Beruflich Dokumente
Kultur Dokumente
OEM
Description - all - Pareto Breakdown Hours By M
ajor Component (M
ultiple Items
grup - multiple - Pareto Breakdown Hours By M
ajor Component
Is Failure Yes
OEM
Description - all -
grup - multiple -
Reason Comp Unit No.
EventID Reported Fault/Description of Repair
HV Electrical EG3976 82571 Generator fail Prepare sent to BSF
WD1513 69396 Fan blade broken( Waiting rectifier block ETA :
WD1686 74626 Welding systemn-progress at BPN
WD3008 80969 Travo 24 volt conWOP Trafo control 24 volt,
WD3013 80968 Switch module p OP Switch mode polarity ETA
EG1950 82993 Starting motor fa
(empty)
EG3102 83003 Lamp OFF 30/11/2019 D12: saulan, Chec
Engine AC1472 75436 Engine can't ru In-progress at BPN ( waitin
WD1925 81112 Crank shaft sealn progress at BPN
WD1889 81011 Welding systemIn-progres at BPN ( testing
WD1509 69766 Engine particle n-progress at BPN
HO0206 83161 Water coolant l 03/12/2019 D12: Feri, Repair
PU2250 83357 Stuffing box lea02/12/2019 D12: KSB, Replace
WD1537 83463 Engine can't sta(empty)
VT0847 82749 Engine oil leaks27/11/2019 N12: M
anpower : Da
VF7129 83407 TC895 : Seat beRepair RH seat belt due to fa
EG1717 82761 Engine shutdo 27/11/2019 N12: Syahruddin,
83043 Engine shutdo 29/11/2019 N12: M
uh M
asdar,
83370 Engine cant run02/12/2019 N12: thomson, To
82887 Engine shutdo 28/11/2019 N12: Syahruddin,
VF7157 83167 TC922 : Engine30/11/2019 D12: M
anpower : N
RD4152 82794 Engine low pow27/11/2019 N12: M
anpower : k
VT1031 82799 Drain valve fue Repai drain valve for fuel trai
VF7146 82892 TC947 : Timing Replace
b Balancer Timing, Repl
EG2290 83492 Engine can't stajump battery to start
VT2108 82792 Air system drop27/11/2019 D12: M
an power :
83079 Air system drop29/11/2019 N12: M
an power :
VF7186 82862 TC947 : Timing Replace
b Timing belt assy
VF7911 83406 TC972 : Engine02/12/2019 D12: M
anpower :
VF7156 82731 TC921 : Engine27/11/2019 D12: M
PM
team,
EG3199 83396 Engine shutdow02/12/2019 N12: thomson, Wa
EG3100 82768 Engine shutdo 27/11/2019 N12: Syahruddin, C
EG8228 83507 Engine can't ru 03/12/2019 N12: thomson, Bl
RD4583 83351 Engine coolant 02/12/2019 D12: Loe C,Erwin,
VT1030 83555 Air system pro 03/12/2019 D12: Lidin, Repai
VT2308 83278 Engine shutdo 01/12/2019 D12: Done by TWS
EG1718 83057 Engine shutdow29/11/2019 N12: M
usa, M
uh M
Is Failure Yes
OEM
Descriptio - all -
grup - multiple -
Reason Comp sys - Part Unit No.
EventID Task Start TimeReported Fault/Job D
LV Electrical Electrical - Electrical HO0205 83312 ### Indicator battery fla
VF7129 83105 30/11/2019 1:0 TC895 : Lights
VF7131 82820 27/11/2019 8:1 TC897 : Rotary Lam
VF7139 83104 29/11/2019 11: TC906 : Lights
VF7153 83536 ### TC920 : Regulator
VF7166 82897 28/11/2019 4:0 TC931 : Rotary lam
VF7176 83578 ### TC960 : Head lamp
VF7531 83142 30/11/2019 7:3 TC021 : Lights
VF7832 82999 29/11/2019 7:0 TC026 : Rotary lam
VT1210 82832 27/11/2019 8:0 Head Lamp OFF
VT2109 83213 ### Door cabin passeng
VT2210 83428 ### Alternator noise
VT2523 83085 29/11/2019 7:0 Cabin Passenger la
VT2526 83084 29/11/2019 8:0 Lights
VF7142 82623 26/11/2019 4:5 TC909 : Brake lamp
83225 30/11/2019 8:1 TC909 : Lights
VF7164 83264 ### TC929 : Battery low
VF7540 83533 ### TC967 : Lights
VF7833 83143 30/11/2019 9:0 TC030 : Horn fail
EG2290 82867 28/11/2019 7:1 Engine can't running
EG3078 83133 30/11/2019 7:0 BCS_Battery low vol
VT1031 83162 30/11/2019 8:0 Turn Signal Abnorma
VF7161 83033 29/11/2019 3:3 TC926 : Head Lamp
VF7554 82953 28/11/2019 9:2 TC957 : Lights
VT1215 83134 30/11/2019 7:0 Crane indicator OFF
AC1294 83453 ### Engine can't start
VF7215 83542 ### TC952 : Lights
VF7544 83166 30/11/2019 8:5 TC963 : Rotary Lam
VF7558 83169 30/11/2019 10: TC953 : Lights
VF7954 82858 28/11/2019 1:0 TC007 : Lights
PU2001 83545 ### Error 11
Controlling - Switch/Relay/Solen VT1040 82908 28/11/2019 2:0 Engine can't start
EG3012 83021 29/11/2019 8:0 BCS_Engine can't sta
LV Electrical Result
Engine Engine - Engine AC1472 75436 27/09/2019 4:3Engine can't running
EG1717 82761 27/11/2019 6:5 Engine shutdown
82887 28/11/2019 9:0 Engine shutdown
83043 29/11/2019 11: Engine shutdown
83370 ### Engine cant running
EG3100 82768 27/11/2019 8:0 Engine shutdown
HO0206 83161 30/11/2019 7:3 Water coolant leaks
VF7129 83407 ### TC895 : Seat belt br
VF7149 82951 28/11/2019 8:2 TC916 : Engine oil lo
VF7186 82862 28/11/2019 1:0 TC947 : Timing belt f
VT1030 83555 ### Air system problem
VT2108 82792 27/11/2019 10: Air system drop
83079 30/11/2019 1:0 Air system drop
VT2308 83278 ### Engine shutdown
WD1509 69766 ### Engine particle ofte
VF7156 82731 27/11/2019 11: TC921 : Engine exce
VF7833 83369 ### TC030 : Engine oil lo
VF7911 83406 ### TC972 : Engine Low
EG2290 83492 ### Engine can't start
VT1031 82799 27/11/2019 7:0 Drain valve fuel pro
WD1889 81011 ### Welding system gener
WD1925 81112 ### Crank shaft seal leak
VF7146 82892 28/11/2019 1:0 TC947 : Timing belt f
VF7157 83167 30/11/2019 10: TC922 : Engine low
PU2250 83357 ### Stuffing box leaks
VF7903 83541 ### TC973 : Engine Low
EG1718 83057 30/11/2019 3:0 Engine shutdown
EG3199 83396 ### Engine shutdown
Fuel - Filter EG8228 83507 ### Engine can't running
RD4152 82794 27/11/2019 8:4 Engine low power
- WD1537 83463 ### Engine can't start
Cooling - Coolant RD4583 83351 ### Engine coolant level
Cooling - Hose/Steel Tube VT0847 82749 27/11/2019 4:0 Engine oil leaks
Engine Result
Brakes Brakes - Brakes VF7139 82954 28/11/2019 10: TC906 : Brake probl
VF7140 82863 28/11/2019 5:0 TC907 : park brake t
VF7186 83168 30/11/2019 7:3 TC947 : Parking bra
VT2526 83387 ### Parking brake not fu
VF7156 83267 ### TC921 : Parking brak
VF7142 83268 ### TC909 : Parking brak
VZ3001 82834 27/11/2019 7:0 Brake chamber loos
VT1218 83400 ### Indicator parking br
- VT1218 83525 ### Parking brake indica
Electrical - Switch/Relay/Solenoi RD4585 83442 ### Indicator parking br
Service Brake Assembly - Brake VZ3000 83300 ### Lining brake worn ou
Brakes Result
Chassis/Frame/CChassis/Frame/Cabin/Steer AxlesVF7131 83031 29/11/2019 9:0 TC897 : Suspension
VF7162 83535 ### TC927 : Seat Belt R
VT1261 83275 ### Operator seat probl
VT2305 83027 29/11/2019 11: Front Shock absorbe
VT2524 83379 ### Passenger seat main
VF7130 83032 29/11/2019 11: TC896 : Engine guar
VF7164 83265 ### TC929 : Wiper probl
VT2304 83516 ### Safety belt broken
VF7146 82822 27/11/2019 11: TC913 : FR RH door
VF7541 82894 28/11/2019 2:1 TC966 : Engine botto
Cabin - Operator Seat VT1041 83151 30/11/2019 11: Operator seat shaky
Chassis/Frame/Cabin/Steer Axles Result
HV Electrical HV Electrical - HV Electrical EG3976 82571 25/11/2019 6:0 Generator fail
WD1513 69396 ### Fan blade broken and
WD1686 74626 20/09/2019 7:0Welding system gener
WD3008 80969 ### Travo 24 volt control
WD3013 80968 ### Switch module polari
EG1950 82993 29/11/2019 4:2 Starting motor fail
EG3102 83003 29/11/2019 5:0 Lamp OFF
HV Electrical Result
Torque ConvertoTorque Converter/Transmission -VT1030 83296 ### Servo clutch failure
VT1211 83201 ### Transmission shiftin
VF7160 82166 22/11/2019 6:0 TC925 : 4 WD Probl
VT2304 83026 29/11/2019 7:0 Double not function
- VF7134 83220 29/11/2019 7:0 TC900 : 4WD proble
Torque Convertor/Transmission Result
Drive Lines/SpliDrive Lines/Splitter Box/Swing/DrVF7189 78296 19/10/2019 7:0TC950 : 4 WD Probl
VF7844 82758 27/11/2019 3:3 TC029 : RH front dri
VT2304 79940 ### Inter axle excessive
VF7215 83266 ### TC952 : 4WD proble
Drive Lines/Splitter Box/Swing/Drives Result
Aircon Aircon - Aircon VF7139 83034 29/11/2019 11: TC906 : AC
VF7140 82771 27/11/2019 11: TC907 : AC
VT2305 82946 29/11/2019 1:0 AC
83212 30/11/2019 9:0 A/C
Aircon Result
Buckets/Bowls/ Buckets/Bowls/Body - Buckets/BVT3131 83368 ### PTO for service modu
VF7138 79969 ### TC905 : Body broke
EG3177 82608 26/11/2019 2:3 Skid worn
VF7534 82734 27/11/2019 8:3 TC018 : Rear back d
Buckets/Bowls/Body Result
Differentials/Be Differentials/Bevel Gears - Diffe VT2306 81824 19/11/2019 7:0 Rear bevel gear fail
VT2304 82944 28/11/2019 8:0 Inter-axle can't neutr
VT2307 83380 ### Differential oil leaks
Differentials/Bevel Gears/Steering Clutches Result
Tyres Tyres - Tyres VF7140 83537 ### TC907 : Schedule re-
Tyres Result
Technology 2 Way Radio - Antenna RD4152 83273 ### Radio communication
Technology Result
Other/M
isc Other/M
isc - Other/M
isc PU2250 82964 29/11/2019 11: Reducer outlet pipe
Other/Misc Result
Total Result
Component (M
ultiple Items)
ar TC886) times
Loan dCar TC032) times
TC970) times
Is Failure Yes
OEM
Descriptio - all -
grup - multiple -
Reason Comp sys - Part Unit No.
