REINFORCEMENT SCHEDULE

Project: Construction of soakpit

Dia.of No. No. Total


Length Length Unit Wt Total Wt
S.N. Description Bar of of Length Rmk
(ft) (mt) (kg/mt) (kg)
(mm) Type Bar (mt)

1 Soakpit
Main bar 10mm Dia. & 14.166' long @6"C/C upto 12.166 10 1 21 14.166 4.32 90.70 0.617 55.99
Main bar 10mm Dia. &10.166' long @6"C/C upto 14.166' 10 1 29 16.5 5.03 145.88 0.617 90.05
2 Chamber
Main bar 10mm Dia. & 3.5' long @6"C/C upto 2 10 5 7 3.5 1.07 37.35 0.617 23.05
Main bar 10mm Dia. & 3.5' long @6"C/C upto 3 10 5 7 3.5 1.07 37.35 0.617 23.05
S. Total 192.15 kg
Wastage @ 7% of total 13.45
Grand Total 205.60 kg
DETAILED QUANTITY ESTIMATE
Project: Construction of soakpit
S.N. Description No. L (ft.) B (ft.) H (ft.) Quantity Unit Remarks

1 Earthwork in excavation
Soak pit 1 12.00 14.00 10.00 120.000
chamber 5 3.50 3.50 2.00 35.000
Total 120.000 cft

2 Brick Aggrigate Filling 1 44.64 1.00 8.00 357.120 cft

3 Coarse Aggregate Filling 1 52.66 1.00 8.00 421.280 cft

4 Stone soling
Stone soiling at wall foundation 1 36.00 1.25 0.75 33.750
Chamber 5 3.50 3.50 0.75 45.938
Total 79.688 cft

5 PCC work (1:3:6 )


Stone soiling at wall foundation 1 36.00 1.25 0.25 11.250
Chamber 5 3.50 3.50 0.25 15.313
Total 26.563 cft

6 PCC for RCC (1:1.5:3)


Soak pit cover 1 10.17 12.17 0.33 40.814
Chamber Cover 5 3.50 3.50 0.33 20.213
Total 61.027 cft

7 Brick work 1:4 CM


Soak pit 1 36.00 1.08 10.00 389.988
Chamber wall 5 11.00 0.75 2.00 82.500
Deducted 25 % honeycomb wall -1 -97.497
Total 374.991 cft

8 Form work
Soakpit slab 1 10.17 12.17 123.680
Chamber Cover 5 3.50 3.50 61.250
Total 184.930 sft

9 M.S. bar including bending & binding in RCC


work 205.596 kg

10 Manhole cover
For soakpit 1 1.000
Total 1.000 No.

11 Waste water pipe 1 80 80.000 rft.


ABSTRACT OF COST

Project: Construction of soakpit


SN Description of Work Unit Quantity Rate (Rs.) Amount (Rs.)
Septic tank / Soak pit
1 Earthwork in excavation in Foundation in BM soil cft 120.000 16.35 1,961.90
2 Brick Aggrigate Filling cft 357.120 82.20 1,770.00
3 Coarse Aggregate Filling cft 421.280 58.11 1,700.00
4 Stone soling cft 79.688 96.94 7,724.81
5 P.C.C.(1:3:6) work cft 26.563 331.99 8,818.39
6 P.C.C. for RCC (1:1.5:3) work cft 61.027 440.20 26,864.14
7 Dry Brick work cft 374.991 381.51 143,064.17
8 M.S. Bar including bending & binding kg 205.596 113.39 23,312.74
9 Form work for RCC work sft 184.930 77.80 14,387.81
10 Manhole cover no 1.000 12.65 12.65
11 Waste water pipe rft. 80.000 500.00 40,000.00

Total 269,616.61
BILL OF QUANTITY (BOQ)

Project: Construction of Septic Tank & Soak Pit for Pokhara Chamber of Commerce & Industry (PCCI)
SN Description of Items Unit Quantity Rate Amount Remarks
In figures In words
A) Civil Work

SITE CLEARANCE:- Site clearance & preparation work, dense


bush cutting (bushes having perimeter upto 30 cm within 100 sq.m
1
(upto 25. Lead and throw from the site), loading & removing all
complete material from the site as per the instruction of site Engineer.
sft #REF!

