Sie sind auf Seite 1von 13

SAP Upgrade

Technical Upgrade
&
Enhancement Package Upgrade
SAP System Current Version For PCI Compliance Comments

SAP ECC SAP EHP3 for SAP ERP 6.0 SP2 on SAP NetWeaver 7.0 SP15 SAP EHP4 for SAP ERP 6.0 SPS14 on SAP NetWeaver 7.0 EHP2 SPS14 No Version upgrade. Only Technical (SPS)and Enhancement package upgrade

SAP PI SAP NetWeaver 7.1 SPS8 SAP NetWeaver 7.1 SPS17 No Version upgrade. Only Technical (SPS) upgrade

SAP BW SAP EHP 1 for SAP NetWeaver 7.0 SPS4 SAP EHP 1 for SAP NetWeaver 7.0 SPS14 No Version upgrade. Only Technical (SPS) upgrade

SAP SOLMAN SAP EHP 1 for SAP Solution Manager 7.0 SPS28 SAP EHP 1 for SAP Solution Manager 7.0 SPS31 No Version upgrade. Only Technical (SPS) upgrade

SAP System Recommneded


SAP EHP6 for SAP ERP 6.0 SPS9 on SAP NetWeaver 7.0 EHP2
SAP ECC SPS14
SAP PI SAP NetWeaver 7.4 SPS4 (Version Upgrade)
SAP BW SAP NetWeaver 7.4 SPS4 (Version Upgrade)
SAP SOLMAN SAP Solution Manager 7.1 (Version Upgrade)
Upgrade
• Why does it take long duration for upgrades ?
• The actual implementation of support
packages (and even support package stacks) is
usually not a labor-intensive task. In fact, the
technical aspects of implementing a support
package stack should not take more than a
day.
• A single support package contains, on average,
about 400 notes and a support package stack
contains around 8,000 notes.
• Some implementations span across several
support package stacks and therefore
translate to the implementation of tens of
thousands of code corrections at once.
• When applying such a massive change to your
code, the main challenge consists of assessing
the impact of that change on the behavior of
the system. By definition, notes are supposed
to only correct bugs, but in reality they
potentially create new problems by changing
standard functionality, introducing new bugs,
or, most commonly, causing custom code to
fail.
• Consequently, support package implementation projects
include extensive testing that is aimed at verifying the
correct operation of the pre-implementation functionality
and identifying any new problems introduced into the
system.
• Not surprisingly, efficient testing was also selected as one
of the key challenges in a support package implementation
project by nearly 39% of survey respondents.
• In regard to implementation timelines, the survey shows
that support package implementations require an average
of 73 person days, with the majority of the effort (42 days)
associated with testing.