Sie sind auf Seite 1von 76

STRUCTURE ANALYSIS REPORT

SITE NAME : NAREH_HILIA


SITE ID : 2252133
TOWER TYPE : SST 42 M
REGION : WEST SUMATERA

NEW DESIGN PROJECT

PREPARED BY :

PT. KAIZEN KONSULTAN

Jl. Meruya Selatan Puri Botanical


Blok H9 No.19 Joglo, Kembangan REV.
Jakarta barat 11640
0
Telp : 021-58906419
E-mail : engineering.division@kaizenkonsultan.co.id
Website : www.kaizenkonsultan.co.id 11 September 2017
STRUCTURE ANALYSIS REPORT
REV.0

Site Name : 1. ANALYSIS RESULT

NAREH_HILIA
2. CALCULATION DESIGN CRITERIA
Site ID :
3. FOUNDATION ANALYSIS
2252133

4. ATTACHMENT

5. DRAWING

MCP118/1G22

11 September 2017
1. ANALYSIS RESULT
FOUNDATION SUMMARY

Site Name : NAREH_HILIA


Site ID : 2252133
Tower Type : SST 42 M - NL
Tower Height : 42 m

DIMENSION

Foundation Depth 2.4 m


Pedestal Dimension 500 mm x 500 mm
Pad Dimension 5.5 m x 5.5 m
Pad Thickness 0.4 m
Tie Beam 300 mm x 400 mm

ANALYSIS

Description Result Allowable Remark

Overtuning Capacity 1.950 > 1.5 OK !!


Bearing Capacity 7.910 > 23.33 OK !!
Sliding Capacity 6.189 > 1.5 OK !!

REINFORCEMENT

Pedestal Rebar 16-D16


Pedestal Stirrup Ø10-200
Tie Beam Rebar 8-D16
Tie Beam Stirrup Ø10-150
Top & Bottom Pad Rebar D16-200
Concrete Volume 16.1805 m3
Rebar Weight 1755.387 kg

NOTES :

Based on the analysis result above, Foundation design is strong


enough to support the propose loading.
2. CALCULATION DESIGN CRITERIA
CALCULATION DESIGN CRITERIA
1. DESIGN CODE AND STANDARD
The design code and standard of the foundation analysis are :
a. American Society For Testing And Materials (ASTM A 615 M).
b. The fabrication and materials of the tower will be according to the
relevant Indonesian Standard and/or Japanese Industrial Standard.
c. American Concrete Institute (ACI 318-99)
d. Tata Cara Perencanaan Struktur Beton untuk Bangunan Gedung
(SNI–03–2847–2002).
e. Baja Tulangan Beton (SNI 07-2052-2002)
f. Peraturan Pembebanan Indonesia untuk Gedung (PPIUG)-1987
g. Uniform Building Code (UBC)-1997
2. STANDARD OF ANALYSIS
The foundation design / analysis tolerances are :
a. Overturning Moment = Minimum 1.5 (Based PPIUG 87 Page 32)
b. Sliding Force = Minimum 1.5 (Based PPIUG 87 Page 32)
c. Uplift Force = Minimum 1.5 (Based PPIUG 87 Page 32)
d. Friction Factor = 0.5 (Ir. Muhammad Aminullah MT.)

Strength reduction factor for foundation are :


a. Bending Tension = 0.8-0.9
(SNI 03-2847-2002 Page 61 and 201)
b. Axial = 0.8-0.9
(SNI 03-2847-2002 Page 61 and 201)
c. Compression 1 = 0.7-0.85
(SNI 03-2847-2002 Page 61 and 201)
d. Compression 2 = 0.7-0.85
(SNI 03-2847-2002 Page 61 and 201)
e. Shear and Torsion = 0.75-0.8
(SNI 03-2847-2002 Page 61 and 201)
f. Reinforcement = 1.05 (Based ASCE, Appendix A)
g. Flexure = 1.5 (Based ASCE, Appendix A)
h. Shear Strength without Shear Reinforcement
= 1.25 (Based ASCE, Appendix A)
3. MATERIALS

Steel materials that are used for the tower and appurtenances
conform to the relevant Indonesian, American or Japanese Industrial
Standards. The assumed material properties :

Fy Fu F’c
Material Standard Grade
(Mpa) (Mpa) (Mpa)
Concrete - K-225 - - 18.675
Plain Bar JIS G3112 SR 24 240 520 -
Rebars
Deformed Bar JIS G3112 SD 40 390 560 -

4. LOAD
LOAD DATA SST 42 m

COMPRESS LOAD OF TOWER TAKEN FROM MS-TOWER


VERT. LOAD HOR. LOAD MOMENT
LEG
FVc (Ton) Fxc (Ton) Fyc (Ton) Mxc (Ton.m) Myc (Ton.m) Mzc (Ton.m)
1 -1.213 -0.601 -0.706 0.006 -0.008 0.004
2 30.729 -1.788 -1.703 -0.011 0.011 0.000
3 -1.685 -0.804 -0.672 0.009 -0.007 -0.004
4 -33.627 -1.822 -1.906 -0.012 0.013 0.000
3. FOUNDATION ANALYSIS
9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name Foundation Analysis
Structure Name Nareh_Hilia

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Bi-Axial)
Ft.Name # L/C Fs Allowable Result
F2 1 6.189 1.5 OK