EventID Task Start TimeReported Fault/Job D
LV Electrical Electrical - Electrical HO0205 83312 ### Indicator battery fla
VF7129 83105 30/11/2019 1:0 TC895 : Lights
VF7131 82820 27/11/2019 8:1 TC897 : Rotary Lam
VF7139 83104 29/11/2019 11: TC906 : Lights
VF7153 83536 ### TC920 : Regulator
VF7166 82897 28/11/2019 4:0 TC931 : Rotary lam
VF7176 83578 ### TC960 : Head lamp
VF7531 83142 30/11/2019 7:3 TC021 : Lights
VF7832 82999 29/11/2019 7:0 TC026 : Rotary lam
VT1210 82832 27/11/2019 8:0 Head Lamp OFF
VT2109 83213 ### Door cabin passeng
VT2210 83428 ### Alternator noise
VT2523 83085 29/11/2019 7:0 Cabin Passenger la
VT2526 83084 29/11/2019 8:0 Lights
VF7142 82623 26/11/2019 4:5 TC909 : Brake lamp
83225 30/11/2019 8:1 TC909 : Lights
VF7164 83264 ### TC929 : Battery low
VF7540 83533 ### TC967 : Lights
VF7833 83143 30/11/2019 9:0 TC030 : Horn fail
EG2290 82867 28/11/2019 7:1 Engine can't running
EG3078 83133 30/11/2019 7:0 BCS_Battery low vol
VT1031 83162 30/11/2019 8:0 Turn Signal Abnorma
VF7161 83033 29/11/2019 3:3 TC926 : Head Lamp
VF7554 82953 28/11/2019 9:2 TC957 : Lights
VT1215 83134 30/11/2019 7:0 Crane indicator OFF
AC1294 83453 ### Engine can't start
VF7215 83542 ### TC952 : Lights
VF7544 83166 30/11/2019 8:5 TC963 : Rotary Lam
VF7558 83169 30/11/2019 10: TC953 : Lights
VF7954 82858 28/11/2019 1:0 TC007 : Lights
PU2001 83545 ### Error 11
Controlling - Switch/Relay/Solen VT1040 82908 28/11/2019 2:0 Engine can't start
EG3012 83021 29/11/2019 8:0 BCS_Engine can't sta
LV Electrical Result
Engine Engine - Engine AC1472 75436 27/09/2019 4:3Engine can't running
EG1717 82761 27/11/2019 6:5 Engine shutdown
82887 28/11/2019 9:0 Engine shutdown
83043 29/11/2019 11: Engine shutdown
83370 ### Engine cant running
EG3100 82768 27/11/2019 8:0 Engine shutdown
HO0206 83161 30/11/2019 7:3 Water coolant leaks
VF7129 83407 ### TC895 : Seat belt br
VF7149 82951 28/11/2019 8:2 TC916 : Engine oil lo
VF7186 82862 28/11/2019 1:0 TC947 : Timing belt f
VT1030 83555 ### Air system problem
VT2108 82792 27/11/2019 10: Air system drop
83079 30/11/2019 1:0 Air system drop
VT2308 83278 ### Engine shutdown
WD1509 69766 ### Engine particle ofte
VF7156 82731 27/11/2019 11: TC921 : Engine exce
VF7833 83369 ### TC030 : Engine oil lo
VF7911 83406 ### TC972 : Engine Low
EG2290 83492 ### Engine can't start
VT1031 82799 27/11/2019 7:0 Drain valve fuel pro
WD1889 81011 ### Welding system gener
WD1925 81112 ### Crank shaft seal leak
VF7146 82892 28/11/2019 1:0 TC947 : Timing belt f
VF7157 83167 30/11/2019 10: TC922 : Engine low
PU2250 83357 ### Stuffing box leaks
VF7903 83541 ### TC973 : Engine Low
EG1718 83057 30/11/2019 3:0 Engine shutdown
EG3199 83396 ### Engine shutdown
Fuel - Filter EG8228 83507 ### Engine can't running
RD4152 82794 27/11/2019 8:4 Engine low power
- WD1537 83463 ### Engine can't start
Cooling - Coolant RD4583 83351 ### Engine coolant level
Cooling - Hose/Steel Tube VT0847 82749 27/11/2019 4:0 Engine oil leaks
Engine Result
Brakes Brakes - Brakes VF7139 82954 28/11/2019 10: TC906 : Brake probl
VF7140 82863 28/11/2019 5:0 TC907 : park brake t
VF7186 83168 30/11/2019 7:3 TC947 : Parking bra
VT2526 83387 ### Parking brake not fu
VF7156 83267 ### TC921 : Parking brak
VF7142 83268 ### TC909 : Parking brak
VZ3001 82834 27/11/2019 7:0 Brake chamber loos
VT1218 83400 ### Indicator parking br
- VT1218 83525 ### Parking brake indica
Electrical - Switch/Relay/Solenoi RD4585 83442 ### Indicator parking br
Service Brake Assembly - Brake VZ3000 83300 ### Lining brake worn ou
Brakes Result
Chassis/Frame/CChassis/Frame/Cabin/Steer AxlesVF7131 83031 29/11/2019 9:0 TC897 : Suspension
VF7162 83535 ### TC927 : Seat Belt R
VT1261 83275 ### Operator seat probl
VT2305 83027 29/11/2019 11: Front Shock absorbe
VT2524 83379 ### Passenger seat main
VF7130 83032 29/11/2019 11: TC896 : Engine guar
VF7164 83265 ### TC929 : Wiper probl
VT2304 83516 ### Safety belt broken
VF7146 82822 27/11/2019 11: TC913 : FR RH door
VF7541 82894 28/11/2019 2:1 TC966 : Engine botto
Cabin - Operator Seat VT1041 83151 30/11/2019 11: Operator seat shaky
Chassis/Frame/Cabin/Steer Axles Result
HV Electrical HV Electrical - HV Electrical EG3976 82571 25/11/2019 6:0 Generator fail
WD1513 69396 ### Fan blade broken and
WD1686 74626 20/09/2019 7:0Welding system gener
WD3008 80969 ### Travo 24 volt control
WD3013 80968 ### Switch module polari
EG1950 82993 29/11/2019 4:2 Starting motor fail
EG3102 83003 29/11/2019 5:0 Lamp OFF
HV Electrical Result
Torque ConvertoTorque Converter/Transmission -VT1030 83296 ### Servo clutch failure
VT1211 83201 ### Transmission shiftin
VF7160 82166 22/11/2019 6:0 TC925 : 4 WD Probl
VT2304 83026 29/11/2019 7:0 Double not function
- VF7134 83220 29/11/2019 7:0 TC900 : 4WD proble
Torque Convertor/Transmission Result
Drive Lines/SpliDrive Lines/Splitter Box/Swing/DrVF7189 78296 19/10/2019 7:0TC950 : 4 WD Probl
VF7844 82758 27/11/2019 3:3 TC029 : RH front dri
VT2304 79940 ### Inter axle excessive
VF7215 83266 ### TC952 : 4WD proble
Drive Lines/Splitter Box/Swing/Drives Result
Aircon Aircon - Aircon VF7139 83034 29/11/2019 11: TC906 : AC
VF7140 82771 27/11/2019 11: TC907 : AC
VT2305 82946 29/11/2019 1:0 AC
83212 30/11/2019 9:0 A/C
Aircon Result
Buckets/Bowls/ Buckets/Bowls/Body - Buckets/BVT3131 83368 ### PTO for service modu
VF7138 79969 ### TC905 : Body broke
EG3177 82608 26/11/2019 2:3 Skid worn
VF7534 82734 27/11/2019 8:3 TC018 : Rear back d
Buckets/Bowls/Body Result
Differentials/Be Differentials/Bevel Gears - Diffe VT2306 81824 19/11/2019 7:0 Rear bevel gear fail
VT2304 82944 28/11/2019 8:0 Inter-axle can't neutr
VT2307 83380 ### Differential oil leaks
Differentials/Bevel Gears/Steering Clutches Result
Tyres Tyres - Tyres VF7140 83537 ### TC907 : Schedule re-
Tyres Result
Technology 2 Way Radio - Antenna RD4152 83273 ### Radio communication
Technology Result
Other/M
isc Other/M
isc - Other/M
isc PU2250 82964 29/11/2019 11: Reducer outlet pipe
Other/Misc Result
Total Result
Component (M
ultiple Items)
ar TC886) times
Loan dCar TC032) times
TC970) times
Tota l Cum
Is Failure Yes
OEM
Description - all -
grup - multiple -
Reason Comp Unit No.
