Beruflich Dokumente
Kultur Dokumente
20 Galvanization
(a) method of galvanization
i) Spring washers
ii) Other spare parts
(b) no. of dips
i) One minute
ii) Half minute
(c) minimum weight of zinc coating (g/sq. m)
i) Casting
ii) Wires
21 Certification Mark (ISI/BS/or any other
International Standard)
22 Packing details
i) Marking
ii) Standard to which conforming
V OPGW ACCESSORIES
A. SUSPENSION ASSEMBLY
1 Manufacturer's name & address
2 Type
3 Material
4 Drawing no. (give complete details and dimension
including no. of components)
5 Reference of Indian Standard specification to which
conform
6 Minimum slip strength with respect to earth wire
B. TENSION ASSEMBLY
1 Manufacturer's name & address
2 Type
3 Material
(a) Body
(b) Bolts and nuts
4 Drawing no. (give complete details and dimension
and no. of components)
Volume-II-Section-IV 8/17
Guaranteed Technical Particulars 9 161 kV Transmission line Project In Togo
(a) Clamp
(b) Messenger cable
(c) Weight
5 Reference of manufacturer's drawing and
catalogue no. etc.
6 Total weight of each damper (kg)
7 Dimensions of balancing weights (mm)
8 Length of each balancing weight (mm)
9 Weight of each balancing weight (kg)
10 Tolerance in balancing weights (+%)
11 Messenger cable
(a) Stranding and wire diameter (mm)
(b) Ultimate tensile strength (kg)
(c) Ultimate bending strength (kg m)
12 Slipping strength of stranded messenger cable with
respect to balancing weight (kg)
13 (a) Diagram showing power dissipated by the
damper in watts for various vibration frequencies &
amplitudes (watts)
(b) Diagram showing the vibration energy for
various frequencies under varied winds and spans
Volume-II-Section-IV 9/17
Guaranteed Technical Particulars 10 161 kV Transmission line Project In Togo
Volume-II-Section-IV 10/17
Guaranteed Technical Particulars 11 161 kV Transmission line Project In Togo
1 Type of insulator
2 Maker's name,address and country
3 Material and Governing standard
4 Detailed dimensional drawing indicating tolerances
for each type of insulator disc enclosed (YES/NO
Volume-II-Section-IV 11/17
Guaranteed Technical Particulars 12 161 kV Transmission line Project In Togo
b) Tension
c) Galvanising process
Volume-II-Section-IV 12/17
Guaranteed Technical Particulars 13 161 kV Transmission line Project In Togo
Volume-II-Section-IV 13/17