EARTHWORK IN EXCAVATION:- Earthwork in excavation in


foundation in all types of BM soil including backfilling, shoring,
timbering of tenches, pumping out of water from the trenches (if
2 necessary) dressing of sides, ramming of bottom, lift upto 2m,
stacking of excavated materials, clear from the edge of foundation
trench all complete as per specification, drawing and instruction of
site Engineer.
cft 120.00

STONE SOLING WORK:- Stone soling to the required depth all


complete including filling the gaps with sand & gravel, packing by
3
watering and ramming to get true level etc. all complete as per
drawing and instruction of the site Engineer.
cft 79.69

PCC (1:3:6) WORK:- Laying machine mixed plain cement concrete


in foundation with cement sand and stone ballast maximum size
4 25mm gauge including setting out, mixing, compacting, curing and
finishing etc. to approved level, line and dimension all complete as
per specification, drawing and the instruction of site Engineer.
cft 26.56
PCC FOR RCC WORK M20 (1:1.5:3):- PCC for RCC work in all
portion including batching, mixing, placing, & compacting, centering
5
& shuttering, curing etc. all complete as per drawing and instruction
of the site Engineer. cft 61.03
BILL OF QUANTITY (BOQ)

Project: Construction of Septic Tank & Soak Pit for Pokhara Chamber of Commerce & Industry (PCCI)
SN Description of Items Unit Quantity Rate Amount Remarks
In figures In words

BRICK MASONARY WORK IN (1:4) C/M:- Providing and


laying first class chimney burn brick in 10 mm thick cement sand
6 with fair finish, curing, filling and raking out joints wherever
required, using approved size and quality bricks all complete as per
drawings, specifications and instruction of site Engineer.
cft 374.99
REINFORCEMENT BAR WORKS:- Straightening, cutting,
fabricating, bending, placing as per design and detail of RCC element
including supplying and binding the reinforcement with 18 gauge
annaled wire for tying the reinforcement for all size of bars at each
7
junction including all wastes and cut pieces, provision for spacers
chairs, providing and placing cement mortar (1:1) cover block to keep
the bars in the intended position at all level etc. all complete as per
the drawing and instruction of the site Engineer.
kg 205.60

FORMWORKS:- Centering & shuttering with providing material


such as shuttering plywood or pvc or sheet with steel props etc. for all
kind of RCC works of any shape and any level with necessary
8 propping, scaffolding, stagging, supporting, cutting holes for
utilization works etc. including providing final surface in correct line,
level, cleaning and applying form oil and removal of forms all
complete as per the drawing and instruction of the site Engineer.
sft 184.93
12.5mm thick cement sand plaster in 1:4 ratio on wall including
9 cleaning the surface, wetting & finishing, scaffolding, curing etc. all
complete as per instruction & satisfaction of site Engineer.
sft #REF!

Cast Iron Manhole cover of size 2'x2' with resting iron plate etc. all
10 complete as per the drawings, specification and instruction of site
Engineer.
no 12.00
DETAILED QUANTITY ESTIMATE
Project: Construction of soakpit
S.N. Description No. L (ft.) B (ft.)

2 Earthwork in excavation
Soak pit 1 12.00 14.00

3 Stone soling
Stone soiling at wall foundation 1 36.00 1.25
Total
4 PCC work (1:3:6 )
Stone soiling at wall foundation 1 36.00 1.25

5 PCC for RCC (1:1.5:3)


Soak pit cover 1 10.17 12.17

6 Brick work 1:4 CM


Soak pit 1 36.00 1.08

6 Dry Brick work


Soak pit 1 36.00 1.08

7 Form work
Soakpit slab 1 10.17 12.17

8 M.S. bar including bending & binding in RCC


work

10 Manhole cover
For soakpit 1

11 Manhole for soilpipe 2


12 Manhole for waste water pipe 2
13 Manhole for ranin water pipe 3

ABSTRACT OF COST

Project: Construction of soakpit


SN Description of Work Unit Quantity Rate (Rs.)
Septic tank / Soak pit
1 Earthwork in excavation in Foundation in BM soil cft 120.000 31.07
2 Stone soling cft 33.750 192.52
3 P.C.C.(1:3:6) work cft 11.250 298.11
4 P.C.C. for RCC (1:1.5:3) work cft 5.083 440.34
5 Brick work 1:4 c/s mortar cft 360.000 404.44
6 M.S. Bar including bending & binding kg 205.596 107.65
7 Form work for RCC work sft 123.680 65.35
9 C.I. Manhole cover no 5.000 12.65
10 Manhole for soilpipe, waste water pipe & ranin no 7.000 500.00
water pipe
Total
MATE

H (ft.) Quantity Unit Remarks

10.00 120.000 cft


Total 120.000 cft

0.75 33.750
Total 33.750 cft

0.25 11.250
Total 11.250 cft

0.50 5.083 cft


Total 5.083 cft

1.75 63.000 cft


Total 63.000 cft

10.00 360.000 cft


Total 360.000 cft

123.680 sft
Total 123.680 sft

205.596 kg

1.000 No.
Total 5.000 No.

2.000 No.
2.000 No.
3.000 No.
Total 7.000 No.

Amount (Rs.)