EventID Reported Fault/Description of Repair
HV Electrical EG3976 82571 Generator fail Prepare sent to BSF
WD1513 69396 Fan blade broken ( Waiting rectifier block ETA :
WD1686 74626 Welding systemn-progress at BPN
WD3008 80969 Travo 24 volt con WOP Trafo control 24 volt,
WD3013 80968 Switch module p OP Switch mode polarity ETA
EG1950 82993 Starting motor fa(empty)
EG3102 83003 Lamp OFF 30/11/2019 D12: saulan, Chec
Engine AC1472 75436 Engine can't ru In-progress at BPN ( waitin
WD1925 81112 Crank shaft sealn progress at BPN
WD1889 81011 Welding systemIn-progres at BPN ( testing
WD1509 69766 Engine particle n-progress at BPN
HO0206 83161 Water coolant l 03/12/2019 D12: Feri, Repair
PU2250 83357 Stuffing box lea02/12/2019 D12: KSB, Replace
WD1537 83463 Engine can't sta(empty)
VF7129 83407 TC895 : Seat beRepair RH seat belt due to fa
EG1717 82761 Engine shutdo 27/11/2019 N12: Syahruddin,
83043 Engine shutdo 29/11/2019 N12: M
uh M
asdar,
83370 Engine cant run02/12/2019 N12: thomson, To
82887 Engine shutdo 28/11/2019 N12: Syahruddin,
VF7157 83167 TC922 : Engine30/11/2019 D12: M
anpower : N
RD4152 82794 Engine low pow27/11/2019 N12: M
anpower : k
VF7146 82892 TC947 : Timing Replace
b Balancer Timing, Repl
VF7186 82862 TC947 : Timing Replace
b Timing belt assy
EG2290 83492 Engine can't stajump battery to start
VF7911 83406 TC972 : Engine02/12/2019 D12: M
anpower :
VF7156 82731 TC921 : Engine27/11/2019 D12: M
PM
team,
EG3199 83396 Engine shutdow02/12/2019 N12: thomson, Wa
EG3100 82768 Engine shutdo 27/11/2019 N12: Syahruddin, C
EG8228 83507 Engine can't ru 03/12/2019 N12: thomson, Bl
RD4583 83351 Engine coolant 02/12/2019 D12: Loe C,Erwin,
EG1718 83057 Engine shutdow29/11/2019 N12: M
usa, M
uh M
addition - all -
Is Failure - all -
OEM
Description - all - Pareto Breakdown Hours By M
ajor Component Volvo A40 Thiess
grup - multiple -
No WorkRequire No
Pareto Breakdown Hours By Major Componen
350
Reason Comp Sum - PeriodTaskDowntimeDuration(08+09) 318.8
HV Electrical 966.
83 300
Engine 811.
92
250 233.3 229.0
Torque Convertor 318.
75
Drive Lines/Split 233.
33 200
Buckets/Bowls/B 229.
00 148.8
150
LV Electrical 148.
75
108.2
Brakes 108.
17 100
Tyres 51.
92
Grease System 17.
58 50 30.8
Chassis/Frame/Ca 17.
00 0
Hydraulics 14.
50
This shape represents
Differentials/Bev 8.
33 a slicer.
Aircon Slicers are supported
6.
33 in Excel
Technology 2010 or later. 1.
00
Total Result 2933.42
If the shape was modified in
an earlier version of Excel, or Tota l Cumul ative
if the workbook was saved in
Excel 2003 or earlier, the
slicer cannot be used.
If the shape was modified in
an earlier version of Excel, or
if the workbook was saved in
Excel 2003 or earlier, the
slicer cannot be used.
addition - all -
Is Failure - all -
OEM
Description - all -
grup - multiple -
No WorkRequire No
Unit No.
EventID ActivitTask Start TimeTask End TimeReportedDescription of Sum - PeriodTaskDowntimeDuration(0
AC1472 75436 (empty27/09/2019 4:3 ### Engine cIn-progress at ###
AC1472 Result ###
WD3013 80968 (empty### 16/12/2019 7: Switch mOP Switch mode ### WD3013 (e
WD3013 Result ###
WD3008 80969 (empty### ### Travo 24 WOP Trafo cont ### WD3008 (e
WD3008 Result ###
WD1925 81112 (empty### ### Crank sha
n progress at B ### WD1925 (e
WD1925 Result ###
WD1889 81011 (empty### ### Welding In-progres at B ### WD1889 (e
WD1889 Result ###
WD1686 74626 (empty20/09/2019 7:0 30/01/2020 7: Welding n-progress at ### WD1686 (e
WD1686 Result ###
WD1513 69396 (empty### 16/12/2019 7: Fan blade
( Waiting rectif ### WD1513 (e
WD1513 Result ###
WD1509 69766 (empty### ### Engine pn-progress at ### WD1509 (e
WD1509 Result ###
VF7189 78296 (empty19/10/2019 7:0 ### TC950 : In-progress rep ### VF7189 (e
VF7189 Result ###
VF7160 82166 (empty22/11/2019 6:0 29/12/2019 7: TC925 : Replace Chain T ### VF7160 (e
VF7160 Result ###
EG3976 82571 (empty25/11/2019 6:0 ### GeneratorPrepare sent t ### EG3976 (e
EG3976 Result ###
EG3177 82608 (empty26/11/2019 2:3 ### Skid worrogress Repair ### EG3177 (e
29/11/2019 7:0 ### Housing (empty) 0.
00
EG3177 Result ###
VF7134 83220 (empty29/11/2019 7:0 ### TC900 : (empty) ### VF7134 (e
VF7134 Result ###
EG1950 82993 (empty29/11/2019 4:2 ### Starting (empty) ### EG1950 (e
83092 (empty29/11/2019 7:0 29/11/2019 10 PM
250HR29/11/2019 D12 3.
00 0 (e
EG1950 Result ###
VF7184 83099 (empty29/11/2019 7:0 29/11/2019 10 TC945 : Performed PM
3.
50 VF7184 (e
29/11/2019 10: ### TC945 : 29/11/2019 N12:64.
50
83540 (empty### ### TC945 : 03/12/2019 D12 0.
25 0 (e
VF7184 Result 68.25
HO0206 83161 (empty30/11/2019 7:3 ### Water co03/12/2019 D12:60.
67 HO0206 (e
### ### Engine caTrouble shoot ch0.
00
HO0206 Result 60.67
VF7138 79969 (empty### 29/11/2019 5: TC905 : epair body at 58.
00 VF7138 (e
29/11/2019 3:3 29/11/2019 3: TC905 : 29/11/2019 D12 0.
00
VF7138 Result 58.00
VT1215 83134 09-Un30/11/2019 7:0 ### Crane in02/12/2019 D12:43.
25 VT1215 09
83411 08-Pl ### ### PM
250HR02/12/2019 N12 3.
00 0 08
### ### M
echanic02/12/2019 N12 5.
00
VT1215 Result 51.25
RD4369 82816 08-Pl 28/11/2019 8:3 28/11/2019 3: PM
2000H28/11/2019 D12 6.
92 RD4369 08
28/11/2019 3:3 28/11/2019 9: Backlog 28/11/2019 D12: 6.
08
28/11/2019 D12: 0.
00
09-Un28/11/2019 9:3 28/11/2019 10 Over run8/11/19 NS : Adj 0.
00 09
28/11/2019 11 Over run28/11/2019 N12: 2.
17
83106 09-Un30/11/2019 9:5 30/11/2019 3: Transmiss 30/11/2019 D12: 5.
58 0 09
83155 09-Un### ### Bottom g02/12/2019 D12:3.
17 0 09
09-Un30/11/2019 9:2 ### Transmiss01/12/2019 D12:25.
17 09
RD4369 Result 49.08
VF7129 83407 (empty### ### TC895 : Repair RH seat 12.
00
b VF7129 (e
### ### TC895 : (empty) 33.
67
83105 (empty30/11/2019 1:0 30/11/2019 2: TC895 : 29/11/2019 N12 1.
00 0 (e
VF7129 Result 46.67
VF7862 83193 (empty### ### TC022 : Replace Tyre po29.
25 VF7862 (e
### ### TC022 : Replace battery 8.
25
VF7862 Result 37.50
RD4368 82715 09-Un27/11/2019 9:4 27/11/2019 10 Hydraulic27/11/2019 D12: 0.
75 RD4368 09
82921 09-Un29/11/2019 2:4 29/11/2019 4: Hydraulic29/11/2019 D12:13.
75 0 09
83417 09-Un### ### Tyre posi03/12/2019 D12:8.
33 0 09
83484 08-Pl ### ### PM
250HR03/12/2019 D12 2.
00 0 08
### ### Backlog 0r 3/12/2019 D12:4.
00
09-Un### ### Over run03/12/2019 N12:4.
08 09
Over runReplace battery 0.
00
RD4368 Result 32.92
VF7140 82771 (empty27/11/2019 11: 27/11/2019 12 TC907 : 27/11/2019 D12 1.
00 VF7140 (e
82863 (empty28/11/2019 5:0 28/11/2019 7: TC907 : adjust parking 2.
00 0 (e
83187 (empty### ### TC907 : 01/12/2019 D12 4.
92 0 (e
### ### TC907 : 01/12/2019 D12:23.
67
### ### TC907 : 02/12/2019 D12 0.
00
83537 (empty### ### TC907 : 03/12/2019 D12 0.
25
VF7140 Result 31.83
VF7166 79006 (empty### 28/11/2019 10 TC931 : Replace RH LH27.
00
82897 (empty28/11/2019 4:0 28/11/2019 5: TC931 : Replace Relay ( 1.
00
VF7166 Result 28.00
VF7145 82772 (empty27/11/2019 1:3 27/11/2019 4: TC912 : 27/11/2019 D12 2.
92
27/11/2019 4:2 28/11/2019 4: TC912 : 27/11/2019 D12:12.
00
27/11/2019 D12 0.
00
28/11/2019 12 TC912 : 27/11/2019 D12 7.
58
82950 (empty28/11/2019 8:1 28/11/2019 8: TC912 : 28/11/2019 N12: 0.
08
VF7145 Result 22.58
VF7176 83102 (empty29/11/2019 8:4 29/11/2019 11 TC960 : 29/11/2019 N12 3.
00
29/11/2019 11: 30/11/2019 4: TC960 : 2 E9/11/2019 N1216.
50
TC960 : 29/11/2019 N12 0.
00
29/11/2019 N12: 0.
00
29/11/2019 N12 0.
00
83223 (empty30/11/2019 10: 30/11/2019 10 TC960 : 30/11/2019 N12: 0.
25
83578 (empty### ### TC960 : Replace Bulb H41.
00
VF7176 Result 20.75
WD1537 83463 (empty### ### Engine ca (empty) 20.
17
WD1537 Result 20.17
RD4367 82798 09-Un27/11/2019 11: 28/11/2019 3: Tyre pos27/11/2019 N12: 3.
75
83308 09-Un### ### Grease l02/12/2019 D12:8.
