Project Name : Proposed Three Storey Commercial Building

Owner Name: Mr. Jojo A. Landingin & Mrs. Ferlin Joy D. Landingin
Location: Brgy. Bonuan Tondaligan, Dagupan City

Summary

DIMENSION MAIN REINFORCEMENTS 2-LEGGED STIRRUPS


BEAM MARK
b h LEFT SUPPORT MID SPAN RIGHT SUPPORT Start End
Top Bottom Top Bottom Top Bottom

10 @ 150 for 10 @ 150 for


Footing Tie Beam 400 450 7-20 dia. 3-25 dia. 7-20 dia. 3-25 dia. 7-20 dia. 3-25 dia.
1500, 12mm dia 1500, 12mm dia

10 @ 150 for 10 @ 150 for


2nd Floor Beam 400 450 6-20 dia. 5-20 dia. 6-20 dia. 5-20 dia. 6-20 dia. 5-20 dia.
1500, 12mm dia 1500, 12mm dia

10 @ 150 for 10 @ 150 for


3rd Floor Beam 400 450 6-20 dia. 5-20 dia. 6-20 dia. 5-20 dia. 6-20 dia. 5-20 dia.
1500, 12mm dia 1500, 12mm dia

10 @ 150 for 10 @ 150 for


Roof Beam 350 450 4-16 dia. 3-16 dia. 4-16 dia. 3-16 dia. 4-16 dia. 3-16 dia.
1500, 12mm dia 1500, 12mm dia

10 @ 150 for 10 @ 150 for


Cantiliver Beam 400 450 4-16 dia. 3-20 dia. 4-16 dia. 3-20 dia. 4-16 dia. 3-20 dia.
1500, 12mm dia 1500, 12mm dia

Roof Beam

D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 24.78 KNS Vc= 121.84 KNS Vs= 0.00 KNS
Tu= 5.23 KN-MET Tc= 4.9 KN-MET Ts= 7.0 KN-MET LOAD 9
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 156. MM C/C FOR 614. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.49 SQ.CM.
AT END SUPPORT - Vu= 12.59 KNS Vc= 109.73 KNS Vs= 0.00 KNS
Tu= 5.23 KN-MET Tc= 4.9 KN-MET Ts= 7.0 KN-MET LOAD 9
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 156. MM C/C FOR 614. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.49 SQ.CM.

2nd and 3rd Floor Beam

D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 64.89 KNS Vc= 124.65 KNS Vs= 0.00 KNS
Tu= 20.62 KN-MET Tc= 5.8 KN-MET Ts= 27.5 KN-MET LOAD 18
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 168. MM C/C FOR 1414. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 7.00 SQ.CM.
AT END SUPPORT - Vu= 9.94 KNS Vc= 122.88 KNS Vs= 0.00 KNS
Tu= 20.62 KN-MET Tc= 5.8 KN-MET Ts= 27.5 KN-MET LOAD 18
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 168. MM C/C FOR 1414. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 7.00 SQ.CM.

Footing Tie Beam

D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 94.02 KNS Vc= 125.82 KNS Vs= 0.00 KNS
Project Name : Proposed Three Storey Commercial Building
Owner Name: Mr. Jojo A. Landingin & Mrs. Ferlin Joy D. Landingin
Location: Brgy. Bonuan Tondaligan, Dagupan City

Tu= 3.21 KN-MET Tc= 5.8 KN-MET Ts= 0.0 KN-MET LOAD 17
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 194. MM C/C FOR 2308. MM
AT END SUPPORT - Vu= 97.59 KNS Vc= 126.30 KNS Vs= 3.81 KNS
Tu= 1.71 KN-MET Tc= 5.8 KN-MET Ts= 0.0 KN-MET LOAD 15
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT IS REQUIRED FOR SHEAR.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 194. MM C/C FOR 2308. MM

Cantilever Beam

AT START SUPPORT - Vu= 32.06 KNS Vc= 127.44 KNS Vs= 0.00 KNS
Tu= 6.93 KN-MET Tc= 5.8 KN-MET Ts= 9.2 KN-MET LOAD 17
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 168. MM C/C FOR 614. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.35 SQ.CM.
AT END SUPPORT - Vu= 16.59 KNS Vc= 127.44 KNS Vs= 0.00 KNS
Tu= 6.93 KN-MET Tc= 5.8 KN-MET Ts= 9.2 KN-MET LOAD 17
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 168. MM C/C FOR 614. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.35 SQ.CM.

Slab Details

Thk Shorter Direction Longer Direction


Slab No. Bottom Bars Top Bars Bottom Bars Top Bars
Dia Spacing Dia Spacing Dia Spacing Dia Spacing
S2 110 mm 10 mm 200 10 mm 200 10 mm 200 10 mm 200
Project Name : Proposed Three Storey Commercial Building
Owner Name: Mr. Jojo A. Landingin & Mrs. Ferlin Joy D. Landingin
Location: Brgy. Bonuan Tondaligan, Dagupan City