1 Damage/Surface Defects Visulal check for Damage / surface defects/ cracks on insulators
Check the availability of complete material as per drawing and for any physical
2 Physical inspection
damage
Proper lifting arrangements (through lifting lugs), orientation of Incoming & Outgoing
4 Lifting
sides
Verification of Check clamps and connectors to suit the conductor stud, groove etc Check the
5
accessories/hardware availability
6 Oil level & leakage check Check oil level of CT & PT and oil leakage (If any)
Tightness of bolts Ensure installation of the CT & PT as per approved drawing and
9 Installation & alignment
aligned
10 Control cable connection Connect control cable & ferruling as per cable schedule
IR Withstand test between winding to winding & winding to earth has checked and
13 IR value Check
resuls are okay
14 Winding Resistance Check Winding resistance to be check and results are okay
Primary / secondary winding polarity, terminal markings has checked and results are
15 Polarity Check
okay and noted