58
83455 09-Un### ### Water coo 03/12/2019 D12:3.
58
83524 09-Un### ### Lights 03/12/2019 N12:0.
33
RD4367 Result 16.25
EG3102 83003 (empty29/11/2019 5:0 30/11/2019 9: Lamp OF30/11/2019 D12:16.
17
EG3102 Result 16.17
VT1218 83525 09-Un### ### Parking (empty) 12.
00
83400 09-Un### ### Indicator02/12/2019 N12:2.
00
VT1218 Result 14.00
RD4370 80674 09-Un### 27/11/2019 3: Diff lock 10/11/2019 D12: 8.
33
82938 09-Un29/11/2019 7:5 29/11/2019 10 Parking b29/11/2019 D12: 2.
58
83020 09-Un29/11/2019 8:0 29/11/2019 10 Sidewall 29/11/2019 N12: 2.
83
RD4370 Result 13.75
VT2291 82831 (empty28/11/2019 3:0 28/11/2019 2: Electrica27/11/2019 N12:11.
00
28/11/2019 2:0 28/11/2019 4: PM
1000H erformed PM
10 2.
00
VT2291 Result 13.00
VZ3001 82834 (empty27/11/2019 7:0 28/11/2019 7: Brake ch27/11/19 NS : R12.
50
Ram door 27/11/2019 N12: 0.
00
VZ3001 Result 12.50
RD4152 82794 09-Un27/11/2019 8:4 28/11/2019 12 Engine l 27/11/2019 N12: 3.
33
83158 08-Pl 30/11/2019 9:2 ### Schedule30/11/2019 N12: 6.
00
09-Un### ### Over run30/11/2019 N12: 0.
58
83273 09-Un### ### Radio co01/12/2019 N12 1.
00
### ### Grease l01/12/2019 N12:0.
92
83529 09-Un### ### Rear vie03/12/2019 N12:0.
17
RD4152 Result 12.00
VZ3542 82943 (empty28/11/2019 6:0 29/11/2019 3: SchedulePerformed bi we 9.
00
VZ3542 Result 9.00
HO0205 82886 (empty28/11/2019 9:0 29/11/2019 3: PM
250HR28/11/2019 N12 6.
00
83312 (empty### ### Indicator01/12/2019 N12:2.
67
HO0205 Result 8.67
VF7139 82954 (empty28/11/2019 10: 28/11/2019 11 TC906 : 28/11/2019 N12: 1.
00
83034 (empty29/11/2019 11: 29/11/2019 4: TC906 : 29/11/2019 D12 5.
00
83104 (empty29/11/2019 11: 30/11/2019 12 TC906 : 29/11/2019 N12 1.
00
29/11/2019 11: 30/11/2019 12 TC906 : 29/11/2019 N12: 0.
08
TC906 : 2E9/11/2019 N12: 0.
00
VF7139 Result 7.08
VF7142 82623 (empty26/11/2019 4:5 27/11/2019 11 TC909 : 27/11/2019 D12 4.
83
26/11/2019 5:0 27/11/2019 11 TC909 : 27/11/2019 D12: 0.
00
82819 (empty27/11/2019 7:4 27/11/2019 8: TC909 : 27/11/2019 N12: 0.
25
83225 (empty30/11/2019 8:1 30/11/2019 9: TC909 : 30/11/2019 N12 1.
50
83268 (empty### ### TC909 : 01/12/2019 D12 0.
25
VF7142 Result 6.83
VF7157 82779 (empty27/11/2019 2:1 27/11/2019 2: TC922 : 27/11/2019 D12 0.
33
82952 (empty28/11/2019 9:0 28/11/2019 10 TC922 : 28/11/2019 N12 1.
00
TC922 : 2E8/11/2019 N12 0.
00
83167 (empty30/11/2019 10: 30/11/2019 2: TC922 : 30/11/2019 D12: 4.
50
83224 (empty30/11/2019 7:0 30/11/2019 7: TC922 : 30/11/2019 N12: 0.
75
VF7157 Result 6.58
VF7544 82890 (empty28/11/2019 9:0 28/11/2019 10 TC963 : Replace propell 0.
00
28/11/2019 2: TC963 : erformed PM
20 5.
25
83166 (empty30/11/2019 8:5 30/11/2019 9: TC963 : 30/11/2019 D12: 0.
67
VF7544 Result 5.92
PU2001 83545 (empty### ### Error 11 04/12/2019 D12:5.
75
PU2001 Result 5.75
EG2290 82867 (empty28/11/2019 7:1 28/11/2019 9: Engine c28/11/2019 N12: 2.
67
83492 (empty### ### Engine cajump battery to 3.
00
EG2290 Result 5.67
EG1717 82761 (empty27/11/2019 6:5 27/11/2019 9: Engine s27/11/2019 N12: 2.
25
82887 (empty28/11/2019 9:0 28/11/2019 9: Engine s28/11/2019 N12 0.
33
83043 (empty29/11/2019 11: 30/11/2019 1: Engine s29/11/2019 N12 1.
42
83370 (empty### ### Engine c02/12/2019 N12:1.
25
EG1717 Result 5.25
VT1183 83203 (empty30/11/2019 7:0 ### Rear dif 30/11/2019 N12 0.
00
Schedule30/11/2019 N12 5.
00
Engine S30/11/2019 N12: 0.
00
Transmis30/11/2019 N12 0.
00
30/11/2019 8:0 30/11/2019 10 Electrica30/11/2019 N12: 0.
00
VT1183 Result 5.00
EG3078 83091 (empty29/11/2019 10: 29/11/2019 1: PM
250HR29/11/2019 D12 3.
00
83133 (empty30/11/2019 7:0 30/11/2019 8: BCS_Batt 30/11/2019 N12: 1.
75
EG3078 Result 4.75
VF7130 82778 (empty27/11/2019 1:4 27/11/2019 2: TC896 : 27/11/2019 D12 0.
42
83032 (empty29/11/2019 11: 29/11/2019 3: TC896 : 29/11/2019 D12 4.
00
29/11/2019 1:1 29/11/2019 3: TC896 : 2E9/11/2019 D12: 0.
00
29/11/2019 2:1 29/11/2019 3: TC896 : 29/11/2019 D12: 0.
00
83403 (empty### ### TC896 : 02/12/2019 D12:0.
25
VF7130 Result 4.67
VF7162 82709 (empty27/11/2019 7:3 27/11/2019 8: TC927 : 27/11/2019 D12: 1.
00
82818 (empty27/11/2019 7:2 27/11/2019 7: TC927 : 27/11/2019 N12: 0.
17
83317 (empty### ### TC927 : eplace tyre POS 1.
50
83402 (empty### ### TC927 : 02/12/2019 D12 0.
25
83535 (empty### ### TC927 : 03/12/2019 D12 0.
92
VF7162 Result 3.83
VF7164 83264 (empty### ### TC929 : 01/12/2019 D12 0.
25
83265 (empty### ### TC929 : 01/12/2019 D12 0.
17
83426 (empty### ### TC929 : 02/12/2019 N12 3.
08
### ### TC929 : Replace shock a 0.
00
### ### TC929 : Add Water Batte 0.
00
### ### TC929 : Replace Spider 0.
00
83538 (empty### ### TC929 : 03/12/2019 D12:0.
25
VF7164 Result 3.75
VF7146 82822 (empty27/11/2019 11: 27/11/2019 11 TC913 : 27/11/2019 N12 0.
58
82892 (empty28/11/2019 1:0 28/11/2019 4: TC947 : RT eplace Balance3.
00
VF7146 Result 3.58
VF7186 82862 (empty28/11/2019 1:0 28/11/2019 4: TC947 : RT eplace Timing 3.
00
83168 (empty30/11/2019 7:3 30/11/2019 8: TC947 : 30/11/2019 D12 0.
50
VF7186 Result 3.50
WD1536 83419 (empty### ### PM
250HR02/12/2019 N12 3.
00
WD1536 Result 3.00
EG3066 82977 (empty28/11/2019 1:0 28/11/2019 4: PM
500HR28/11/2019 D12 3.
00
EG3066 Result 3.00
EG3069 83435 (empty### ### PM
250HR02/12/2019 D12 3.
00
EG3069 Result 3.00
EG3076 83332 (empty### ### PM
250HR01/12/2019 D12:3.
00
EG3076 Result 3.00
VZ3000 83300 (empty### ### Lining b 01/12/2019 N12:3.
00
VZ3000 Result 3.00
EG3140 82975 (empty28/11/2019 1:0 28/11/2019 4: PM
500HR28/11/2019 D12 3.
00
EG3140 Result 3.00
EG3144 82810 (empty27/11/2019 1:0 27/11/2019 4: PM
250HR27/11/2019 D12 3.
00
EG3144 Result 3.00
EG3147 83436 (empty### ### PM
250HR02/12/2019 D12 3.
00
EG3147 Result 3.00
EG3171 83326 (empty### ### PM
250HR01/12/2019 D12 3.
00
EG3171 Result 3.00
EG3065 83215 (empty30/11/2019 9:0 30/11/2019 12 PM
1000H30/11/2019 D12 3.
00
EG3065 Result 3.00
EG3214 83553 (empty### ### PM
500HR03/12/2019 D12 3.
00
EG3214 Result 3.00
EG3866 82973 (empty28/11/2019 8:0 28/11/2019 11 PM
2000H28/11/2019 D12 3.
00
EG3866 Result 3.00
EG4141 83559 (empty### ### PM
250HR03/12/2019 D12 3.
00
EG4141 Result 3.00
EG4267 83329 (empty### ### PM
250HRerformed PM
2 3.
00
EG4267 Result 3.00
EG4268 83089 (empty29/11/2019 8:0 29/11/2019 11 PM
500HR29/11/2019 D12 3.
00
EG4268 Result 3.00
AC1294 83453 (empty### ### Engine caChecked air comp3.
00
AC1294 Result 3.00
EG2382 83431 (empty### ### PM
500HRerformed PM
50 3.
00
EG2382 Result 3.00
EG1825 83214 (empty30/11/2019 7:0 30/11/2019 10 PM
2000H30/11/2019 D12 3.
00
EG1825 Result 3.00
EG1873 82808 (empty27/11/2019 8:0 27/11/2019 11 PM
250HR27/11/2019 D12 3.
00
EG1873 Result 3.00
VF7860 82730 (empty27/11/2019 7:3 27/11/2019 10 TC025 : 27/11/2019 D12 3.