1.2 Check of Overturning Moment


Ft.Name # L/C X - OVM Y - OVM Allowable Result
F2 1 1.95 2.56 1.5 OK / OK

1.3 Check of Bearing Pressure (Uni-Axial)


2 2
Ft.Name # L/C X - Qu(tonf/m ) Y - Qu(tonf/m ) Allowable Result
F2 1 7.91 6.33 23.33 OK / OK

1.4 Check of Uplift Force


Ft.Name # L/C Qu / Fz Allowable Result
F2 1 N/A 1.5 OK

2. DESIGN OF FOOTING
2.1 Check of Reinforcement 2
(Unit : cm )
Ft.Name Sec.Nam # L/C Req.As top / bottom Used.As top / bottom Result
S1 (X) 2 3.60 / 3.60 10.05 / 10.05 OK / OK
F2
S1 (Y) 2 3.60 / 3.60 10.05 / 10.05 OK / OK

2.2 Check of One Way Shear (Unit : tonf)


Ft.Name Sec.Nam # L/C fVc Vu Result
S1 (X) 2 20.40 0.00 OK
F2
S1 (Y) 2 19.45 0.00 OK

2.3 Check of Two Way Shear (Unit : tonf)


Ft.Name # L/C Ct. Pr.Name fVc Vu Result
F2 2 4 137.437 35.463 OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FRAME ANALYSIS
3.1 FRAME DRAWING
3.2 FRAME ANALYSIS DATA

4. FOUNDATION DATA
4.1 FOOTING AND SECTION DATA
4.2 PIER DATA
4.3 LOAD CASE
4.4 LOAD COMBINATION

5. CHECK OF STABILITY
5.1 CHECK OF SLIDING
5.2 CHECK OF OVERTURNING MOMENT
5.3 CHECK OF CONTACT PRESSURE
5.4 CHECK OF UPLIFT

6. DESIGN OF FOOTING
6.1 DESIGN MOMENT AND SHEAR FORCE
6.2 REQUIRED REINFORCEMENT
6.3 ONE WAY SHEAR FORCE
6.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 225.000 kgf/cm
2
Lean Concrete (Lf'c : compressive strength) 225.000 kgf/cm
2
Reinforcement (10M ~ 16M , yield strength) 3900.000 kgf/cm
2
Reinforcement (19M ~ , yield strength) 3900.000 kgf/cm
3
Rs (Soil unit weight) 1.700 ton/m
3
Rc (Concrete unit weight) 2.400 ton/m
6 2
Es (Steel Modulus of Elasticity) 2.000 10 kgf/cm
2
Ec (Concrete Modulus of Elasticity) 203108.500 kgf/cm

- Soil Capacity
Items Value
Soil Name Nareh_Hilia
Footing List F2
2
Qa (Soil Bearing Capacity) 23.33 tonf/m
Buoyancy Consider
WL (Water Label from the EL = 0) -500 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
Passive Soil Pressure Not Consider
2
Cu (Undrained cohesion) Clay , 23.33 tonf/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 0%
Allowable Increase of Soil (Seismic) 0%
Allowable Increase of Soil (Test) 0%
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against uplift 1 1.5
Friction factor (m) 0.5

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 4

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 CL COMPRESS LOAD

Comb . ID Load Combination for stability


1 1.0 SW + 1.0 CL
Comb . ID Load Combination for Reinforcement
2 1.0 SW + 1.0 CL

Copyright (c) GS E&C. All Rights Reserved


9/11/2017

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE
A01

NOTES
* OUTPUT UNIT : mm
4 3

01

Foundation Analysis PROJECT

FOUNDATION LOCATION PLAN


Nareh_Hilia

SQUAD CHECK
1 2

Y
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

F2

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN

Copyright (c) GS E&C. All Rights Reserved


9/11/2017

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


9/11/2017

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

5500
1062 1062
3376

1062

NOTES
4 3
* OUTPUT UNIT : mm
CL FOOTING

5500

3376

Foundation Analysis PROJECT

1 2
1062

FOUNDATION DETAIL FOR


F2

SQUAD CHECK
FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD


AS SHOWN

Copyright (c) GS E&C. All Rights Reserved


9/11/2017

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

TYP.
50
NOTES
* OUTPUT UNIT : mm
16M@200

16M@200
Foundation Analysis PROJECT

FOUNDATION DETAIL FOR


F2
16M@200
16M@200

SQUAD CHECK
REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD


AS SHOWN

Copyright (c) GS E&C. All Rights Reserved


9/11/2017

1 2

4 3

2000
400
LEAN CONC. 50 THK
1 2
ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


9/11/2017 F2 Item No.

1 2 3
500 500 500
50 50 50
TYP. TYP. TYP.

10M 10M 10M


500

500

500
16-16M 16-16M 16-16M
30 GR.

30 GR.

30 GR.
50

50

50
50

50

50
2700

2700

2700
@200

@200

@200
10M

10M

10M
16M 16M 16M
100

100

100
4
500
50
TYP.

10M
500

16-16M
30 GR.

