mpa) 28 Days for Slab Control Box 6 and 7 Slab - Landfill

Iwan Rahmat/ Felix Sirait PAKCRETE (35 Mpa) 28 Days for Transition Block Type 1/2 Grid Line 2 + Pocket Slab - Jetty Const New Complete
P.7.1 (32 Mpa) 7 Days for Bored Pile P36 - Jetty Const
P.7.1 (32 Mpa) 7 Days for PC3L 093-PRK-31002 D9/10/11+PHT E9/10/11 - Train 3
P.7.1 (32 Mpa) 7 Days for Boiler A P1/P3/P50/P2 - Utility
Iwan Rahmat/ Felix Sirait New Complete
P.4.1 (21 Mpa) 7 Days for Wall Section STA 0+60~0+100 Right Side - HR 8
P.7.1 (32 Mpa) 7 Days for Bored Pile P32 - Flare HR 8
P.4.1(32
3Tr (21Mpa)
Mpa)7 7Days
Daysfor
forPile
Slab Drainage
Cap STA 0+202 - HR 8TB-03/04 B-02/03 B/C03 B02/03 - ORF
017-PLF-31001-PC-B03
Iwan Rahmat/ Felix Sirait New Complete

Pocket Slab Grid 3 to Grid 4


Field inspection: Check before concrete delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and horizontal levels
 steel bars
Ali Anofia  anchor bolts New Complete
Ruhyan Harahap  embedment, pockets, holes, joints, chamfer, mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Ali Anofia L01-JET2-TRESTLE-PIL-44E & LP42 New Complete


Ruhyan Harahap Survey check before to proceed with driving of steel piles
L01-JET2-TRESTLE-PIL-44E & LP42
Ali Anofia Inspection and record driving steel pile : New Complete
Ruhyan Harahap Check and record the blows number necessary to reach: set per 10 blow and drop height of ram to be recorded.
(rebound)

Ali Anofia L01-JET2-TRESTLE-PIL-44E & LP42 New Complete


Ruhyan Harahap Final Inspection - As built ECC Record

Ali Anofia Ca New Complete


Ruhyan Harahap

Pocket Slab Grid 3 to Grid 4


Inspection during delivering fresh structural concrete:
Ali Anofia Check the concrete quality during delivery New Complete
Ruhyan Harahap Document review of batch ticket
Material sampling

TEP-TGH-MRR-01342-Type "H"-1 Diameter -1 Length 655mm ASTM A 193/A 193m High Strength
Alfan New
Alloy Steel Achor Bolts

Dafid TEP-TGH-MRR-01311-SS Pack -E (Plate) New Complete

Dafid TEP-TGH-MRR-01346C-THINNER FOR STRUCTURE New Complete

Field inspection: Check before concrete


In-situ Density / Compaction Test:
delivery/placement:
Dian  Inspection execution and location of test (PRP) New Cancelled Due To R
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Ulfa New Cancelled No concrete
Document review of batch ticket
Material sampling

Ulfa Check and verify compliance with project requirement of precast piles delivered at site New Complete

Ulfa Check before to proceed with driving of precast pile New Complete

Ulfa Pile driving inspection report New Complete

Ulfa Pile Final nspection Report New Complete

Muristoni Visual inspection of the welded joints New Complete

Pile load test report


Ulfa New Complete
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)

Daniel / Darmawan Bolt tightening inspection and testing (Demonstration bolt pre tensioning) New Complete

Daniel / Darmawan Bolt tightening inspection and testing (Demonstration bolt pre tensioning) New Rejected

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Check borehole after completion of drilling activities


Quantity : Piles
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Foudation for Fence Part 3 (36 pcs)
Field Inspection before Concrete Placement
Suyatman New Complete
• U-Ditch for Hauling Road 8 STA 0+100 ~0+127 (Wall section), Left side
Inspection during delivery fresh Structural Concrete
Suyatman New Complete
• U-Ditch for Hauling Road 8 STA 0+100 ~0+127 (Wall section), Left side
Inspection during delivery fresh Structural Concrete
Suyatman New Cancelled No concrete
• JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side
In-situ Density / Compaction
Suyatman • Backfill layer 1,2,3 New Complete Done (actual inspection STA
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+575 HR 6 (Inside road)
Finishing Inspection :
Suyatman Check completeness of Structural concrete works prior to proceed with backfilling activities New Complete
• Drainage U-Ditch at Hauling Road 6, Left side, STA 2+575~ 2+595 HR 6 (Inside road)
Finishing Inspection Precast:
Suyatman Check completeness of structural concrete works and check the ID & Date marking New Complete
•Precast Box Culvert BC 1X1

Gede Putu Release confirmation of pile : Check and verify coordinate of pile, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub New Complete
Piperack 31006)

Gede Putu Release confirmation of pile : Check and verify coordinate of pile, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub New Complete
Piperack 31006)

Gede Putu Check the length and bending of pc wire, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub Piperack 31006) New Complete

Gede Putu Check completeness of Pile inside reinforcement, axis E-1 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check completeness of Pile inside reinforcement, axis E-3 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check completeness of Pile inside reinforcement, axis F-1 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for PHT, axis E-1 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for PHT, axis E-3 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for PHT, axis F-1 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for Pile Cap, axis E-1 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for Pile Cap, axis E-3 PC1 (Sub Piperack 31006) New Complete

Gede Putu Check and verify cutting bending for Pile Cap, axis F-1 PC1 (Sub Piperack 31006) New Complete
Mico Check heating blanket application and curing time, Line 187-DO-31553/U00 New Complete
Mico Check heating blanket application and curing time, Line 187-DO-31528/T00 New Complete
Mico Check joint and assembly preparation pipe, Line 187-DO-31528/T00 New Complete

Gede Putu Check before concrete delivering/placement for pht, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub Piperack 31006) New Complete
Gede Putu Check before concrete delivering/placement for pile cap, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub Piperack New Complete
31006)

Gede Putu Inspection during delivering structural concrete for pile cap, axis E-1 PC1 & E-3 PC1 & F-1 PC1A (Sub Piperack New Complete
31006)

Gede Putu Check and verify cutting bending for tie beam, tie beam A/B-11 -16 New Complete

Gede Putu Check and verify cutting bending for tie beam, tie beam B/C-14 & B/C-15 & A-13 & A-15 New Complete

Gede Putu Check before concrete delivering/placement for tie beam, tie beam A/B-11 -16 New Complete

Gede Putu Check before concrete delivering/placement for tie beam, tie beam B/C-14 & B/C-15 & A-13 & A-15 New Complete

Gede Putu Inspection during delivering structural concrete for tie beam, tie beam A/B-11 -16 New Complete

Gede Putu Inspection during delivering structural concrete for tie beam, tie beam B/C-14 & B/C-15 & A-13 & A-15 New Complete

Gede Putu Check before concrete delivering/placement for pht & pile cap, axis E/F-2 PC3A (Sub piperack 31006) New Complete

Gede Putu Inspection during delivering structural concrete for Pile Cap, axis E/F-2 PC3A (Sub piperack 31006) New Complete

Gede Putu Inspection of subgrade and grade layer before laying fill material , FHVS PR New Complete

Gede Putu Inspection of subgrade and grade layer before laying fill material , OMH-8 New Cancelled Area water p

Gede Putu Inspection during delivering fresh lean concrete, FHVS PR New Complete

Gede Putu Inspection during delivering fresh lean concrete, OMH-8 New Cancelled Area water p

Novi Insitu Density/ Compaction test : New Complete


Inspection execution and location of test , Boiler A & Utility, Boiler B
Novi Insitu Density/ Compaction test : New Cancelled Area Not R
Inspection execution and location of test , STG 2
Gede Putu Insitu Density/ Compaction test : New Cancelled Material Sti
Inspection execution and location of test , D/E/F-26/27

Gede Putu Insitu Density/ Compaction test : New Complete


Inspection execution and location of test , D/E/F-28/29/30

Novi Check before concrete delivering/placement for pile cap, STG 3 New Complete

Novi Inspection during delivering structural concrete for Pile Cap, STG 3 New Complete

Hudaya Inspection after concrete protective coating application for pile cap, Boiler A & Utility, Boiler B New Complete Floor Boiler
Mico Check joint and assembly preparation pipe, Line 187-DO-31517/T00 New Complete

Hudaya Inspection after concrete protective coating application for Pedestal E28,E29,F28 New Complete

Hudaya Inspection after concrete protective coating application for Pile cap Floor and Pedestal New Complete

Mico Check heating blanket application and curing time, Line 187-DO-31517/T00 New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dafid Material Receiving inspection of sandiwich Panel For Bottling Station Material New Complete
Dian Pouring Concrete for Slab of Mobile Silo New Complete
Dian Compaction for Gravel of Parking Area New Complete
Pouring Concrete for Pedestal of Shelter Foundation of Bottling Station Building (Storage Capacity 1644
Dian Gallons),Section 2 New Complete

Dian Pouring Concrete for Bundwall of Cement Shelter Foundation, Section 4 New Complete
Yatmico Bolt Tightening New Complete
Yatmico Box Up New Complete
Yatmico Box Up New Continue
Yatmico Bolt Tightening New Continue
Pre Pour Installation V-Ditch with geocell
Suyatman • Hauling Road 2 STA 0+900~1+000 (South side) New Cancelled Double

Inspection during delivering Concrete V-Ditch with geocell


Suyatman • Hauling Road 2 STA 0+900~1+000 (South side) New Complete Done (actual concreting STA

In-situ Density / Compaction Test (PLT) For SI 1145


Gede Putu • Point 1 New Complete

Inspection during delivering Fresh Structure Concrete


Suyatman • JB HR 1 (Wall Sect) STA 0+210 South West side New Cancelled No concrete

Inspection of Subgrade layer before laying fill material


Suyatman • Crane mat, Utility Point 1 New Cancelled Wet soil condition doe

In-situ Density / Compaction Test (Field CBR test)


Suyatman • Crane mat, Utility Point 1 New Cancelled Wet soil condition doe

Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : MEGGER PP WH PANEL New Complete

Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : MEGGER SDP New Cancelled Not IKM S
Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : MEGGER PP AC New Complete

Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : MEGGER PP LAUNDRY New Complete
Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : MEGGER SDP New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

Not Ready for Inspection


Due To Rain
No concrete supply

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No concrete supply
No concrete supply

Done (actual inspection STA 0+335 to STA 0+595)


Area water ponding

Area water ponding


Area Not Ready

Material Still Wet

Floor Boiler A Only


REASON

REASON

Double RFI

Done (actual concreting STA 0+900 to STA 0+920)

No concrete supply

Wet soil condition doe to rainy last night

Wet soil condition doe to rainy last night

Not IKM Scope


DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00521 USI Batching Plant 15:00 Witness Witness

2 RFI-CIV-0203-06M-US00522 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV-0203-06M-US00523 USI Batching Plant 15:00 Witness Witness


4 RFI-CIV020304M-MB00051 MEINDO LCR-03 09.00 WIT Witness Witness

5 RFI-CIV020305M-MB00049 MEINDO LCR-03 10.00 WIT Witness Witness

6 RFI-CIV020304M-MB00052 MEINDO NEW MCB 09.00 WIT Witness Witness

7 RFI-CIV020305M-MB00050 MEINDO NEW MCB 10.00 WIT Witness Witness

8 RFI-CIV020102M-MB00045 MEINDO NEW MCB 10.00 WIT Witness Witness

9 RFI-CIV020102M-MB00046 MEINDO TAR SHELTER 10.00 WIT Witness Witness

10 RFI-CIV021101M-MC00022 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

11 RFI-CIV021102M-MC00019 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

12 RFI-CIV020101M-MC00027 MEINDO L03 North Part 14.00 WIT Witness Witness

13 RFI-CIV020101M-MC00028 MEINDO L03 North Part 14.00 WIT Witness Witness

14 RFI-CIV020303M-MC00048 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

15 RFI-CIV020303M-MC00049 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance


16 RFI-CIV020304M-MC00043 MEINDO L03 North Part 14.00 WIT Witness Witness

17 RFI-CIV020304M-MC00044 MEINDO L03 North Part 14.00 WIT Witness Witness

18 RFI-CIV021104M-MC00018 MEINDO L03 North Part 14.00 WIT Witness Witness

20 RFI-CIV020305M-MC00047 MEINDO ORF 14.00 WIT Witness Witness

21 RFI-CIV020304M-MD00012 MDI Jetty Construction 09.00 AM Witness Witness


22 RFI-PAI010202M-MD00011 MDI Jetty Construction 02.30 PM Witness Witness

23 RFI-PAI010205M-MD00010 MDI Jetty Construction 02.30 PM Review Review

24 RFI-CIV020304M-MD00013 MDI Jetty Construction 03.00 PM Witness Witness

25 RFI-PIP010502M-EP00165 EPTCO ORF Area 07.30 WIT Witness Witness

26 RFI-PIP010503M-EP00165 EPTCO ORF Area 09.00 WIT Witness Witness

27 RFI-PIP010502M-EP00166 EPTCO Utility 07.30 WIT Witness Witness

28 RFI-PIP010503M-EP00166 EPTCO Utility 09.00 WIT Witness Witness

29 RFI-CIV010403M-MP00015 MEINDO BOG 14.00 WIT Witness Witness

ONSHORE PIPELINE
30 RFI-CIV000505M-MP00285 MEINDO 08.00 WIT Review Review
( HDD)
ONSHORE PIPELINE
31 RFI-CIV010501M-MP00285 MEINDO 08.00 WIT Witness Witness
( HDD)
ONSHORE PIPELINE
32 RFI-CIV010502M-MP00285 MEINDO 08.00 WIT Witness Witness
( HDD)
ONSHORE PIPELINE
33 RFI-CIV010503M-MP00294 MEINDO 08.00 WIT Witness Witness
( HDD)

ONSHORE PIPELINE
34 RFI-WLD000401M-MP00281 MEINDO 08.00 WIT Surveillance Surveillance
( HDD)

ONSHORE PIPELINE
35 RFI-CIV010603M-MP00126 MEINDO 08.00 WIT Review Review
( HDD)

36 TEP-TGH-RFI-00226 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

37 RFI-CIV000101M-GT00001 GTA Matoa Sport Hall 08.30 WIT Review Review

38 RFI-PAI010101M-PM00008 PMMJO LAYDOWN AREA 09.30 AM Witness Surveillance

39 RFI-WLD000603M-PM00006 PMMJO TAR SHELTER MEINDO 10.00 AM Surveillance Surveillance

40 RFI-WLD000604M-PM00009 PMMJO TAR SHELTER MEINDO 10.00 AM Review Review

41 RFI-CIV020307M-PP00089 PP Train 3 09.30 Witness Witness

42 RFI-CIV020307M-PP00090 PP Train 3 14.00 Witness Witness

43 RFI-CIV021202M-PP00370 PP Train 3 09.00 Witness Surveillance

44 RFI-CIV020304M-PP00455 PP Train 3 13.30 Witness Witness

45 RFI-CIV020305M-PP00452 PP Train 3 14.00 Witness Witness

46 RFI-CIV021202M-PP00371 PP Train 3 08.00 Witness Surveillance


47 RFI-CIV020304M-PP00456 PP Train 3 08.30 Witness Witness

48 RFI-CIV020305M-PP00453 PP Train 3 09.00 Witness Witness

49 RFI-CIV020701M-PP00109 PP Utility 14.00 Hold Witness

50 RFI-CIV021202M-PP00372 PP Utility 08.30 Witness Witness

51 RFI-CIV020102M-PP00083 PP Utility 09.30 Witness Witness

52 RFI-CIV020102M-PP00084 PP Train 3 09.30 Witness Witness

53 RFI-PIP010402M-PP00027 PP Utility 09.00 Witness Witness

54 RFI-PIP010403M-PP00030 PP Utility 09.30 Witness Witness

55 RFI-PIP010403M-PP00031 PP Utility 10.00 Witness Witness

56 RFI-CIV010401M-LC00106 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

57 RFI-CIV010402M-LC00130 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

58 RFI-CIV010403M-LC00130 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness
59 RFI-CIV010404M-LC00131 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

09.00 WIT
60 RFI-CIV020305M-LC00802 LCI Landfill 13.30 WIT Witness Witness

61 RFI-CIV020305M-LC00803 LCI Hauling Road 6 09.00 WIT Witness Witness

10.00 WIT
62 RFI-CIV020102M-LC00527 LCI Hauling Road 6 15.00 WIT Witness Witness

63 RFI-CIV020304M-LC00222 LCI Hauling Road 6 09.00 WIT Witness Witness

64 RFI-CIV020305M-LC00804 LCI Hauling Road 6 09.30 WIT Witness Witness

65 RFI-CIV020101M-LC00503 LCI Hauling Road 6 15.00 WIT Witness Witness


66 RFI-CIV020304M-MB00046 MEINDO ORF 08.30 WIT Witness Witness

67 RFI-CIV020305M-MB00048 MEINDO OFR 09.00 WIT Witness Witness

68 RFI-CIV020701M-PP00111 PP Train 3 15.00 WIT Hold Witness

69 RFI-CIV020303M-LC00377 LCI Hauling Road 6 15.30 WIT Surveillance Surveillance


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1096 Buma CWAA 09.00 AM Surveillance -


2 RFI-QR-TCW-BUM-1097 Buma Sub Contractor Camp 1 14.00 PM Surveillance -
3 RFI-QR-TCW-BUM-1098 Buma Sub Contractor Camp 1 14.00 PM Surveillance -
4 RFI-TEP-1150102-H03-001A-5F-0306 PT.Baharu Penta Kencana Construction Camp 08:00 WIT Witnessed -

5 LCI-CIV-0201-01M-1114 LCI Hauling Road 2 08.00 WIT Witness N/A

6 LCI-CIV-0203-03M-1115 LCI Hauling Road 2 08.30 WIT Witness N/A

7 LCI-CIV-0203-05M-1116 LCI Hauling Road 1 08.45 WIT Witness N/A

8 LCI-LCI-009-02M-1117 LCI Hauling Road 2 08.45 WIT Witness N/A

9 LCI-CIV-0201-02M-1118 LCI Train 3 12.00 WIT Witness N/A

10 LCI-CIV-0201-01M-1119 LCI Utility 16.00 WIT Witness N/A

11 LCI-CIV-0201-02M-1120 LCI Utility 16.30 WIT Witness N/A


INSPECTION SCHEDULE 10-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


3Tr (32 Mpa) 28 Days for Wall Foundation - New MCB
3Tr (32 Mpa) 28 Days for Bored Pile P62/P66 - Jetty Const
3Tr (32 Mpa) 28 Days for Fire Boiler B Pedestal P53 - Utility
Iwan Rahmat/ Felix Sirait 3Tr (32 Mpa) 28 Days for Fire Boiler A Pedestal P18/P19/P31 - Utility
New Complete
3Tr (32 Mpa) 28 Days for Pile Cap PC5 017-PRK-31002 - ORF
3Tr (32 Mpa) 28 Days for Amine Closed Drain Drum 023-D-31007 -Train 3

3Tr (32 Mpa) 28 Days for Main Pipe Rask PC3-F28/29/30 - Train 3
MD2 (21 Mpa) 7 Days for Wall Section STA 2+660~2+635 - HR 6
Iwan Rahmat/ Felix Sirait 3Tr (32 Mpa) 7Days for Joint Box Culvert STA 2+610 - HR 6 New Complete
MD2 (21 Mpa) 7 Days for Slab Drainage STA 0+100~0+150 Left - HR 8 (Flare)
3Tr (32 Mpa) 7 Days for Pedestal Boiler A P4 - Utility

3Tr (32 Mpa) 7 Days for 093-PRK-31001 PC1 C10 PHT A,B,C/10 Pile Cap - Train 3
Iwan Rahmat/ Felix Sirait New Complete
3Tr (32 Mpa) 7 Days for 093-PRK-31001 PC2 C7/8 Pile Cap - Train 3
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Nanda  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Field inspection:
Inspection duringCheck before
delivering concrete
fresh structural concrete:
delivery/placement:
Check the concrete quality during delivery
Nanda  poured lean concrete status New Complete
Document review of batch ticket
 formwork
Material & reinforcement vertical and
sampling
horizontal levels
 steel bars
Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc. during delivering fresh structural concrete:
Inspection
 quantity,
Check diameter/size,
the concrete qualityshape
during delivery
Dian  locations(Coordinates/elevation) New Cancelled No concrete
Document review of batch ticket
 concrete
Material cover thickness
sampling
 etc.
In-situ Density / Compaction Test:
Dian New Complete
 Inspection execution and location of test (Sand Cone)

In-situ Density / Compaction Test:


Dian New Cancelled
 Inspection execution and location of test (PRP)

Nanda Check and verify coordinate of pile New Cancelled

Nanda Check marking point for Pile crushing level New Cancelled Due To r

Nanda Inspection for subgrade and grade layer before laying fill material New Cancelled Due To r

Nanda Inspection for subgrade and grade layer before laying fill material New Cancelled Due To r

Inspection during delivering fresh lean concrete :


Nanda New Cancelled Due To r
-Check the lean concrete quality during delivery

Inspection during delivering fresh lean concrete :


Nanda New Cancelled Due To r
-Check the lean concrete quality during delivery
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Nanda  anchor bolts New Cancelled Due To r
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.inspection: Check before concrete
Field
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Nanda  anchor bolts New Cancelled Due To r
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Finishing inspection:
 Check completeness of pile inside
Nanda reinforcement according to position and New Cancelled Due To r
elevation of reinforcement prior to proceed to
foundation work

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa New Complete
Document review of batch ticket
Material sampling

Trasition Block Type I Grid 3


Field inspection: Check before concrete delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and horizontal levels
 steel bars
Ali Anofia
 anchor bolts New Complete
Ruhyan Harahap  embedment, pockets, holes, joints, chamfer, mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Ali Anofia L01-JET2-TRESTLE-PIL-N3E & L01-JET2-TRESTLE-PIL-N3E New Complete
Ruhyan Harahap Measurement of dry film thickness

Ali Anofia L01-JET2-TRESTLE-PIL-N3E & L01-JET2-TRESTLE-PIL-N3E New Complete


Ruhyan Harahap Final Painting Release Report

Trasition Block Type II Grid 3


Field inspection: Check before concrete delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and horizontal levels
 steel bars
Ali Anofia  anchor bolts New Complete
Ruhyan Harahap
 embedment, pockets, holes, joints, chamfer, mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31019/R00
Muristoni New Complete
082-WF-31102/R00
082-WF-31049/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31019/R00
Muristoni New Complete
082-WF-31102/R00
082-WF-31049/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico 082-WF-31771/U00 New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Mico 082-WF-31771/U00 New Complete