00
TC025 : 27/11/2019 D12 0.
00
VF7860 Result 3.00
EG1973 83433 (empty### ### PM
500HR02/12/2019 D12 3.
00
EG1973 Result 3.00
EG2000 83556 (empty### ### PM
500HR03/12/2019 D12 3.
00
EG2000 Result 3.00
EG2308 83331 (empty### ### PM
250HR01/12/2019 D12 3.
00
EG2308 Result 3.00
EG2322 83438 (empty### ### PM
250HR02/12/2019 D12 3.
00
EG2322 Result 3.00
EG1801 83216 (empty30/11/2019 11: 30/11/2019 2: PM
500HR30/11/2019 D12 3.
00
EG1801 Result 3.00
EG2383 83554 (empty### ### PM
500HR03/12/2019 D12 3.
00
EG2383 Result 3.00
EG2422 83090 (empty29/11/2019 9:0 29/11/2019 12 PM
500HR29/11/2019 D12 3.
00
EG2422 Result 3.00
EG2427 83327 (empty### ### PM
250HR01/12/2019 D12 3.
00
EG2427 Result 3.00
EG2510 82972 (empty28/11/2019 7:0 28/11/2019 10 PM
2000H28/11/2019 D12 3.
00
EG2510 Result 3.00
VF7534 82734 (empty27/11/2019 8:3 27/11/2019 11 TC018 : Repair Rear bac 3.
00
VF7534 Result 3.00
EG2767 83093 (empty29/11/2019 2:0 29/11/2019 5: PM
250HR29/11/2019 D12 3.
00
EG2767 Result 3.00
EG3011 82974 (empty28/11/2019 9:0 28/11/2019 12 PM
500HR28/11/2019 D12 3.
00
EG3011 Result 3.00
EG3032 83437 (empty### ### PM
250HR02/12/2019 D12 3.
00
EG3032 Result 3.00
EG3055 82807 (empty27/11/2019 7:0 27/11/2019 10 PM
250HR27/11/2019 D12 3.
00
EG3055 Result 3.00
EG3057 83217 (empty30/11/2019 1:0 30/11/2019 4: PM
250HR30/11/2019 D12 3.
00
EG3057 Result 3.00
VF7156 82731 (empty27/11/2019 11: 27/11/2019 1: TC921 : 27/11/2019 D12 2.
42
83267 (empty### ### TC921 : 01/12/2019 D12 0.
25
VF7156 Result 2.67
VF7911 83406 (empty### ### TC972 : 02/12/2019 D12:2.
58
VF7911 Result 2.58
EG3199 83396 (empty### ### Engine s02/12/2019 N12:2.
17
EG3199 Result 2.17
VF7135 83101 (empty29/11/2019 7:0 29/11/2019 9: TC901 : 29/11/2019 N12 2.
00
TC901 : 29/11/2019 N12: 0.
00
VF7135 Result 2.00
EX8205 83523 08-Pl ### ### PM
250HR03/12/2019 N12 0.
75
### ### M
echanic03/12/2019 N12:1.
25
EX8205 Result 2.00
VF7559 83222 (empty30/11/2019 7:0 30/11/2019 9: TC951 : 30/11/2019 N12 2.
00
TC951 : 30/11/2019 N12: 0.
00
TC951 : 3E0/11/2019 N12: 0.
00
VF7559 Result 2.00
FL0104 82830 (empty27/11/2019 10: 28/11/2019 12 Electrica27/11/2019 N12: 2.
00
FL0104 Result 2.00
VF7159 83577 (empty### ### ElectricaCheck Battery, 0.
00
### Backlog Ar djust Parking 0.
00
### TC924 : 03/12/2019 N12 1.
58
### ### AC serviClean AC Filter, 0.
33
VF7159 Result 1.92
EG3100 82768 (empty27/11/2019 8:0 27/11/2019 9: Engine s27/11/2019 N12: 1.
83
EG3100 Result 1.83
EG3012 83021 (empty29/11/2019 8:0 29/11/2019 9: BCS_Engi 29/11/2019 N12: 1.
67
EG3012 Result 1.67
VF7844 82758 (empty27/11/2019 3:3 27/11/2019 4: TC029 : Replace RH front0.
00
27/11/2019 5: TC029 : Repair RH front 1.
67
VF7844 Result 1.67
VF7833 83000 (empty29/11/2019 7:0 29/11/2019 8: TC030 : 29/11/2019 D12 1.
00
83143 (empty30/11/2019 9:0 30/11/2019 9: TC030 : 3H0/11/2019 D12 0.
33
83369 (empty### ### TC030 : TEop up engine o 0.
25
VF7833 Result 1.58
VF7530 82859 (empty28/11/2019 1:3 28/11/2019 3: TC019 : 28/11/2019 D12 1.
50
VF7530 Result 1.50
VF7870 83145 (empty30/11/2019 10: 30/11/2019 11 TC023 : 30/11/2019 D12 1.
50
VF7870 Result 1.50
EG8228 83507 (empty### ### Engine ca03/12/2019 N12:1.
42
EG8228 Result 1.42
VF7215 83266 (empty### ### TC952 : 01/12/2019 D12:1.
00
83542 (empty### ### TC952 : 03/12/2019 D12 0.
25
VF7215 Result 1.25
VF7552 83316 (empty### ### Backlog dr justed brake s 0.
00
### TC959 : erformed PM
50 1.
25
VF7552 Result 1.25
VF7131 82820 (empty27/11/2019 8:1 27/11/2019 8: TC897 : 27/11/2019 N12: 0.
25
83031 (empty29/11/2019 9:0 29/11/2019 10 TC897 : 29/11/2019 D12 1.
00
TC897 : 29/11/2019 D12 0.
00
TC897 : 29/11/2019 D12: 0.
00
VF7131 Result 1.25
VF7946 83146 (empty30/11/2019 2:0 30/11/2019 3: TC004 : 30/11/2019 D12 1.
17
VF7946 Result 1.17
RD4389 83393 09-Un### ### Lights 02/12/2019 N12:1.
17
RD4389 Result 1.17
VF7541 82894 (empty28/11/2019 2:1 28/11/2019 3: TC966 : Repaired engin 1.
00
VF7541 Result 1.00
VF7543 83532 (empty### ### TC965 : 03/12/2019 D12 1.
00
VF7543 Result 1.00
VF7555 83531 (empty### ### TC956 : 03/12/2019 D12 1.
00
VF7555 Result 1.00
EX8212 83119 08-Pl 30/11/2019 9:1 30/11/2019 10 Pre Serv30/11/2019 D12: 1.
00
EX8212 Result 1.00
VF7558 82777 (empty27/11/2019 10: 27/11/2019 10 TC953 : 27/11/2019 D12: 0.
58
83169 (empty30/11/2019 10: 30/11/2019 10 TC953 : 30/11/2019 D12 0.
33
TC953 : 30/11/2019 D12 0.
00
VF7558 Result 0.92
EG1718 83057 (empty30/11/2019 3:0 30/11/2019 3: Engine s29/11/2019 N12 0.
92
EG1718 Result 0.92
VF7948 82860 (empty28/11/2019 9:0 28/11/2019 9: TC011 : 28/11/2019 D12 0.
92
VF7948 Result 0.92
VF7956 82861 (empty28/11/2019 8:1 28/11/2019 9: TC013 : 28/11/2019 D12 0.
92
VF7956 Result 0.92
VF7903 83541 (empty### ### TC973 : 03/12/2019 D12:0.
83
VF7903 Result 0.83
VF7153 83536 (empty### ### TC920 : 03/12/2019 D12 0.
83
VF7153 Result 0.83
VF7152 83269 (empty### ### TC919 ; 01/12/2019 D12:0.
33
83404 (empty### ### TC919 : 02/12/2019 D12:0.
25
VF7152 Result 0.58
VF7158 82770 (empty27/11/2019 1:1 27/11/2019 1: TC923 : 27/11/2019 D12: 0.
50
VF7158 Result 0.50
VF7832 82999 (empty29/11/2019 7:0 29/11/2019 7: TC026 : 29/11/2019 D12 0.
50
VF7832 Result 0.50
VF7531 83142 (empty30/11/2019 7:3 30/11/2019 8: TC021 : 30/11/2019 D12 0.
50
VF7531 Result 0.50
VF7540 83533 (empty### ### TC967 : 03/12/2019 D12 0.
42
VF7540 Result 0.42
EX8182 82955 08-Pl 29/11/2019 9:3 29/11/2019 9: Pre Servi29/11/2019 D12: 0.
25
EX8182 Result 0.25
VF7161 83033 (empty29/11/2019 3:3 29/11/2019 3: TC926 : 29/11/2019 D12 0.
17
VF7161 Result 0.17
VF7149 82951 (empty28/11/2019 8:2 28/11/2019 8: TC916 : 2E8/11/2019 N12: 0.
17
VF7149 Result 0.17
VF7954 82858 (empty28/11/2019 1:0 28/11/2019 1: TC007 : 28/11/2019 D12 0.
17
VF7954 Result 0.17
VF7554 82953 (empty28/11/2019 9:2 28/11/2019 9: TC957 : 28/11/2019 N12 0.
08
VF7554 Result 0.08
VZ3145 82697 (empty### ### Lining b 01/12/2019 N12:0.
00
VZ3145 Result 0.00
Total Result ###
ComponTotaCumulative
Engine 43 2.
0263064 42.
75
Torque ### 17.
703519 373.
5
Buckets### 28.
557886 602.
5
Drive Li### 36.
647312 773.
16667
LV Elect 77 40.
312833 850.
5
Brakes 36 42.
023147 886.
58333
Hydraul 15 42.
710432 901.
08333
Grease 9 43.
117273 909.
66667
Differen 8 43.
512264 918
Chassis 8 43.
875657 925.
66667
Aircon 6 44.
160051 931.
66667
Technology #VALUE!
Tyres #VALUE!
Total Result #VALUE!
#VALUE!
#VALUE!
PeriodTaskDowntimeDuration(08+09)
25.
