1 soil analysis (SBC ) Job Completed Completed Completed Completed Completed Completed
Marking
5 RCC work in foundation Job - Completed Completed - - -
6
1st half of staging height Job - 25% Completed ` - - -
including room roof slab
Balance staging botton
7 dome circular beam , head job - - - - - -
beam and conical wall
10
C.I/D.I pipe fitting of inlet job - - - - - -
valve
11
Fixing of C.I , D/F pipes job - - - - - -
specials and sluice valve
SHRIRAM EPC LTD.
Fixing of MS Ladders ,
12 railling,lightning arrester, job - - - - - -
and water level indicator
Wood work, Brick work
13 and steel work in door and job - - - - - -
windows
Snowcem/painting ,white
14 washing, colour, washing job - - - - - -
etc
Testing of full hydraulic
15 structure of elevated water job - - - - - -
tank
16
Commissioning and Trail job - - - - - -
run
SHRIRAM EPC LTD.
5. Compound Wall
SL No. Description Units BOQ Quantity Previous Today Cumulative Rem
1 Excavation m 3
352.64 226.6 0.0 226.6
2 Removal of Unserviceable Soil m3 222.72 203.9 0.0 203.9
3 PCC-M 15 m 3
68.05 23.6 0.0 23.6
4 RCC- M 20 work in foundation m3 163.95 20.6 0.0 20.6
5 Steel Consumption MT 16.39 3.73 0.0 3.73
6 Brick Work m3 197.97 70.3 0.0 70.3
7 Plaster m² 1741.55 232.3 0.0 232.3
6. House Service Connections
SL No. Description No of Quantity Previous Today Cumulative Rem
1 House Service Connections 55245
AM EPC LTD.
Date 11/23/2019
JUIDCO Ltd.
NJS Engineers India Pvt. Ltd.
11/25/2019
-
ACHINE - MATERIAL DESCRIPTION
Material Details
Received Issued Balance
Laying Details
Remarks
Cumulative
-
-
-
-
-
-
-
-
-
-
0
AM EPC LTD.
Laying Details
Remarks
Cumulative
21342.27 -
-
-
-
-
-
-
-
-
-
21342.27
Cumulative
13445.6301
128
13257.39
AM EPC LTD.
2450
AM EPC LTD.
Remarks
ESR-7 ESR-8
(18 Lakh Litre) (20.5 Lakh Litre)
JMADA JMADA
Officer Colony Officer Colony
Completed Completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
AM EPC LTD.
- -
- -
- -
- -
- -
AM EPC LTD.
Remarks
Remarks
MATERIALS DETAILS FOR JUIDCO
SL. CEMENT SAND AGGREGATE 8 MM 10 MM
SITE
NO. PUR USED PUR USED PUR USED PUR USED PUR
1 Near Talab,Chattabad Masjid Road
2 Way to Lilori Sthal,Opposite Lilori Park 2400 704 140.28 61 98.44 82 1.5 0.8 3.5
Near Sarsawati Shisu Mandir,
3 70 5 3 8 7
Tetulmari(Baba Chowk)
4 Near Chetudih Malkera Road,Chhatabad
In & Around Gareriya Water Treatment
5 15 1 1
Plant
6 At Chottaputki near B.C.C.L Project office.
7 At Chottaputki near B.C.C.L Project office.
Proposed Sahid Bhagat Singh Colony,
8 Matkuriya
Near Sarsawati Shisu Mandir,
3 450 355 40 29 50 35 1.5 1.3 0.5
Tetulmari(Baba Chowk) Boundry Wall
2 8 4 5 4 4 2
1.7 3.3 1 2
Laying Details as on date
Date Today Cumulative Area
8/19/2019 16.5 16.5 Zone-1
8/20/2019 55 71.5 Zone-1
8/22/2019 82.5 154 Zone-1
8/23/2019 165 319 Zone-1
8/24/2019 38.5 357.5 Zone-1
8/26/2019 77 434.5 Zone-1
8/27/2019 148.5 583 Zone-1
8/28/2019 109.5 692.5 Zone-1