Check before reinforcing cage & structural concrete


Nanda New Complete
placement

Ulfa Check and verify compliance with project requirement of precast piles delivered at site New Complete

Ulfa Check before to proceed with driving of precast pile New Complete

Pile driving inspection report


Ulfa New Complete
Ulfa Pile Final nspection Report New Complete

Miuristoni Visual inspection of the welded joints New Complete

Pile load test report


Ulfa New Complete
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)

Alfan / Dafid TEP-TGH-MMR-01321-Steel Pipe New Complete

Rahmat Check & Verify Topographic Instrument Certificate (Auto Level) New Complete

Witness ( W )
Hudaya Checking of Painting application: New Cancelled Embeded Plate Defec
- Surface preparation & primer application

Surveillance ( S )
Daniel / Darmawan Visual Inspection of the welded joints : New Complete
- Weld Profile

Review ( R )
Muristoni Execution of NDT on Welded Joints and Results Evaluation New Complete
(After Buttering)

Gede Putu Check completeness of structural works for pedestal (surface only), PC3 axis F-29 & F-30 & D-28/29/30 New Complete

Gede Putu Check completeness of structural works for pile cap, Table Top MR New Complete

Gede Putu Check and verify cutting bending for pile cap, axis D-7/8 PC2D New Complete

Gede Putu Check before concrete delivering/placement for pile cap, axis D-7/8 PC2D New Complete

Gede Putu Inspection during delivering structural concrete for pile cap, axis D-7/8 PC2D New Cancelled Due to Concrete P

Gede Putu Check and verify cutting bending for tie beam , tie beam B/C-17 & B/C-18 & New Complete
Gede Putu Check before concrete delivering/placement for tie beam, tie beam B/C-17 & B/C-18 & New Complete

Gede Putu Inspection during delivering structural concrete for tie beam, tie beam B/C-17 & B/C-18 & New Complete

Hudaya Inspection after concrete protective coating application for pile cap, Boiler A & Utility, Boiler B New Cancelled Job Not Ready Yet (Mor

Novi Check and verify cutting bending for rebar pedestal, Portable water tank New Complete

Novi Insitu Density/ Compaction test : New Cancelled Area Not R


Inspection execution and location of test , Boiler A & Utility, Boiler B

Gede Putu Insitu Density/ Compaction test : New Cancelled Material too wet, due
Inspection execution and location of test , D/E/F-28/29

Mico Check joint and assembly preparation pipe, Line 187-DC-31528/U00 New Complete

Mico Check heating blanket application and curing time, Line 187-DC-31528/U00 New Complete

Mico Check heating blanket application and curing time, Line 187-DC-31553/U00 New Complete

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Check borehole after completion of drilling activities


Quantity : Piles
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12
Check the structural concrete quality during delivery (Quantity : Piles)
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12

Inspection during delivery fresh Structural Concrete


Ulfa • Foudation for Fence Part 3 (36 pcs) New Cancelled No concrete

Inspection during delivery fresh Structural Concrete


Suyatman • JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side New Cancelled No concrete

In-situ Density / Compaction


Suyatman • Backfill layer 2,3 New Cancelled Wet soil condition d
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+575 HR 6 (Inside road)

Field Inspection before Concrete Placement


Suyatman • U-Ditch for Hauling Road 6 STA 2+580 ~2+600 (Wall section), Right side New Complete

Inspection during delivery fresh Structural Concrete


Suyatman • U-Ditch for Hauling Road 6 STA 2+580 ~2+600 (Wall section), Right side New Complete

Inspection of Subgrade for General site preparation


Suyatman • Box Culvert No.96 Hauling Road 6 STA 2+610~0+640, left side New Complete
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Ulfa Complete
Document review of batch ticket
Material sampling

Inspection After concrete protective coating application for pile cap D22,E22,D23,E23,E23,F23 AND TIE BEAM D-
Hudaya Complete
22/23&E22/23

Inspection during delivery Lean Concrete


Suyatman • Join Box From drainage Hauling Road 6 STA 2+640 to Drainage Hauling Road 8 STA 0+320 New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Excavation Inspection of V-Ditch New Complete


Dian Pouring Concrete of Sewage Manhole SMH9 New Complete
Dian Pouring Concrete Precast of SMP 30009 New Complete
Yatmiko Service Test New Complete

Inspection of subgrade for General site preparation


Suyatman • PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07) New Complete

Inspection during delivery fresh Lean concrete


Suyatman • PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07) New Complete

Inspection during delivering Fresh Structure Concrete


Suyatman • JB HR 1 (Wall Sect) STA 0+210 South West side New Complete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman • Hauling Road 2 STA 0+920~1+000 (South side) New Complete

In-situ Density / Compaction Test (PLT) For SI 1145


• Point
Gede Putu New Complete

Inspection of Subgrade layer before laying fill material


• Crane mat, Utility Point 1
Novi New Cancelled Area Have much Wa

In-situ Density / Compaction Test (Field CBR test)


• Crane mat, Utility Point 1
Novi New Cancelled Area Too Wet / Much W
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
No concrete supply

Due To rain

Due To rain

Due To rain

Due To rain

Due To rain
Due To rain

Due To rain

Due To rain
Embeded Plate Defect To Be Rectified

Due to Concrete Pump matter


Job Not Ready Yet (More repair Reqnred )

Area Not Raedy

Material too wet, due to rain last night

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue


No Activites Due to Safety Stand Down issue

No concrete supply

No concrete supply

Wet soil condition doe to rainy day


REASON

REASON

Area Have much Water Cause Rain

Area Too Wet / Much Water Cause Rain


DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010502M-EP00167 EPTCO ORF Area 07.30 WIT Witness Witness

2 RFI-PIP010503M-EP00167 EPTCO ORF Area 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00168 EPTCO Utility 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00168 EPTCO Utility 09.00 WIT Witness Witness

5 RFI-CIV000101M-AJ00001 ANTAJAYA Office Area / Utility Area 09.00 WIT Review Review

6 RFI-TNK010105M-AJ00002 ANTAJAYA Office Area / Utility Area 10.00 WIT Witness Witness

7 RFI-CIV021101M-MC00023 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

8 RFI-CIV021102M-MC00020 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

9 RFI-CIV020101M-MC00030 MEINDO L03 North Part 14.00 WIT Witness Witness

10 RFI-CIV020101M-MC00031 MEINDO L03 North Part 14.00 WIT Witness Witness


11 RFI-CIV020303M-MC00050 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

12 RFI-CIV020303M-MC00051 MEINDO L03 North Part 14.00 WIT Surveillance Surveillance

13 RFI-CIV020304M-MC00047 MEINDO L03 North Part 14.00 WIT Witness Witness

14 RFI-CIV020304M-MC00048 MEINDO L03 North Part 14.00 WIT Witness Witness

15 RFI-CIV021104M-MC00019 MEINDO L03 North Part 14.00 WIT Witness Witness

16 RFI-CIV020102M-MB00047 MEINDO TAR SHELTER 10.00 WIT Witness Witness

17 RFI-CIV020401M-MB00003 MEINDO TAR SHELTER 09.00 WIT Witness Witness

18 RFI-SST0101-01M-MB00001 MEINDO TAR SHELTER 09.00 WIT Witness Witness

19 RFI---- --M-MB00001 MEINDO TAR SHELTER 09.00 WIT Witness Witness

ONSHORE PIPELINE
20 RFI-CIV000505M-MP00286 MEINDO ( HDD) 08.00 WIT Review Review

ONSHORE PIPELINE
21 RFI-CIV010501M-MP00286 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
22 RFI-CIV010502M-MP00286 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
23 RFI-CIV010503M-MP00295 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
24 RFI-WLD000401M-MP00282 MEINDO ( HDD) 08.00 WIT Surveillance Surveillance

25 RFI-CIV020305M-MB00051 MEINDO NEW MCB 10.00 WIT Witness Witness

26 RFI-CIV-0203-06M-US00524 USI Batching Plant 15:00 Witness Witness

27 RFI-CIV-0203-06M-US00525 USI Batching Plant 15:00 Witness Witness

28 RFI-WLD000304M-MD00001 MDI Jetty Construction 08.00 AM Review Review

29 RFI-CIV010704M-MD00054 MDI Offshore Jetty Construction 09.00 AM Witness Witness

30 RFI-CIV010705M-MD00057 MDI Offshore Jetty Construction 09.00 AM Witness Witness


31 RFI-CIV010706M-MD00054 MDI Offshore Jetty Construction 09.00 AM Review Review

32 RFI-CIV010703M-MD00033 MDI Offshore Jetty Construction 01.00 PM Witness Witness

33 RFI-CIV020305M-MD00012 MDI Jetty Construction 02.00 PM Witness Witness

34 RFI-CIV010401M-LC00107 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

35 RFI-CIV010402M-LC00131 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

36 RFI-CIV010403M-LC00131 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

37 RFI-CIV010404M-LC00132 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

09.00 WIT
38 RFI-CIV020305M-LC00805 LCI Landfill 13.30 WIT Witness Witness

39 RFI-CIV020305M-LC00806 LCI 09.00 WIT Witness Witness


Hauling Road 6
10.00 WIT
40 RFI-CIV020102M-LC00528 LCI 15.00 WIT Witness Witness
Hauling Road 6

41 RFI-CIV020304M-LC00223 LCI 08.00 WIT Witness Witness


Hauling Road 8

42 RFI-CIV020305M-LC00807 LCI 08.30 WIT Witness Witness


Hauling Road 8

43 RFI-CIV020307M-LC00060 LCI 09.00 WIT Witness Witness


Hauling Road 8

44 RFI-CIV000409M-LC00071 LCI 08.00 WIT Witness Witness

LCI Office

45 RFI-CIV020304M-LC00224 LCI Witness Witness


Landfill 09.30 WIT

46 RFI-CIV020305M-LC00808 LCI Witness Witness


Landfill 10.00 WIT

47 RFI-CIV020304M-PP00457 PT PP Train 3, axis E-7/8 PC2B 08.00 WITNESS/HOLDPOINT WITNESS

48 RFI-CIV020305M-PP00454 PT PP Train 3, axis E-7/8 PC2B 09.00 WITNESS/HOLDPOINT WITNESS

49 RFI-CIV020701M-PP00110 PT PP Train 3, Table Top MR 10.00 HOLDPOINT WITNESS

Train 3, axis D-23 PC1 & E-23 PC1 & F-


50 RFI-CIV020701M-PP00111 PT PP 23/24/25 PC3G 10.30 HOLDPOINT WITNESS

51 RFI-CIV021104M-PP00144 PT PP Train 3, axis E-12/13 PC2 13.3 WITNESS WITNESS


52 RFI-CIV021202M-PP00373 PT PP Train 3, axis E-12/13 PC2 14.00 WITNESS SURVEILLANCE

53 RFI-CIV020304M-PP00458 PT PP Train 3, axis E-12/13 PC2 14.30 WITNESS/HOLDPOINT WITNESS

54 RFI-CIV020305M-PP00455 PT PP Train 3, axis E-12/13 PC2 15.00 WITNESS/HOLDPOINT WITNESS

55 RFI-CIV021101M-PP00076 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 09.00 SURVEILLANCE SURVEILLANCE

56 RFI-CIV021102M-PP00068 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 09.30 SURVEILLANCE SURVEILLANCE

57 RFI-CIV021103M-PP00090 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 10.00 WITNESS WITNESS

58 RFI-CIV021104M-PP00145 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 10.15 WITNESS WITNESS

59 RFI-CIV021202M-PP00374 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 10.30 WITNESS SURVEILLANCE

60 RFI-CIV020304M-PP00459 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 14.00 WITNESS/HOLDPOINT WITNESS

61 RFI-CIV020305M-PP00456 PT PP Train 3, axis A-3 PC1 (Sub Piperack 31006) 14.30 WITNESS/HOLDPOINT WITNESS

62 RFI-CIV020304M-PP00460 PT PP Train 3, axis B-17 PC3E 13.30 WITNESS/HOLDPOINT WITNESS

63 RFI-CIV020305M-PP00457 PT PP Train 3, axis B-17 PC3E 14.00 WITNESS/HOLDPOINT WITNESS

Train 3, PC3A axis D-28/29 & PC3 axis E-


64 RFI-CIV020102M-PP00085 PT PP 15.00 WITNESS WITNESS
28/29 & PC3 axis F-28/29

65 RFI-PIP010402M-PP00028 PT PP Train 3, Line 187-DO-31517/T00 09.00 WITNESS SURVEILLANCE

66 RFI-PIP010403M-PP00032 PT PP Train 3, Line 187-DO-31517/T00 13.00 WITNESS SURVEILLANCE

67 RFI-CIV020701M-PP00112 PT PP Utility, Boiler A 14.00 HOLDPOINT WITNESS

68 RFI-CIV020701M-PP00113 PT PP Utility, Boiler B 15.00 HOLDPOINT WITNESS

69 RFI-CIV021104M-PP00146 PT PP Utility, Boiler A & B 08.30 WITNESS WITNESS

70 RFI-PIP010402M-PP00029 PT PP Utility, Line 187-DC-31526/U00 09.00 WITNESS SURVEILLANCE


71 RFI-PIP010403M-PP00033 PT PP Utility, Line 187-DC-31526/U00 10.00 WITNESS SURVEILLANCE
72 RFI-CIV020102M-PP00086 PT PP Utility, Boiler A & B 09.30 WITNESS WITNESS

73 RFI-PAI010101M-PM00008 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Surveillance

74 RFI-WLD000601M-PM00007 PMM-JO TAR SHELTER (MEINDO) 09.00 WIT Surveillance Surveillance


75 RFI-WLD000603M-PM00007 PMMJO TAR SHELTER MEINDO 10.00 AM Surveillance Surveillance

76 RFI-WLD000604M-PM00010 PMMJO TAR SHELTER MEINDO 09.00 AM Review Review


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-TEP-1150102-H03-001A-5F-0307 PT.Baharu Penta Kencana New Warehouse 08:00 WIT Witnessed -

2 LCI-CIV-0201-01M-1121 LCI Utility 16.00 WIT Witness N/A

3 LCI-CIV-0201-02M-1122 LCI Utility 16.30 WIT Witness N/A

4 LCI-LCI-009-02M-1123 LCI Hauling Road 2 08.00 WIT Witness N/A

5 LCI-CIV-0201-01M-1124 LCI Hauling Road 2 08.00 WIT Witness N/A

6 LCI-CIV-0203-03M-1125 LCI Hauling Road 2 08.30 WIT Witness N/A

7 IKM-TEP5500-QAC-MEL-RFI-192 IKM Accomodation Type -E14 (5500POB) -SC 2 07.00 WIT Witness N/A

8 IKM-TEP5500-QAC-MEL-RFI-392 IKM Accomodation Type -E14 (5500POB) -SC 2 08.00 WIT Witness N/A
INSPECTION SCHEDULE 11-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31020/R00
Muristoni New Complete
082-WF-31023/R00
082-WF-31036/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31020/R00
Muristoni New Complete
082-WF-31023/R00
082-WF-31036/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico New Complete
082-WF-31771/U00

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31771/U00

Dian Check and Verify Topographic Instrument certificates before Topographic Works ( Auto Level ) New Complete

Darmawan Welding ROD ESAB & LINCOLN Dia 2.5 x 350mm and E7018 Dia 3.2 x 350mm New Complete

Nanda Check and verify coordinate of pile New Complete

Nanda Check marking point for Pile crushing level New Complete

Nanda Inspection for subgrade and grade layer before laying fill material New Cancelled
Because o

Nanda Inspection for subgrade and grade layer before laying fill material New Cancelled Because o
Inspection during delivering fresh lean concrete :
Nanda New Cancelled
-Check the lean concrete
Field inspection: quality
Check before during delivery
concrete Because o
delivery/placement:
 poured lean
Inspection concrete
during status
delivering fresh lean concrete :
Nanda  formwork
-Check the & reinforcement
lean concrete vertical
quality anddelivery
during New Complete
Field inspection: Check before concrete
horizontal levels
delivery/placement:

 steel
poured bars
lean concrete status
Nanda  anchor
 formwork bolts
& reinforcement vertical and New Cancelled
 embedment, Because o
horizontal levelspockets, holes, joints, chamfer,
mesh,
 steel etc.
bars
Nanda 
 quantity,
anchor boltsdiameter/size, shape New Complete
 locations(Coordinates/elevation)
Finishing
embedment, pockets, holes, joints, chamfer,
 concrete inspection:
cover thickness
mesh,
 etc.
 Check
 etc. completeness
quantity,
of pile inside
diameter/size,
Nanda reinforcement according toshape
position and New Cancelled
 locations(Coordinates/elevation)
elevation of reinforcement prior to proceed to Because o
 concrete cover
foundation work thickness
 etc. Density / Compaction Test:
In-situ
Dian Main Item grouting:
 Inspection Checks
execution before delivery
and location &
of test (PRP) New Cancelled Wet Soil Con
placement of mixed grout:
 status of chipped & soaked prepared
Dian foundation New Cancelled Not Rea
 surface under erected base plate or equipment,
formwork vertical & horizontal levels, joints,
Daniel shape
Bolts tightening inspection and testing New No confirmatin

Grout Pouring record


Dian  Batch daily recording of total grout poured and New Cancelled Not Rea
items traceability.

Ulfa Check and verify compliance with project requirement of precast piles delivered at site New Complete

Ulfa Check before to proceed with driving of precast pile New Complete

Pile driving inspection report


Ulfa New Complete

Ulfa Pile Final nspection Report New Complete

Muristoni Visual inspection of the welded joints New Complete

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Dian Document review of batch ticket New Complete
Material sampling
Test Sample Cylinder : Type
P.4.1 (21 Mpa) 7 Days for Slab Drainage STA 2+610~2+640 - HR 6
P.7.1 (32 Mpa) 7 Days for Bored PIleP22/P18 - Jetty Const ( Kali Kabora)
P.7.1 (32 Mpa) 7 Days for KO Drum Tie Beam (186-PRK-31009) K/L/M-07 PH+PC+TB - Train 3
Iwan Rahmat/ Felix Sirait P.4.1 (21 Mpa) 7 Days for Bored Pile T03-036 - Train 3
New Complete
P.7.1 (32 Mpa)
Test Sample 7 Days: for
Cylinder Pedestal Block 5 (093-PRK-31002 Pedestal PC3 E28 F29) - Train 3
Type
Compressor
P.4.1 (21 Mpa) 7 Days for Slab - HR 8 Shelter Filter House and Support PHT - Train 3
P.4.1 (21 Mpa) 28 Days forPaving - TAR Shelter
P.4.1 (21 Mpa) 28 Days for Slab V Ditch - AR 7
Iwan Rahmat/ Felix Sirait P.7.1 (32 Mpa) 28 Days for Fire Boiler 2 Foundation - Utility New Complete
P.7.1 (32 Mpa) 28 Days for Bored Pile P 56/P60 - Jetty Const
P.7.1 (32 Mpa) 28 Days for Pedestal Boiler A - Utility
Ali Anofia Lincoln CS Electronics & Denki New Complete
Ruhyan Harahap Welding consumable certificates review and storage handling control.