50
50
2700

@200
10M

16M
100

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 11

3. FRAME ANALYSIS

3.1 FRAME DRAWING


Sturcture 1

16 (P4)

12 13 (P3)

15 9
15 (Girder_3)
7 (P1) 12
16 (Girder_4)
3 11
10 (P2)
14 (Girder_2)
6 8
6
13 (Girder_1)
14
10 9
4
2 11
7
3
5

5
1
1 8
4
2

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 12

3.2 FRAME ANALYSIS DATA


3.2.1 Structure 1
Member and Force Unit ( tonf,tonf-m )
Member LC# Axial Shear-Y Shear-Z Torsion Moment-Y Moment-Z
i -0.91 -2.737 0 0.002 -0.002 -3.927
1
j -0.91 -1.679 0 0.002 -0.003 3.527
13
i -0.91 -2.737 0 0.002 -0.002 -3.927
2
j -0.91 -1.679 0 0.002 -0.003 3.527
i 0.562 -2.724 -0.003 0.003 -0.003 -4.021
1
j 0.562 -1.666 -0.003 0.003 0.008 3.389
14
i 0.562 -2.724 -0.003 0.003 -0.003 -4.021
2
j 0.562 -1.666 -0.003 0.003 0.008 3.389
i 0.556 1.863 0.003 -0.057 0.008 3.723
1
j 0.556 2.922 0.003 -0.057 -0.003 -4.354
15
i 0.556 1.863 0.003 -0.057 0.008 3.723
2
j 0.556 2.922 0.003 -0.057 -0.003 -4.354
i -0.916 -2.916 0 -0.056 0.002 -4.229
1
j -0.916 -1.858 0 -0.056 0.003 3.831
16
i -0.916 -2.916 0 -0.056 0.002 -4.229
2
j -0.916 -1.858 0 -0.056 0.003 3.831

Support Reactions Unit ( tonf,tonf-m )


Joint LC# Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z
1 1.51 1.626 8.484 0 0 0
1
2 1.51 1.626 8.484 0 0 0
1 0.877 1.138 -28.065 0 0 0
2
2 0.877 1.138 -28.065 0 0 0
1 1.359 1.236 -0.219 0 0 0
3
2 1.359 1.236 -0.219 0 0 0
1 1.264 0.99 36.314 0 0 0
4
2 1.264 0.99 36.314 0 0 0

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 13

4. FOUNDATION DATA
4.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F2
Ft. Type MAT
2
5500 Area 30.250 m
Ft. Thickness 400.00 mm
3
Ft. Volume 12.100 m
500 500 500 500
Ft. Weight 29.040 tonf

4 3 Soil Height 2000.00 mm


3
Soil Volume 58.500 m
Soil Weight 99.450 tonf
5500

Buoyancy 57.475 tonf


Self Weight (except Pr.SW) 71.015 tonf

500 500 500 500

1 2

500
2700
2000

The Origin coordinate


400

The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F2 All Direct 12.100 m 58.500 m 6.480 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 30.250 m 29.040 tonf 99.450 tonf 134.970 tonf

4.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
1 Rectangle 500.000 500.000 2700.000 0.250 1.620 -1688.000 -1688.000
2 Rectangle 500.000 500.000 2700.000 0.250 1.620 1688.000 -1688.000
F2
3 Rectangle 500.000 500.000 2700.000 0.250 1.620 1688.000 1688.000
4 Rectangle 500.000 500.000 2700.000 0.250 1.620 -1688.000 1688.000

4.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
My are based on the right hand rule.
Fx
Mx

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 14

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 CL COMPRESS LOAD

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -1.62 0 0
1
2 -0.6 -0.71 -1.21 0.01 -0.01
1 0 0 -1.62 0 0
2
2 -1.79 -1.7 30.73 -0.01 0.01
F2 1 0 0 -1.62 0 0
3
2 -0.8 -0.67 -1.69 0.01 -0.01
1 0 0 -1.62 0 0
4
2 -1.82 -1.91 -33.63 -0.01 0.01
Footing SW 0.000 0.000 -71.015 0.000 0.000

4.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
(Frame Analysis) in centroid of Pile Group
Case NonPileType
in centroid of Footing

4.4.1 Load Combination in Pier Top (Without SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 -0.601 -0.706 -1.213 0.006 -0.008
1
2 -0.601 -0.706 -1.213 0.006 -0.008
1 -1.788 -1.703 30.729 -0.011 0.010
2
2 -1.788 -1.703 30.729 -0.011 0.010
F2
1 -0.804 -0.672 -1.685 0.009 -0.007
3
2 -0.804 -0.672 -1.685 0.009 -0.007
1 -1.822 -1.906 -33.627 -0.012 0.013
4
2 -1.822 -1.906 -33.627 -0.012 0.013

4.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
1 -1.510 -1.626 -8.484 0.000 0.000
1
2 -1.510 -1.626 -8.484 0.000 0.000
1 -0.877 -1.138 28.065 0.000 0.000
2
2 -0.877 -1.138 28.065 0.000 0.000
F2
1 -1.359 -1.236 0.219 0.000 0.000
3
2 -1.359 -1.236 0.219 0.000 0.000
1 -1.264 -0.990 -36.314 0.000 0.000
4
2 -1.264 -0.990 -36.314 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 15

4.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F2 1 -5.010 -4.990 -87.529 -93.982 -123.362 1340.6 , 3823.7

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F2 S1 2 -5.010 -4.990 -16.514 -93.982 -123.362 1340.6 , 3823.7

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 16

5. CHECK OF STABILITY
5.1 CHECK OF SLIDING
mSFz + P.F
Formula : > Fs -> OK (Bi-Axial)
SFx2 + SFy2
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( tonf )
( mSFz + P.F ) / SFx + SFy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
F2 Bi-Axial 1 0.5 87.53 / 7.07 = 6.19 1.5 OK

5.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK Unit ( tonf-m )
Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 1 -240.7 / -123.36 = 1.95 1.5 OK
F2
Y 1 240.7 / 93.98 = 2.56 1.5 OK

