PLAN DE PRODUCCION Y COMPRAS

This
This spreadsheet
spreadsheet was
was created
created by
by either
either POM,
POM, QM
QM or
or
POM-QM for Windows, V4.
POM-QM for Windows, V4.

Indented Bill of Materials


Number per Indented
Item name Level parent BOM
B 0 1B
E 1 3 E
F 1 1 F
C 0 2C
E 1 1 E
F 1 2 F

Distinct items 4

B Lead time 1 Safety Stock 0 Lot size 1

Gross requirements 0 250 300 300 300 200


Scheduled receipts
On Hand Inventory 0 0 0 0 0 0 0
NET POQ Req 0 250 300 300 300 200
Planned receipts 0 250 300 300 300 200
Planned orders 250 300 300 300 200 0

C Lead time 3 Safety Stock 0 Lot size 500

Gross requirements 0 0 0 0 0 0
Scheduled receipts
On Hand Inventory 0 0 0 0 0 0 0
NET POQ Req 0 0 0 0 0 0
Planned receipts 0 0 0 0 0 0
Planned orders 0 0 0 0 0 0

E Lead time 4 Safety Stock 0 Lot size 5000

Gross requirements 750 900 900 900 600 0


Scheduled receipts 0 0 0 0 0 0
On Hand Inventory 5750 5750 5000 4100 3200 2300 1700
NET POQ Req 0 0 0 0 0 0
Planned receipts 0 0 0 0 0 0
Planned orders 0 0 0 0 0 0

F Lead time 5 Safety Stock 0 Lot size 750

Gross requirements 250 300 300 300 200 0


Scheduled receipts 0 0 0 0 0 0
On Hand Inventory 4750 4750 4500 4200 3900 3600 3400
NET POQ Req 0 0 0 0 0 0
Planned receipts 0 0 0 0 0 0
Planned orders 0 0 0 0 0 0
Minimum
quantity 1

Minimum
quantity 500

Minimum
quantity 5000
Minimum
quantity 750