1 Asphall Mixing Plant (AMP), Kapasitas 1000 kg/batch. E01 Unit 5,586,619,188.17
2 Asphall Finisher, Kapasitas Hopper 10 Ton E02 Unit 2,324,023,322.02
3 Asphall Sprayer E03 Unit 182,676,328.71
4 Bulldozer 100-150 Hp E04 Unit 685,543,606.23
5 Compressor 4000-6500 L\M E05 Unit 531,065,271.93
6 Concrete Mixer 0.3-0.6 M3 E06 Unit 343,017,395.17
7 Crane 10-15 Ton E07 Unit 533,199,288.29
8 Dump Truck 3-4 M3 E08 Unit 279,000,000.00
9 Dump Truck E09 Unit 1,100,000,000.00
10 Excavator 80-140 Hp E10 Unit 705,791,813.50
11 Flat Bed Truck 3-4 M3 E11 Unit 724,049,143.00
12 Generator Set E12 Unit 1,197,950,068.78
13 Motor Grader >100 Hp E13 Unit 1,540,144,926.64
14 Track Loader 75-100 Hp E14 Unit 991,847,713.75
15 Wheel Loader 1.0-1.6 M3 E15 Unit 955,155,839.71
16 Three Wheel Roller 6-8 T E16 Unit 465,233,837.06
17 Tandem Roller 6-8 T. E17 Unit 1,325,085,221.79
18 Tire Roller 8-10 T. E18 Unit 1,087,614,584.93
19 Vibratory Roller 5-8 T. E19 Unit 1,050,398,576.58
20 Concrete Vibrator E20 Unit 30,376,020.00
21 Stone Crusher E21 Unit 1,969,647,122.93
22 Water Pump 70-100 Mm E22 Unit 5,000,000.00
23 Water Tanker 3000-4500 L. E23 Unit 675,328,677.28
24 Pedestrian Roller E24 Unit 150,000,000.00
25 Tamper E25 Unit 29,165,722.78
26 Jack Hammer E26 Unit 35,000,000.00
27 Fulvi Mixer E27 Unit 2,693,284,248.24
28 Concrete Pump E28 Unit 469,816,453.35
29 Trailer 20 Ton E29 Unit 1,080,000,000.00
30 Pile Driver + Hammer E30 Unit 875,000,000.00
31 Crane On Track 35 Ton E31 Unit 5,798,480,382.09
32 Welding Set E32 Unit 17,500,000.00
33 Bore Pile Machine E33 Unit 2,250,000,000.00
34 Asphalt Liquid Mixer E34 Unit 160,400,437.23
35 Trailler 15 Ton E35 Unit 1,080,000,000.00
36 Rock Drill Breaker E36 Unit 493,923,856.88
37 Cold Milling E37 Unit 2,914,416,888.61
38 Cold Recycler E38 Unit 15,091,423,820.12
39 Hot Recycler E39 Unit 9,985,784,189.10
40 Aggregat (chip) Spreader E40 Unit 981,847,713.75
41 Asphalt Distribution E41 Unit 604,194,648.53
42 Split Form Paver E42 Unit 1,482,503,944.22
43 Concrete Pan Mixer E43 Unit 1,070,013,115.62
44 Concrete Breaker E44 Unit 2,400,099,624.10
45 Asphalt Tanker E45 Unit 692,508,866.62
46 Cement Tanker E46 Unit 500,000,000.00
47 Concrete Mixer (350) E47 Unit 92,264,937.90
48 Vibrating Rammer E48 Unit 20,000,000.00
49 Truk Mixer E49 Unit 825,712,079.55
50 Bore Pile Machine Dia 60 E50 Unit 4,631,759,686.04
51 Crane On Track 75 - 100Ton E51 Unit 9,522,829,741.87
52 Blending Equipment E52 Unit 601,508,628.25
53 Asphalt Liquid Mixer (kap 20000) E34a Unit 503,923,856.88
HARGA DIPENGARUHI HARGA DIPENGARUHI
SELISIH KABUPATEN
INFLASI INFLASI
BATANGHARI
(5)
(9) (6)
HARGA HARGA
DIPENGARUHI SELISIH KABUPATEN DIPENGARUHI SELISIH
INFLASI MUARO JAMBI INFLASI
(8)
HARGA HARGA
KABUPATEN DIPENGARUHI SELISIH KABUPATEN DIPENGARUHI
MERANGIN INFLASI SAROLANGUN INFLASI
(10) (11)
(12) (13)
(14)
(15)
HARGA
HARGA DIPENGARUHI
KABUPATEN
NO. URAIAN KODE SATUAN KOTA JAMBI DIPENGARUHI SELISIH INFLASI
BATANGHARI
INFLASI
HARGA
HARGA DIPENGARUHI
KABUPATEN
NO. URAIAN KODE SATUAN KOTA JAMBI DIPENGARUHI SELISIH INFLASI
BATANGHARI
INFLASI
HARGA
HARGA DIPENGARUHI
KABUPATEN
NO. URAIAN KODE SATUAN KOTA JAMBI DIPENGARUHI SELISIH INFLASI
BATANGHARI
INFLASI
HARGA
HARGA DIPENGARUHI
KABUPATEN
NO. URAIAN KODE SATUAN KOTA JAMBI DIPENGARUHI SELISIH INFLASI
BATANGHARI
INFLASI
HARGA