Ali Anofia L01-JET2-TRESTLE-PIL-44G & LP42 New Complete


Ruhyan Harahap Survey check before to proceed with driving of steel piles
L01-JET2-TRESTLE-PIL-44G & LP42
Ali Anofia Inspection and record driving steel pile : New Complete
Ruhyan Harahap Check and record the blows number necessary to reach:
 set per 10 blow and drop height of ram to be recorded. (rebound)
Ali Anofia L01-JET2-TRESTLE-PIL-44G & LP42
Final Inspection – As built ECC Record New Complete
Ruhyan Harahap Check & Verify compliance between AFC Dwgs and As Built datum (horizontal and vertical displacement, etc)
Ali Anofia L01-JET2-TRESTLE-PIL-44G
PDA test of pile  New Complete
Ruhyan Harahap Acceptance testsType
carried
Transition Block 1 &out on piles
2 Grid 3 randomly selected after construction
Ali Anofia Inspection during delivering fresh structural concrete:
Check
Surveythe concrete
report beforequality duringwith
to proceed delivery
driving steel casing/drilling activities New Complete
Ruhyan Harahap Document review of batch ticket
Quantity
Check : Pile
borehole after completion of drilling activities
Material
Pile No : Psampling
Quantity : 8 Piles
Yulius Pile
Pile No
No :: P
P42 New Cancelled No Activites Due to Safet
Pile
Pile No
No :: P
P 12
8
Pile No : P 4
Yulius Pile Nobefore
Check : P 12 reinforcing cage and structural concrete placement of bore pile (Quantity : Piles) New Cancelled No Activites Due to Safet
Pile No : P 2
Pile No : P 8
Yulius Pile
CheckNothe
: P structural
4 concrete quality during delivery (Quantity : Piles) New Cancelled No Activites Due to Safet
Pile
Pile No
No :: P
P 12
2
Pile No : P 8
Yulius Pile No : P 4 New Cancelled No Activites Due to Safet
Pile No : P 12

Inspection during delivery fresh Structural Concrete


Ulfa • Foudation for Fence Part 3 (36 pcs) New Cancelled due to no concr

Suyatman Inspection during delivery fresh Structural Concrete New Cancelled Full Water
• JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side
In-situ Density / Compaction
Suyatman • Backfill layer 2,3 New Complete
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+575 HR 6 (Inside road)

Suyatman Field Inspection before Concrete Placement New Complete


• U-Ditch for Hauling Road 8 STA 0+040 ~0+067 (Wall section), Left side

Suyatman Inspection during delivery fresh Structural Concrete New Complete


•U-Ditch for Hauling Road 8 STA 0+040 ~0+067 (Wall section), Left side
Finishing Inspection :
Suyatman Check completeness of Structural concrete works prior to proceed with backfilling activities New Complete
• U-Ditch for Hauling Road 8 STA 0+067 ~0+100 Left side

Dafid New Complete


Check and verify compliance with Project Requirements other civil material used in the Project before shipping
• Manhole Cover (Cast iron heavy duty) dia 600 mm ASTM A48 Grade 35 from vendor PT. Antasan Bersama (8 pcs)

Ulfa Field Inspection before Concrete Placement New Complete


• Tie Beam of Fence (part 2)

Ulfa Inspection during delivery fresh Structural Concrete New Cancelled due to no concr
• Tie Beam of Fence (part 2)

Gede Putu Check before concrete delivering/placement for pile cap New Complete

Gede Putu Inspection during delivering structural concrete for pile cap New Complete

Water ponding due to rain la


Hudaya Inspection after concrete protective coating application for pile cap New Cancelled Inspection ) Dewat

Hudaya Inspection after concrete protective coating application for pile cap New Complete

Gede Putu Check completeness of Pile inside reinforcement New Complete


Gede Putu Check and verify cutting bending for pile cap New Complete

Gede Putu Check before concrete delivering/placement for pile cap New Complete

Gede Putu Inspection during delivering structural concrete for pile cap New Complete

Gede Putu Release confirmation of pile : Check and verify coordinate of pile New Complete

Gede Putu Inspection before cutting: Check marking point for pile crushing level New Complete

Gede Putu Check the length and bending of pc wire New Complete

Gede Putu Check completeness of Pile inside reinforcement New Complete

Gede Putu Check and verify cutting bending for Pile Cap & PHT New Complete

Gede Putu Check before concrete delivering/placement for PHT & pile cap New Complete

Gede Putu Inspection during delivering structural concrete for pile cap New Complete

Gede Putu Check before concrete delivering/placement for pedestal New Complete

Gede Putu Inspection during delivering structural concrete for pedestal New Complete

Insitu Density/ Compaction test :


Gede Putu New Complete
Inspection execution and location of test

Mico Check joint and assembly preparation pipe New Complete

Mico Check heating blanket application and curing time New Complete

Water ponding due to rain la


Hudaya Inspection after concrete protective coating application for pile cap New Cancelled Inspection ) Dewat

Water ponding due to rain la


Hudaya Inspection after concrete protective coating application for pile cap New Cancelled Inspection ) Dewat

Area Not ready for inspection /


Novi Check completeness of Pile inside reinforcement New Cancelled night

Mico Check joint and assembly preparation pipe New Complete


Mico Check heating blanket application and curing time New Complete
Insitu Density/ Compaction test : Area Not ready for inspection /
Novi New Cancelled
Inspection execution and location of test night

Witness ( W )
Hudaya Checking of Painting application: New Complete RF7(COLUMN2&1
- Surface preparation & primer application

Fit-up and preparation Inspection of the to be welded joints :


Daniel/ Darmawan New Complete
-Fit Up (root gap , alignment cleanliness , etc)
Surveillance ( S )
Daniel Visual Inspection of the welded joints : New No confirmatin
- Weld Profile

Review ( R )
Muristoni Execution of NDT on Welded Joints and Results Evaluation
New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Yatmiko Pneumatic Test of Fuel Oil piping New Complete

Inspection of Subgrade layer before laying fill material Area Not ready for inspection /
Novi • Crane mat, Utility Point New Cancelled night
In-situ Density / Compaction Test (Field CBR test) Area Not ready for inspection /
Novi • Crane mat, Utility Point New Cancelled night
Inspection during delivering Concrete V-Ditch with geocell
Suyatman • Hauling Road 2 STA 0+940~1+000 (South side) New Complete

Inspection of subgrade for General site preparation


Suyatman • PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07) New Complete

Inspection during delivery fresh Lean concrete


Suyatman • PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07) New Complete

Abdul Gani Inspecttion and checks before energizing the Installation : Earth Resistance New Complete

Abdul Gani Inspecttion and checks before energizing the Installation : Section C New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

Because of rain

Because of rain
Because of rain

Because of rain

Because of rain

Wet Soil Condition

Not Ready

No confirmatin by QC csts

Not Ready
No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

due to no concrete supply

Full Water doe

due to no concrete supply

Water ponding due to rain last night (No Access For


Inspection ) Dewatering Full Day
Water ponding due to rain last night (No Access For
Inspection ) Dewatering Full Day

Water ponding due to rain last night (No Access For


Inspection ) Dewatering Full Day

Area Not ready for inspection / full water cause rain last
night

Area Not ready for inspection / full water cause rain last
night

RF7(COLUMN2&11) Continue
No confirmatin by QC csts
REASON

REASON

Area Not ready for inspection / full water cause rain last
night
Area Not ready for inspection / full water cause rain last
night
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00526 USI Batching Plant 15:00 Witness Witness

2 RFI-CIV-0203-06M-US00527 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV-0004-01M-US00193 USI Batching Plant 09:00 Witness Witness

4 RFI-CIV000405M-AJ00001 ANTAJAYA Utility 10.00 WIT Witness Witness

5 RFI-PIP010502M-EP00169 EPTCO ORF Area 07.30 WIT Witness Witness

6 RFI-PIP010503M-EP00169 EPTCO ORF Area 09.00 WIT Witness Witness

7 RFI-PIP010502M-EP00170 EPTCO Utility 07.30 WIT Witness Witness

8 RFI-PIP010503M-EP00170 EPTCO Utility 09.00 WIT Witness Witness


9 RFI-CIV010703M-MD00034 MDI Offshore Jetty Construction 09.00 AM Witness Witness

10 RFI-CIV010704M-MD00055 MDI Offshore Jetty Construction 09.00 AM Witness Witness

11 RFI-CIV010705M-MD00058 MDI Offshore Jetty Construction 09.00 AM Witness Witness

12 RFI-CIV010706M-MD00055 MDI Offshore Jetty Construction 09.00 AM Review Review

13 RFI-CIV020307M-MD00008 MDI Jetty Construction 10.00 AM Review Review

14 RFI-CIV020401M-MD00006 MDI Jetty Construction 04.00 PM Witness Witness

15 RFI-CIV021402M-MD00020 MDI Jetty Construction 02.00 PM Witness Surveillance

16 RFI-WLD000301M-MD00006 MDI Jetty Construction 08.00 AM Review Review

17 RFI-CIV000102M-MP0008 MEINDO BOG 09.00 WIT Hold Review


ONSHORE PIPELINE
18 RFI-CIV000505M-MP00287 MEINDO ( HDD) 08.00 WIT Review Review

ONSHORE PIPELINE
19 RFI-CIV010501M-MP00287 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
20 RFI-CIV010502M-MP00287 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
21 RFI-CIV010503M-MP00296 MEINDO ( HDD) 08.00 WIT Witness Witness

ONSHORE PIPELINE
22 RFI-WLD000401M-MP00283 MEINDO ( HDD) 08.00 WIT Surveillance Surveillance

23 RFI-CIV000102M-MP0009 MEINDO ORF 10.00 WIT Hold Review

24 RFI-CIV021103M-MC00014 MEINDO ORF 09.00 WIT Witness Witness

25 RFI-CIV020307M-MC00004 MEINDO ORF 09.00 WIT Hold Witness

26 RFI-CIV000404M-MC00006 MEINDO L03 North Part 10.00 WIT Hold Witness


27 RFI-CIV020401M-MB00004 MEINDO TAR SHELTER 09.00 WIT Witness Witness

28 RFI-SST0101-01M-MS00002 MEINDO TAR SHELTER 09.00 WIT Witness Witness

29 RFI-SST0101-02M-MS00001 MEINDO TAR SHELTER 09.00 WIT Surveillance Surveillance

30 RFI-CIV021202M-MB00063 MEINDO NEW MCB 09.00 WIT Witness Surveillance

31 RFI-CIV010401M-LC00108 LCI Pipe and Access to Jetty Area Witness Witness

07.30 WIT

32 RFI-CIV010402M-LC00132 LCI Pipe and Access to Jetty Area Witness Witness

07.45 WIT

33 RFI-CIV010403M-LC00132 LCI Pipe and Access to Jetty Area Witness Witness

08.15 WIT

34 RFI-CIV010404M-LC00133 LCI Pipe and Access to Jetty Area Witness Witness

08.30 WIT

35 RFI-CIV020304M-LC00225 LCI Pipe and Access to Jetty Area 10.00 WIT Witness Witness

09.00 WIT
36 RFI-CIV020305M-LC00809 LCI Witness Witness
13.30 WIT
Landfill

37 RFI-CIV020305M-LC00810 LCI Witness Witness

Landfill 10.00 WIT


38 RFI-CIV020305M-LC00811 LCI Witness Witness

Hauling Road 6 09.00 WIT

39 RFI-CIV020102M-LC00529 LCI Witness Witness


10.00 WIT
Hauling Road 6 15.00 WIT

40 RFI-CIV020304M-LC00226 LCI Witness Witness

Hauling Road 6 08.00 WIT

41 RFI-CIV020305M-LC00812 LCI Witness Witness

Hauling Road 6 09.00 WIT

42 RFI-CIV020307M-LC00061 LCI Witness Witness

Hauling Road 8 09.00 WIT

43 RFI-SST010101M-PM00002 PMMJO TRAIN 3 MODULE 4 08.30 AM Witness Surveillance

44 RFI-PAI010101M-PM00010 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Surveillance

45 RFI-PAI010102M-PM00012 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Witness

46 RFI-PAI010102M-PM00013 PMMJO TAR SHELTER MEINDO 02.00 PM Witness Witness

47 RFI-PAI010102M-PM00014 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Witness

48 RFI-PAI010102M-PM00015 PMMJO TAR SHELTER MEINDO 02.00 PM Witness Witness


49 RFI-CIV021202M-PP00375 PT PP Train 3, axis A-17 PC3B 10.00 WITNESS SURVEILLANCE

50 RFI-CIV020304M-PP00461 PT PP Train 3, axis A-17 PC3B 09.00 WITNESS/HOLDPOINT WITNESS

51 RFI-CIV020305M-PP00458 PT PP Train 3, axis A-17 PC3B 10.00 WITNESS/HOLDPOINT WITNESS

52 RFI-PIP010403M-PP00034 PT PP Utility, Line 187-DC-31528/U00 08.00 WITNESS SURVEILLANCE

53 RFI-PIP010405M-PP00002 PT PP Utility, Line 187-DO-31571/T00 15.00 HOLDPOINT HOLDPOINT

54 RFI-CIV000404M-PP00011 PT PP Utility, LCR B-13 - B-16 14.00 HOLDPOINT WITNESS

55 RFI-CIV000404M-PP00009 PT PP Utility, LCR A-13 - B-16 14.00 HOLDPOINT WITNESS

56 RFI-CIV000404M-PP00010 PT PP Utility, LCR B-8 - B-12 14.00 HOLDPOINT WITNESS

57 RFI-CIV000404M-PP00008 PT PP Utility, LCR A-8 - A-12 14.00 HOLDPOINT WITNESS

58 RFI-CIV020307M-PP00091 PT PP Utility, Boiler A & B 08.30 HOLDPOINT WITNESS

59 RFI-CIV020701M-PP00115 PT PP Utility, Boiler A & B 16.00 HOLDPOINT WITNESS

60 RFI-CIV020701M-PP00116 PT PP Train 3, axis F/E/D-28/29/30 15.00 HOLDPOINT WITNESS


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1099 BUMA BOF Area 08.00 AM Witness

Kitchen Area
2 RFI-TEP-1168784-H03-0002-1B-0312 PT. BPK Genset Station SC-2 8:00 Witness

Kitchen Area
3 RFI-TEP-1168784-H03-0002-1B-0313 PT. BPK Genset Station SC-2 9:00 Witness

4 RFI-TEP-1150102-H03-001A-4D.1-0308 PT.Baharu Penta Kencana BOF 08:00 WIT Witnessed -

5 RFI-QR-TCW-BUM-1100 Buma Construction Camp Area 09.00 AM Surveillance -

6 LCI-LCI-009-02M-1126 LCI Hauling Road 2 08.00 WIT Witness N/A

7 LCI-CIV-0201-02M-1127 LCI Train 3 10.30 WIT Witness N/A

8 LCI-CIV-0203-03M-1128 LCI Hauling Road 2 08.30 WIT Witness N/A

9 LCI-CIV-0201-01M-1129 LCI Access Road 3 14.30 WIT Witness N/A

10 LCI-CIV-0201-02M-1130 LCI Access Road 3 15.30 WIT Witness N/A

11 IKM-TEP5500-QAC-MEL-RFI-424 IKM Accommodation Type-Kitchen Dining (5500POB) - SC 2 8.00 Witness N/A

12 IKM-TEP5500-QAC-MEL-RFI-425 IKM Accommodation Type-Kitchen Dining (5500POB) - SC 2 10.00 Witness N/A


INSPECTION SCHEDULE 12-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.4.1 (21 Mpa) 7 Days for Slab Drainage STA 0+190~0+130 - HR 7
P.7.1 (32 Mpa) 7 Days for Pedestal PC2 Block 5 - Train 3
Iwan Rahmat/ Felix Sirait P.4.1 (21 Mpa) 7 Days for Wall Drainage STA 0+300~0+369 - HR 8 New Complete
P.7.1 (32 Mpa) 7 Days for Bored Pile P 24 - Jetty Const
P.4.1 (21 Mpa) 28 Days for TAR Shelter - New MCB

Test Sample Cylinder : Type


Iwan Rahmat/ Felix Sirait New Complete
PACKRETE (35 Mpa) 7 Days for Transition Block Type 7/8 Gird 1 Pocket Slab Type 1/1C - Ex. Wika Workshop

Verifycation and Visual Check


Iwan Rahmat/ Felix Sirait New Complete
Coarse Aggregate Shipment #4 PT CBSP

Dafid / Alfan Check and Verfy compliance with project requirement for the grout to be used and trhe related material New Cancelled Materail Is Not Ready to insp

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Muristoni 082-WF-31020/R00 New Complete
082-WF-31036/R00

Visual Inspection of Butt Fusion Welding For Line Number :


Muristoni 082-WF-31020/R00 New Complete
082-WF-31036/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico New Complete
082-WF-31771/U00

Visual Inspection of Butt Fusion Welding For Line Number :


Mico New Complete
082-WF-31771/U00
Ali Anofia LP43
PDA test of pile  New Complete
Ruhyan Harahap Acceptance tests carried out on piles randomly selected after construction

Ali Anofia LP43 & LP44 New Complete


Ruhyan Harahap Survey check before to proceed with driving of steel piles

LP43 & LP44


Ali Anofia Inspection and record driving steel pile : New Complete
Ruhyan Harahap Check and record the blows number necessary to reach:
 set per 10 blow and drop height of ram to be recorded. (rebound)

Ali Anofia LP43 & LP44


Final Inspection – As built ECC Record New Complete
Ruhyan Harahap Check & Verify compliance between AFC Dwgs and As Built datum (horizontal and vertical displacement, etc)

Transition Block Type 1 & 2 Grid 3


Ali Anofia Finishing Inspection: New On Going
Ruhyan Harahap Check completeness of structural concrete works prior to
proceed with backfilling activities for all item’s foundation

Grouting BB Type 1 Grid 4


Main Item grouting: Checks before delivery & placement of mixed grout
Ali Anofia  status of chipped & soaked prepared foundation New Complete
Ruhyan Harahap  surface under erected base plate or equipment, formwork vertical & horizontal levels, joints, shape,
 clearance between base plate and foundation top, chamfers, etc.
 Cement Material for grouting

Precast Road Slab Grid 3


Inspection on Precast Installation
Ali Anofia Check Position of Precast: Horizontal, vertical and Elevation New Complete
Ruhyan Harahap Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection

Ali Anofia Welder List - Haerudin New Complete


Ruhyan Harahap Review of Subcontractor welder qualification.

Check & verify Project Bench Marks before


Nanda commencement of the Project works. New Complete
Ulfa Check and verify compliance with project requirement of precast piles delivered at site New Complete

Ulfa Check before to proceed with driving of precast pile New Complete

Pile driving inspection report


Ulfa New Complete

Ulfa Pile Final nspection Report New Complete

Muristoni Visual inspection of the welded joints New Complete

Check & verify Project Bench Marks before


Ulfa commencement of the Project works. New Complete

Inspection after Cutting:


Ulfa  Check the length of PC wire New Complete
 Check the bending angle of PC wire

Finishing Inspection:
Ulfa Check completeness of structural concrete works prior to New Complete
proceed with backfilling activities for all item’s foundation

Nanda Check and verify compliance with project requirement of embedment materials New Complete
Main Item grouting: Checks before delivery &
placement of mixed grout:
 status of chipped & soaked prepared
Dian foundation New Complete
 surface under erected base plate or equipment,
formwork vertical & horizontal levels, joints,
shape

Darmwan / Daniel Bolts tightening inspection and testing New Cancelled Not Rea

Darmwan / Daniel Inspection of Main Structure Installation New Cancelled Not Rea

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Dian - Size/length New Complete
- Packing for mobilization

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 8 New Complete
Pile Noborehole
Check :P4 after completion of drilling activities
Pile No : P 12
Quantity : Piles
Pile No : P 2
Pile No : P 8
Yulius Pile No : P 4 New Cancelled No Activites Due to Safet
Pile No : P 12

Check before reinforcing cage and structural concrete placement of bore pile (Quantity : Piles)
Pile No : P 2
Yulius Pile No : P 8 New Cancelled No Activites Due to Safet
Pile No : P 4
Pile No : P 12
Check the structural
Field Inspection concrete
before quality
Concrete during (Part
Placement delivery
10 (Quantity
) : Piles)
•Pile
PileNoNo: P: 2 Type
Yulius Pile
• PileNoNo: P: 8 Type New Cancelled No Activites Due to Safet
•Pile
PileNoNo: P: 4 Type
Pile
• PileNoNo: P: 12 Type
• Pile No : Type
• Pile No : Type
Yulius • Pile No : Type New Complete
• Pile No : Type

Ulfa New Complete


Inspection during delivery fresh Structural Concrete
• Foudation for Fence Part 3 (36 pcs)

Ulfa New Cancelled No concrete


Inspection during delivery fresh Structural Concrete
• Tie Beam of Fence (part 2)
Suyatman New Cancelled No concrete
Inspection
In-situ during
Density delivery fresh Structural Concrete
/ Compaction
• JB
Backfill layer 2,3 Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side
Box Culvert at
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+590 HR 6 (Inside
road)
Suyatman • Backfill layer 3,4 New Cancelled No concrete
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR 6 (Inside
road)

Suyatman New Complete


Field Inspection before Concrete Placement
• U-Ditch for Hauling Road 6 STA 2+640 radius 2+700 (Wall section), Right side

Suyatman New Complete


Inspection during delivery fresh Structural Concrete
• U-Ditch for Hauling Road 6 STA 2+640 radius 2+700 (Wall section), Right side

Suyatman Finishing Inspection : New Complete


Check completeness of Structural concrete works prior to proceed with backfilling activities
• Drainage U-Ditch at Hauling Road 8, Right side, STA 0+300~ 0+369 HR 8 (Inside road)

Daniel Bolts tightening inspection and testing New Cancelled The mockup isn

Equipment:
- Whirling Hygrometer (SN: FJ093380)
Hudaya Witness ( W ) New Complete
Checking of Painting application:
- Surface preparation & primer application

Witness ( W )
Hudaya DFT Check for primary coat New Complete

Witness ( W )
Hudaya DFT Check for Intermediate Coat New Complete

Witness ( W )
Hudaya DFT Check for primary coat New Cancelled Primer Paint S

Witness ( W )
Hudaya DFT Check for Intermediate Coat New Cancelled Job Not St
Gede Putu Check and verify cutting bending for Pedestal New Complete

Gede Putu Check before concrete delivering/placement for Pedestal New Complete

Gede Putu Inspection during delivering structural concrete for Pedestal New Complete

Mico Check heating blanket application and curing time New Cancelled Not Rea

Mico Piping pressure test New Cancelled Not Rea

Novi Check and verify compliance with project requirement of embedment material (anchor bolt) New Complete

Novi Check and verify compliance with project requirement of embedment material (anchor bolt) New Complete

Novi Check and verify compliance with project requirement of embedment material (anchor bolt) New Complete

Novi Check and verify compliance with project requirement of embedment material (anchor bolt) New Complete

Novi Check completeness of structural concrete works New Complete

Hudaya Inspection after concrete protective coating application for pile cap New Cancelled Coating Not y

Hudaya Inspection after concrete protective coating application for pile cap New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dafid Receiving Material Inspection for Gravel New Complete

Yatmiko Visual Inspection check of Switchgear Installation New Complete

Yatmiko Insulation Resistance and Continuity test of cable New Complete

Yatmiko/ Gani Visual Check of Fire Water Installation on Asphalt Mixed Plant New Complete

Dian Compaction Inspection for Acces Road Zone 14,16,17,18,45 & 48 New Complete
Inspection during delivering Concrete V-Ditch with geocell
Suyatman New Complete
• Hauling Road 2 STA 0+960~1+000 (South side)

In-situ Density / Compaction Test (PLT) For SI 1145


Gede Putu New Complete
• Point
Inspection during delivery fresh Lean concrete
• PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)
Suyatman New Complete

Inspection of Subgrade layer before laying fill material


Iwan New Complete
• Access Road 3, STA 1+400 ~ 1+500
In-situ Density / Compaction Test (Field CBR test)
Iwan New Complete
• Access Road 3, STA 1+400 ~ 1+500

Yatmiko/ Gani Inspections and checks before energizing the electrical installation : Insulation & Contuinity Test PP3 New Complete

Yatmiko/ Gani Inspections and checks before energizing the electrical installation : Insulation & Contuinity Test PPAC2 New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)

Materail Is Not Ready to inspect still at the container


Not Ready

Not Ready

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No Activites Due to Safety Stand Down issue

No concrete supply
No concrete supply

No concrete supply

The mockup isn't finished

Primer Paint Still Wet

Job Not Started


Not Ready

Not Ready

Coating Not yet Done


REASON

REASON
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010502M-EP00171 EPTCO ORF Area 07.30 WIT Witness Witness

2 RFI-PIP010503M-EP00171 EPTCO ORF Area 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00172 EPTCO Utility 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00172 EPTCO Utility 09.00 WIT Witness Witness

