Sie sind auf Seite 1von 16

REFINERIA ISLA (CURAZAO) S.A.

Crude Unit Optimization at Refineria Isla, Curacao

A ROMeo Case Study

S. Ranganathan , A. Offerman and J. Cijntje


Refineria ISLA, Curacao
R. C. McFarlane, V. Lough
Invensys Production Management

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
Talk Outline

™ Project overview/scope

™ ROMeo overview

™ Process MRA overview

™ CD3 Crude Unit Case Study

™ Conclusions

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
Overview: Refineria Isla

™ Refineria Isla (Curacao) S. A.


Š Curacao, Netherland Antilles
Š Affiliate of PDVSA, Venezuela
Š Crude Distillation Unit-3 capacity : 180,000 bbls/day
Š 26-30 API; switch every 2-3 days

™ Scope of CD3 optimization model


Š Atmospheric unit
Š Vacuum unit
Š Preheat train including furnaces
Š Gas plant

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
Overview: Highlights

™ Real-time Optimization: ROMeo


Š State-of-the-art equation-based modeling/real-time
optimization package
Š Enhanced usability features for faster implementation/
ease of maintenance
™ Invensys Process MRA
Š Reliable, robust online NMR technology
Š Crude, kerosene and naphtha stream analysis for
improved APC and optimizer performance

™ Project executed by refinery staff


Š 1.5 refinery engineers
Š 0.25 Invensys engineer (consulting only)

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

Overview: Milestones

™ MRA Analyzer
Š Test Installation Nov 2000
Š Final Installation including Crude August 2001
™ ROMeo
Š Started June 2001
‰ Model building/application configuration performed entirely
by refinery staff; consulting from Invensys
Š Online, open-loop since Jan, 2002
‰ Optimization moves reviewed before being implemented by
operations staff
Š Online, closed-loop since March, 2002
‰ Optimization moves transmitted to DCS and implemented
automatically

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

ROMeo Overview

™ ROMeo: Rigorous On-line Modeling and Equation-based


Optimization

Š Joint development project between Invensys/SimSci and Shell


U.S.A
Š Implemented worldwide in FCCUs, Hydrotreaters/Hydrocrackers,
Crude units, Ethylene crackers
Š Common look/feel for all stages of model configuration,
implementation, maintenance and off-line studies
Š Enhanced usability features cut down implementation time,
improve maintainability
Š Refinery engineers required only three days of training to carry out
most of the configuration tasks

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
What are the Process MRA
Features ?

™ Minimum temperature and no


chemical pre-conditioning
™ Sampling is non invasive and
simple in design
™ Structural Groups have their own
domains (orthogonal)
™ Energy absorption is Linear
across the spectral range
™ Short track execution, with
conceptual study, basic design
and reduced client risk
™ Robust, less noisy measurement
-->significant benefit to APC &
Optimization 60 M Hz
8 7 6 5 4 3 2 1 0 -1
Methyl Paraffinic
Aromatic Olefinic Water Oxygenate Aromatic

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

CD3 Crude Unit


Case Study

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

Real-time Optimization Objectives

™ How to maximize most valuable products like kerosene,


heavy gasoil, LPG?

™ How should circulating reflux flows be adjusted to maximize


heat integration with the gas section?

™ How to adjust the crude and vacuum furnace duties?

™ Can column pressure, reboiler and reflux in gas section be


adjusted to minimize fuel gas?

™ Can we achieve uniform operating philosophy acceptable to


all shifts?

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

System Overview

Economics.XLS Blend.XLS

ROMeo

Limits ProcessModel DataRec


(MS ACCESS)

Optimization
Lab
LIMS
TARGETS

PI System

MRA DCS

PLANT

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
Problem Size, Platform and
Performance

™ Size
Š 252 Measurements
Š 26,000 Equations
Š Degrees of Freedom
‰ 170 in Data Reconciliation (tuning parameters)
‰ 31 in Optimization (targets to APC/DCS)
™ Platform
Š Dell PC with dual 1-GHz CPUs , 2 GB RAM.
Š Windows NT Enterprise server
Š Networked to Foxboro I/A, PI, LIMS.
™ Performance
Š Reconciliation: 10 minutes
Š Optimization: 5 minutes

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

On-line MRA data

™ MRA supplies real-time measurements to APC and ROMeo


Optimizer
™ ROMeo:
Š Crude: 5 pt TBP
Š improves feed characterization during data
reconciliation

™ ROMeo, APC:
Š Kero: freeze point, flash point
Š Naptha: end point
Š closer operation to constraints by APC and ROMeo
improved benefits

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

Feed Characterization

Crude Tank
Composition

Crude Book

Blend Select Tank


Assay Data
Components Lineup

Plant
Reconciliation NMR TBP Data
Measurements

Lab Data

Reconciled Crude Assay

Legend:
Real Time

Daily

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.
On-line Feed Characterization
with MRA

Crude Adjustment

100

90

80

70

60
WT% Yield

Before
50
After
40 NMR

30

20

10

0
-150 50 250 450 650 850 1050
CutPoint Deg C

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

Benefits

™ Online:
Š Preliminary benefit estimate: 7-12 K $US/Day
Š benefits derived primarily from:
‰ kero maximization

‰ improved heat integration

™ Off line:
Š Several circulating reflux flows were moved from their
traditional operating levels
Š Avoided unnecessary opening of columns and
exchangers during short turn around
Š Understand the impact of crude switch on downstream
units

F:\Isla General Presentation 2001.ppt


REFINERIA ISLA (CURAZAO) S.A.

Conclusions

™ The usability features of ROMeo allowed application to be


configured by plant engineers on time (4 months) and
within budget

™ On-line optimization provides a set of operating guidelines


to capture the benefit in real time instead of running the unit
on preset operating guidelines that may be suboptimal

™ Process MRA provides valuable real-time measurements to


enhance APC and ROMeo performance

F:\Isla General Presentation 2001.ppt