HARGA DIPENGARUHI
KABUPATEN
NO. URAIAN KODE SATUAN KOTA JAMBI DIPENGARUHI SELISIH INFLASI
BATANGHARI
INFLASI
2,212.20 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 180,000.00 185,405.69 5,405.69
2,212.20 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 180,000.00 185,405.69 5,405.69
2,212.20 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 180,000.00 185,405.69 5,405.69
2,212.20 95,055.40 97,910.07 2,854.67 0.00 0.00 0.00 180,000.00 185,405.69 5,405.69
6,190.65 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 480,000.00 494,415.17 14,415.17
6,819.95 0.00 0.00 50,916.47 52,445.57 1,529.10 215,427.44 221,897.07 6,469.63
6,752.20 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 204,583.02 210,726.98 6,143.96
1,546.63 0.00 0.00 65,982.19 67,963.74 1,981.55 31,562.40 32,510.27 947.87
4,294.52 0.00 0.00 67,927.74 69,967.72 2,039.98 73,203.01 75,401.41 2,198.40
1,733.11 62,709.68 64,592.95 1,883.27 62,709.68 64,592.95 1,883.27 81,709.68 84,163.55 2,453.87
320.44 10,670.00 10,990.44 320.44 10,670.00 10,990.44 320.44 10,670.00 10,990.44 320.44
1,861.96 60,000.00 61,801.90 1,801.90 62,000.00 63,861.96 1,861.96 60,000.00 61,801.90 1,801.90
37.24 1,200.00 1,236.04 36.04 1,240.00 1,277.24 37.24 1,200.00 1,236.04 36.04
1,021.07 39,000.00 40,171.23 1,171.23 39,000.00 40,171.23 1,171.23 58,000.00 59,741.83 1,741.83
1,171.23 20,000.00 20,600.63 600.63 44,000.00 45,321.39 1,321.39 20,000.00 20,600.63 600.63
4,744.99 164,000.00 168,925.18 4,925.18 176,000.00 181,285.56 5,285.56 164,000.00 168,925.18 4,925.18
4,608.56 95,055.40 97,910.07 2,854.67 237,952.00 245,098.08 7,146.08 156,272.24 160,965.35 4,693.11
3,558.74 123,500.00 127,208.90 3,708.90 123,500.00 127,208.90 3,708.90 118,500.00 122,058.74 3,558.74
3,153.32 110,000.00 113,303.48 3,303.48 110,000.00 113,303.48 3,303.48 105,000.00 108,153.32 3,153.32
480.51 15,000.00 15,450.47 450.47 20,000.00 20,600.63 600.63 16,000.00 16,480.51 480.51
SATUAN DASAR
AMBI TAHUN 2019
HARGA SATUAN DASAR PEKERJAAN BPJN IV
HARGA UPAH
(1) (2) (3) (4) (7) (5) (6) (8) (9) (10) (11)
1 Pekerja (L01) Jam 12,900.00 12,700.00 13,150.00 12,850.00 12,750.00 12,950.00 12,800.00
2 Tukang (L02) Jam 18,250.00 18,250.00 18,250.00 18,075.00 18,100.00 17,950.00 17,950.00
3 Mandor (L04) Jam 18,600.00 18,275.00 18,350.00 18,700.00 18,475.00 17,975.00 17,475.00
4 Operator (L05) Jam 18,600.00 18,600.00 18,600.00 18,800.00 17,250.00 15,700.00 15,700.00
5 Pembantu Operator (L06) Jam 18,200.00 18,050.00 19,450.00 17,350.00 17,100.00 16,950.00 17,050.00
6 Sopir / Driver (L07) Jam 12,500.00 12,400.00 12,425.00 12,550.00 12,400.00 12,500.00 12,400.00
7 Pembantu Sopir / Drive (L08) Jam 16,350.00 16,300.00 16,700.00 14,950.00 16,375.00 16,225.00 16,325.00
8 Mekanik (L09) Jam 18,150.00 17,950.00 18,500.00 17,100.00 15,875.00 16,225.00 16,400.00
9 Pembantu Mekanik (L10) Jam 16,250.00 15,875.00 15,875.00 14,900.00 16,325.00 15,975.00 16,075.00
10 Kepala Tukang (L03) Jam 20,050.00 19,750.00 20,000.00 20,100.00 19,750.00 19,750.00 19,750.00
11 Tukang Las (L11) Jam 18,050.00 17,850.00 17,900.00 17,800.00 17,875.00 17,675.00 17,675.00
12 Oli Man/Crew (L12) Jam 15,900.00 15,700.00 15,700.00 14,400.00 15,875.00 15,525.00 15,625.00
13 Juru Ukur (L13) Jam 16,950.00 16,850.00 17,100.00 17,000.00 16,800.00 17,000.00 16,025.00