5.3 CHECK OF CONTACT PRESSURE


5.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


q1,q2 = or
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
P = L0 q(x) width(x) dx

5.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F2 30.250 5.500 5.500 76.2552 76.2552

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 17

5.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- X-Direction (Uni-Axial) 2
Unit( tonf , tonf-m , tonf/m )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F2 1 7.914 0.000 0.000 4.022 7.9 23.3(gross) 73.13 % OK

- Y-Direction (Uni-Axial) 2
Unit( tonf , tonf-m , tonf/m )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F2 1 0.000 6.330 0.472 5.500 6.3 23.3(gross) 91.42 % OK

5.4 CHECK OF UPLIFT


5.4.1 Formula
- Theory of Meyerhof and Adams (CRC Press edited. 1999)
-In Case Sand,
For Circular and Square
Df
( )cr-s = Refer to Figure 8.8
B
Df Df
Fq = 1 + 2 [ 1 + m ( )]( ) Ku tanf - Shallow Foundation
B B
Fq = Refer to Figure 8.10 - Deep Foundation
For Rectangular
Df Df L Df
( )cr-r = ( )cr-s [ 0.133 ( ) + 0.876 ] 1.4 ( )cr-s
B B B B
Df B Df
Fq = 1 + { [ 1 + 2m ( )]( )+1}( ) Ku tanf - Shallow Foundation
B L B Figure 8.8
Fq = Refer to Figure 8.10 - Deep Foundation
Qu = Fq g A Df
Where, B = Footing Width (Footing Diameter)
L = Footing Length
Df = Depth of embedment
m = Coefficient which is a function of the soil friction angle f
Ku = nominal uplift coefficient
Df
( )cr-s = Critical embedment ratio of square or circular foundation.
B
Df
( )cr-r = Critical embedment ratio of rectangular foundation.
B
Figure 8.10
if Df/B >= (Df/B)cr , Deep Foundation
if Df/B < (Df/B)cr , Shallow Foundation

-In Case Clay,


For Circular and Square
Df 2
( )cr-s = 0.107 Cu (kN/m ) + 2.5 7
B
Fc = 7.56 + 1.44 (B/L)
if Df/B >= (Df/B)cr , Deep Foundation
Qu = A [ Fc Cu + g Df ]
if Df/B < (Df/B)cr , Shallow Foundation
Qu = A [ b' Fc Cu + g Df ]
Df/B
a' = , b' = Fc / Fc*
(Df/B)cr-s
For Rectangular
Df Df L Df
( )cr-r = ( )cr-s [ 0.73 + 0.27 ( ) 1.55 ( )
B B B B cr-s

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 18

Fc = 7.56 + 1.44 (B/L)


if Df/B >= (Df/B)cr , Deep Foundation
Qu = A [ Fc Cu + g Df ]
if Df/B < (Df/B)cr , Shallow Foundation
Qu = A [ b' Fc Cu + g Df ]
Df/B
a' = , b' = Fc / Fc*
(Df/B)cr-r
2
Where, Cu = Undrained cohesion, in tonf/m
Df
( )cr-s = Critical embedment ratio of square or circular foundation.
B
Df
( )cr-r = Critical embedment ratio of rectangular foundation.
B

5.4.2 Uplift Check


Footing Name : F2 (Clay) 2
Unit( m , tonf/m , tonf )
f gs B L Df Df / B
0 1.7 5.5 5.5 2.4 0.44

(Df / B)cr Cu Fc a' b' Qu


7 23 9 0.062 0.104 776.93

# L/C Qu / Fz Safety Factor Result


1 Fz = -5.8 < 0 -- Not Consider Check Uplift 1.5 OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 19

6. DESIGN OF FOOTING
6.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

6.1.1 Data Unit( mm , tonf , tonf-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
S1 X 2 5500.00 5500.00 16.514 -123.36 16.514
F2
S1 Y 2 5500.00 5500.00 16.514 -93.982 16.514

6.1.2 Design Parameters


Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

2
Unit(kgf/cm ,mm)
f(Flexure) f(Shear) f'c fy1 fy2 f_cl f_clt f_clb
0.8 0.75 225.00 3900.00 3900.00 50.0 50.0 50.0

6.2 REQUIRED REINFORCEMENT


6.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 = bd
fy
3 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 20

Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )


If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.8 , r.req =
fy ( 1- 1-
0.85fck )
6.2.2 Check of Footing Reinforcement
Footing Name : F2 GroupType : Mat_Foundation
- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2

2 top 5 - 16M @ 200 2.750 1.000 34.200 10.053


S1
2 botom 5 - 16M @ 200 2.750 1.000 34.200 10.053

Sec.Nam L.Comb. Mu (tonf-m) Rn r.Req


2 top - - -
S1
2 bottom - - -

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2 2
As4(cm ) As5(cm )
2
Asmax(cm )
2

2 top 3.600 - - 12.331 10.463 64.798


S1
2 bottom 3.600 - - 12.331 10.463 64.798

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
2 top 10.053 3.600 OK
S1
2 bottom 10.053 3.600 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2

2 top 5 - 16M @ 200 2.750 1.000 32.600 10.053


S1
2 botom 5 - 16M @ 200 2.750 1.000 32.600 10.053

Sec.Nam L.Comb. Mu (tonf-m) Rn r.Req


2 top - - -
S1
2 bottom - - -

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2 2
As4(cm ) As5(cm )
2
Asmax(cm )
2

2 top 3.600 - - 11.754 9.974 61.766


S1
2 bottom 3.600 - - 11.754 9.974 61.766

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
2 top 10.053 3.600 OK
S1
2 bottom 10.053 3.600 OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 21

6.3 ONE WAY SHEAR FORCE


6.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.75 2 fck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!