3,728.40
6,497.55
3,353.74
2,238.25
145,598.40
22,132.41
8,082.46
63.25
3,500.00

195,194.46
General Analysis Page 10

Item : Earthwork excavation in ………..including 10m lead & 1.5m lift


A Soft Soil having silt and clay
Norms No. B1-1
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 0.70 800.00 560.00
Sub-Total 560.00
Tools & Plants @ 3% 16.80
Total (Dept. Rate) 576.80

Item : Boulder Soling & levelling works in foundation including 30m lead.
Norms No. C10 (6-5)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 1.50 800.00 1200.00
Material Boulder Stone Cu.M 1.20 1850.00 2220.00

Total (Dept. Rate) 3420.00

Item : Plain cement concrete works in foundation including material collection & 30m lead

A In (1:3:6)
Norms No. D1(7-2) ga
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 800.00 800.00
Unskilled Md 4.0 1050.00 4200.00
Material Cement(N.S. marks) M.T 0.22 17854.00 3927.88
Agg. 40 mm Cu.M 0.65 1850.00 1202.50
Agg. 20 mm Cu.M 0.24 1900.00 456.00
Course Sand Cu.M 0.47 2350.00 1104.50
Water Litre 120 0.18 21.60
Total (Dept. Rate) 11712.48 331.67

B M20 (1:1.5:3)
Norms No. D2(7-4)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 150.00 120.00
Unskilled Md 7.0 800.00 5600.00
Material Cement (OPC) M.T 0.4 17854.00 7141.60
Agg. 20 mm(Crusher) Cu.M 0.57 1900.00 1083.00
Agg. 10 mm(Crusher) Cu.M 0.29 1900.00 551.00
Sand(Crusher screen) Cu.M 0.425 2350.00 998.75
Water ltr 200 0.18 36.00
Sub-Total 15530.35
Total (Dept. Rate) 15530.35 439.79

Prepared By: Checked By : Recommended By: Approved By:


General Analysis Page 11

Item : Brick masonry works including materials collection, preparation of mortar with 30m
A Chimney Bhatta Bricks in c/s mortar 1:4
Norms No. C2(5-1)kha2 / 5(2)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1050.00 1575.00
Unskilled Md 2.2 800.00 1760.00
Material Cement(N.S. marks) M.T 0 17854.00 0.00
Brick No. 560.00 18.08 10124.80
Sand(Crusher Screen) Cu.M 0 2350.00 0.00
Water ltr 0 0.18 0.00
Sub-Total 13459.80
Total (Dept. Rate) 13459.80

D Form works by using iron props and 18mm thick Water proof Ply wood
Norms No. E6(8-4)Ka
Unit 100 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 17.200 1050.00 18060.00
Unskilled Md 25.700 800.00 20560.00
Material Local Wood Cu.M 0.232 40606.00 9420.59
18 mm plywood board Sq.m 16.500 1702.86 28097.19
Iron pipe(props) wall 1no Props
th1.65mm and pipesize asumed as 3.5m
50mm dia. no 4.400 1094.52 4815.89 long
Nails Kg 25.000 107.32 2683.00
Sub-Total 83636.67 Per sq.m
Total (Dept. Rate) 83636.67 836.37
Note:- It is assumed that the wood used in form work can be used 6 times and remaining 25% scrap
value.(1.6875x1.1x0.75)/6=0.232 cum.
It is asumed that the ply wood used in form work can be used 6 times and remaining 10% scrap value
100x1.1x0.9/6=16.5
It is asumed that the black Pipe used in form work can be used 15 times and remaining 25% scrap value
88/15x0.75 =4.4

Reinforcement bar for RCC works including cutting, binding, bending & placing as per
12 Item :
drawing with 30m lead
Norms No. D9(7-5)
Unit 1M.T
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 12.0 1050.00 12600.00
Unskilled Md 12.0 800.00 9600.00
Material T.M.T. Bar Mt 1.05 85880.00 90174.00
Binding wire Kg. 10 101.70 1017.00
Sub-Total 113391.00 Per Kg
Total (Dept. Rate) 113391.00 113.39

Prepared By: Checked By : Recommended By: Approved By: