DOC. NO.

: 1043-1313 -MA-TRD-0003
REQUISITION REV. NO.: A
PERUIVETIIIN
PAGE : COVER
I r-- .11

TECHNICAL REQUISITION DOCUMENT


FOR SUPPLY STEEL PIPE PILE

PROJECT NAME : TBA

CLIENTS : TBA
CONTRACTOR : PETROVIETNAM TECHNICAL SERVICES CORPORATION

A 05-NOV-2018 Issue for Bid N.Q.V N.T.S N.C.L

PTSC CLIENT
REV. NO. DATE DESCRIPTION PREP'N REVIEW
APPROVAL APPROVAL

PTSC CLIENT
REV. NO. DISCIPLINE PREPARATION REVIEW
APPROVAL APPROVAL

A MA
-------y_t__________
N.Q.V N.T.S N.C.L

This DOCUMENT is the property of PetroVietnam Technical Services Corporation. Therefore it shall not be released to any
third party without permission of authorized personnel of the PetroVietnam Technical Services Corporation.
DOC. No.
***********
1043-BD-MA-TRD-0003
REV. : A
TRD FOR SUPPLY STEEL PIPE PILE PAGE : 2/4

Table of Content
1. GENERAL 3
2. SCOPE OF WORK 3
3. ATTACHMENT 3
4. QUOTATION ATTACHMENT 3
5. QUANTITY 4

Att. #1: Specification for Steel Tube Piles


Att. #2: Steel Tube Piles Details

PTSC Page 2 / 4
DOC. No.
***********
1043-BD-MA-TRD-0003
REV. : A
TRD FOR SUPPLY STEEL PIPE PILE PAGE : 3/4

1. GENERAL

This document is to covers the requirement for Supply the Steel Pipe Pile for expand
the Jetty at Thi Vai river in Ba Ria-Vung Tau province.

2. SCOPE OF WORK

MATERIAL SUPPLY Construction


DESCRIPTION PTSC REMARKS
PTSC
(Contracto Sub-Con. Sub-Con.
(Contractor)
r)
1) Pile Supply(1) R R
2) Pile Coating R R
3) Delivery to site (2) R
4) Unloading from
R
delivered barge
(1)
: Including cover steel plate for pile joint and other steel plate as per drawing
(2)
: Schedule to be updated later
3. ATTACHMENT
1. Specification for Steel Tube Piles
2. Steel Tube Piles Details
4. QUOTATION ATTACHMENT
1. Scope of works
2. Inspection and test plan (ITP)
3. Records, reports and certificates
4. Fabrication method
5. Delivery times

PTSC Page 3 / 4
DOC. No.
***********
1043-BD-MA-TRD-0003
REV. : A
TRD FOR SUPPLY STEEL PIPE PILE PAGE : 4/4

5. QUANTITY

MATERIAL SUPPLY
No. Items Remarks
Dimension Quantity (nos) Length (m)

1 Jetty control room


- Test pile D606.6x16 1 52

- Working pile 24 50

2 TN2
- Test pile D812.8x16

- Working pile 8 52

3 TN2A
- Test pile D812.8x16 1 58
- Working pile 15 56

4 TN3
- Test pile D812.8x16

- Working pile 4 52

5 TN3A
- Test pile D812.8x16 1 54
- Working pile 15 52
6 TN4
- Test pile D812.8x16

- Working pile 8 52
7 TV1
- Test pile D812.8x16 1 62

- Working pile 7 60
8 TV2
- Test pile D812.8x16 1 62

- Working pile 7 60
9 TV4
- Test pile D812.8x16 1 62

- Working pile 7 60

PTSC Page 4 / 4