6.3.2 Check of One-Way Shear


Footing Name : F2 GroupType : Mat_Foundation PileType : False

Unit : mm
5500

4 3
5500

5030

1 2

5030

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (tonf) Vu (tonf) Result
S1 2 5030 342 1000 20.403 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (tonf) Vu (tonf) Result
S1 2 5030 326 1000 19.449 0 OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 22

6.4 TWO WAY SHEAR FORCE


6.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.75 2 (1 + 2/bc) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.75 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.75 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

6.4.2 Check of Two-WayShear

2
Ft.Name F2 Punching Area 7089.640 cm

5500 Pr.Name 4 Ratio Shade 0.977

Shape Rectangle f Vc1 206.155 tonf

4 3 L.Comb. 2 f Vc2 208.277 tonf


5500

Pl 500 mm f Vc3 137.437 tonf

Pw 500 mm f Vc 137.437 tonf


1 2
bo / d 3368 / 342 mm Vu 35.463 tonf

bc / as 1 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 1

CONTENTS

1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA
2. FRAME ANALYSIS
2.1 FRAME DRAWING
2.2 FRAME ANALYSIS DATA
3. CANTIL BEAM DESIGN
3.1 FORMULA
3.2 CANTIL BEAM DESIGN
4. TENSION DESIGN
4.1 FORMULA
4.2 TENSION DESIGN
5. PM DIAGRAM
5.1 FORMULA
5.2 PM DIAGRAM & ANALYSIS
5.3 ANALYSIS & RESULT
5.4 DETAIL PM DIAGRAM
6. ONE-WAY SHEAR
6.1 FORMULA
6.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 2

1. INPUT DATA
1.1 General
Design Code American Concrete Institute (ACI 318) [Metric]

Input Unit MKS Output Unit MKS

f Bending f Axial f Sprial reinf. f Tied reinf. f Shear


0.8 0.8 0.7 0.7 0.75

f'c fy (10M ~ 16M) fy (19M ~) Ec Es Steel Db Cover


2 2 2 2 2
225 kgf/cm 3900 kgf/cm 3900 kgf/cm 203108.5 kgf/cm 2000000 kgf/cm ASTM A615 (M) 50 mm

1.2 Pier Data


500 Pier Name 1 Ver Bar 16M, 5 5 EA
50
Pier Shape Rectangle Tie Bar 10M @ 200 mm
2
Width 500 mm f'c 225 kgf/cm
500

2
Length 500 mm fy 3900 kgf/cm
2
Height 2700 mm Using As 32.17 cm

dx 432 mm dy 432 mm
2 2 2
Main Bar 5-5-16 , Area = 32.17cm , Amin (0.8%) = 20cm , Amax (8%) = 200cm

Bar Check Reinforcrment Area is OK

500 Pier Name 2 Ver Bar 16M, 5 5 EA


50
Pier Shape Rectangle Tie Bar 10M @ 200 mm
2
Width 500 mm f'c 225 kgf/cm
500

2
Length 500 mm fy 3900 kgf/cm
2
Height 2700 mm Using As 32.17 cm

dx 432 mm dy 432 mm
2 2 2
Main Bar 5-5-16 , Area = 32.17cm , Amin (0.8%) = 20cm , Amax (8%) = 200cm

Bar Check Reinforcrment Area is OK

500 Pier Name 3 Ver Bar 16M, 5 5 EA


50
Pier Shape Rectangle Tie Bar 10M @ 200 mm
2
Width 500 mm f'c 225 kgf/cm
500

2
Length 500 mm fy 3900 kgf/cm
2
Height 2700 mm Using As 32.17 cm

dx 432 mm dy 432 mm
2 2 2
Main Bar 5-5-16 , Area = 32.17cm , Amin (0.8%) = 20cm , Amax (8%) = 200cm

Bar Check Reinforcrment Area is OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 3

500 Pier Name 4 Ver Bar 16M, 5 5 EA


50
Pier Shape Rectangle Tie Bar 10M @ 200 mm
2
Width 500 mm f'c 225 kgf/cm
500

2
Length 500 mm fy 3900 kgf/cm
2
Height 2700 mm Using As 32.17 cm

dx 432 mm dy 432 mm
2 2 2
Main Bar 5-5-16 , Area = 32.17cm , Amin (0.8%) = 20cm , Amax (8%) = 200cm

Bar Check Reinforcrment Area is OK

1.3 Loading Data


1.3.1 Load Case Unit( tonf , tonf-m )
Pier Name Name Fx Fy Fz Mx My
SW 0 0 -1.62 0 0
1
CL -0.601 -0.706 -1.213 0.006 -0.008
SW 0 0 -1.62 0 0
2
CL -1.788 -1.703 30.729 -0.011 0.01
SW 0 0 -1.62 0 0
3
CL -0.804 -0.672 -1.685 0.009 -0.007
SW 0 0 -1.62 0 0
4
CL -1.822 -1.906 -33.627 -0.012 0.013