5 RFI-PIP010504M-EP00003 EPTCO Train 3 08.00 WIT Witness Witness

6 RFI-CIV-0203-06M-US00528 USI Batching Plant 15:00 Witness Witness

7 RFI-CIV030901M-MB00006 MEINDO NEW MCB 09.00 WIT Witness Witness

8 RFI-CIV010401M-LC00109 LCI Pipe and Access to Jetty Area Witness Witness


07.30 WIT
9 RFI-CIV010402M-LC00133 LCI Pipe and Access to Jetty Area Witness Witness

07.45 WIT

10 RFI-CIV010403M-LC00133 LCI Pipe and Access to Jetty Area Witness Witness

08.15 WIT

11 RFI-CIV010404M-LC00134 LCI Pipe and Access to Jetty Area Witness Witness

08.30 WIT

09.00 WIT
12 RFI-CIV020305M-LC00813 LCI Landfill Witness Witness
14.00 WIT

13 RFI-CIV020305M-LC00814 LCI Witness Witness

Landfill 10.00 WIT

14 RFI-CIV020701M-LC00094 LCI Hauling Road 6 09.00 WIT Witness Witness

15 RFI-CIV020102M-LC00530 LCI Train 3 10.00 WIT Witness Witness

16 RFI-CIV020305M-LC00815 LCI Hauling Road 6 09.00 WIT Witness Witness


17 RFI-CIV020102M-LC00531 LCI Hauling Road 6 Witness Witness
09.00 WIT

15.00 WIT

18 RFI-CIV020101M-LC00504 LCI Pipe and Access to Jetty Area Witness Witness


15.30 WIT
19 RFI-CIV020102M-LC00532 LCI Pipe and Access to Jetty Area Witness Witness
16.00 WIT
20 RFI-CIV020102M-PP00087 PT PP Train 3, Axis D-E-F 28/29/30 10.00 WITNESS WITNESS

21 RFI-CIV020701M-PP00117 PT PP Train 3, Table Top MR 14.00 HOLDPOINT WITNESS

22 RFI-CIV021202M-PP00376 PT PP Train 3, Table Top MR C1-C2-C3 10.00 WITNESS SURVEILLANCE

23 RFI-CIV021202M-PP00377 PT PP Train 3 AXIS B-B'4-9 10.30 WITNESS SURVEILLANCE

24 RFI-CIV021202M-PP00378 PT PP Train 3, axis B 7/8/9 PC4 14.00 WITNESS SURVEILLANCE

25 RFI-CIV021202M-PP00379 PT PP Train 3, axis D-12/13 PC2D 14.00 WITNESS SURVEILLANCE

26 RFI-CIV020305M-PP00462 PT PP LCR Axis A8-A16 14.00 WITNESS/HOLDPOINT WITNESS


27 RFI-CIV020305M-PP00463 PT PP LCR Axis B8-B16 14.00 WITNESS/HOLDPOINT WITNESS

28 RFI-CIV020304M-PP000465 PT PP LCR Axis A8-A16 14.00 WITNESS/HOLDPOINT WITNESS

29 RFI-CIV020304M-PP000466 PT PP LCR Axis B8-B16 14.00 WITNESS/HOLDPOINT WITNESS

30 RFI-CIV020701M-PP00118 PT PP Utility, Boiler B 10.00 HOLDPOINT WITNESS

31 RFI-CIV020102M-PP00087 PT PP Utility, Boiler A 10.01 WITNESS WITNESS

32 RFI-CIV000201M-PP00012 PT PP BOF 10.00 WITNESS WITNESS

33 RFI-CIV020304M-PP00462 PT PP Train 3, axis D-12/13 PC2D 13.30 WITNESS/HOLDPOINT WITNESS

34 RFI-CIV020305M-PP00459 PT PP Train 3, axis D-12/13 PC2D 14.00 WITNESS/HOLDPOINT WITNESS

35 RFI-CIV021202M-PP00380 PT PP Train 3, axis B-15 PC3 09.00 WITNESS SURVEILLANCE

36 RFI-CIV020304M-PP00463 PT PP Train 3, axis B-15 PC3 09.30 WITNESS/HOLDPOINT WITNESS

37 RFI-CIV020305M-PP00460 PT PP Train 3, axis B-15 PC3 10.00 WITNESS/HOLDPOINT WITNESS


38 RFI-CIV021202M-PP00381 PT PP Train 3, axis A-16 PC3C & A-18 PC3B 13.00 WITNESS SURVEILLANCE

39 RFI-CIV020304M-PP00464 PT PP Train 3, axis A-16 PC3C & A-18 PC3B 13.30 WITNESS/HOLDPOINT WITNESS

40 RFI-CIV020305M-PP00461 PT PP Train 3, axis A-16 PC3C & A-18 PC3B 14.30 WITNESS/HOLDPOINT WITNESS

41 RFI- - PM0005 PMM-JO Train 3- Module 4 08.00 AM Hold Witness

42 RFI-PAI010101M-PM00011 PMMJO TAR SHELTER MEINDO 03.00 PM Witness Surveillance

43 RFI-PAI010101M-PM00012 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Surveillance

44 RFI-PAI010102M-PM00016 PMMJO TAR SHELTER MEINDO 09.30 AM Witness Witness

RFI-CIV020701M-PP00119 PP Utility 17.00 WIT Hold Witness

45 RFI-PAI010102M-PM00017 PMMJO TAR SHELTER MEINDO 02.00 PM Witness Witness


PROPOSED COMPANY
CONTRACTOR
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION INVOLVEMENT INVOLVEMENT
CODE
TIME CODE

1 RFI-CIV020102M-MP0001 MEINDO BROWN FIELD 09.00 WIT Witness Witness

TE
PROPOSED COMPANY
CONTRACTOR
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION INVOLVEMENT INVOLVEMENT
CODE
TIME CODE

1 RFI-QR-TCW-BUM-1101 Buma Buma Laydown Area 08.00 WIT Witness

2 LCI-CIV-0201-01M-1131 LCI Hauling Road 1 08.30 WIT Witness N/A

3 LCI-CIV-0201-02M-1132 LCI Hauling Road 1 09.00 WIT Witness N/A

4 LCI-LCI-009-02M-1133 LCI Hauling Road 2 08.00 WIT Witness N/A

5 LCI-CIV-0201-02M-1134 LCI Train 3 11.00 WIT Witness N/A

6 LCI-CIV-0203-04M-1135 LCI Flare Area 08.00 WIT Witness N/A

7 LCI-CIV-0213-02M-1136 LCI Flare Area 08.30 WIT Witness N/A

8 LCI-CIV-0203-04M-1137 LCI Access Road 5 13.30 WIT Witness N/A

9 LCI-CIV-0203-05M-1138 LCI Access Road 5 14.00 WIT Witness N/A

10 LCI-CIV-0201-01M-1139 LCI Utility 15.00 WIT Witness N/A


11 LCI-CIV-0201-02M-1140 LCI Utility 15.00 WIT Witness N/A

Accommodation Type-Kitchen Dining


12 IKM-TEP5500-QAC-MEL-RFI-431 IKM 8.00 Witness N/A
(5500POB) - SC 2
Accommodation Type-Kitchen Dining
13 IKM-TEP5500-QAC-MEL-RFI-432 IKM 9.00 Witness N/A
(5500POB) - SC 2
Accommodation Type-Kitchen Dining
14 IKM-TEP5500-QAC-MEL-RFI-433 IKM 10.00 Witness N/A
(5500POB) - SC 2
Accommodation Type-Kitchen Dining
15 IKM-TEP5500-QAC-MEL-RFI-434 IKM 11.00 Witness N/A
(5500POB) - SC 2
Accommodation Type-Kitchen Dining
16 IKM-TEP5500-QAC-MEL-RFI-435 IKM 11.00 Witness N/A
(5500POB) - SC 2
INSPECTION SCHEDULE 13-Jan-19

TANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Muristoni New Complete
082-WF-31064/R00

Visual Inspection of Butt Fusion Welding For Line Number :


Muristoni New Complete
082-WF-31064/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico New Complete
082-WF-31771/U00
Visual Inspection of Butt Fusion Welding For Line Number :
Mico New Complete
082-WF-31771/U00

Mico As Built & Cover Inspection New Complete

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for PC 017-PLF-31001 A04-TB.A 03/04 Tb.A 04/05; B04-TB.B04-
Iwan Rahmat/ Felix Sirait New Complete
TB.03/04 - ORF
P.7.1 (32 Mpa) 28 Days for TAR Shelter - New MCB

Water tightness test of plumbing fixtures and


Dian water distribution piping downstream of the New Complete
isolation valve and within the building

Survey report before to proceed with driving steel casing/drilling activities


Yulius / Iwan Quantity : Pile New Complete
Pile No : P 4
Pile No : P 12
Quantity : Piles
Pile No : P 2
Pile No : P 8
Yulius / Iwan Pile No : P 4 New Complete Done only fp
Pile No : P 12

Check before reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Pile No : P 2
Yulius / Iwan Pile No : P 8 New Complete Done only fp
Pile No : P 4
Pile No : P 12

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 2
Yulius / Iwan Pile No : P 8 New Complete Done only fp
Pile No : P 4
Pile No : P 12

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Foudation for Fence Part 4 ( pcs)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Tie Beam of Fence (part 2)

Final Inspection :
Hudaya Inspection after concrete protective coating application for Box Culvert No.96 Hauling New Complete
Road 6 STA 2+610`0+640 (20 PCS)

Inspection of Subgrade before laying fill material


Gede putu New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 3), Line no.

Inspection during delivery fresh Structural Concrete


Suyatman New Cancelled No concrete
• JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side
In-situ Density / Compaction Only accepted for layer
• Backfill layer 2,3
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR 2+540 with result 6 &
the 2nd layer at STA
Iwan 6 (Inside road) New Complete FAILED with the result
• Backfill layer 3,4 4th pun
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR
6 (Inside road)

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius / Iwan New Complete
• TP 8 , Layer 6
In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius / Iwan New Cancelled High Moisture
• TP 8 , Layer 6
Gede putu Insitu Density/ Compaction test : New Complete

Hudaya Inspection after concrete protective coating application for Table Tap MR New Complete South & We

Gede putu Check and verify cutting bending for rebar colomn New Complete

Gede putu Check and verify cutting bending for pile cap New Complete

Gede putu Check completeness of Pile inside reinforcement New Complete

Gede putu Check and verify cutting bending for pile cap New Complete

Novi Check before during delivering Tie Beam New Cancelled Area Net
Novi Check before during delivering Tie Beam New Cancelled Area Net

Novi Check during delivering Tie Beam New Cancelled Area Net

Novi Check during delivering Tie Beam New Cancelled Area Net

Hudaya Inspection after concrete protective coating application for boiler New Complete Pedestal & Flo

Novi Insitu Density/ Compaction test : New Cancelled Area Net

Dian Check and verify receiving soil material from Sorong Quarry New Continue

Gede putu Check before concrete delivering/placement for Pile Cap New Complete

Gede putu Inspection during delivering structural concrete for Pile cap New Complete

Gede putu Check and verify cutting bending for Pedestal New Complete

Gede putu Check before concrete delivering/placement for Pedestal New Complete

Gede putu Inspection during delivering structural concrete for Pedestal New Complete
Gede putu Check and verify cutting bending for Pedestal New Cancelled Still Install A

Gede putu Check before concrete delivering/placement for Pedestal New Cancelled Still Install A

Gede putu Inspection during delivering structural concrete for Pedestal New Cancelled Still Install A

1. Verify Foundation release and Measurement of Anchor Bolt Condition location and
elevation
(Pedestal GL,D,E,F (24&24)
Daniel / Darmawan 2.Check level of Shim Padding ( Pedestal GL D,E,F (24&24) New Complete
3.Check location of Embedded item (N/A)
Equipmet Serial Number Use for Inspection
Auto Level Serial Number WP 050455

Equipment:
- Whirling Hygrometer (SN: FJ093380)
Hudaya Witness ( W ) New Cancelled Job Not St
Checking of Painting application:
- Surface preparation & primer application
Equipment:
- Whirling Hygrometer (SN: FJ093380)
Hudaya Witness ( W ) New Cancelled Job Not St
Checking of Painting application:
- Surface preparation & primer application
Witness ( W )
Hudaya New Complete RF-7 Beam Col
DFT Check for primary coat

Hudaya Inspection after concrete protive application Boiler A Floor New Complete

Witness ( W )
Hudaya New Complete RF-7 Beam C
DFT Check for Intermediate Coat
BROWNFIELD

INSPECTION INSPECTIO
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS N RESULT

In-situ Density / Compaction Test:


Suyatman New Complete
 Inspection execution and location of tesT (PRP Test)

TEMPORARY WORK

INSPECTION INSPECTIO
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS N RESULT

Alfan Receving material Inspection for Rebar New Complete


Inspection of Subgrade layer before laying fill material
Iwan Rahmat • Hauling Road 1, STA 0+060 ~ 0+200 New Complete

In-situ Density / Compaction Test (Field CBR test) for subgrade layer
Iwan Rahmat • Hauling Road 1, STA 0+060 ~ 0+200 New Complete

Inspection during delivering Concrete V-Ditch with geocell


Suyatman • Hauling Road 2 STA 0+970~1+000 (South side) New Complete

In-situ Density / Compaction Test (PLT) For SI 1145


Gede putu • Point New Complete
Field inspection: Check before concrete placement
Yulius / Iwan • Precast Duct Bank at HR3 (1 pcs) New Complete 2 pcs is D

Inspection during delivery fresh Structural Concrete


Yulius / Iwan • Precast Duct Bank at HR3 (1 pcs) New Complete 2 pcs is D

Field inspection: Check before concrete placement


Suyatman • Junction Box for RCP at Access Road 5 STA 2+210 New Cancelled Full Water doe to R

Inspection during delivery fresh Structure concrete


Suyatman • Junction Box for RCP at Access Road 5 STA 2+210 New Cancelled Full Water doe to R

Inspection of Subgrade layer before laying fill material


Novi • Crane mat, Utility Point New Complete
In-situ Density / Compaction Test (Field CBR test)
Novi • Crane mat, Utility Point New Complete

Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP ( PSU 1 )
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP ( PSU 2 )
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP ( PSU 3 )
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP ( PSU 4 )
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP ( PSU 5 )
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Done only fpr P2 & P8

Done only fpr P2 & P8

Done only fpr P2 & P8

No concrete supply

No concrete supply

No concrete supply
Only accepted for layer 3rd at STA 0+335 -
2+540 with result 6 & 13 on 4th punch
the 2nd layer at STA 2+540 - 2+595 is
FAILED with the result 20.5cm & 20.5 on
4th punch.

High Moisture Content

South & West Wall

Area Net Ready


Area Net Ready

Area Net Ready

Area Net Ready

Pedestal & Floor Partial

Area Net Ready


Still Install Anchor

Still Install Anchor

Still Install Anchor

Job Not Started

Job Not Started

RF-7 Beam Colulun 2& 11

RF-7 Beam Column 2


REASON

REASON

2 pcs is Done

2 pcs is Done

Full Water doe to Rainy last night

Full Water doe to Rainy last night


DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00529 USI Batching Plant 15:00 Witness Witness

2 RFI-CIV-0203-06M-US00530 USI Batching Plant 15:00 Witness Witness

3 RFI-PIP010502M-EP00173 EPTCO ORF Area 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00173 EPTCO ORF Area 09.00 WIT Witness Witness

5 RFI-PIP010502M-EP00174 EPTCO Utility 07.30 WIT Witness Witness


6 RFI-PIP010503M-EP00174 EPTCO Utility 09.00 WIT Witness Witness

7 RFI-CIV020101M-MC00033 MEINDO L03 North Part 10.00 WIT Witness Witness

8 RFI-CIV020303M-MC00053 MEINDO L03 North Part 10.00 WIT Surveillance Surveillance

9 RFI-CIV021101M-MC00024 MEINDO L03 North Part 10.00 WIT Surveillance Surveillance

10 RFI-CIV021102M-MC00021 MEINDO L03 North Part 10.00 WIT Surveillance Surveillance

11 RFI-CIV020101M-MC00034 MEINDO ORF 10.00 WIT Witness Witness

12 RFI-CIV020303M-MC00054 MEINDO ORF 10.00 WIT Surveillance Surveillance

13 RFI-CIV020304M-MC00050 MEINDO ORF 10.00 WIT Witness Witness

14 RFI-CIV020305M-MC00050 MEINDO ORF 10.00 WIT Witness Witness


15 RFI-CIV021202M-MC00030 MEINDO ORF 10.00 WIT Witness Surveillance

16 RFI-CIV021202M-MB00064 MEINDO NEW MCB 09.00 WIT Witness Surveillance

17 RFI-CIV020304M-MB00054 MEINDO NEW MCB 09.00 WIT Witness Witness


18 RFI-CIV020305M-MB00053 MEINDO NEW MCB 10.00 WIT Witness Witness

19 RFI-WLD000303M-MD00016 MDI Jetty Construction 08.00 AM Review Review

20 RFI-CIV020307M-MD00009 MDI Jetty Construction 08.30 AM Review Review

21 RFI-CIV010704M-MD00056 MDI Offshore Jetty Construction 09.00 AM Witness Witness

22 RFI-CIV010705M-MD00059 MDI Offshore Jetty Construction 09.00 AM Witness Witness

23 RFI-CIV010706M-MD00056 MDI Offshore Jetty Construction 09.00 AM Review Review

24 RFI-CIV010703M-MD00035 MDI Offshore Jetty Construction 09.00 AM Witness Witness

25 RFI-CIV021402M-MD00021 MDI Jetty Construction 08.00 AM Witness Surveillance


26 TEP-TGH-RFI-00218 CSTS BOF LAYDOWN 09.00 WIT Witness Witness

27 RFI-CIV000405M-AJ00002 ANTAJAYA Utility 15.00 WIT Witness Witness

28 RFI-PAI010101M-PM0013 PMMJO NEW LAYDOWN AREA 09.00 AM Witness Surveillance

29 RFI-PAI010101M-PM0014 PMMJO NEW LAYDOWN AREA 09.00 AM Witness Surveillance

30 RFI-SST010101M-PM00003 PMMJO TAR SHELTER MEINDO 09.00 AM Witness Witness

31 RFI-SST0101-02M-MS00001 MEINDO TAR SHELTER 09.00 WIT Surveillance Surveillance

32 RFI-CIV010401M-MP00020 MEINDO BOG 09.00 WIT Witness Surveillance


33 RFI-CIV010401M-LC00110 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

34 RFI-CIV010402M-LC00134 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

35 RFI-CIV010403M-LC00134 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

36 RFI-CIV010404M-LC00135 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

37 RFI-CIV010604M-LC00006 LCI Pipe and Access to Jetty Area 08.00 WIT Witness Witness

38 RFI-CIV020101M-LC00505 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

39 RFI-CIV020102M-LC00533 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness
09.00 WIT
40 RFI-CIV020305M-LC00816 LCI Landfill Witness Witness
14.00 WIT

41 RFI-CIV020305M-LC00817 LCI Landfill 10.00 WIT Witness Witness

42 RFI-CIV020305M-LC00818 LCI Hauling Road 6 09.00 WIT Witness Witness

09.00 WIT
43 RFI-CIV020102M-LC00534 LCI Hauling Road 6 Witness Witness
15.00 WIT

44 RFI-CIV020304M-LC00227 LCI Hauling Road 6 08.30 WIT Witness Witness

45 RFI-CIV020305M-LC00819 LCI Hauling Road 6 09.15 WIT Witness Witness


Layer 1:
09.15 WIT
46 RFI-CIV020102M-LC00535 LCI Hauling Road 8 Witness Witness
Layer 2:
15.15 WIT

47 RFI-CIV021402M-LC00025 LCI Accsess Road 8 08.30 WIT Witness Witness

48 RFI-CIV020701M-LC00095 LCI Accsess Road 8 15.00 WIT Witness Witness

49 RFI-CIV020101M-LC00506 LCI Train 3 14.00 WIT Witness Witness

50 RFI-CIV020102M-LC00536 LCI Train 3 14.30 WIT Witness Witness

51 RFI-CIV020304M-PP00467 PT PP Train 3, Axis B 7/8/9, Axis A-9, Axis C-9 10.00 WITNESS/HOLDPOINT WITNESS

52 RFI-CIV020305M-PP00464 PT PP Train 3, Axis B 7/8/9, Axis A-9, Axis C-9 14.00 WITNESS/HOLDPOINT WITNESS

53 RFI-CIV020304M-PP00468 PT PP Train 3, Axis B/C 19, Axis A/B 17/18/19 10.00 WITNESS/HOLDPOINT WITNESS

54 RFI-CIV020305M-PP00465 PT PP Train 3 AXIS B 15/16/17 Axis C 17/18 13.00 WITNESS/HOLDPOINT WITNESS

55 RFI-CIV020305M-PP00466 PT PP Train 3, Axis B 15/16 13.00 WITNESS/HOLDPOINT WITNESS

56 RFI-CIV020304M-PP00465 PT PP Utility, LCR TB B-13/14 10.00 WITNESS/HOLDPOINT WITNESS

57 RFI-CIV020701M-PP000119 PT PP Utility, Boiler A 10.00 HOLDPOINT WITNESS


58 RFI-CIV020701M-PP000120 PT PP Utility, Boiler B 10.00 HOLDPOINT WITNESS

59 RFI-CIV020102M-PP00088 PT PP Utility, Boiler A 14.00 WITNESS WITNESS

60 RFI-CIV020307M-PP00092 PT PP Utility, STG 3 15.00 HOLDPOINT WITNESS


Utility, 164-PRK-31001 (A-1, A-2, A-3 &
61 RFI-CIV021202M-PP00384 PT PP 08.30 WITNESS SURVEILLANCE
B-1, B-2, B-3)
Utility, 164-PRK-31001 (C-2, C-3, D-2 &
62 RFI-CIV021202M-PP00383 PT PP 09.00 WITNESS SURVEILLANCE
D-3, E-2, E-3)

63 RFI-CIV021202M-PP00382 PT PP Utility, 164-PRK-31001 (F-2 & F-3) 09.30 WITNESS SURVEILLANCE

Utility, LCR tb B-13/14, B-14/15, B-


64 RFI-CIV020305M-PP00464 PT PP 15/16,A-13/14, A-14/15, A-15/16, A/B- 14.00 WITNESS/HOLDPOINT WITNESS
13, A/B-14, A/B-15, A/B-16

