Sie sind auf Seite 1von 2

Work Schedule for Anchor Bolt Fixation

Items of Works November December


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13
Earthwork Excavation
F1-2 Nos
F2-2 Nos
Dismentaling of BrickWorks
Around F1-2 Nos
Around F2-2 Nos
Reinforcement Binding
Grid 1/F1-2 Nos
Grid 2/F3-2 Nos
Tie Beam
Line & Level of Template
Grid 5
Grid 4
Grid 3
Grid 2
Grid 1
Formworks
Grid-1/F2-2 Nos
Grid 2/F3-2 Nos
Grid 5
Grid 5 Cantilever Portion
Grid A Cantilever Portion
Grid 1 Cantilever Portion
Grid E Cantilever Portion
RCC Concrete
Grid-1/F2-2 Nos Upto Band
Grid 2/F3-2 Nos Upto Band FINSIH OF ANCHOR BOLT FIX
Grid 5
Grid 4
Grid 3
Grid 2
Grid 1
Tie Beam
Earthwork Filling upto Plinth