1.3.2 Load Combination List


Comb . ID Load Combination for Reinforcement
2 1.0 SW + 1.0 CL

1.3.3 In Pier Top Unit( tonf , tonf-m )


P. Name LC# SFx SFy SFz SMx SMy
1 2 -0.601 -0.706 -1.213 0.006 -0.008
2 2 -1.788 -1.703 30.729 -0.011 0.01
3 2 -0.804 -0.672 -1.685 0.009 -0.007
4 2 -1.822 -1.906 -33.627 -0.012 0.013

1.3.4 In Pier Bottom Unit( tonf , tonf-m )


P. Name LC# SFx SFy SFz SMx SMy
1 2 -1.51 -1.626 -8.484 -1.301 1.208
2 2 -0.877 -1.138 28.065 -0.91 0.702
3 2 -1.359 -1.236 0.219 -0.989 1.087
4 2 -1.264 -0.99 -36.314 -0.792 1.012

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 4

2. FRAME DRAWING

2.1 FRAME DRAWING


Sturcture 1

16 (P4)

12 13 (P3)

15 9
15 (Girder_3)
7 (P1) 12
16 (Girder_4)
3 11
10 (P2)
14 (Girder_2)
6 8
6
13 (Girder_1)
14
10 9
4
2 11
7
3
5

5
1
1 8
4
2

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 5

2.2 FRAME ANALYSIS DATA


2.2.1 Structure 1
Member and Force Unit ( tonf,tonf-m )
Member LC# Axial Shear-Y Shear-Z Torsion Moment-Y Moment-Z
i -0.91 -2.737 0 0.002 -0.002 -3.927
1
j -0.91 -1.679 0 0.002 -0.003 3.527
13
i -0.91 -2.737 0 0.002 -0.002 -3.927
2
j -0.91 -1.679 0 0.002 -0.003 3.527
i 0.562 -2.724 -0.003 0.003 -0.003 -4.021
1
j 0.562 -1.666 -0.003 0.003 0.008 3.389
14
i 0.562 -2.724 -0.003 0.003 -0.003 -4.021
2
j 0.562 -1.666 -0.003 0.003 0.008 3.389
i 0.556 1.863 0.003 -0.057 0.008 3.723
1
j 0.556 2.922 0.003 -0.057 -0.003 -4.354
15
i 0.556 1.863 0.003 -0.057 0.008 3.723
2
j 0.556 2.922 0.003 -0.057 -0.003 -4.354
i -0.916 -2.916 0 -0.056 0.002 -4.229
1
j -0.916 -1.858 0 -0.056 0.003 3.831
16
i -0.916 -2.916 0 -0.056 0.002 -4.229
2
j -0.916 -1.858 0 -0.056 0.003 3.831

Support Reactions Unit ( tonf,tonf-m )


Joint LC# Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z
1 1.51 1.626 8.484 0 0 0
1
2 1.51 1.626 8.484 0 0 0
1 0.877 1.138 -28.065 0 0 0
2
2 0.877 1.138 -28.065 0 0 0
1 1.359 1.236 -0.219 0 0 0
3
2 1.359 1.236 -0.219 0 0 0
1 1.264 0.99 36.314 0 0 0
4
2 1.264 0.99 36.314 0 0 0

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 6

3. CANTIL BEAM DESIGN


3.1 FORMULA
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 = bd
fy
3 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.8 , r.req =
fy
1- 1- (
0.85fck )
3.2 CANTIL BEAM DESIGN Unit( cm )
P.Name bx by dx dy
1 50 50 43.2 43.2
2 50 50 43.2 43.2
3 50 50 43.2 43.2
4 50 50 43.2 43.2
2
Unit(cm )
P.Name Pier As temp. As (As1) Using As (All) Result
1 32.17 4.5 32.17 OK
2 32.17 4.5 32.17 OK
3 32.17 4.5 32.17 OK
4 32.17 4.5 32.17 OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 7

2
Unit(cm )
P.Nam Dir LC# UsingAs As2 As3 As4 As5 AsSelect Result
X 2 10.05 0.9 1.2 7.79 6.61 1.2 OK
1
Y 2 10.05 0.97 1.29 7.79 6.61 1.29 OK
X 2 10.05 0.52 0.7 7.79 6.61 0.7 OK
2
Y 2 10.05 0.68 0.9 7.79 6.61 0.9 OK
X 2 10.05 0.81 1.08 7.79 6.61 1.08 OK
3
Y 2 10.05 0.74 0.98 7.79 6.61 0.98 OK
X 2 10.05 0.75 1 7.79 6.61 1 OK
4
Y 2 10.05 0.59 0.79 7.79 6.61 0.79 OK

4. TENSION DESIGN
4.1 FORMULA
-For rectangular shape D1
A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2)) t
3 3
(D1 + t) * (D2 + t) (D1 - t) * (D2 - t)

D2
Ix = -
12 12
3 3
(D2 + t) * (D1 + t) (D2 - t) * (D1 - t)
Iy = -
12 12
-S Fz Mux (D2 / 2)
Tux = ( + ) As
A Ix
-S Fz Muy (D1 / 2)
Tuy = ( + ) As
A Iy
Tu = Max(Tux, Tuy)
Tu
Req.As = , f = 0.8
f fy
-For circular or octagonal shape
4 SMu S Fz
Tu = As fs = -
Nb Dia Nb
Dia

If Tu is negative that means Tu is in compression. That Case is N/A!!