65 RFI-PIP010402M-PP00030 PT PP Train 3, Line187-DO-31518/T00 09.00 WITNESS SURVEILLANCE

66 RFI-PIP010403M-PP00035 PT PP Train 3, Line187-DO-31518/T00 10.00 WITNESS SURVEILLANCE

67 RFI-CIV020102M-PP00089 PT PP Train 3, D/E/F-26/27/28/29/30/ 10.00 WITNESS WITNESS

68 RFI-CIV020701M-PP00122 PP Train 3 16.00 WIT HOLDPOINT Witness

69 RFI-CIV020701M-PP00124 PP Utility 16.30 WIT HOLDPOINT Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1102 Buma BOF Area 08.30 AM Surveillance -

2 RFI-QR-BPF-BUM-00158 Buma Batching Plan 9:00 AM Surveillance -


3 RFI-QR-BSB-BUM-017 Buma Subcontractor Camp 1 2:00 PM Surveillance -

4 LCI-CIV-0201-01M-1141 LCI Combo Dock 13.30 WIT Witness N/A

5 LCI-CIV-0201-02M-1142 LCI Combo Dock 14.00 WIT Witness N/A

6 LCI-CIV-0213-02M-1143 LCI Flare Area 10.00 WIT Witness N/A

7 LCI-CIV-0203-04M-1144 LCI Access Road 5 13.30 WIT Witness N/A

8 LCI-LCI-009-02M-1145 LCI Hauling Road 2 08.00 WIT Witness N/A

9 LCI-CIV-0214-02M-1146 LCI Hauling Road 2 09.00 WIT Witness N/A

10 LCI-CIV-0201-02M-1147 LCI Hauling Road 2 10.00 WIT Witness N/A

11 LCI-CIV-0201-02M-1148 LCI Train 3 10.00 WIT Witness N/A

12 LCI-CIV-0203-05M-1151 LCI Access Road 5 14.00 WIT Witness N/A

Accommodation Type-Loundry
13 IKM-TEP5500-QAC-MEL-RFI-441 IKM 07.00 Witness N/A
(5500POB) - SC 2
Accommodation Type-Loundry
14 IKM-TEP5500-QAC-MEL-RFI-442 IKM 08.00 Witness N/A
(5500POB) - SC 2

Accommodation Type-Washing
15 IKM-TEP5500-QAC-MEL-RFI-445 IKM 09.00 Witness N/A
(5500POB) - SC 2

16 IKM-TEP5500-QAC-MEL-RFI-446 IKM Accommodation Type-Washing 10.00 Witness N/A


(5500POB) - SC 2
INSPECTION SCHEDULE 14-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for Bored Pile P16/PP20 - Jetty Const
P.7.1 (32 Mpa) 7 Days for Bored Pile ( Kali Kobara) - Jetty Const
Iwan Rahmat/ Felix Sirait P.7.1 (32 Mpa) 7 Days for Pagar Leighton - Landfill New Complete
P.7.1 (32 Mpa) 7 Days for Axis Grid 8-9/AB,7-8/CD - New MCB
P.7.1 (32 Mpa) 7 Days for Boiler Meindo - Utility
P.7.1 (32 Mpa) 7 Days for Pedestal PC3 Block 5 - Train 3

Test Sample Cylinder : Type


Iwan Rahmat/ Felix Sirait P.4.1 (21 Mpa) 28 Days for TAR Shelter - New MCB New Complete
P.7.1 (32 Mpa) 28 Days for PHT - Utility

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31102/R00
Mico / Ichsan New Complete
082-WF-31038/R00
082-WF-31043/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31102/R00
Mico / Ichsan New Complete
082-WF-31038/R00
082-WF-31043/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico New Complete
082-WF-31771/U00
Visual Inspection of Butt Fusion Welding For Line Number :
Mico New Complete
082-WF-31771/U00

Nanda Inspection for subgrade and grade layer before laying fill material New Complete

Inspection during delivering fresh lean concrete :


Nanda -Check the lean concrete quality during delivery
New Cancelled No concrete

Nanda Check and verify coordinate of pile New Complete

Nanda Check marking point for Pile crushing level New Complete

Ulfa Inspection for subgrade and grade layer before laying fill material New Complete

Field inspection:
Inspection duringCheck before
delivering concrete
fresh lean concrete :
Ulfa delivery/placement:
New Complete
-Check the lean concrete quality during delivery
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Ulfa  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
Inspection
 concrete during delivering fresh structural concrete:
cover thickness
Check
 etc. the concrete quality during delivery
Ulfa New Cancelled No concrete
Document review of batch ticket
Material sampling
Check and verify cutting and bending of reinforce
rebar including:
Ulfa  bending shape New Complete
 Size/length
 Packing for mobilization

Check and verify cutting and bending of Reinforce rebar including:


Dian - bending shape New Complete
- Size/length
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Dian New Complete
Document review of batch ticket
Material sampling
Welding Machine (8 pcs)
Ali Anofia Welding and Allied Processes Equipment and Measurement Devices Calibration New Complete
Ruhyan Harahap verification.
Transition Block Type 7 Grid 1
Ali Anofia Finishing Inspection: New Complete
Ruhyan Harahap Check completeness of structural concrete works prior to
proceed with backfilling activities for all item’s foundation

Ali Anofia LP33 & LP23 (L01-JET2-PLATFORM-PIL) New Complete


Ruhyan Harahap Survey check before to proceed with driving of steel piles

LP33 & LP23 (L01-JET2-PLATFORM-PIL)


Ali Anofia Inspection and record driving steel pile :
Ruhyan Harahap Check and record the blows number necessary to reach:
New Complete
set per 10 blow and drop height of ram to be recorded. (rebound)

LP33 & LP23 (L01-JET2-PLATFORM-PIL)


Ali Anofia Final Inspection – As built ECC Record
Ruhyan Harahap Check & Verify compliance between AFC Dwgs and As Built datum (horizontal and
New Complete
vertical displacement, etc)

LP23 (L01-JET2-PLATFORM-PIL)
Ali Anofia PDA test of pile New Complete
Ruhyan Harahap Acceptance tests carried out on piles randomly selected after construction

Precast I Beam Type 1 & 2 Grid 4 to Grid 5 (L01-JET2-TRESTLE-PB)


Inspection on Precast Installation
Ali Anofia Check Position of Precast: Horizontal, vertical and Elevation New On Going
Ruhyan Harahap Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection
Dafid TEP-TGH-MRR-01325- Machinery Equipment and Material (Van Stack) for LCN Project New Complete

Dafid / Alfan Check and Verify compliance with project requirements for the grout to be used and New Complete
the related material

Equipment:
- Whirling Hygrometer (SN: FJ093380)
Witness ( W )
Hudaya Checking of Painting application: New Complete To Continue 2ND C
- Surface preparation & primer application
EMBEDDED PLATE EMR-5.7

Equipment:
- Whirling Hygrometer (SN: FJ093380)
Witness ( W )
Hudaya Checking of Painting application: New Complete
- Surface preparation & primer application

DWG. 093PRK31002-4-C008 REV. Z02

Daniel / Darmawan Witness ( W ) New Rejected


Bolts tightening inspection and testing

Daniel / Darmawan Inspection of Main Structure Installation New Complete

Nanda Survey report before to proceed with driving steel New Complete
casing/drilling activities
Survey report before to proceed with driving steel casing/drilling activities
Quantity : Pile
Yulius New Complete
Pile No : P 75
Pile No : P 71

Check borehole after completion of drilling activities


Quantity : Piles
Pile No : P 4
Yulius New Complete
Pile No : P 12
Pile No : P 75
Pile No : P 71

Check before reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Pile No : P 4
Yulius New Complete
Pile No : P 12
Pile No : P 75
Pile No : P 71

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 4
Yulius Pile No : P 12 New Complete
Pile No : P 75
Pile No : P 71

PIT Test for Soldier Pile


Yulius • Check integrity of concreting New Complete
• Pile no. P56, P50, P44, P38

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius New Cancelled High Moisture
• TP 8 , Layer 6

In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius New Cancelled High Moisture
• TP 8 , Layer 6
Inspection during delivery fresh Structural Concrete
Ulfa New Cancelled No concrete
• Foudation for Fence Part 4 ( pcs)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Tie Beam of Fence (part 2)

Inspection during delivery fresh Structural Concrete


Suyatman New Complete
• JB Box Culvert at Hauling Road 6, STA 2+600 (BC 24) (Slab Section), Left Side

In-situ Density / Compaction


• Backfill layer 2
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR
Suyatman 6 New Complete
• Backfill layer 4
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR
6

Field Inspection before Concrete Placement


Suyatman New Complete
• U-Ditch for Hauling Road 6 STA 2+595 ~ 2+600 (Wall section), Left side

Inspection during delivery fresh Structural Concrete


Suyatman New Complete
U-Ditch for Hauling Road 6 STA 2+595 ~ 2+600 (Wall section), Left side
In-situ Density / Compaction Test
• Backfill layer 1
Suyatman New Complete
• Backfill layer 2
for U-Ditch at Hauling Road 8, Right side, STA 0+300 ~ 0+369

Inspection on Precast Installation


• Check Position of Precast: Horizontal, vertical and Elevation
Suyatman • Check the connection to main structure New Complete
• Grout Placement Inspection
for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600

Final Inspection :
Hudaya Inspection after concrete protective coating application for PC Box Culvert no.57 New Complete
(BC1x1) at Access Road 8 STA 0+600 (Gap filling)

Inspection of Subgrade before laying fill material


Gede Putu New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

In-situ Density / Compaction Test ;


Gede Putu New Complete
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

Gede Putu Check before concrete delivering/placement for tie beam New Complete

Gede Putu Inspection during delivering structural concrete for Pile cap New Cancelled Due to Cem

Gede Putu Check before concrete delivering/placement for tie beam New Complete

Gede Putu Inspection during delivering structural concrete forpedestal New Complete

Gede Putu Inspection during delivering structural concrete for pedestal New Complete

Novi Check during delivering Tie Beam New Cancelled Cleaning

Hudaya Inspection after concrete protective coating application for boiler New Complete
Hudaya Inspection after concrete protective coating application for boiler New Complete

Insitu Density/ Compaction test :


Novi New Complete
Inspection execution and location of test

Novi Check completeness of structural works for pile cap New Complete

Novi Check and verify cutting bending for PHT New Complete

Novi Check and verify cutting bending for PHT New Complete

Novi Check and verify cutting bending for PHT New Complete

Novi Inspection during delivering structural concrete for tie beam New Cancelled Cleaning

Mico Check joint and assembly preparation pipe New Complete

Mico Check heating blanket application and curing time New Complete

Insitu Density/ Compaction test :


Gede Putu New Complete
Inspection execution and location of test

INSPECTION AFTER CONCRETE PROTECTIVE COATING FOR D19/E19/F19 FLOOR &


Hudaya New Complete
PEDESTAL

Hudaya INSPECTION AFTER CONCRETE PROTECTIVE COATING FOR BOILER A FLOOR New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Pouring concrete for slab of Pinger Pier section 7 New Complete

Felix Pouring Concrete for Bundwall of Cement Shelter Foundation, Section 5 New Complete
Pouring Concrete for Pedestal of Shelter Foundation of Bottling Station Building
Dian New Complete
(Refilling Gallon and Gallon Sanitazion Area)
Inspection of Subgrade layer before laying fill material (Subbase layer)
Suyatman New Complete
• Access for Boiler at Combo Dock (SI-1146)
In-situ Density / Compaction Test (Field CBR test) for Subbase layer
Suyatman New Complete
• Access for Boiler at Combo Dock (SI-1146)
Inspection during delivery fresh Structural Concrete
Yulius New Complete
• Precast Duct Bank at HR3 (2 pcs)
Field inspection: Check before concrete placement
Suyatman New Cancelled Need to be dewater
• Junction Box for RCP at Access Road 5 STA 2+210
Inspection during delivering Concrete V-Ditch with geocell
Suyatman New Complete
• Hauling Road 2 STA 0+980~1+000 (South side)
Inspection on Precast Installation
Suyatman • Check Position of Precast: Horizontal, vertical and Elevation for PC Box Culvert New Complete
(BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)
In-situ Density / Compaction Test
Suyatman • Backfill layer 1 New Complete
for PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)
In-situ Density / Compaction Test (PLT) For SI 1145
Gede Putu New Complete
• Point

Inspection during delivery fresh Structure concrete


Suyatman New Cancelled Need to be dewater
• Junction Box for RCP at Access Road 5 STA 2+210

Inspections and checks before energizing the electrical installation : Section A, Section
Yatmiko New Complete
B
Yatmiko Inspections and checks before energizing the electrical installation : Section D New Complete

Inspections and checks before energizing the electrical installation : Section A, Section
Yatmiko New Complete
B

Yatmiko Inspections and checks before energizing the electrical installation : Section D New Complete
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
No concrete supply

No concrete supply
To Continue 2ND Coat Next Day
High Moisture Content

High Moisture Content


No concrete supply

No concrete supply
Due to Cemen not

Cleaning Issue
Cleaning Issue
REASON

REASON

Need to be dewatering before rain.

Need to be dewatering before rain.


DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV-0203-06M-US00531 USI Batching Plant 15:00 Witness Witness

2 RFI-CIV-0203-06M-US00532 USI Batching Plant 15:00 Witness Witness

3 RFI-PIP010502M-EP00175 EPTCO ORF Area 07.30 WIT Witness Witness


4 RFI-PIP010503M-EP00175 EPTCO ORF Area 09.00 WIT Witness Witness

5 RFI-PIP010406P-EP00004 EPTCO Utility 08.00 WIT Hold Point Hold Point

Interconnecting PipeWay From ORF to


6 RFI-CST000203M-UP00107 Unilap 08.00 AM Witness Witness
Train 3

Interconnecting PipeWay From ORF to


7 RFI-CST000202M-UP00107 Unilap 08.00 AM Witness Witness
Train 3

8 RFI-CIV010603M-MP00127 MEINDO ORF 08.00 WIT Review Review

9 RFI-PAI010102M-PM0018 PMMJO Laydown Area 09.00 AM Witness Witness

10 RFI-PAI010102M-PM0019 PMMJO Laydown Area 09.00 AM Witness Witness

11 RFI-PAI010102M-PM0020 PMMJO Laydown Area 09.00 AM Witness Witness


12 RFI-CIV020102M-PP00090 PT PP Train 3, axis D/E/F-19 PC1 10.00 WITNESS WITNESS

13 RFI-CIV020304M-PP00474 PT PP Utility, Portable water tank 09.00 WITNESS/HOLDPOINT WITNESS

14 RFI-CIV020305M-PP00472 PT PP Utility, Portable water tank 14.00 WITNESS/HOLDPOINT WITNESS

15 RFI-CIV020307M-PP00093 PT PP Train 3, D/E/F-17/18 15.00 HOLDPOINT WITNESS

16 RFI-CIV020102M-PP00091 PT PP Utility, Package Boiler A & B 15.30 WITNESS WITNESS


17 RFI-CIV020304M-PP00469 PT PP Train 3, Axis A/C/E 19/18 13.00 WITNESS/HOLDPOINT WITNESS

18 RFI-CIV020305M-PP00467 PT PP Train 3, Axis A/C/E 19/18 14.00 WITNESS/HOLDPOINT WITNESS

19 RFI-CIV020304M-PP00470 PT PP Train 3, Axis A/B-B/B'-10-15 08.00 WITNESS/HOLDPOINT WITNESS

20 RFI-CIV020305M-PP00468 PT PP Train 3, Axis A/B-B/B'-10-15 09.00 WITNESS/HOLDPOINT WITNESS

21 RFI-CIV020304M-PP00471 PT PP Train 3, Axis E2/3, Axis D-4 08.30 WITNESS/HOLDPOINT WITNESS

22 RFI-CIV020305M-PP00469 PT PP Train 3, Axis E2/3, Axis D-4 10.00 WITNESS/HOLDPOINT WITNESS

23 RFI-CIV020304M-PP00472 PT PP Train 3, Axis A/B-B/B'-1 C4-C5 10.00 WITNESS/HOLDPOINT WITNESS

24 RFI-CIV020305M-PP00470 PT PP Train 3, Axis A/B-B/B'-1 C4-C5 15.00 WITNESS/HOLDPOINT WITNESS

25 RFI-CIV020101M-PP000234 PT PP Train 3, OMH-8/13 13.30 WITNESS WITNESS

26 RFI-CIV020303M-PP000250 PT PP Train 3, OMH-8/13 15.00 SURVEILLANCE SURVEILLANCE

27 RFI-CIV020304M-PP00475 PT PP Train 3, Acid Gas Absorbes (PD-2) 09.00 WITNESS/HOLDPOINT WITNESS

28 RFI-CIV020305M-PP00473 PT PP Train 3, Acid Gas Absorbes (PD-2) 13.00 WITNESS/HOLDPOINT WITNESS

29 RFI-CIV020303M-MC00055 MEINDO ORF 10.00 WIT Surveillance Surveillance


30 RFI-CIV020305M-MC00051 MEINDO ORF 10.00 WIT Witness Witness

31 RFI-CIV000404M-MC00007 MEINDO ORF 10.00 WIT Hold Witness

32 RFI-CIVD21202M-MD00011 MDI Jetty Construction 08.00 AM Review Review

33 RFI-CIVD21402M-MD00022 MDI Jetty Construction 08.30 AM Review Review

34 RFI-CIVD20401M-MD00008 MDI Jetty Construction 09.00 AM Witness Witness

35 RFI-CIVD20304M-MD00014 MDI Jetty Construction 10.00 AM Witness Witness


36 RFI-CIVD20304M-MD00015 MDI Jetty Construction 02.00 PM Witness Witness

37 RFI-CIVD20305M-MD00014 MDI Jetty Construction 03.00 PM Witness Witness

38 RFI-CIVD20305M-MD00013 MDI Jetty Construction 03.00 PM Witness Witness

39 RFI-CIV010705M-MD00060 MDI Offshore Jetty Construction 09.00 AM Witness Witness

40 RFI-CIV010706M-MD00057 MDI Offshore Jetty Construction 09.00 AM Review Review

41 RFI-CIV010703M-MD00036 MDI Offshore Jetty Construction 09.00 AM Witness Witness


42 RFI-CIV010704M-MD00057 MDI Jetty Construction 09.00 AM Witness Surveillance

43 RFI-CIV021202M-MB00065 MEINDO NEW MCB 10.00 WIT Witness Surveillance

44 RFI-CIV020304M-MB00055 MEINDO NEW MCB 10.00 WIT Witness Witness


45 RFI-CIV020305M-MB00054 MEINDO NEW MCB 10.00 WIT Witness Witness

46 RFI-CIV021202M-MB00066 MEINDO TAR SHELTER 09.00 WIT Witness Surveillance

47 RFI-CIV020304M-MB00056 MEINDO TAR SHELTER 09.00 WIT Witness Witness

48 RFI-CIV020305M-MB00055 MEINDO TAR SHELTER 09.00 WIT Witness Witness

49 RFI-SST0101-01M-MSS00004 MEINDO TAR SHELTER 09.00 WIT Witness Witness


50 RFI-CIV020401M-MB00005 MEINDO TAR SHELTER 09.00 WIT Witness Witness

51 RFI-CIV010401M-LC00111 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

52 RFI-CIV010402M-LC00135 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

53 RFI-CIV010403M-LC00135 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

54 RFI-CIV010404M-LC00136 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

55 RFI-CIV020101M-LC00507 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

56 RFI-CIV020102M-LC00537 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness

57 RFI-CIV000407M-LC00006 LCI LCI Office 08.00 WIT Witness Witness


Layer 3:
09.00 WIT
58 RFI-CIV020102M-LC00538 LCI Hauling Road 6 Witness Witness
Layer 4:
15.00 WIT
59 RFI-CIV020102M-LC00539 LCI Hauling Road 8 Witness Witness
Layer 2:
60 RFI-CIV020101M-LC00508 LCI Train 3 14.00 WIT
15.15 Witness Witness

61 RFI-CIV020102M-LC00540 LCI Train 3 14.30 WIT Witness Witness

09.00 WIT
62 RFI-CIV020305M-LC00820 LCI Landfill Witness Witness
14.00 WIT

63 RFI-CIV020305M-LC00821 LCI Landfill 10.00 WIT Witness Witness

64 RFI-CIV020102M-LC00541 LCI Accsess Road 8 15.30 WIT Witness Witness

65 RFI-CIV000202M-LC00032 LCI Hauling Road 2 (BOF) 13.30 WIT Witness Witness

66 TEP-TGH-RFI-00232 CSTS NEW LAYDOWN 09.00 WIT Witness Witness

67 RFI-CIV020701M-PP00125 PP Train 3 16.00 WIT Hold Point Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-TEP-1168784-H03-0002-1B-0314 PT. BPK Contractor Camp 8:00 Witness Witness

2 RFI-TEP-1168784-H03-0002-1B-0315 PT. BPK Contractor Camp 10:00 Witness Witness

3 RFI-TEP-1168784-H03-0002-1B-0316 PT. BPK Contractor Camp 14:00 Witness Witness

4 LCI-CIV-0201-01M-1150 LCI Access Road 9 08.00 WIT Witness N/A

5 LCI-CIV-0201-02M-1151 LCI Access Road 9 08.30 WIT Witness N/A

6 LCI-CIV-0203-04M-1152 LCI Access Road 5 10.00 WIT Witness N/A

7 LCI-CIV-0203-05M-1153 LCI Access Road 5 10.30 WIT Witness N/A

8 LCI-LCI-009-02M-1154 LCI Hauling Road 2 08.00 WIT Witness N/A

9 LCI-CIV-0201-02M-1155 LCI Hauling Road 2 10.00 WIT Witness N/A

10 LCI-CIV-0201-02M-1156 LCI Train 3 10.00 WIT Witness N/A

Accommodation Type-B9(5500POB) -
11 IKM-TEP5500-QAC-MEL-RFI-274 IKM 8.00 Witness N/A
SC 2
Accommodation Type-B9 (5500POB) -
12 IKM-TEP5500-QAC-MEL-RFI-275 IKM 9.00 Witness N/A
SC 2
Accommodation Type-B10 (5500POB) -
13 IKM-TEP5500-QAC-MEL-RFI-280 IKM 10.00 Witness N/A
SC 2

