Updates on policy in Malaysia

Capt Ahmad Imran Mohd Azmi


MOGSC EXCO

17th Sept 2019, Marina Bay Sands, Singapore

1
1. Introduction MOGSC

2. Implementation of Integrated Logistics Control Tower (ILCT)

3. Vessel requirements for ongoing developments

4. Updates on policy in Malaysia

2
ABOUT MOGSC

1. The Malaysian Oil & Gas Services Council or


MOGSC was formed on 1st December 2003
2. An initiative to establish an association driven
and promoted by the services sector of the
Malaysian Oil & Gas Industry.
3. To promote the capabilities of Malaysian
service providers and showcase Malaysia as
the regional hub for the Oil and Gas Industry.
4. Membership of 500+ companies that
represent all sectors within the industry
5. A platform to contact and network with local
players
6. To address emerging issues through group
consultation

3
Sharing of information and assisting the industry
Implementation of Integrated Logistics Control
Tower (ILCT)

7
INTEGRATED LOGISTICS CONTROL TOWER (ILCT)
• The Integrated Logistics Control Tower (ILCT) aims to enable
vessel sharing across 14 Malaysia producing Petroleum
Arrangement Contractors (PACs) to lower the logistics cost
across upstream operations in Malaysia.
• An initiative under Cost Reduction Alliance 2.0 or better known
as Coral 2.0. Driving cost optimization through 11 focus
initiatives
• In 2018, over 20 work packages under the Integrated Logistics
Control Tower (ILCT) contracts awarded, which encompass the
service of 124 offshore support vessels (OSVs) — more than a
third of total industry supply — up to 5 years basis.

8
IMPLEMENTATION OF ILCT

• Encountered multiple obstacles towards ILCT implementation


such as vessel priority, marine HSE standardization, vessels
technical specifications, joint coordination agreement, liabilities,
cost allocation, accumulative contract value re-distribution, and
governance matters.
• ILCT Committee comprises of PETRONAS and PACs members
with the key roles to control the overall allocation of vessels,
mediate any conflict, and improve ILCT performance.
• ILCT Manual was jointly developed by PETRONAS and PACs to
govern the implementation of ILCT and is regularly referred by
PACs as guiding principle in operating vessels.

9
RESULTS OF ILCT

• Synergy resulted in 12 vessels


reductions from 142 to 130 vessels
that equivalent to RM100 millions of
cost savings yearly.
• PETRONAS and PACs benefit from this
synergy mainly through optimized
traveling route, which results in lower
Daily Charter Rate and fuel cost.
• Supports PETRONAS’ agenda to
nurture capabilities of local vessel
owners to become regional vessel
operators.

10
INTEGRATED LOGISTICS CONTROL TOWER (ILCT)

MOGSC MLWG visit to ILCT control center on 9th July 2019


11
Vessel requirements for ongoing developments

12
PETRONAS ACTIVITY OUTLOOK 2019-2021

• In the latest activity outlook, it is expected to


roughly double the demand for jack-up rigs,
from 9-10 units in 2018 to approximately
16-18 in 2019, and 17-19 units in 2020-
2021.
• Increase in greenfield projects and brownfield
activities.
• 2019 projection for offshore installations has
been raised from 6–7 to 8–9, with 5-13 units
projected for 2021.
• First time PETRONAS is sharing the list of
major contracts in key categories and its
associated services
13
MARINE VESSELS OUTLOOK
Ø Better outlook for marine vessels on the back of an
expected pickup in drilling activities
Ø A new Frame Agreement established to support Drilling
and Development requirements.
Ø Remaining requirements catered via spotchartered
contract or bundled in maincontractor scope.

38-44 vessels for AHTS >100MT


67-72 vessels for AHTS =<100MT
49-52 vessels for PSVs/SSVs
80-83 vessels for FCBs
MARINE VESSELS OUTLOOK

Ø Positive outlook can be expected for FCBs.


Ø Higher speed vessels (>30kn) or Catamaran design
vessel with lower operating cost are seen as good
alternatives to chopper.

Ø Positive outlook can be expected for PSVs/SSVs.


Ø Increase in Drilling activity will boost demand further
for PSVs/SSVs.

Ø Positive outlook is expected for AHTS to fulfil the


increase in Development activity, especially for drilling
and production.
DECOMMISSIONING OUTLOOK
Well Abandonment

- to prepare a well to be closed permanently


- insufficient hydrocarbon to make production activities
commercially viable, or after production operations have
drained the reservoir.

Upstream Facilities Decommissioning

- to permanently make safe the facilities such as WHP &


CPP and Subsea Tree, FPSO/FSO and Vent platforms at
t h e e n d o f p r o d u c t i o n l i f e c yc l e o r w h e n t h e r e i s
insufficient hydrocarbon
WELL ABANDONMENT

Well Abandonment planned, with different complexities

• 2019 ~50 Wells


• 2020 ~40 Wells
• 2021 ~60 Wells

17
WELL ABANDONMENT

The following key services are required

• Drilling Rigs
• Hydraulic Workover Units (HWUs)
• Offshore Support Vessels (OSVs)
• Lifting Services
• T h i r d Pa r t y D r i l l i n g S e r v i c e s i n c l u d i n g S l i c k l i n e ,
Cementing, Fishing, Perforation-Wash-Cement etc.

18
UPSTREAM FACILITIES DECOMMISSIONING

WHP & CPP (Topside & Jacket)

• 2019 ~800 metric tonnes


• 2020 ~15.5k metric tonnes
• 2021 ~27.7k metric tonnes

Subsea Tree, FSO and Vent Platform

• 2019 ~ 180 metric tonnes


• 2020 ~ 460 metric tonnes
• 2021 ~ relocation of FSO

19
UPSTREAM FACILITIES DECOMMISSIONING

The following key services are required

• Engineering Services
• Decommissioning yard/facility
• Transport and Lifting Services
• Decommissioning cutting services e.g.: Diamond Wire
Cutting, Abrasive Water Jet Cutting, etc.
• Other Services such as Underwater, Decontamination,
Remediation, etc.

20
Updates on Policy

21
LNG POWERED OSV

• Strategic intent for Malaysia to become the


regional LNG bunkering hub.
• PETRONAS advocating LNG as the preferred
marine fuel of choice.
• Migration of local (currently diesel-fueled) OSV
fleet to LNG, as the cleaner option.
• The first commercial LNG Bunkering is poised for
start-up by end 2019 from RGT2 (Pengerang,
Johor) and RGT1 (Sg Udang, Melaka), followed
by KSB (Kemaman, Terengganu) and ASB (W.P.
Labuan).
• Dual-fueled LNG-based engines are expected to
be the future solution.

22
LNG POWERED OSV

23