Tu
Req.As = , f = 0.8
f fy
Nb = number of bars
Dia = Diameter of Rebar arrangement
SFz = vertical load + Pier self weight

4.2 TENSION DESIGN Unit(mm , tonf,cm )


2

P. Name LC# Dia (D1/D2) Tu UsingAs/EA Req.As/EA Result


1 2 364 / 364 0.14 2.01 0.04 OK
2 2 364 / 364 2.22 2.01 0.71 OK
3 2 364 / 364 0.57 2.01 0.18 OK
4 2 364 / 364 -1.75 2.01 N/A OK

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 8

5. PM DIAGRAM
5.1 FORMULA
1) Maximum Axial Load Strength
- Po = 0.85 f'c (Ag-Ast) + S fy Ast
- Pnmax = f1 Po ( f1 = Axial Strenth Resuction Factiors)
- Mnmax = The Value of diagram, When P is Pn.
- Pumax = f2 Pnmax

f2 = Sprial or Tied Reinforcement Reduction Factor

2) Balanced Strain Condition


A balanced Strain condition exists at a cross-setion
when the maximum strain at the extreme
compression fiber just reaches eu = 0.003 simultaneously
with the first yield strain of es = fy/Es in the tension reinforcement.
The ratio of neutral axis depth cb is shown below
Cb eu
=
d eu + ey
eu = 0.003
fc = 0.85 fck

3) Strength for Combined Flexure and Axial Load


Maximum usable strain at extreme
concrete compression fiber shall
be assumed equal to eu = 0.003
if c that is neutral axis is supposed,
Pn and Mn can be calculated as below
fPn = f0.85 fck ( Acomp - S(1 to 11) Ast ) + S(1 to 28) fs Ast
fMn = f0.85 fck ( Acomp - S(1 to 11) Ast ) ( h/2 - c + yc )
+ S(1 to 28) fs Ast ( h/2 - c + ys )
fs(i) = e(i) Es , - fy fs(i) fy
Pn
Sprial or Tied Reinforcement Reduction Factor f = 0.9 - 0.2 0.9
Pa
Pa = 0.1 fck Ag
Acomp is Area from top to a (b1c)
b1c = 0.85 - 0.05 ( fck - 4000 ) / 1000 0.65 (psi)

4) Slenderness Effects
Cm p2EI 0.2EcIg + EsIse
dns = 1 Pc = 2 EI =
1-Pu/0.75Pc (klu) 1+bd

5) Shear
f fy Av d
fVc = f 2 f'c bw d , fVs = (psi)
s
fVsmax = f 8 f'c bw d (psi)
fVn = fVc + fVs

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 9

5.2 PM DIAGRAM & ANALYSIS


5.2.1 Pier Name : 1

P (tonf , tonf-m ) Axis X - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 Mx
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

P (tonf , tonf-m ) Axis Y - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 My
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 10

5.2.2 Pier Name : 2

P (tonf , tonf-m ) Axis X - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400 Mn / fMn 23.41 tonf-m / 16.38 tonf-m


fPnmax
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 Mx
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

P (tonf , tonf-m ) Axis Y - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 My
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

5.2.3 Pier Name : 3

P (tonf , tonf-m ) Axis X - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 Mx
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 11

P (tonf , tonf-m ) Axis Y - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400 Mn / fMn 23.41 tonf-m / 16.38 tonf-m


fPnmax
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 My
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

5.2.4 Pier Name : 4

P (tonf , tonf-m ) Axis X - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 Mx
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

P (tonf , tonf-m ) Axis Y - Axis (All comb.)

600 Po 597.426 tonf

500 Pnmax Pn / fPn 477.941 tonf / 334.558 tonf

400
fPnmax Mn / fMn 23.41 tonf-m / 16.38 tonf-m
300
Pb / fPb 215.994 tonf / 151.196 tonf
200 Balanced
Mb / fM 45.3 tonf-m / 31.71 tonf-m
100
c(Balanced) 261.82 mm
0 My
emin 30.24 mm
-100
klu / rx 36
10 20 30 40 50
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


9/11/2017
Site Name : Nareh_Hilia
Calculation Sheet
of Site ID : 2252133

Foundation Client : PT. PKP Page 12

5.3 ANALYSIS & RESULT


5.3.1 Moment Check unit (tonf-m )
Pier L/C# dx dy SdMux SdMuy fMnx fMny Result
1 2 1.028 1.028 1.34 1.24 15.24 14.04 OK
2 2 1 1 0.91 0.7 12.65 9.63 OK
3 2 1 1 0.99 1.09 13.83 14.91 OK
4 2 1.134 1.134 1.25 1.25 15.64 15.64 OK

5.3.2 Force Check unit (tonf )


Pier L/C# SFz fPs fPnmax Result
1 2 -96.58 334.56 8.48 OK
2 2 -100.37 334.56 -28.07 OK
3 2 -100.37 334.56 -0.22 OK
4 2 -87.82 334.56 36.31 OK

6. ONE-WAY SHEAR
6.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d (eq 11-3)
Av fy d
- Vs = (eq 11-15)
s
- Vu <= f Vc + f Vs , f = 0.75 (eq 11-1)
- When, Value of f Vs shall not exceed f 8 fck Bw d (Vs max)

6.2 ONE-WAY SHEAR Unit(tonf)


P. Name Dir. LC# fVc fVs fVs max Vu Result
X 2 12.886 14.886 51.545 1.51 OK
1
Y 2 12.886 14.886 51.545 1.626 OK
X 2 12.886 14.886 51.545 0.877 OK
2
Y 2 12.886 14.886 51.545 1.138 OK
X 2 12.886 14.886 51.545 1.359 OK
3
Y 2 12.886 14.886 51.545 1.236 OK
X 2 12.886 14.886 51.545 1.264 OK
4
Y 2 12.886 14.886 51.545 0.99 OK