Accommodation Type-B10 (5500POB) -


14 IKM-TEP5500-QAC-MEL-RFI-281 IKM 11.00 Witness N/A
SC 2

Accommodation Type-B11 (5500POB) -


15 IKM-TEP5500-QAC-MEL-RFI-286 IKM 14.00 Witness N/A
SC 2

Accommodation Type-B11 (5500POB) -


16 IKM-TEP5500-QAC-MEL-RFI-287 IKM 15.00 Witness N/A
SC 2
INSPECTION SCHEDULE 15-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for Bored Pile P14/P06 - Jetty Const
P.7.1 (32 Mpa) 7 Days for Pile Cap 017-PLF-31001 PC1 - ORF
Iwan / Felix Sirait P.7.1 (32 Mpa) 7 Days for Pedestal 017-PRK-31002 PC5 - ORF New Complete
P.7.1 (32 Mpa) 7 Days for PHT Axis A7/8 - Train 3
P.7.1 (32 Mpa) 7 Days for PC2 Axis A7/8/9 - Train 3
P.7.1 (32 Mpa) 7 Days for PHT Axis D 15/16 - Train 3

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for 093-PRK-31002 PC2 Axis D15/16 - Train 3
P.7.1 (32 Mpa) 7 Days for Axis Grid 7/8-C/E - New MCB
P.7.1 (32 Mpa) 7 Days for Duth Bank - Flare Area
Iwan / Felix Sirait New Complete
P.7.1 (32 Mpa) 28 Days for Bored Pile CLT #1 - Utility
P.7.1 (32 Mpa) 28 Days for Pedestal Boiler P4 - Utility
P.7.1 (32 Mpa) 28 Days for Pedestal PC3 Axis B12/13 - Utility
P.7.1 (32 Mpa) 28 Days for Bored Pile T03-032 - Train 3

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31003/R00
Muristoni New Complete
082-WF-31009/R00
082-WF-31043/R00
Visual Inspection of Butt Fusion Welding For Line Number :
082-WF-31003/R00
Muristoni New Complete
082-WF-31009/R00
082-WF-31043/R00

Mico P&ID’s Conformity checks report for process Subsystem New Complete

Check and verify the soil and water sampling is performed according to method
Dian New Complete
statement and SOP

Dian Check and verify the soil and water test location is corres New Complete

Pile load test report


Ulfa New Complete
Acceptance tests carried out on piles randomly selected after construction (RESTRIKE)

Witness ( W )
DFT Check for Primer Coat and Visual Inspection

DFT Equipment
Hudaya New Complete
SN: - UE17320
- PC17882 (Probe)
093PRK31002-4-C008
Witness ( W )
DFT Check for Primer Coat
DFT Equipment
Hudaya SN: - UE17320 New Complete
- PC17882 (Probe)

EMBEDDED PLATE EMR-5.7


(Total
WitnessQty.
(W 2))
DFT Check for Intermediate Coat
DFT Equipment
SN: - UE17320
Hudaya New Complete
- PC17882 (Probe)

EMBEDDED PLATE EMR-5.7


(Total Qty. 2)
Insitu Density/ Compaction test :
Gede Putu New Complete
Inspection execution and location of test

Novi Check before concrete delivering/placement for pedestal New Complete

Novi Inspection during delivering structural concrete for pedestal New Cancelled

Gede Putu Check completeness of structural works (surface only) New Complete

Insitu Density/ Compaction test :


Novi New Complete
Inspection execution and location of test
Gede Putu Check before concrete delivering/placement for pedestaL New Complete

Gede Putu Inspection during delivering structural concrete for pedestal New Complete

Gede Putu Check before concrete delivering/placement for PHT New Complete

Gede Putu Inspection during delivering structural concrete for PHT New Complete

Gede Putu Check before concrete delivering/placement for PHT New Complete

Gede Putu Inspection during delivering structural concrete for PHT New Complete

Gede Putu Check before concrete delivering/placement for Column New Complete

Gede Putu Inspection during delivering structural concrete for column New Complete

Gede Putu Inspection of subgrade and grade layer before laying fill material New Complete

Gede Putu Inspection during delivering fresh lean concrete New Complete

Gede Putu Check before concrete delivering/placement for pedestaL New Complete

Gede Putu Inspection during delivering structural concrete for pedestal New Complete

Inspection during delivering fresh lean concrete :


Ulfa New Complete
-Check the lean concrete quality during delivery
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Ulfa New Complete
Document review of batch ticket
Material sampling

Ulfa Check and verify compliance with project requirement of embedment materials New Complete

Bearing Block Type 6 & 7 GL - 9


Check and verify cutting and bending of reinforce rebar including:
Ali Anofia - bending shape New Complete
Ruhyan Harahap - Size/length
- Packing for mobilization

Road Slab Grid 4 to Grid 5


- Inspection on Precast Installation
- Check Position of Precast: Horizontal, vertical
Ali Anofia - and Elevation New Complete
Ruhyan Harahap - Check the Connection to main structure
- Check for Elastomeric rubber Pad
- Grout Placement Inspection

Coupler Grouting Grid Line 4


Main Item grouting: Checks before delivery & placement of mixed grout:
- status of chipped & soaked prepared oundation
Ali Anofia - surface under erected base plate or equipment, formwork vertical & horizontal New Complete
Ruhyan Harahap levels, joints, shape,
- clearance between base plate and foundation top, chamfers, etc.
- Cement Material for grouting

Bearing Block Tye 6 & 7 Grid Line 9


Main Item grouting: Checks before delivery & placement of mixed grout:
- status of chipped & soaked prepared oundation
Ali Anofia - surface under erected base plate or equipment, formwork vertical & horizontal New Complete
Ruhyan Harahap levels, joints, shape,
- clearance between base plate and foundation top, chamfers, etc.
- Cement Material for grouting
Road Slab Grid 4 to Grid 5 ,S01D1 Grid 1,Grid 3
Main Item grouting: Checks before delivery & placement of mixed grout:
- status of chipped & soaked prepared oundation
Ali Anofia - surface under erected base plate or equipment, formwork vertical & horizontal New On Going
Ruhyan Harahap levels, joints, shape,
- clearance between base plate and foundation top, chamfers, etc.
- Cement Material for grouting

Bearing Block Tye 6 & 7 Grid Line 9


Inspection during delivering fresh structural concrete:
Ali Anofia Check the concrete quality during delivery New Postpone Resched
Ruhyan Harahap Document review of batch ticket
Material sampling

Road Slab Grid 4 to Grid 5 ,S01D1 Grid 1,Grid 3


Inspection during delivering fresh structural concrete:
Ali Anofia Check the concrete quality during delivery New Postpone Resched
Ruhyan Harahap Document review of batch ticket
Material sampling

L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL)
Ali Anofia Inspection and record driving steel pile : New Complete
Ruhyan Harahap Check and record the blows number necessary to reach:
set per 10 blow and drop height of ram to be recorded. (rebound)

L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL)
Ali Anofia Final Inspection – As built ECC Record New Complete
Ruhyan Harahap Check & Verify compliance between AFC Dwgs and As Built datum (horizontal and
vertical displacement, etc)

L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL)
Ali Anofia PDA test of pile New Postpone Resched
Ruhyan Harahap Acceptance tests carried out on piles randomly selected after construction
Ali Anofia L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL) New Complete
Ruhyan Harahap Survey check before to proceed with driving of steel piles

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Okta / Dian - Size/length
New Complete
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta / Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.
Inspection during delivering fresh structural concrete:
Check the concrete quality during delivery
Okta / Dian New Cancelled Concrete Pump N
Document review of batch ticket
Material sampling

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Okta / Dian New Complete
- Size/length
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta / Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Okta / Dian Check the concrete quality during delivery New Complete
Document review of batch ticket
Material sampling

Darmawan Bolts tightening inspection and testing New Cancelled Plumbness Not
Main Item grouting: Checks before delivery &
placement of mixed grout:
 status of chipped & soaked prepared Plumbness test From
Okta / Dian foundation New Cancelled Complete
 surface under erected base plate or equipment,
formwork vertical & horizontal levels, joints,
shape

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 67 New Complete
Pile No : P 63
Pile No : P 73

Check borehole after completion of drilling activities


Quantity : Piles
Pile No : P 71
Yulius New Complete
Pile No : P 63
Pile No : P 67
Pile
CheckNobefore
: P 73 reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Pile No : P 71
Yulius New Complete
Pile No : P 63
Pile No : P 67
Pile No : P 73

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 71
Yulius Pile No : P 63 New Complete
Pile No : P 67
Pile No : P 73

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius New Cancelled High Moisture
• TP 8 , Layer 6
In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius • TP 8 , Layer 6
New Cancelled High Moisture
Check and verify compliance with Project requirements of Gate & Fence system
Alfan / Dafid / Kadek (Verification of material received at site) New Complete
In-situ
• FenceDensity
Post and/ Compaction
Accessories (Part 2)
• Backfill layer 3
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR
Suyatman 6 New Cancelled Wet soil condition doe t
• Backfill layer 4
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR
6
• Backfill layer 3
Okta New Complete
• Backfill layer 4
for U-Ditchof
Inspection atSubgrade
Hauling Road 8, Right
before layingside, STA 0+300 ~ 0+369
fill material
Iwan New Complete
• Backfill layer 1 ; Part 1, Line no.

Iwan In-situ Density / Compaction Test ; New Complete


• Backfill layer 1 ; Part 1, Line no.

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Foudation for Fence Part 4 ( pcs)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Tie Beam of Fence (part 2)

In-situ Density / Compaction Test ;


Okta • Backfill layer 1 New Cancelled Due To R
for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600

Verification material received at Site


Dian New Complete
• Sub-Base Material, source from Quarry Palu Indah Teknik (Shipment #1)

Alfan / Dafid / Kadek TEP-TGH-MRR-00389- TAMPLATE New Cancelled

Hudaya Inspection concrete after protective coating Table Top MR -Side Wall North New Complete
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Yatmiko / Andel Gani Visual Inspection check of Distribution Panel Installation New Complete

Yatmiko / Andel Gani Insulation Resistance test of busbar equipment New Complete

Yatmiko / Andel Gani Insulation Resistance and Continuity test of cable New Complete

Inspection of Subgrade layer before laying fill material (Sub-base layer)


Okta New Cancelled Due To R
• Access Road 9 STA 0+680 ~ 0+816
In-situ Density / Compaction Test (Field CBR test for Sub-base layer)
Okta New Cancelled Due To R
• Access Road 9 STA 0+680 ~ 0+816
Field inspection: Check before concrete placement
Suyatman New Complete
• Junction Box for RCP at Access Road 5 STA 2+210 (Slab Section)
Inspection during delivery fresh Structure concrete casting will be carrie
Suyatman New Cancelled
• Junction Box for RCP at Access Road 5 STA 2+210 (Slab Section) because the tim
Inspection during delivering Concrete V-Ditch with geocell
Suyatman New Complete
• Hauling Road 2 STA 0+990~1+000 (South side)
In-situ Density / Compaction Test
Suyatman • Backfill layer New Complete
for PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)

Gede Putu In-situ Density / Compaction Test (PLT) For SI 1145 New Complete
• Point
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test JB & MCB
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test SDP
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test JB & MCB

Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test SDP

Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test JB & MCB

Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko / Andel Gani New Complete
Contuinity Test SDP
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Reschedule

Reschedule

Reschedule
Concrete Pump Not Available

Plumbness Not Ready Yet


Plumbness test From Steel Sruture not
Complete Yet

High Moisture Content

High Moisture Content

Wet soil condition doe to rainy last morning


No concrete supply

No concrete supply

Due To Rain
REASON

REASON

Due To Rain

Due To Rain

casting will be carried out tomorrow


because the time too late
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010505M-EP00004 EPTCO Utility 14.00 WIT Witness Witness

2 RFI-PIP010404M-EP00004 EPTCO Utility 09.00 WIT Witness Witness


INSPECTION SCHEDULE 16-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Ichsan Piping pressure testing New

Inspection before pressure test :


Ichsan - Pre-test Punch listing New
-Releanse for pressure test
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010502M-EP00176 EPTCO ORF Area 07.30 WIT Witness Witness

2 RFI-PIP010503M-EP00176 EPTCO ORF Area 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00177 EPTCO Train 3 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00177 EPTCO Train 3 09.00 WIT Witness Witness

5 RFI-PIP010404M-EP00004 EPTCO Utility 10.00 WIT Hold Point Hold Point


RFI-PIP010505M-EP00004
6 EPTCO Utility 15.00 WIT Hold Point Hold Point

7 RFI-PIP010504M-EP00004 EPTCO Utility 16.00 WIT Witness Witness

8 RFI-CIV-0203-06M-US00533 USI Batching Plant 15:00 Witness Witness

9 RFI-CIV-0203-06M-US00534 USI Batching Plant 15:00 Witness Witness

10 RFI-CIV010704M-MD00058 MDI Jetty Construction 09.00 AM Review Review

11 RFI-CIV010705M-MD00061 MDI Jetty Construction 09.00 AM Review Review

12 RFI-CIV010706M-MD00059 MDI Jetty Construction 09.00 AM Witness Witness

13 RFI-CIV010704M-MD00059 MDI Offshore Jetty Construction 09.00 AM Witness Witness


14 RFI-CIV010705M-MD00062 MDI Offshore Jetty Construction 09.00 AM Witness Witness

15 RFI-CIV010706M-MD00058 MDI Offshore Jetty Construction 09.00 AM Witness Witness

16 RFI-CIVD20305M-MD00013 MDI Jetty Construction 03.00 PM Witness Witness


17 RFI-CIVD20305M-MD00014 MDI Jetty Construction 03.00 PM Witness Witness

18 RFI-CIV010703M-MD00036 MDI Offshore Jetty Construction 09.00 AM Witness Witness

19 RFI-CIV021202M-MD00012 MDI Jetty Construction 10.00 AM Witness Witness

20 RFI-CIV021202M-MD00013 MDI Jetty Construction 04.00 PM Witness Witness

21 RFI-CIV021202M-MC00031 MEINDO L03 North Part 14.00 WIT Witness Surveillance

22 RFI-CIV020305M-MB00056 MEINDO NEW MCB 08.00 WIT Witness Witness


23 RFI-CIV021202M-MB00067 MEINDO NEW MCB 09.00 WIT Witness Surveillance

24 RFI-CIV020304M-MB00056 MEINDO NEW MCB 10.00 WIT Witness Witness

25 RFI-CIV020305M-MB00057 MEINDO NEW MCB 10.00 WIT Witness Witness

26 RFI-CIV020102M-MB00048 MEINDO NEW MCB 09.00 WIT Witness Witness

27 RFI-CIV020401M-MB00006 MEINDO TAR SHELTER 14.00 WIT Witness Witness


28 RFI-PIP010402M-PP00031 PT PP Train 3, Line187-DO-31514/T00 09.00 WITNESS SURVEILLANCE

29 RFI-PIP010403M-PP00036 PT PP Utility, Portable water tank 10.00 WITNESS SURVEILLANCE

Utility, Axis A-1,A-2,B-1,B-3,C-2,C-3,D-


30 RFI-CIV021104M-PP00149 PT PP 2,D-3,E-2,E-3,F-2,F-3 (SUB PIPE RACK 08.00 WITNESS WITNESS
164-PRK-31001)

Utility, Axis A-1,A-2,B-1,B-3,C-2,C-3,D-


31 RFI-CIV020304M-PP00477 PT PP 2,D-3,E-2,E-3,F-2,F-3 (SUB PIPE RACK 08.30 WITNESS/HOLDPOINT WITNESS
164-PRK-31001)

Utility, Axis A-1,A-2,B-1,B-3,C-2,C-3,D-


32 RFI-CIV020305M-PP00476 PT PP 2,D-3,E-2,E-3,F-2,F-3 (SUB PIPE RACK 09.00 WITNESS/HOLDPOINT WITNESS
164-PRK-31001)

33 RFI-CIV020307M-PP00094 PT PP Utility, Boiler A & Boiler B 09.30 HOLDPOINT WITNESS

34 RFI-CIV020102M-PP00092 PT PP Utility, Boiler A & Boiler B 10.00 WITNESS WITNESS

35 RFI-CIV021202M-PP00386 PT PP Train 3, axis PC2A-D-17/18 & C2B-E/18 13.00 WITNESS SURVEILLANCE

36 RFI-CIV021202M-PP00387 PT PP Train 3,Axis PC3C-A-16 & PC3-C-16 13.00 WITNESS SURVEILLANCE

37 RFI-CIV020304M-PP00478 PT PP Train 3, axis PC2A-D-17/18 & C2B-E/18 13.00 WITNESS/HOLDPOINT WITNESS

38 RFI-CIV020304M-PP00479 PT PP Train 3,Axis PC3C-A-16 & PC3-C-16 13.00 WITNESS/HOLDPOINT WITNESS

39 RFI-CIV020305M-PP00477 PT PP Train 3, axis PC2A-D-17/18 & C2B-E/18 13.00 WITNESS/HOLDPOINT WITNESS


40 RFI-CIV020305M-PP00478 PT PP Train 3,Axis PC3C-A-16 & PC3-C-16 13.00 WITNESS/HOLDPOINT WITNESS

41 RFI-CIV021202M-PP00388 PT PP Train 3, TABLETOP-MR-A/B-1-6 13.00 WITNESS SURVEILLANCE

42 RFI-CIV020304M-PP00480 PT PP Train 3, TABLETOP-MR-A/B-1-6 13.00 WITNESS/HOLDPOINT WITNESS

43 RFI-CIV020305M-PP00479 PT PP Train 3, TABLETOP-MR-A/B-1-6 13.00 WITNESS/HOLDPOINT WITNESS


44 RFI-CIV010401M-LC00112 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

45 RFI-CIV010402M-LC00136 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

46 RFI-CIV010403M-LC00136 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

47 RFI-CIV010404M-LC00137 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

48 RFI-CIV020101M-LC00510 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness
49 RFI-CIV020102M-LC00542 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness

50 RFI-CIV020304M-LC00228 LCI Hauling Road 6 09.00 WIT Witness Witness

51 RFI-CIV020305M-LC00822 LCI Hauling Road 6 09.15 WIT Witness Witness

52 RFI-CIV020307M-LC00062 LCI Hauling Road 6 08.30 WIT Witness Witness

53 RFI-CIV020307M-LC00063 LCI Hauling Road 6 09.15 WIT Witness Witness

Layer 3:
09.00 WIT
54 RFI-CIV020102M-LC00543 LCI Hauling Road 6 Witness Witness
Layer 4:
15.00 WIT
55 RFI-CIV020304M-LC00229 LCI Flare Area 10.00 WIT Witness Witness

56 RFI-CIV020305M-LC00823 LCI Flare Area 14.00 WIT Witness Witness

57 RFI-CIV020307M-LC00064 LCI Hauling Road 8 08.00 WIT Witness Witness

Layer 1:
09.15 WIT
58 RFI-CIV020102M-LC00544 LCI Hauling Road 8 Witness Witness
Layer 2:
15.15 WIT

09.00 WIT
59 RFI-CIV020305M-LC00824 LCI Landfill Witness Witness
14.00 WIT

60 RFI-CIV020305M-LC00825 LCI Landfill 10.00 WIT Witness Witness

61 RFI-CIV020102M-LC00545 LCI Accsess Road 8 09.30 WIT Witness Witness


62 RFI-CIV000201M-LC00017 LCI Construction road to Jetty 08.00 WIT Witness Witness

63 RFI-CIV020305M-LC00826 LCI Access Road 7 09.00 WIT Witness Witness

64 RFI-CIV020101M-LC00511 LCI Train 3 14.00 WIT Witness Witness

65 RFI-CIV020102M-LC00546 LCI Train 3 14.30 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION
INSPECTION TIME CODE CODE

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-FG-BUM-116 Buma Warehaouse Area (West Side 2) 08.30 AM Surveillance -

2 RFI-TEP-1150102-H03-001A-5F-0309 PT.Baharu Penta Kencana BOF 07:00 WIT Witnessed -

3 IKM-TEP5500-QAC-MEL-RFI-449
Accommodation Type-
IKM 8.00 Witness N/A
Comissary(5500POB) - SC 2

4 IKM-TEP5500-QAC-MEL-RFI-454 IKM Accommodation Type-Gymnasium 9.00 Witness N/A


(5500POB) - SC 2

5 LCI-CIV-0201-02M-1157 LCI Train 3 10.00 WIT Witness N/A

6 LCI-CIV-0203-05M-1158 LCI Access Road 5 10.30 WIT Witness N/A

7 LCI-LCI-009-02M-1159 LCI Hauling Road 2 08.00 WIT Witness N/A


INSPECTION SCHEDULE 16-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31003/R00
Muristoni New Complete
082-WF-31009/R00
082-WF-31010/R00

Visual Inspection of Butt Fusion Welding For Line Number :


082-WF-31003/R00
Muristoni New Complete
082-WF-31009/R00
082-WF-31010/R00

Ichsan / Mico Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number : New Complete
082-WF-31768/T00

Visual Inspection of Butt Fusion Welding For Line Number :


Ichsan / Mico New Complete
082-WF-31768/T00

Inspection before pressure test :


Ichsan / Mico - Pre-test punch listing New Complete
- Release for pressure test
Ichsan / Mico Piping pressure testing New postpone Due To

Ichsan / Mico As Built & Cover Inspection New Cancelled Due To

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for STR T02- Train 3
P.7.1 (32 Mpa) 7 Days for Pedestal B16Tie Beam BC/14 and BC/15 A13A15 - Train 3
P.4.1 (21 Mpa) 7 Days for Wall Drainage STA 0+100 ~ 0+127 - HR 8
Iwan Rahmat/ Felix Sirait New Complete
P.7.1 (32 Mpa) 7 Days for Bored Pile Flare Area P2 - Jetty Const
P.7.1 (32 Mpa) 7 Days for STG 3 - Utility
P.7.1 (32 Mpa) 28 Days for Bored Pile P48/P58
P.4.1 (21 Mpa) 28 Days for Drainage HR 8

Test Sample Cylinder : Type


Iwan Rahmat/ Felix Sirait P.7.1 (32 Mpa) 28 Days for Pedestal Boiler A P17, Boiler B P6/P9 - Utility New Complete
P.7.1 (32 Mpa) 28 Days for Pile Cap - ORF

Ali Anofia L01-JET2-TRESTLE-PIL 8E,8G New postpone Resched


Ruhyan Harahap Survey check before to proceed with driving of steel piles

L01-JET2-TRESTLE-PIL 8E,8G
Ali Anofia Inspection and record driving steel pile : New postpone Resched
Ruhyan Harahap Check and record the blows number necessary to reach:
set per 10 blow and drop height of ram to be recorded. (rebound)