17 RD4369 Transmission error (Unit can't moving reversTransmission error (Unit can't moving reverse) 25.
17 hrs
WD3013 Switch module polarity broken hrs Switch module polarity broken hrs
WD3008 Travo 24 volt control failure hrs Travo 24 volt control failure hrs
EG3976 Generator fail hrs Generator fail hrs
EG1950 Starting motor fail hrs Starting motor fail hrs
EG3102 Lamp OFF hrs Lamp OFF hrs
VF7160 TC925 : 4 WD Problem (Used Loan Car TC88 TC925 : 4 WD Problem (Used Loan Car TC884) hrs
VF7134 TC900 : 4WD problem (Used Loan Car TC970 TC900 : 4WD problem (Used Loan Car TC970) hrs
RD4369 Transmission error (Unit can't moving reverse
Transmission error (Unit can't moving reverse) hrs
RD4369 Transmission oil low hrs Transmission oil low hrs
VT1183 Transmission SOS Follow up hrs Transmission SOS Follow up hrs
VF7189 TC950 : 4 WD Problem (Used Loan Car TC88 TC950 : 4 WD Problem (Used Loan Car TC886) hrs
VF7166 TC931 : 4 WD Problem (Used Loan Car TC93 TC931 : 4 WD Problem (Used Loan Car TC937) hrs
VF7140 TC907 : Backlog repair hrs TC907 : Backlog repair hrs
VF7145 TC912 : Backlog repair hrs TC912 : Backlog repair hrs
VF7844 TC029 : RH front drive shaft fail (Used Loan TC029 : RH front drive shaft fail (Used Loan dCar TC032) hrs
VF7215 TC952 : 4WD problem hrs TC952 : 4WD problem hrs
VF7860 TC025 : Backlog repair hrs TC025 : Backlog repair hrs
VF7544 TC963 : Backlog repair hrs TC963 : Backlog repair hrs
VF7176 TC960 : Backlog repair hrs TC960 : Backlog repair hrs
VF7164 TC929 : Backlog repair hrs TC929 : Backlog repair hrs
VF7184 TC945 : Brake System (Used Loan Car TC93TC945 : Brake System (Used Loan Car TC937) hrs
VZ3001 Brake chamber loose hrs Brake chamber loose hrs
VT1218 Parking brake indicator ON hrs Parking brake indicator ON hrs
VF7145 TC912 : Backlog repair hrs TC912 : Backlog repair hrs
VZ3000 Lining brake worn out hrs Lining brake worn out hrs
RD4370 Parking brake sticky hrs Parking brake sticky hrs
VF7140 TC907 : park brake too low hrs TC907 : park brake too low hrs
VT1218 Indicator parking brake flash ON hrs Indicator parking brake flash ON hrs
VF7139 TC906 : Brake problem hrs TC906 : Brake problem hrs
PM
2000HRS service (Duration 9 hrs) and backog repair, Planned
43780.
2916666667 Switch module polarity broken hSwitch module polarity broken , Actual Dur.
hrs
43780.
2916666667 Travo 24 volt control failure hrsTravo 24 volt control failure , Actual Dur.
hrs
43810.
2916666667 Crank shaft seal leaks hrs Crank shaft seal leaks , Actual Dur.
hrs
43810.
2916666667 Welding system generator fail hrWelding system generator fail, Actual Dur.
hrs
20/09/2019 7:00 AM
Welding system generator fail hWelding system generator fail, Actual Dur.
hrs
43593.
2916666667 Fan blade broken and block rectifie
Fan blade broken and block rectifier fail, Actual Dur.
hrs
43716.
375 Engine particle often shutdown hrs Engine particle often shutdown, Actual Dur.
hrs
19/10/2019 7:00 AM
TC950 : 4 WD Problem (Used LoTC950 : 4 WD Problem (Used Loan Car TC886), Actual Dur.
hrs
22/11/2019 6:00 AM
TC925 : 4 WD Problem (Used LoTC925 : 4 WD Problem (Used Loan Car TC884), Actual Dur.
hrs
25/11/2019 6:00 PM
Generator fail hrs Generator fail, Actual Dur.
hrs
26/11/2019 2:30 PM
Skid worn hrs Skid worn, Actual Dur.
hrs
29/11/2019 7:00 AM
TC900 : 4WD problem (Used Loa
TC900 : 4WD problem (Used Loan Car TC970), Ac
29/11/2019 4:20 PM
Starting motor fail hrs Starting motor fail, Actual Dur.
hrs
29/11/2019 7:00 AM
PM
250HRS Service, Planned 3 PM
250HRS Service, Planned 3 Hrs, Actual Dur.
hrs
29/11/2019 7:00 PM
TC945 : PM
20.
000KM
Service TC945 : PM
20.
000KM
Service, Actual Dur.
hrs
43536.
2986111111 TC945 : Schedule retorque tyre TC945 : Schedule retorque tyre , Actual Dur.
hrs
30/11/2019 7:30 PM
Water coolant leaks hrs Water coolant leaks, Actual Dur.
hrs
43535.
2916666667 TC905 : Body broken (Used LoanTC905 : Body broken (Used Loan Car TC970), Actual Dur.
hrs
30/11/2019 7:00 PM
Crane indicator OFF hrs Crane indicator OFF, Actual Dur.
hrs
43508.
8333333333 PM
250HRS Service, Planned 8 PM
28/11/2019 8:35 AM
PM
2000HRS service (Duration 9
PM
2000HRS service (Duration 9 hrs) and backog repair, Planned
30/11/2019 9:50 AM
Transmission oil low hrs Transmission oil low, Actual Dur.
hrs
43508.
4409722222 Bottom guard engine loose hrs Bottom guard engine loose, Actual Dur.
hrs
43508.
3888888889 TC895 : Seat belt broken hrs TC895 : Seat belt broken , Actual Dur.
hrs
30/11/2019 1:00 AM
TC895 : Lights hrs TC895 : Lights, Actual Dur.
hrs
43477.
0833333333 TC022 : Tyre pos 4 leak (Used LoTC022 : Tyre pos 4 leak (Used Loan Car TC032), Actual Dur.
hrs
27/11/2019 9:40 AM
Hydraulic leaks hrs Hydraulic leaks, Actual Dur.
hrs
29/11/2019 2:45 AM
Hydraulic oil leaks hrs Hydraulic oil leaks, Actual Dur.
hrs
43536.
1388888889 Tyre position 3 Flat hrs Tyre position 3 Flat, Actual Dur.
hrs
43536.
5416666667 PM
250HRS Service (Duration 4 PM
reverse) 25.
17 hrs
Car TC884) hrs
ar TC970) hrs
reverse) hrs
r TC970) hrs
an Car TC031) hrs
Actual Dur.
hrs
ual Dur.
hrs
Actual Dur.
hrs
Is Failure - all -
OEM
Description - all -
grup - multiple -
- PeriodTaskM
aint.
Duration
Engine PU2
PU2250 Stuffing box leaks 48 hrs
WD1686 WeWD1686 Welding system generator fail hrs
WD3008 Tra
WD3008 Travo 24 volt control failure hrs
WD3013 SwWD3013 Switch module polarity broken hrs
EG1950 Sta
EG1950 Starting motor fail hrs
EG3102 LEG3102 Lamp OFF hrs
EG1875 EnEG1875 Engine cant start hrs
Engine AC1
AC1472 Engine can't running 168 hrs
WD1925 CrWD1925 Crank shaft seal leaks hrs
WD1889 WeWD1889 Welding system generator fail hrs
WD1509 EnWD1509 Engine particle often shutdown hrs
HO0206 WaHO0206 Water coolant leaks hrs
PU2250 StPU2250 Stuffing box leaks hrs
WD1537 EnWD1537 Engine can't start hrs
VF7129 TCVF7129 TC895 : Seat belt broken hrs
EG1717 EnEG1717 Engine shutdown hrs
Engine s Engine shutdown hrs
Engine caEngine cant running hrs
Engine s Engine shutdown hrs
VT1183 EnVT1183 Engine SOS Follow up hrs
EG3100 Fue
EG3100 Fuel low level hrs
Engine s Engine shutdown hrs
VF7142 TCVF7142 TC909 : Engine low power hrs
PU1731 EnPU1731 Engine cant run hrs
VF7157 TCVF7157 TC922 : Engine low power hrs
RD4152 EnRD4152 Engine low power hrs
Over run Over run : Fuel screen blocked hrs
EG2290 Eng
EG2290 Engine can't start hrs
VF7186 TC9
VF7186 TC947 : Timing belt fail hrs
VF7146 TC9
VF7146 TC947 : Timing belt failure hrs
EG1874 FuEG1874 Fuel low level hrs
VF7911 TCVF7911 TC972 : Engine Low Power hrs
VF7156 TCVF7156 TC921 : Engine excessive noise hrs
EG3199 EnEG3199 Engine shutdown hrs
- PeriodTaskM
aint.
Duration
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
VF7189 TC9
TC950 : 4 WD Problem (Used Loan Car TC886) hrs
HO0206 Wat
Water coolant leaks hrs
Is Failure Yes
No WorkRequired No
Unit No. Event OEM Meter Meter Resp. Maintenance Event Start Time Event End Time Total Period Total Period Task Start Time
ID Description (Start) (End) Group Area Event Event Event Event
Maint. Maint. Downtime Downtime
Duration Duration Duration Duration
(08+09) (08+09)
M
elawan
CR3039 83211 FRA M
AC 25 26,104.
0 26,104.
0 Workshop Workshop 30/11/2019 7:00 PM
04/12/2019 7:00 PM
96.
00 84.
00 96.
00 84.
00 30/11/2019 7:00 PM
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 81 of 349
DR0889 65899 ATL DM
L SP 10,444.
5 10,444.
5 Workshop Workshop 06/07/2019 6:05 PM
04/12/2019 7:00 PM
3624.
92 168.
00 168.
00 168.
00 06/07/2019 6:05 PM
M
elawan
M
elawan
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 82 of 349
EX2407 78669 KOM
PC400LC7 5,698.
0 5,698.
0 Electrical Workshop 24/10/2019 1:00 AM
04/12/2019 7:00 PM
1002.
00 168.
00 1001.
57 168.
00 24/10/2019 1:00 AM
Trade M
elawan
M
0 M
elawan
M
0 M
elawan
SLF Peri
M
0
Peri
GR1396 83473 CAT 18M
3 6,726.
0 6,726.
0 Workshop Workshop 03/12/2019 1:40 PM
04/12/2019 7:40 PM
30.
00 17.
33 29.
33 17.
33 03/12/2019 1:40 PM
M
elawan
M
elawan
M
elawan
VF7129 83407 M
IT 1.
0 1.
0 Workshop Workshop M
itra 02/12/2019 9:20 AM
04/12/2019 7:00 PM
57.
67 45.
67 57.
67 45.