Copyright (c) GS E&C. All Rights Reserved


4. ATTACHMENT
5. DRAWING
AS PLAN DRAWING
PT. PERMATA KARYA PERDANA - Bill of Quantity - BTS ANTENNA 2017
Site ID : 2252133
Vendor :-
Project : 2017 STRATEGIC ROLLOUT PHASE 1
Site Name : NAREH HILIA
Tower Height : SST 42 M NEW LIGHT
Scope of Works : FOUNDATION DESIGN
Project Manager :
Issued Date: 9/11/2017

No Item Works Qty Unit Unit Price IDR Total Price IDR Amount IDR Comment

I Site Preparation -
1 Site Survey
- Java - Ls
- Outside Java 1.00 Ls
- Islands - Ls
2 Mobilization dan Demobilization
- Java - Ls
- Outside Java 1.00 Ls
- Islands - Ls

II Steel Material Tower -


1 Steel Material and Fabrication
- Plate and Pipe Included Bolt, Nuts and Washer - kg
- Plate and Angle Included Bolt, Nuts and Washer - kg
2 Delivery - kg
3 Galvanizing (Hot Deep and Cold Galvanizing) - kg
4 Erection - kg
5 Painting - kg

III Finishing of Works -


1 Site Recondition - Ls
2 Dock for ATP and Site Binder (BAST) - Ls

IV Base Frame Pole of Works -


1 Base frame WF - 200 x 100 x 5.5 x 8 (Hot Deep Galvanized) - kg
2 HILTI HIT-RE 500 + HAS-E-F (m16-260) - set
3 Stud Bolt M16-265 - pcs

V Foundation Tower Strengthening of Works -


1 Concrete pouring with reinforcement steel bar (included excavation and compaction) - m3
2 Foundation Bore Pile diameter 60 cm - m'
3 HILTI - HIT RE - 500 (Rebar D16) - set
4 HILTI HVU+HAS-N (8.8) M20-280 - set
5 HILTI HIT HY 150 (M16-150) - set
6 HILTI HIT HY 150 (Similiar) Rebar 16 - set
7 HILTI - HVU - HAS - E - F (M16 - 500mm) - set
8 HILTI - HVU - HAS - E - F (M20 - 300mm) - set
9 HILTI - HVU - HAS - E - F (M24 - 290mm) - set
10 HILTI - HVU - HAS - E - F (M27 - 340mm) - set
11 Chipping existing footing / building floor (Included water profing) - set
12 Casing Concrete Diameter 80cm -100cm (Material) - m'
13 Short Well Digging Diameter 100cm (Excavation) - m'
14 SIKAGROUT 214 -11 Injection (Zak@25 kg) Grouting - point
15 SIKATOP 107 - SEAL (Zak@25 kg) Waterproofing - m2
16 SIKADUR - 31 - (Zak@6 kg/set) Coring - point
17 SIKADUR - 752 - (Zak@10 kg/set) Crack - m2
18 Welding - point
19 Moving Material Tower for Extend & Strengthening Included Accessories to Roof Top Building - kg
20 Moving Material to Roof Top Building -
- Poles 3 meter Included Accessories - pcs
- Poles 6 meter Included Accessories - pcs
- Poles 9 meter Included Accessories - pcs
- Poles 12 meter Included Accessories - pcs
- Poles 15 meter Included Accessories - pcs
PT. PERMATA KARYA PERDANA - Bill of Quantity - BTS ANTENNA 2017
Site ID : 2252133
Vendor :-
Project : 2017 STRATEGIC ROLLOUT PHASE 1
Site Name : NAREH HILIA
Tower Height : SST 42 M NEW LIGHT
Scope of Works : FOUNDATION DESIGN
Project Manager :
Issued Date: 9/11/2017

No Item Works Qty Unit Unit Price IDR Total Price IDR Amount IDR Comment
21 Guy Wire dia 10mm Included Accessories - m'
22 Guy Wire dia 12mm Included Accessories - m'

VI Supply, Delivery and Install Antenna Mounting (FR + MW) -


1 Supply, Delivery and Install Antenna Mounting 3 Sectoral for poles included U-bouts, nuts, bouts and washer - set
2 Supply, Delivery and Install Antenna Mounting 1 Sectoral for poles included U-bouts, nuts, bouts and washer - set

VII Supply, Delivery and Install Grounding System -


1 Splitzen + Aluminum 60 mm - set
2 Steel Cable Wire 80mm - m'
3 AAC 70mm2 (Aluminum) - m'
4 Copper Lightning Arrester 30 cm - pcs
5 Aluminum Busbar 300mm x 50mm x 8m - pcs
6 PVC Pipe 1'' (Inch) - m'
7 PVC Pipe 1'' Flexible 1'' (Inch) - m'
8 Repositioning Lightning rod and Support - Ls
9 Repositioning OB-Light and Support - Ls

VIII Miscellaneous of Works -


1 Concrete Works for Foundation (K-225 With SK SNI 03.2002 Standard) 16.18 m3
2 Steel Weight for Foundation (SNI 07.2052 1990/JIS G-3112 Standard) 1,755.39 kg
Grand total Included Overhead + Profit -
Rounding -

PT. PERMATA KARYA PERDANA Vendor

Das könnte Ihnen auch gefallen