L01-JET2-TRESTLE-PIL 8E,8G
Ali Anofia Final Inspection – As built ECC Record New postpone Resched
Ruhyan Harahap

Ali Anofia LP44,LP45 (L01-JET2-PLATFORM-PIL) New postpone High Ti


Ruhyan Harahap Survey check before to proceed with driving of steel piles
LP44,LP45 (L01-JET2-PLATFORM-PIL)
Ali Anofia Inspection and record driving steel pile : New postpone High Ti
Ruhyan Harahap Check and record the blows number necessary to reach:
set per 10 blow and drop height of ram to be recorded. (rebound)

Ali Anofia LP44,LP45 (L01-JET2-PLATFORM-PIL) New postpone High Ti


Ruhyan Harahap Final Inspection – As built ECC Record

Road Slab Grid 4 to Grid 5 ,S01D1 Grid 1,Grid 3


Inspection during delivering fresh structural concrete:
Ali Anofia Check the concrete quality during delivery New Complete
Ruhyan Harahap Document review of batch ticket
Material sampling
Bearing Block Type 6 & 7 Grid line 9
Inspection during delivering fresh structural concrete:
Ali Anofia Check the concrete quality during delivery New Complete
Ruhyan Harahap Document review of batch ticket
Material sampling

L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL)
Ali Anofia PDA test of pile New postpone High Ti
Ruhyan Harahap Acceptance tests carried out on piles randomly selected after construction

Transition Block Type 1 GL-4


Check and verify cutting and bending of reinforce rebar including:
Ali Anofia - bending shape New Complete
Ruhyan Harahap - Size/length
- Packing for mobilization

Transition Block Type 2 GL-4


Check and verify cutting and bending of reinforce rebar including:
Ali Anofia - bending shape New postpone Resched
Ruhyan Harahap - Size/length
- Packing for mobilization

Check and verify cutting and bending of reinforce


rebar including:
Nanda  bending shape New Complete
 Size/length
 Packing for mobilization

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Okta / Dian New Complete
Document review of batch ticket
Material sampling
Check and verify cutting and bending of Reinforce rebar including:
- bending shape
Okta / Dian New Complete
- Size/length
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta / Dian  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Okta / Dian New Complete
Document review of batch ticket
Material sampling

In-situ Density / Compaction Test:


Okta / Dian New Complete
 Inspection execution and location of test (PRP)

Main Item grouting: Checks before delivery &


placement of mixed grout:
 status of chipped & soaked prepared Plumbness test From
Okta / Dian foundation New Cancelled Complete
 surface under erected base plate or equipment,
formwork vertical & horizontal levels, joints,
shape
Mico Check joint and assembly preparation pipe New Complete

Mico Check before concrete delivering/placement for pedestal New Complete

Novi Check completeness of Pile inside reinforcement New Cancelled Not Cleaning and

Novi Check before concrete delivering/placement for pht New Cancelled Not Cleaning and

Novi Inspection during delivering structural concrete for PHT New Complete

Novi Check completeness of structural works for Pedestal New Cancelled Part of top elevation

Insitu Density/ Compaction test :


Novi Inspection execution and location of test New Cancelled Area Not Ready

Gede Putu Check and verify cutting bending for Pedestal New Complete

Gede Putu Check and verify cutting bending for Pedestal New Complete

Gede Putu Check before concrete delivering/placement for Pedestal New Cancelled Heavy r

Gede Putu Check before concrete delivering/placement for Pedestal New Complete

Gede Putu Inspection during delivering structural concrete for pedestal New Complete
Gede Putu Inspection during delivering structural concrete for pedestal New Complete

Gede Putu Check and verify cutting bending for Coloumn New Complete

Cancelled Additional tierod for the


Gede Putu Check before concrete delivering/placement for Coloumn New from CSTS su

Gede Putu Inspection during delivering structural concrete for Coloumn New Cancelled Due to the formwork
Survey report before to proceed with driving steel casing/drilling activities
Quantity : Pile
Yulius Pile No : P 63 New Complete
Pile No : P 73
Pile No : P 69

Check borehole after completion of drilling activities


Quantity : Piles
Yulius Pile No : P 63 New Complete
Pile No : P 73
Pile No : P 69

Check before reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Yulius Pile No : P 63 New Complete
Pile No : P 73
Pile No : P 69

Check the structural concrete quality during delivery (Quantity : Piles)


Yulius Pile No : P 63 New Complete
Pile No : P 73
Pile No : P 69

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius • TP 8 , Part 2 Layer 5 New Cancelled High Moisture
• TP 8 , Part 3 Layer 1
In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius • TP 8 , Part 2 Layer 5 New Cancelled High Moisture
• TP 8 , Part 3 Layer 1

Field Inspection before Concrete Placement for U-Ditch for Hauling Road 6
• STA 2+625.5 ~ 2+630 (Slab section), Right side
Suyatman • STA 2+597.7 ~ 2+600 (Slab section), Right side New Complete
• STA 2+638.3 ~ 2+640 (Slab section), Right side
• STA 2+613.1~ 2+610 (Slab section), Right side

Inspection during delivery fresh Structural Concrete


For U-Ditch for Hauling Road 6
• STA 2+625.5 ~ 2+630 (Slab section), Right side
Suyatman New Complete
• STA 2+597.7 ~ 2+600 (Slab section), Right side
• STA 2+638.3 ~ 2+640 (Slab section), Right side
• STA 2+613.1~ 2+610 (Slab section), Right side
Finishing Inspection :
Check completeness of Structural concrete works prior to proceed with backfilling
Suyatman New Complete
activities
• Drainage U-Ditch at Hauling Road 6, Right side STA 2+597 ~ 2+535

Finishing Inspection :
Check completeness of Structural concrete works prior to proceed with backfilling
Suyatman New Complete
activities
• Drainage U-Ditch at Hauling Road 6, Left side STA 2+595 ~ 2+600

In-situ Density / Compaction


• Backfill layer 3
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR
Suyatman 6 New Cancelled Wet Soil condition d
• Backfill layer 4
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR
6
Field Inspection before Concrete Placement
Yulius • U-Ditch for Access Road to Flare area (Wall section), STA 0+240 ~ 0+293.47 Right New Complete
side

Inspection during delivery fresh Structural Concrete


Yulius • U-Ditch for Access Road to Flare area (Wall section), STA 0+240 ~ 0+293.47 Right New Complete
side

Finishing Inspection :
Check completeness of Structural concrete works prior to proceed with backfilling
activities
Suyatman New Complete
For Drainage U-Ditch at Hauling Road 8
• STA 0+100 ~ 0+127 Left side
• STA 0+040 ~ 0+067 Left side

In-situ Density / Compaction Test


• Backfill layer 3
Suyatman New Cancelled Wet Soil condition d
• Backfill layer 4
for U-Ditch at Hauling Road 8, Right side, STA 0+300 ~ 0+369

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Foudation for Fence Part 4 ( pcs)

Inspection during delivery fresh Structural Concrete


Ulfa • Tie Beam of Fence (part 2) New Cancelled No concrete

In-situ Density / Compaction Test ;


Okta • Backfill layer 1 New Cancelled Due To
for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600
Check and verify sieve material (site excavated or imported borrow pit material) to be
used for general backfilling area :
Yulius New Complete
• Soil sampling
• Review of material properties (Soil classification, MDD, etc) / Laboratory Test

Inspection during delivery fresh Structural Concrete


Okta • Drainage Access Road 7 (Wall section), Right side, STA 0+420`0+440 New Cancelled No concrete
• Drainage Access Road 7 (Wall section), Right side, STA 0+300`0+380

Inspection of Subgrade before laying fill material


Gede Putu New Cancelled Still too wet t
• Backfill layer 2 ; Part 1, Line no.

In-situ Density / Compaction Test ;


Gede Putu New Cancelled Still too wet t
• Backfill layer 2 ; Part 1, Line no.
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Pouring Concrete for Pole Foundation of Fence New Complete

Yatmico Hydrostatic Test New Complete

Inspections and checks before energizing the electrical installation : Insulation & Installation Not Compl
Yatmico / Abdul Gani New Cancelled
Contuinity Test JB & MCB not insta

Yatmico / Abdul Gani Inspections and checks before energizing the electrical installation : Insulation & New Cancelled Installation Not Compl
Contuinity Test JB & MCB not insta

In-situ Density / Compaction Test (PLT) For SI 1145


Gede Putu New Complete
• Point

Inspection during delivery fresh Structure concrete


Okta New Complete
• Junction Box for RCP at Access Road 5 STA 2+210 (Slab Section)

Okta Inspection during delivering Concrete V-Ditch with geocell New Complete
• Hauling Road 2 STA 0+995~1+000 (South side)
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Due To rain

Due To rain

Reschedule

Reschedule

Reschedule

High Tide
High Tide

High Tide
High Tide

Reschedule
Plumbness test From Steel Sruture not
Complete Yet
Not Cleaning and much water

Not Cleaning and much water

Part of top elevation not yet finidhing

Area Not Ready ,Due To rain

Heavy rain
Additional tierod for the form work request
from CSTS supervisor

Due to the formwork additional tierod


High Moisture Content
High Moisture Content

Wet Soil condition doe to rany day


Wet Soil condition doe to rany day

No concrete supply

No concrete supply

Due To rain
No concrete supply

Still too wet to process

Still too wet to process


REASON

REASON

Installation Not Complete doe to Ceilling


not install yet

Installation Not Complete doe to Ceilling


not install yet
DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-PIP010502M-EP00178 EPTCO ORF Area 07.30 WIT Witness Witness

2 RFI-PIP010503M-EP00178 EPTCO ORF Area 09.00 WIT Witness Witness

3 RFI-PIP010502M-EP00179 EPTCO Utility 07.30 WIT Witness Witness

4 RFI-PIP010503M-EP00179 EPTCO Utility 09.00 WIT Witness Witness

5 RFI-PIP010502M-EP00180 EPTCO Train 3 07.30 WIT Witness Witness


6 RFI-PIP010503M-EP00180 EPTCO Train 3 09.00 WIT Witness Witness

7 RFI-PIP010504M-EP00005 EPTCO Utility 16.00 WIT Witness Witness

8 RFI-CST000202M-UP00106 UNILAB Desalination and Tankage Flare Area 08.30 WIT Witness Witness

9 RFI-CST000203M-UP00108 UNILAB Desalination and Tankage Flare Area 09.00 WIT Witness Witness

10 RFI-CIV010704M-MD00058 MDI Jetty Construction 09.00 AM Review Review

11 RFI-CIV010705M-MD00061 MDI Jetty Construction 09.00 AM Review Review

12 RFI-CIV010706M-MD00059 MDI Jetty Construction 09.00 AM Witness Witness

13 RFI-CIV010704M-MD00059 MDI Offshore Jetty Construction 09.00 AM Witness Witness

14 RFI-CIV010705M-MD00062 MDI Offshore Jetty Construction 09.00 AM Witness Witness

15 RFI-CIV010706M-MD00058 MDI Offshore Jetty Construction 09.00 AM Witness Witness


16 RFI-CIV020304M-MD00016 MDI Jetty Construction 03.30 PM Witness Witness
17 RFI-CIV010703M-MD00037 MDI Offshore Jetty Construction 09.00 AM Witness Witness

18 RFI-CIV021202M-MD00013 MDI Jetty Construction 10.00 AM Witness Witness

19 RFI-CIV-0203-06M-US00535 USI Batching Plant 15:00 Witness Witness

20 RFI-CIV000404M-MC00008 MEINDO L03 North Part 09.00 WIT Hold Witness

21 RFI-CIV021202M-MC00032 MEINDO L03 North Part 10.00 WIT Witness Surveillance

22 RFI-CIV021202M-MB00068 MEINDO NEW MCB 09.00 WIT Witness Surveillance


23 RFI-CIV020304M-MB00058 MEINDO NEW MCB 10.00 WIT Witness Witness

24 RFI-CIV020305M-MB00058 MEINDO NEW MCB 10.00 WIT Witness Witness

25 RFI-CIV010405M-MP00001 MEINDO UTILITY 09.00 WIT Witness Witness

Utility, Desilinated Water Tank, Axis A-


26 RFI-CIV021104M-PP00150 PT PP 08.00 WITNESS WITNESS
1, B-1
Utility, Desilinated Water Tank, Axis A-
27 RFI-CIV020305M-PP00481 PT PP 08.30 WITNESS/HOLDPOINT WITNESS
1, B-1

Utility, Desilinated Water Tank, Axis A-


28 RFI-CIV020304M-PP00482 PT PP u WITNESS/HOLDPOINT WITNESS
1, B-1

29 RFI-CIV020307M-PP00095 PT PP Utility, Boiler A, Boiler B 09.30 HOLDPOINT WITNESS

30 RFI-CIV020102M-PP00093 PT PP Utility, Boiler A, Boiler B 15.00 WITNESS WITNESS

31 RFI-PIP010402M-PP00032 PT. PP Train 3, Line187-DO-31513C/T00 09.00 WITNESS SURVEILLANCE

32 RFI-PIP010403M-PP00037 PT. PP Train 3, Line187-DO-31513C/T00 10.00 WITNESS SURVEILLANCE

33 RFI-PIP010402M-PP00033 PT. PP Utility, Line187-DO-31520/U00 09.00 WITNESS SURVEILLANCE

34 RFI-PIP010403M-PP00038 PT. PP Utility, Line187-DO-31520/U00 10.00 WITNESS SURVEILLANCE

35 RFI-CIV000201M-PP00013 PT. PP BOF 09.30 WITNESS WITNESS

36 RFI-CIV021202M-PP00389 PT. PP Train 3, axis E-17 & C-17, A-16 13.00 WITNESS SURVEILLANCE
37 RFI-CIV020304M-PP00484 PT. PP Train 3, axis E-17 & C-17, A-16 13.30 WITNESS/HOLDPOINT WITNESS

38 RFI-CIV020305M-PP00482 PT. PP Train 3, axis E-17 & C-17, A-16 14.00 WITNESS/HOLDPOINT WITNESS

39 RFI-CIV021202M-PP00390 PT. PP Train 3, axis E-4/5/6 PC3 15.00 WITNESS SURVEILLANCE

40 RFI-CIV020304M-PP00483 PT. PP Train 3, axis E-4/5/6 PC3 15.30 WITNESS/HOLDPOINT WITNESS

41 RFI-CIV020305M-PP00483 PT. PP Train 3, axis E-4/5/6 PC3 16.00 WITNESS/HOLDPOINT WITNESS

42 RFI-CIV021104M-PP00151 PT. PP Train 3, axis E-4/5/6 PC3 08.00 WITNESS WITNESS

43 RFI-CIV021101M-PP00077 PT. PP Train 3, axis E-4/5/6 PC3 08.00 SURVEILLANCE SURVEILLANCE


44 RFI-CIV021102M-PP00069 PT. PP Train 3, axis E-4/5/6 PC3 08.00 SURVEILLANCE SURVEILLANCE

45 RFI-CIV021202M-PP00391 PT PP Train 3, Agru Inlet Filter Coalescer 10.10 WITNESS SURVEILLANCE

46 RFI-CIV021202M-PP00392 PT PP Train 3, Acid Gas Absorber 10.10 WITNESS SURVEILLANCE

47 RFI-CIV020307M-PP00096 PT PP Train 3, Axis A/B/C-17/18/19 09.30 HOLDPOINT WITNESS

48 RFI-CIV020307M-PP00097 PT PP Train 3, TB-D/E-19 10.00 HOLDPOINT WITNESS

49 RFI-CIV020102M-PP00094 PT PP Train 3, E/F 28/29/30 14.00 WITNESS WITNESS

50 RFI-CIV010401M-LC00113 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness

51 RFI-CIV010402M-LC00137 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

52 RFI-CIV010403M-LC00137 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness
53 RFI-CIV010404M-LC00138 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

54 RFI-CIV020101M-LC00512 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness

55 RFI-CIV020102M-LC00547 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness

56 RFI-CIV020101M-LC00513 LCI Train 3 15.00 WIT Witness Witness

57 RFI-CIV020102M-LC00548 LCI Train 3 15.30 WIT Witness Witness


58 RFI-CIV020102M-LC00549 LCI Hauling Road 6 Witness Witness
Layer 4:
15.00 WIT
59 RFI-CIV020304M-LC00230 LCI Hauling Road 6 08.30 WIT Witness Witness

60 RFI-CIV020305M-LC00827 LCI Hauling Road 6 09.00 WIT Witness Witness

Layer 1:
09.15 WIT
61 RFI-CIV020102M-LC00550 LCI Hauling Road 8 Witness Witness
Layer 2:
15.15 WIT

62 RFI-CIV020102M-LC00551 LCI Accsess Road 8 14.30 WIT Witness Witness

09.00 WIT
63 RFI-CIV020305M-LC00828 LCI Landfill Witness Witness
14.00 WIT

64 RFI-CIV020305M-LC00829 LCI Landfill 10.00 WIT Witness Witness

65 RFI-CIV020305M-LC00830 LCI Access Road 7 09.00 WIT Witness Witness

66 RFI-CIV000101M-LC00026 LCI LCI Office 08.00 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-CIV020102M-MP0002 MEINDO BROWN FIELD 09.00 WIT Witness N/A

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1104 Buma 'Buma Laydown 9:00 AM Surveillance N/A

2 RFI-QR-BPF-BUM-00159 Buma 'Batching Plant Area 10:00 AM Surveillance N/A

3 RFI-QR-TCW-BUM-1103 Buma 'Subcontractor Camp-2 14:00 PM Surveillance N/A

4 LCI-CIV-0201-02M-1162 LCI Train 3 10.00 WIT Witness N/A

5 LCI-CIV-0203-04M-1163 LCI Camp Access Road 08.00 WIT Witness N/A

6 LCI-CIV-0201-02M-1164 LCI Hauling Road 2 10.00 WIT Witness N/A

7 LCI-CIV-0208-02M-1165 LCI Combo Dock 08.00 WIT Witness N/A

8 IKM-TEP-TSF-QAC-MEL-RFI-043
Accommodation Type-Lund Sheed
IKM 8.00 Witness N/A
(TSF)

9 IKM-TEP-TSF-QAC-MEL-RFI-044
Accommodation Type-Lund Sheed
IKM 9.00 Witness N/A
(TSF)

10 IKM-TEP-TSF-QAC-MEL-RFI-045
Accommodation Type-Lund Sheed
IKM 10.00 Witness N/A
(TSF)
INSPECTION SCHEDULE 17-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
082-WF-31009/R00
Muristoni 082-WF-31010/R00
New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Muristoni 082-WF-31009/R00 New Complete
082-WF-31010/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Ichsan / Mico 082-WF-31791/U00 New Complete

Visual Inspection of Butt Fusion Welding For Line Number :


Ichsan / Mico 082-WF-31791/U00
New Complete

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Ichsan / Mico 082-WF-31768/T00 New Complete
Visual Inspection of Butt Fusion Welding For Line Number :
Ichsan / Mico 082-WF-31768/T00
New Complete

Ichsan / Mico As Built & Cover Inspection New Complete

Dian Check and verify the soil and water test location is correct New Cancelled Due To r

Check and verify the soil and water sampling is performed according to method
Dian statement and SOP
New Cancelled Due To r

Ali Anofia L01-JET2-TRESTLE-PIL 8E,8G


Ruhyan Harahap Survey check before to proceed with driving of steel piles
New On Going

L01-JET2-TRESTLE-PIL 8E,8G
Ali Anofia Inspection and record driving steel pile :
Ruhyan Harahap Check and record the blows number necessary to reach:
New On Going
set per 10 blow and drop height of ram to be recorded. (rebound)

L01-JET2-TRESTLE-PIL 8E,8G
Ali Anofia
Ruhyan Harahap Final Inspection – As built ECC Record New On Going

Ali Anofia LP44,LP45 (L01-JET2-PLATFORM-PIL)


Ruhyan Harahap Survey check before to proceed with driving of steel piles
New Complete

LP44,LP45 (L01-JET2-PLATFORM-PIL)
Ali Anofia Inspection and record driving steel pile :
Ruhyan Harahap Check and record the blows number necessary to reach:
New Complete
set per 10 blow and drop height of ram to be recorded. (rebound)

LP44,LP45 (L01-JET2-PLATFORM-PIL)
Ali Anofia
Ruhyan Harahap Final Inspection – As built ECC Record New Complete
Transition Block Type 1 GL-4
Field Inspection : Check before concrete
Delivery/placement :
- Pour lean concrete status
- formwork & reinforcement vertical and horizontal levels
Ali Anofia
Ruhyan Harahap - steel bars New On Going
- anchor bolts
- embedment, pockets, holes, joints, chamfer, mesh, etc.
- quantity, diameter/size, shape
- Locations(Coordinates/elevation)
- concrete cover thickness
L01-JET2-TRESTLE-44J,44K,LP44 (L01-JET2-PLATFORM-PIL)
Ali Anofia
Ruhyan Harahap PDA test of pile New Complete
Acceptance tests carried out on piles randomly selected after construction

Transition Block Type 2 GL-4


Check and verify cutting and bending of reinforce rebar including: Still Waiting Const
Ali Anofia - bending shape New Cancelled
Ruhyan Harahap - Size/length (Liftin
- Packing for mobilization

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for LCR Wall and Coloumn - Train 3
P.4.1 (21 Mpa) 7 Days for Wall Drainage - HR 6
P.7.1 (32 Mpa) 7 Days for PC2 E7/8 - Train 3
Iwan Rahmat/ Felix Sirait P.7.1 (32 Mpa) 7 Days for Pile Cap and Tie Beam - ORF New Complete
P.7.1 (32 Mpa) 28 Days for Bored Pile P54 - Jetty Const
P.4.1 (21 Mpa) 28 Days for Slab Drainage 0+300~0+363 Right Side - HR 8
P.7.1 (32 Mpa) 28 Days for Pedestal Boiler B - Utility
P.7.1 (32 Mpa) 28 Days for Bored Pile LLT#1 - Utility

Check and verify compliance with Project


requirements of embedment materials (commercial
Nanda bolts, anchor bolts, nuts and washers, plates, flats, New Complete
sections, bars and bent, expansion bolt, chemical
bolts)

