Beruflich Dokumente
Kultur Dokumente
Content
1.1 Project Management Framework
1.2 Construction Project Life Cycle in Government Organization
1.3 Importance of Project Management Construction in KSA
PART 1
CHAPTER #2
Content
2.1 Idea of Educational Buildings
2.2 Budget of Project
2.3 Rent a Building
2.4 Funding
2.5 Project Governance
2.6 Stakeholders
2.7 Accountability and Responsibility
PART 1
CHAPTER #3
Content
3.1 Types of Tender
3.2 Tender Documents Preparation
3.3 How to Accomplish Work?
3.4 Tendering Procedure
PART 1
CHAPTER #4
Content
4.1 Locating and Delivering The Construction
4.2 Design delivery
3.3 Project Execution Plan
4.4 Work Breakdown Structure (WBS)
PART 1
CHAPTER #5
Content
5.1 Performance Monitoring
5.2 Quality Management & Control
5.3 Subcontractor
5.4 Substituting The Consultant
5.5 Safety
5.6 Welfare Systems
PART 1
CHAPTER #6
Content
6.1 Period Deadline
6.2 Commissioning Services
6.3 Does The Building Working as Designed?
6.4 Operating & Maintenance of The Building
PART 1
RESULTS, DISCUSSIONS, AND CONCLUSION
PART 1
CHAPTER #8
Scope of Work
Content
8.1 Introduction
8.2 Method Of Evaluating Agreed Time And Cost In Contract
PART 2
CHAPTER #9
Time Scheduling
Content
9.1 Estimating Project Time
9.1.1 Original Case
9.1.2 Modified Case
9.1.3 Extra Case
9.2 Discussion
PART 2
CHAPTER #10
Cost Estimation
Content
10.1 Estimating Project Cost
10.1.1 Calculating L+S-Building For Modified Case
10.1.2 Calculating C+E-Building For Modified Case
10.2 Revit Case Study
10.3 Discussion
PART 2
RESULTS, DISCUSSIONS, AND RECOMMENDATIONS
PART 2
APPENDICES
Content
A-1 A visit to Owner – PMO and data collection
A-2 Data Analysis
A-3 Original case tasks sheet
A-4 Modified case tasks sheet
A-5 Extra case tasks sheet
EXECUTIVE SUMMARY
Content
Project Statement
Objectives
Methodology
Report Structure
RESULTS, RECOMMENDATION AND CONCLUSION
CONCLUSION
REFERENCES