67 02/12/2019 9:20 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7134 83220 M
IT 110,915.
0 110,915.
0 Workshop Workshop M
itra 29/11/2019 7:00 AM
04/12/2019 7:00 PM
132.
00 120.
00 132.
00 120.
00 29/11/2019 7:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7160 82166 M
IT 113,408.
0 113,408.
0 Workshop Workshop 22/11/2019 6:00 AM
29/12/2019 7:00 PM
901.
00 168.
00 901.
00 168.
00 22/11/2019 6:00 AM
TRITOND/CAB M
itsubishi
GLX M
ahakam
Berlian
Samjaya
VF7189 78296 M
IT 120,162.
0 120,162.
0 Workshop Workshop 19/10/2019 7:00 AM
12/12/2019 7:00 PM
1308.
00 168.
00 1308.
00 168.
00 19/10/2019 7:00 AM
TRITOND/CAB M
itsubishi
GLX M
ahakam
Berlian
Samjaya
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 83 of 349
EG3976 82571 HAR HT8Y 13,437.
0 13,437.
0 Electrical Field Shop Pit 25/11/2019 6:00 PM
04/12/2019 7:00 PM
217.
00 168.
00 217.
00 168.
00 25/11/2019 6:00 PM
Trade Tania
PU1681 81837 SYK HH200 8,783.
5 8,783.
5 Field Field Shop Pit 19/11/2019 7:00 AM
04/12/2019 7:00 PM
372.
00 168.
00 372.
00 168.
00 03/12/2019 7:00 AM
Peri
M
elawan
PU1741 80132 M
UL M
VFC420 18,652.
5 18,652.
5 Field Field Shop Pit 04/11/2019 1:00 PM
03/01/2020 1:00 PM
1440.
00 168.
00 726.
00 168.
00 04/11/2019 1:00 PM
Tania
M
elawan
RD2467 83388 CAT 785C 38,348.
2 38,348.
2 Workshop Workshop 02/12/2019 9:00 PM
04/12/2019 7:00 PM
46.
00 34.
00 46.
00 34.
00 03/12/2019 9:00 AM
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 84 of 349
RD2561 82987 CAT 785C 33,375.
7 33,375.
7 Workshop Workshop TWS 29/11/2019 2:15 PM
09/12/2019 2:15 PM
240.
00 112.
75 124.
75 112.
75 29/11/2019 2:15 PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 85 of 349
RD2561 82987 CAT 785C 33,375.
7 33,375.
7 Workshop Workshop TWS 29/11/2019 2:15 PM
09/12/2019 2:15 PM
240.
00 112.
75 124.
75 112.
75 30/11/2019 7:00 PM
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 86 of 349
RD3914 83526 CAT 777D 26,952.
8 26,952.
8 Workshop Workshop 04/12/2019 1:50 AM
04/12/2019 6:50 PM
17.
00 5.
17 9.
00 5.
17 04/12/2019 1:50 AM
M
elawan
Peri
Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 87 of 349
VT1218 83525 VOL FM
X330 1.
0 1.
0 Electrical Workshop 03/12/2019 7:00 PM
04/12/2019 7:00 PM
24.
00 12.
00 24.
00 12.
00 03/12/2019 7:00 PM
Trade M
elawan
VT2210 83428 ISU NPS75 5,217.
0 5,217.
0 Workshop Workshop TWS 02/12/2019 8:00 PM
04/12/2019 7:00 PM
47.
00 35.
00 47.
00 35.
00 02/12/2019 8:00 PM
VT2306 81824 M
IT COLT 1,224.
0 1,224.
0 Workshop Workshop TWS 19/11/2019 7:00 AM
04/12/2019 7:00 PM
372.
00 168.
00 372.
00 168.
00 19/11/2019 7:00 AM
DIESEL 4X4
VT2306 81824 M
IT COLT 1,224.
0 1,224.
0 Workshop Workshop TWS 19/11/2019 7:00 AM
04/12/2019 7:00 PM
372.
00 168.
00 372.
00 168.
00 25/11/2019 10:00 PM
DIESEL 4X4
SERVICE
TRUCK
SERVICE
TRUCK
M
P240E31W M
elawan
500 Balikpapan
Support Facility
500 M
elawan
WD1686 74626 LIN DC600 1,926.
7 1,926.
7 Electrical Workshop 20/09/2019 7:00 AM
30/01/2020 7:00 PM
3180.
00 168.
00 3180.
00 168.
00 20/09/2019 7:00 AM
Trade Balikpapan
Support Facility
WD1889 81011 M
IL BIG BLUE 29,045.
0 29,045.
0 Electrical Workshop 12/11/2019 7:00 AM
04/12/2019 7:00 PM
540.
00 168.
00 540.
00 168.
00 12/11/2019 7:00 AM
WD1925 81112 M
IL BIG BLUE 9,330.
0 9,330.
0 Workshop Workshop 12/11/2019 7:00 AM
11/12/2019 7:00 PM
708.
00 168.
00 708.
00 168.
00 12/11/2019 7:00 AM
800X Balikpapan
Support Facility
WD3008 80969 M
IL GOLDSTAR 292,394.
0 292,394.
0 Electrical Workshop 11/11/2019 7:00 AM
11/12/2019 7:00 PM
732.
00 168.
00 732.
00 168.
00 11/11/2019 7:00 AM
WD3013 80968 M
IL 185,162.
0 185,162.
0 Electrical Workshop TWS 11/11/2019 7:00 AM
16/12/2019 7:00 PM
852.
00 168.
00 852.
00 168.
00 11/11/2019 7:00 AM
DIM
ENSION Trade
562
AC1294 83453 ATL XAHS 225 5,881.
7 5,881.
7 Workshop Workshop TWS 03/12/2019 2:00 AM
03/12/2019 5:00 AM
3.
00 3.
00 3.
00 3.
00 03/12/2019 2:00 AM
Tamara
Trade M
elawan
HO0205 82886 M
AN 16,172.
5 16,172.
5 Workshop Workshop 28/11/2019 9:00 PM
29/11/2019 3:00 AM
6.
00 6.
00 6.
00 6.
00 28/11/2019 9:00 PM
M
T1740SLT M
elawan
HO0205 83312 M
AN 16,171.
9 16,171.
9 Workshop Workshop 01/12/2019 7:00 PM
01/12/2019 9:40 PM
2.
67 2.
67 2.
67 2.
67 01/12/2019 7:00 PM
M
T1740SLT M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 88 of 349
HO0206 83161 M
AN 13,999.
0 13,999.
0 Workshop Workshop 30/11/2019 7:30 PM
03/12/2019 8:10 AM
60.
67 60.
67 60.
67 60.
67 30/11/2019 7:30 PM
M
T1740SLT M
elawan
HO0206 83161 M
AN 13,999.
0 13,999.
0 Workshop Workshop 30/11/2019 7:30 PM
03/12/2019 8:10 AM
60.
67 60.
67 60.
67 60.
67 02/12/2019 10:00 AM
M
T1740SLT M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Peri
Peri
Trade
Tania
Trade
Trade Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 89 of 349
DZ1637 83344 CAT D10T 40,651.
9 40,651.
9 Workshop Workshop 02/12/2019 11:10 AM
03/12/2019 5:40 PM
30.
50 30.
50 30.
50 30.
50 02/12/2019 11:10 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 90 of 349
DZ1641 82958 CAT D10T 35,535.
0 35,535.
0 Field Field Shop Pit 29/11/2019 10:10 AM
29/11/2019 3:00 PM
4.
83 4.
83 4.
83 4.
83 29/11/2019 10:55 AM
Peri
Peri
Trade M
elawan
M
elawan
Trade Tania
Trade Tania
Trade Tania
Trade Tania
DZ1999 82636 CAT D8R 9,014.
3 9,020.
9 Workshop Workshop 26/11/2019 7:15 PM
27/11/2019 3:25 PM
20.
17 8.
42 20.
17 8.
42 26/11/2019 7:15 PM
M
elawan
M
elawan
Tania
Tania
Peri
Peri
DZ3031 83346 CAT D10R 69,373.
0 69,373.
0 Electrical Field Shop Pit 02/12/2019 11:25 AM
03/12/2019 1:00 AM
13.
58 13.
58 13.
58 13.
58 02/12/2019 11:25 AM
Trade Peri
Trade Peri
DZ3047 83482 CAT D10R 63,682.
0 63,682.
0 Electrical Field Shop Pit 03/12/2019 1:00 PM
03/12/2019 4:20 PM
3.
33 3.
33 3.
33 3.
33 03/12/2019 1:00 PM
Trade Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 91 of 349
DZ3049 83398 CAT D10R 64,115.
0 64,115.
0 Electrical Field Shop Pit 02/12/2019 10:35 PM
02/12/2019 11:20 PM
0.
75 0.
75 0.
75 0.
75 02/12/2019 10:35 PM
Trade Tania
M
elawan
Tania
Tania
M
elawan
M
elawan
M
elawan
M
elawan
Tania
Tania
DZ8038 82879 KOM
D85ESS 3,202.
1 3,202.
1 Field Field Shop Pit 28/11/2019 8:20 PM
28/11/2019 9:30 PM
1.
17 1.
17 1.
17 1.
17 28/11/2019 8:20 PM
Tania
DZ8039 82757 KOM
D85ESS 2,224.
0 2,224.
0 Field Other 27/11/2019 9:40 AM
27/11/2019 10:55 AM
1.
25 1.
25 1.
25 1.
25 27/11/2019 9:40 AM
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 92 of 349
DZ8042 83086 CAT D8R 7,499.
3 7,499.
3 Workshop Workshop 30/11/2019 6:00 AM
01/12/2019 3:50 AM
21.
83 21.
83 21.
83 21.
83 30/11/2019 7:00 PM
M
elawan
M
elawan
Peri
DZ8095 82678 KOM
D85ESS 451.
5 451.
5 Workshop Workshop 26/11/2019 11:00 PM
27/11/2019 11:00 AM
12.
00 4.
00 12.
00 4.
00 26/11/2019 11:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
Tania
Trade M
elawan
DZ8103 83306 KOM
D65P 502.
0 502.
0 Electrical Workshop 01/12/2019 7:00 PM
02/12/2019 4:00 AM
9.
00 9.
00 9.
00 9.
00 01/12/2019 7:00 PM
Trade M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 93 of 349
DR0885 82741 ATL DM
L SP 16,797.
7 16,801.