Check and verify cutting and bending of reinforce


rebar including:
Nanda  bending shape New Complete
 Size/length
 Packing for mobilization

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Okta New Complete
- Size/length
- Packing for mobilization
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta  anchor bolts New Complete
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Okta New Cancelled Due To r
Document review of batch ticket
Material sampling

Final Inspection
Nanda  Check & verify compliance between AFC Dwgs. And As Built datum ) horizontal and New Complete
vertical displacement of pile cage, batter deviation, etc

Novi CHECK COMPLETENESS OF PILE INSIDE REINFORCEMENT New Complete


Novi Inspection during delivering structural concrete for PHT New Cancelled Cleani

Novi Check before concrete delivering/placement for PHT New Cancelled

Novi Check Completness Of Structural Concrete Works For Pedestal New Complete

Insitu Density/ Compaction test :


Novi Inspection execution and location of test
New Cancelled Area Not Rady B

Gede Putu Check joint and assembly preparation pipe New Complete

Mico Check heating blanket application and curing time New Complete

Mico Check joint and assembly preparation pipe New Complete

Mico Check heating blanket application and curing time New Complete

Check and verify sieve material (site excavated or imported borrow pit materail) to be
used under the foundation of main items & general backfilling area :
Dian New Complete
- soil sampling
- review of material properties certificates

Gede Putu Check and verify cutting bending for pedestal New Cancelled Rainy and de
Gede Putu Check before concrete delivering/placement for pedestal New Cancelled Rainy and de

Gede Putu Inspection during delivering structural concrete for pedestal New Cancelled Not Ready inspect Jo

Gede Putu Check and verify cutting bending for pile cap & pht New Cancelled Not Ready inspect Jo

Gede Putu Check before concrete delivering/placement for pile cap & pht New Cancelled Not Ready inspect Jo

Gede Putu Inspection during delivering structural concrete for pile cap & pht New Complete

Gede Putu Check completeness of Pile inside reinforcement New Complete

Gede Putu Release confirmation of pile : Check and verify coordinate of pile New Complete
Gede Putu Inspection before cutting: Check marking point for pile crushing level New Complete

Gede Putu Check and verify cutting bending for pedestal New Complete

Gede Putu Check and verify cutting bending for pedestal New Complete

Gede Putu Check Completness Of Structural Concrete Works For Pedestal New Complete

Gede Putu Check Completness Of Structural Concrete Works For Tie Beam New Complete

Gede Putu trial compaction bof material New Cancelled Due To r

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Pile No : P 65
Yulius New Complete
Pile No : P 61
Pile No : P 55
Pile No : P 59

Check borehole after completion of drilling activities


Quantity : Piles
Pile No : P 69
Yulius New Complete
Pile No : P 65
Pile No : P 61
Pile No : P 55

Check before reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Pile No : P 69
Yulius New Complete
Pile No : P 65
Pile No : P 61
Pile No : P 55
Check the structural concrete quality during delivery (Quantity : Piles)
Pile No : P 69
Yulius Pile No : P 65 New Complete
Pile No : P 61
Pile No : P 55

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius • TP 8 , Part 2 Layer 5 New Cancelled High Moisture
• TP 8 , Part 3 Layer 1

In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius • TP 8 , Part 2 Layer 5 New Cancelled High Moisture
• TP 8 , Part 3 Layer 1

Inspection of Subgrade before laying fill material


Gede Putu New Cancelled Rainy and de
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

In-situ Density / Compaction Test ;


Gede Putu New Cancelled Rainy and de
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR
Suyatman 6 New Cancelled Wet Soil Condition d
• Backfill layer 4
for Drainage
Field U-Ditch
Inspection at Concrete
before Hauling Road 6, Left side,
Placement STA 0+335
for U-Ditch HR 8 radius
for Hauling Roadto62+540 HR
Suyatman 6
• STA 2+613 radius to 2+625 (wall section), Right side New Complete

Inspection during delivery fresh Structural Concrete


Suyatman For U-Ditch for Hauling Road 6 New Complete
• STA STA 2+613 radius to 2+625 (wall section), Right side

In-situ Density / Compaction Test


• Backfill layer 3
Suyatman New Cancelled Wet Soil Condition d
• Backfill layer 4
for U-Ditch at Hauling Road 8, Right side, STA 0+300 ~ 0+369

In-situ Density / Compaction Test ;


Okta • Backfill layer 1 New Cancelled Due To r
for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Foudation for Fence Part 4 ( pcs)

Inspection during delivery fresh Structural Concrete


Ulfa New Cancelled No concrete
• Tie Beam of Fence (part 2)

Inspection during delivery fresh Structural Concrete


Okta • Drainage Access Road 7 (Wall section), Right side, STA 0+420`0+440 New Complete
• Drainage Access Road 7 (Wall section), Right side, STA 0+300`0+380
Verification of Laboratorium Equipment
Okta New Complete
• DCP (tagging no. TEP-LCI-DCP-17005 & TEP-LCI-DCP-17006)
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

In-situ Density / Compaction Test:


Nanda New Cancelled Permit Not
 Inspection execution and location of tesT (PRP Test)

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dian Pouring Concrete for Precast of Lighting Pole Foundation New Complete

Felix Pouring Concrete for slab of Mobile batching Plant Ram New Complete

Dian Pouring concrete for walkway of Building Type E2 up to E14 New Complete

In-situ Density / Compaction Test (PLT) For SI 1145


Gede Putu New Complete
• Point

Field inspection: Check before concrete placement


Okta New Complete
• Joint Box Culvert at Camp Access Road STA 0+100 (Wall Section)

In-situ Density / Compaction Test


Suyatman • Backfill layer New Cancelled Wet Soil Condition d
for PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)
Inspection during delivery fresh Structural Concrete
Okta New Complete
• Access for Boiler at Combo Dock
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP Lund Sheed
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test PP AC Lund Sheed
Inspections and checks before energizing the electrical installation : Insulation &
Yatmiko New Complete
Contuinity Test SDP
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
Due To rain

Due To rain
Still Waiting Construction Activity
(Lifting)
Due To rain
Cleaning

Area Not Rady Because Rain

Rainy and dewatering


Rainy and dewatering

Not Ready inspect Joint survey not yet

Not Ready inspect Joint survey not yet

Not Ready inspect Joint survey not yet


Due To rain
High Moisture Content

High Moisture Content

Rainy and dewatering

Rainy and dewatering


Wet Soil Condition doe to rainy Day

Wet Soil Condition doe to rainy Day

Due To rain

No concrete supply

No concrete supply
REASON

Permit Not Ready

REASON

Wet Soil Condition doe to rainy Day


DAILY QUALITY INS
TANGGUH EX
PLAN

PER

PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT


NO. RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 TEP-TGH-RFI-00233 CSTS TTP SHELTER 15.15 WIT Witness Witness

2 RFI-CIV-0203-06M-US00536 USI Batching Plant 15:00 Witness Witness

3 RFI-CIV-0203-06M-US00537 USI Batching Plant 15:00 Witness Witness

4 RFI-CIV-0203-06M-US00538 USI Batching Plant 15:00 Witness Witness

5 RFI-PIP010502M-EP00181 EPTCO ORF Area 07.30 WIT Witness Witness


6 RFI-PIP010503M-EP00181 EPTCO ORF Area 09.00 WIT Witness Witness

7 RFI-PIP010502M-EP00182 EPTCO Utility 07.30 WIT Witness Witness

8 RFI-PIP010503M-EP00182 EPTCO Utility 09.00 WIT Witness Witness

9 RFI-PIP010504M-EP00006 EPTCO Utility 16.00 WIT Witness Witness

10 RFI-WLD000303M-MD00017 MDI Jetty Construction 08.30 AM Review Review

11 RFI-WLD000303M-MD00018 MDI Jetty Construction 08.30 AM Review Review

12 RFI-CIV021202M-MD00014 MDI Jetty Construction 10.00 AM Witness Witness


13 RFI-CIV021402M-MD00023 MDI Offshore Jetty Construction 09.00 AM Witness Witness

14 RFI-CIV021202M-MC00033 MEINDO ORF 09.00 WIT Witness Surveillance

15 RFI-CIV021301M-MC00001 MEINDO ORF 09.00 WIT Witness Witness

16 RFI-CIV021302M-MC00001 MEINDO ORF 10.00 WIT Witness Witness


17 RFI-CIV021101M-MC00026 MEINDO ORF 10.00 WIT Surveillance Surveillance

18 RFI-CIV021102M-MC00023 MEINDO ORF 10.00 WIT Surveillance Surveillance

19 RFI-CIV021202M-MB00070 MEINDO LCR-03 09.00 WIT Witness Surveillance

20 RFI-CIV020304M-MB00060 MEINDO NEW MCB 10.00 WIT Witness Witness

21 RFI-CIV020305M-MB00059 MEINDO NEW MCB 13.30 WIT Witness Witness

22 RFI-CIV021202M-MB00071 MEINDO NEW MCB 09.00 WIT Witness Surveillance


23 RFI-CIV020304M-MB00061 MEINDO NEW MCB 09.00 WIT Witness Witness

24 RFI-CIV020305M-MB00060 MEINDO NEW MCB 09.00 WIT Witness Witness

25 RFI-CIV020401M-MB00007 MEINDO TAR SHELTER 14.00 WIT Witness Witness

26 RFI-CIV020102M-PP00095 PT PP Utility 13.30 WITNESS WITNESS

27 RFI-CIV020101M-PP000235 PT PP Utility 08.30 WITNESS WITNESS

28 RFI-CIV020307M-PP00098 PT PP Train 3 15.00 HOLDPOINT WITNESS


29 RFI-CIV020307M-PP00099 PT PP Train 3 09.30 HOLDPOINT WITNESS

30 RFI-CIV021202M-PP00393 PT PP Train 3 13.00 WITNESS SURVEILLANCE

31 RFI-CIV021202M-PP00394 PT PP Train 3, E-17 & F-17 13.00 WITNESS SURVEILLANCE


Train 3, A-16 & C-16 & 053-SHL-
32 RFI-CIV020304M-PP00486 PT PP 13.00 WITNESS/HOLDPOINT WITNESS
31001-A/B-B/B'-4-9

33 RFI-CIV020304M-PP00487 PT. PP Train 3, E-17 & F-17 13.00 WITNESS/HOLDPOINT WITNESS

Train 3, A-16 & C-16 & 053-SHL-


34 RFI-CIV020305M-PP00486 PT. PP 13.30 WITNESS/HOLDPOINT WITNESS
31001-A/B-B/B'-4-9

35 RFI-CIV020305M-PP00487 PT. PP Train 3, E-17 & F-17 13.30 WITNESS/HOLDPOINT WITNESS

36 RFI-CIV020304M-PP00488 PT. PP Utility 13.30 WITNESS/HOLDPOINT WITNESS

37 RFI-CIV020305M-PP00488 PT. PP Utility 14.00 WITNESS/HOLDPOINT WITNESS

38 RFI-CIV020305M-PP00489 PT. PP Utility, Portable water tank 14.30 WITNESS/HOLDPOINT WITNESS

39 RFI-CIV010401M-LC00114 LCI Pipe and Access to Jetty Area 07.30 WIT Witness Witness
40 RFI-CIV010402M-LC00138 LCI Pipe and Access to Jetty Area 07.45 WIT Witness Witness

41 RFI-CIV010403M-LC00138 LCI Pipe and Access to Jetty Area 08.15 WIT Witness Witness

42 RFI-CIV010404M-LC00139 LCI Pipe and Access to Jetty Area 08.30 WIT Witness Witness

43 RFI-CIV020101M-LC00514 LCI Pipe and Access to Jetty Area 15.30 WIT Witness Witness
44 RFI-CIV020102M-LC00552 LCI Pipe and Access to Jetty Area 16.00 WIT Witness Witness

45 RFI-CIV020101M-LC00515 LCI Train 3 15.00 WIT Witness Witness

46 RFI-CIV020102M-LC00553 LCI Train 3 15.30 WIT Witness Witness

Layer 3:
09.00 WIT
47 RFI-CIV020102M-LC00554 LCI Hauling Road 6 Witness Witness
Layer 4:
15.00 WIT

Layer 1:
09.15 WIT
48 RFI-CIV020102M-LC00555 LCI Hauling Road 8 Witness Witness
Layer 2:
15.15 WIT

49 RFI-CIV020305M-LC00831 LCI Access Road 7 09.00 WIT Witness Witness

50 RFI-CIV020102M-LC00556 LCI Accsess Road 8 14.30 WIT Witness Witness


BR
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 ELE-0302-01M-XX0001 CSTS 18T BRIDGE, FRONT OF CNDENSATE 09.00 WIT Witness N/A

TEMP
PROPOSED CONTRACTOR INVOLVEMENT COMPANY INVOLVEMENT
NO RFI NO SUBCONTRACTOR LOCATION OF INSPECTION INSPECTION TIME CODE CODE

1 RFI-QR-TCW-BUM-1105 BUMA BOF 09.00 WIT Witness N/A

2 LCI-CIV-0203-05M-1166 LCI Camp Access Road 14.00 WIT Witness N/A

3 LCI-CIV-0201-02M-1167 LCI Hauling Road 2 14.00 WIT Witness N/A

4 LCI-CIV-0201-02M-1168 LCI Utility 17.00 WIT Witness N/A


INSPECTION SCHEDULE 18-Jan-19

ANGGUH EXPANSION PROJECT - LNG EPC


RESULT

PERMANENT WORK
QC Inspector REASO
INSPECTION INSPECTION
ITEM / WORK TO BE INSPECTED STATUS RESULT (Only if inspection ressult Reje
CSTS BP Note)

Alfan TEP-TGH-MRR-01446-SHAVER MACHINE New

Test Sample Cylinder : Type


P.7.1 (32 Mpa) 7 Days for KO Drum Tie Beam GL: N-O/7-8 - Train 3
P.7.1 (32 Mpa) 7 Days for PC2 D/7-8 - Train 3
P.7.1 (32 Mpa) 7 Days for PC2 E12/13 - Train 3
Iwan / Felix Sirait New
P.7.1 (32 Mpa) 7 Days for Pedestal B/17-18 - Train 3
P.7.1 (32 Mpa) 7 Days for Slab New MCB - New MCB
P.4.1 (21 Mpa) 7 Days for Wall Drainage STA 0+67~0+100 Left Side - HR 8

Test Sample Cylinder : Type


Iwan / Felix Sirait P.7.1 (32 Mpa) 28 Days for Trial Produstion CA.USI Shipment #14 - BP 1 New
P.7.1 (32 Mpa) 28 Days for Trial Produstion CA.USI Shipment #14 - BP 2

Test Sample Cylinder : Type


Iwan / Felix Sirait PAKCRETE (35 Mpa) 7 Days for Transition Block Type 1 (2No) Type 2 (2No) Grid 3 - New
Jetty Const

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Muristoni 082-WF-31010/R00 New
082-WF-31011/R00
Visual Inspection of Butt Fusion Welding For Line Number :
Muristoni 082-WF-31010/R00 New
082-WF-31011/R00

Joint Preparation and Pre-Assembly Inspection of UG HDPE Work For Line Number :
Mico / Ichsan New
082-WF-31791/U00

Visual Inspection of Butt Fusion Welding For Line Number :


Mico / Ichsan 082-WF-31791/U00
New

Mico / Ichsan As Built & Cover Inspection New

Portable Welding Rod Dryer


Ali Anofia Welding and Allied Processes Equipment and Measurement Devices New
Ruhyan Harahap Calibration verification.

Portable Welding Rod Dryer


Ali Anofia Welding and Allied Processes Equipment and Measurement Devices New
Ruhyan Harahap Calibration verification.

Transition Block Type 2 Grid Line 4


Check and verify cutting and bending of reinforce rebar including:
Ali Anofia - bending shape New
Ruhyan Harahap - Size/length
- Packing for mobilization
Concrete Lining Pile 42G,42J,42K (L01-JET2-TRESTLE-PROT)
Inspection on Precast Installation
Check Position of Precast: Horizontal, vertical
Ali Anofia and Elevation New
Ruhyan Harahap Check the Connection to main structure
Check for Elastomeric rubber Pad
Grout Placement Inspection

Check and verify cutting and bending of reinforce


rebar including:
Ulfa  bending shape New
 Size/length
 Packing for mobilization

Field inspection: Check before concrete delivery/placement:


 Set up formwork and rebar reinforcement assembly and
final set dimension
 Installation of steel bars
 Setting anchor bolts dimension and position
Ulfa New
 Setting embedment, pockets, holes, joints, chamfer,
mesh, handling/lifting hook, etc.
 quantity, diameter/size, shape
 Set up for precast joint
 concrete cover thickness, Etc

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Ulfa New
Document review of batch ticket
Material sampling
Ulfa Check and verify coordinate of pile New

Ulfa Check marking point for Pile crushing level New

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Gede Putu New
- Size/length
- Packing for mobilization

Field inspection: Check before concrete


delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta  anchor bolts New
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Check the concrete quality during delivery
Okta New
Document review of batch ticket
Material sampling

Check and verify cutting and bending of Reinforce rebar including:


- bending shape
Okta New
- Size/length
- Packing for mobilization
Field inspection: Check before concrete
delivery/placement:
 poured lean concrete status
 formwork & reinforcement vertical and
horizontal levels
 steel bars
Okta  anchor bolts New
 embedment, pockets, holes, joints, chamfer,
mesh, etc.
 quantity, diameter/size, shape
 locations(Coordinates/elevation)
 concrete cover thickness
 etc.

Inspection during delivering fresh structural concrete:


Okta Check the concrete quality during delivery New
Document review of batch ticket
Material sampling

Main Item grouting: Checks before delivery &


placement of mixed grout:
 status of chipped & soaked prepared
Okta foundation New
 surface under erected base plate or equipment,
formwork vertical & horizontal levels, joints,
shape

Insitu Density/ Compaction test :


Novi New
Inspection execution and location of test, Boiler A & B

Inspection of subgrade and grade layer before laying fill material for HDPE Pipe, line
Novi New
'082-wf-31771-16''-12PDOF3-NF & line '082-wf-31789-U00

Check completeness of structural works for tie beam, TB axis D-18/19, E-18/19, F-
Gede Putu New
18/19, D/E-17, D/E-18, E/F-17, E/F-18
Check completeness of structural works for pile cap, TB axis D-18/19, E-18/19, F-
Gede Putu New
18/19, D/E-17, D/E-18, E/F-17, E/F-18

Check and verify cutting bending for Pedestal & Pile cap, A-16 & C-16, 053-SHL-31001-
Gede Putu New
A/B-B/B'-4-9

Gede Putu Check and verify cutting bending for Pedestal New

Gede Putu Check before concrete delivering/placement for pedestal & Pile cap New

Gede Putu Check before concrete delivering/placement for pedestal New

Gede Putu Inspection during delivering structural concrete for pedestal & Pile cap New

Gede Putu Inspection during delivering structural concrete for pedestal New

Check before concrete delivering/placement for pht , 164-TK-31001-A-1,A-2,B-2,B-


Novi New
3,C-2,C-3,D-2,D-3,E-2,E-3,F-2,F-3

Inspection during delivering structural concrete for PHT, 164-TK-31001-A-1,A-2,B-2,B-


Novi New
3,C-2,C-3,D-2,D-3,E-2,E-3,F-2,F-3

Novi Inspection during delivering structural concrete for pedestal New

Survey report before to proceed with driving steel casing/drilling activities


Quantity : Pile
Yulius Pile No : P 61 New
Pile No : P 51
Pile No : P 55
Check borehole after completion of drilling activities
Quantity : Piles
Pile No : P 61
Yulius New
Pile No : P 51
Pile No : P 55

Check before reinforcing cage and structural concrete placement of bore pile
(Quantity : Piles)
Yulius Pile No : P 61 New
Pile No : P 51
Pile No : P 55

Check the structural concrete quality during delivery (Quantity : Piles)


Pile No : P 61
Yulius New
Pile No : P 51
Pile No : P 55

Inspection of subgrade for Pipe and Access to Jetty Area sheet 04


Yulius • TP 8 , Part 2 Layer 5 New
• TP 8 , Part 3 Layer 1
In-situ Density / Compaction Test for Pipe and Access to Jetty Area sheet 04
Yulius • TP 8 , Part 2 Layer 5 New
• TP 8 , Part 3 Layer 1

Inspection of Subgrade before laying fill material


Gede Putu New
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

In-situ Density / Compaction Test ;


Gede Putu New
• Sand Bedding Elevation (Under HDPE Pipe) (Part 2), Line no.

In-situ Density / Compaction


• Backfill layer 3
for Drainage U-Ditch at Hauling Road 6, Left side, STA 2+540 HR 8 radius to 2+595 HR
Suyatman 6 New
• Backfill layer 4
for Drainage U-Ditch at Hauling Road 6, Left side, STA 0+335 HR 8 radius to 2+540 HR
6

In-situ Density / Compaction Test


• Backfill layer 3
Suyatman New
• Backfill layer 4
for U-Ditch at Hauling Road 8, Right side, STA 0+300 ~ 0+369

Inspection during delivery fresh Structural Concrete


Okta • Drainage Access Road 7 (Wall section), Right side, STA 0+420`0+440 New
• Drainage Access Road 7 (Wall section), Right side, STA 0+300`0+325

In-situ Density / Compaction Test ;


Okta • Backfill layer 1 New
for PC Box Culvert no.57 (BC1x1) at Access Road 8 STA 0+600
BROWNFIELD
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Abdul Gani INSTALLATION CABLE AND INSULATION CABLE TESTING BEFORE ENERGIZING New

TEMPORARY WORK
INSPECTION INSPECTION
QC Inspector N/A ITEM / WORK TO BE INSPECTED REASO
STATUS RESULT

Dafid Receiving material Inspection for Material Plywood ,Polythene sheet,wiremesh New

Inspection during delivery fresh Structure concrete


Okta New
• Joint Box Culvert at Camp Access Road STA 0+100 (Wall Section)

In-situ Density / Compaction Test


Suyatman • Backfill layer New
for PC Box Culvert (BC1x1m) at Hauling Road 2 STA 0+880 (BC 07)

In-situ Density / Compaction Test (PLT) For SI (To be Confirmed)


Novi • Point
New
RESULT

REASON

(Only if inspection ressult Reject/Pending/Accept witn


Note)
REASON

REASON