3 Workshop Workshop 27/11/2019 2:35 PM
30/11/2019 11:05 AM
68.
50 68.
50 68.
50 68.
50 28/11/2019 7:00 AM
M
elawan
M
elawan
Peri
Trade Tania
Trade Tania
DR0961 83501 CAT M
D6290 11,468.
0 11,468.
0 Field Field Shop Pit 03/12/2019 7:20 PM
03/12/2019 10:20 PM
3.
00 3.
00 3.
00 3.
00 03/12/2019 7:20 PM
Tania
M
elawan
M
elawan
M
elawan
M
elawan
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 94 of 349
DR6002 82769 TER SKF11 4,452.
3 4,452.
3 Electrical Field Shop Pit 27/11/2019 9:35 PM
28/11/2019 3:00 AM
5.
42 5.
42 5.
42 5.
42 27/11/2019 9:35 PM
Trade M
elawan
M
elawan
Peri
Peri
Peri
Peri
Peri
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
EX1721 82990 HIT EX36006 41,905.
0 41,905.
0 Field Field Shop Pit 29/11/2019 4:05 PM
29/11/2019 5:00 PM
0.
92 0.
92 0.
92 0.
92 29/11/2019 4:05 PM
Tania
Tania
EX1722 83137 HIT EX36006 41,080.
0 41,080.
0 Field Field Shop Pit 30/11/2019 7:30 PM
30/11/2019 9:50 PM
2.
33 2.
33 2.
33 2.
33 30/11/2019 7:30 PM
Tania
Tania
Trade Tania
Peri
Peri
Peri
Peri
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 95 of 349
EX1729 82960 LIE R984C 25,110.
8 25,110.
8 Field Field Shop Pit 29/11/2019 10:30 AM
30/11/2019 3:30 PM
29.
00 29.
00 29.
00 29.
00 29/11/2019 7:00 PM
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Tania
Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 96 of 349
EX1737 82796 LIE R984C 29,223.
0 29,227.
0 Field Other 27/11/2019 11:00 PM
29/11/2019 11:35 AM
36.
58 36.
58 36.
58 36.
58 29/11/2019 7:00 AM
Tania
M
0
M
0
M
0
M
elawan
Trade
Tania
Peri
Peri
Peri
EX2510 82722 KOM
PC3008 9,694.
0 9,694.
0 Field Other 27/11/2019 10:35 AM
27/11/2019 5:05 PM
6.
50 6.
50 6.
50 6.
50 27/11/2019 10:35 AM
M
0
EX2513 81733 KOM
PC2008 8,885.
1 8,885.
1 Workshop Workshop 18/11/2019 11:00 AM
01/12/2019 9:20 AM
310.
33 98.
33 304.
33 98.
33 18/11/2019 5:00 PM
M
0 M
elawan
M
0 Tania
EX2514 83256 KOM
PC2008 8,472.
1 8,472.
1 Field Field Shop Pit 01/12/2019 5:35 PM
02/12/2019 2:40 PM
21.
08 21.
08 21.
08 21.
08 01/12/2019 5:35 PM
M
0 Tania
M
0 Tania
EX2521 82755 KOM
PC2008 7,805.
4 7,805.
4 Field Field Shop Pit 27/11/2019 2:20 PM
27/11/2019 3:25 PM
1.
08 1.
08 1.
08 1.
08 27/11/2019 2:20 PM
M
0 Tania
M
0 Peri
M
0 Peri
EX2521 83458 KOM
PC2008 7,873.
0 7,873.
0 Field Field Shop Pit 03/12/2019 10:05 AM
03/12/2019 5:35 PM
7.
50 7.
50 7.
50 7.
50 03/12/2019 10:05 AM
M
0 Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 97 of 349
EX3008 82700 HIT EX55005 76,925.
0 76,927.
6 Field Field Shop Pit 27/11/2019 7:40 AM
28/11/2019 10:20 PM
38.
67 38.
67 38.
67 38.
67 27/11/2019 7:40 AM
Peri
Peri
Peri
Peri
Peri
EX3009 82825 HIT EX55005 62,703.
0 62,703.
0 Field Field Shop Pit 28/11/2019 9:05 AM
28/11/2019 9:50 AM
0.
75 0.
75 0.
75 0.
75 28/11/2019 9:05 AM
Peri
Trade Peri
Peri
Peri
Peri
M
elawan
M
elawan
Tania
Tania
EX3014 83046 HIT EX25005 3,130.
0 3,130.
0 Field Field Shop Pit 30/11/2019 12:00 AM
30/11/2019 1:50 AM
1.
83 1.
83 1.
83 1.
83 30/11/2019 12:00 AM
Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 98 of 349
EX3014 83046 HIT EX25005 3,130.
0 3,130.
0 Field Field Shop Pit 30/11/2019 12:00 AM
30/11/2019 1:50 AM
1.
83 1.
83 1.
83 1.
83 30/11/2019 12:00 AM
Tania
Tania
Tania
Tania
EX3015 82939 HIT EX25005 74,591.
8 74,591.
8 Field Field Shop Pit 29/11/2019 7:45 AM
29/11/2019 9:00 AM
1.
25 1.
25 1.
25 1.
25 29/11/2019 7:45 AM
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Tania
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 99 of 349
EX3042 82949 HIT EX36005 76,970.
9 76,974.
9 Field Field Shop Pit 29/11/2019 9:00 AM
30/11/2019 3:15 PM
30.
25 30.
25 30.
25 30.
25 29/11/2019 9:00 AM
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Tania
Tania
Tania
EX3043 83521 HIT EX36005 72,851.
0 72,851.
0 Field Field Shop Pit 03/12/2019 11:10 PM
04/12/2019 12:40 AM
1.
50 1.
50 1.
50 1.
50 03/12/2019 11:10 PM
Tania
Tania
Tania
M
elawan
M
ustahil
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 100 of 349
EX3057 83480 HIT EX36005 46,140.
6 46,141.
7 Field Field Shop Pit 03/12/2019 2:40 PM
03/12/2019 4:55 PM
2.
25 2.
25 2.
25 2.
25 03/12/2019 2:40 PM
M
elawan
M
elawan
Peri
Peri
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 101 of 349
EX3143 83157 HIT EX36006 31,729.
5 31,733.
5 Field Field Shop Pit 30/11/2019 9:25 PM
02/12/2019 3:45 AM
30.
33 30.
33 30.
33 30.
33 01/12/2019 7:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 102 of 349
EX3184 83290 HIT EX36006 54,450.
0 54,450.
0 Field Field Shop Pit 02/12/2019 12:00 AM
02/12/2019 1:00 AM
1.
00 1.
00 1.
00 1.
00 02/12/2019 12:00 AM
M
elawan
Peri
EX3190 83350 HIT EX55006 54,323.
0 54,323.
0 Field Field Shop Pit 02/12/2019 1:30 PM
03/12/2019 9:45 PM
32.
25 32.
25 32.
25 32.
25 02/12/2019 1:30 PM
Peri
Peri
Peri
Peri
Peri
Peri
Peri
Trade Peri
Trade Peri
Trade Peri
M
elawan
M
elawan
M
elawan
M
0
M
0 Tania
M
0
M
0 Peri
M
0 Peri
M
0
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 103 of 349
GR1182 82941 CAT 16M
40,718.
0 40,718.
0 Field Field Shop Pit 29/11/2019 8:10 AM
29/11/2019 8:15 AM
0.
08 0.
08 0.
08 0.
08 29/11/2019 8:10 AM
Tania
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 104 of 349
GR1396 83473 CAT 18M
3 6,726.
0 6,726.
0 Workshop Workshop 03/12/2019 1:40 PM
04/12/2019 7:40 PM
30.
00 17.
33 29.
33 17.
33 03/12/2019 1:40 PM
M
elawan
Peri
M
elawan
GR1398 83394 CAT 18M
3 7,664.
8 7,664.
8 Workshop Workshop 02/12/2019 9:40 PM
03/12/2019 7:20 AM
9.
67 9.
67 9.
67 9.
67 02/12/2019 9:40 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
GR1399 82992 CAT 18M
3 6,762.
0 6,762.
0 Workshop Workshop 29/11/2019 1:40 PM
29/11/2019 4:55 PM
3.
25 3.
25 3.
25 3.
25 29/11/2019 1:40 PM
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 105 of 349
GR1405 82847 CAT 18M
3 4,872.
0 4,872.
0 Workshop Workshop 28/11/2019 2:10 PM
29/11/2019 1:40 AM
11.
50 11.
50 11.
50 11.
50 28/11/2019 7:00 PM
M
elawan
M
elawan
VF7129 83105 M
IT 150,675.
0 150,675.
0 Workshop Workshop M
itra 30/11/2019 1:00 AM
30/11/2019 2:00 AM
1.
00 1.
00 1.
00 1.
00 30/11/2019 1:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7129 83407 M
IT 151,005.
0 151,005.
0 Workshop Workshop M
itra 02/12/2019 9:20 AM
04/12/2019 7:00 PM
57.
67 45.
67 57.
67 45.
67 02/12/2019 9:20 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7130 82778 M
IT 96,909.
0 96,909.
0 Workshop Workshop M
itra 27/11/2019 1:40 PM
27/11/2019 2:05 PM
0.
42 0.
42 0.
42 0.
42 27/11/2019 1:40 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7130 83032 M
IT 134,769.
0 134,769.
0 Workshop Workshop M
itra 29/11/2019 11:00 AM
29/11/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 11:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7130 83032 M
IT 134,769.
0 134,769.
0 Workshop Workshop M
itra 29/11/2019 11:00 AM
29/11/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 1:10 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7130 83032 M
IT 134,769.
0 134,769.
0 Workshop Workshop M
itra 29/11/2019 11:00 AM
29/11/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 2:15 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7130 83403 M
IT 134,819.
0 134,819.
0 Workshop Workshop M
itra 02/12/2019 2:30 PM
02/12/2019 2:45 PM
0.
25 0.
25 0.
25 0.
25 02/12/2019 2:30 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7131 82820 M
IT 143,182.
0 143,182.
0 Workshop Workshop M
itra 27/11/2019 8:10 PM
27/11/2019 8:25 PM
0.
25 0.
25 0.
25 0.
25 27/11/2019 8:10 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7131 83031 M
IT 143,502.
0 143,502.
0 Workshop Workshop M
itra 29/11/2019 9:00 AM
29/11/2019 10:00 AM
1.
00 1.
00 1.
00 1.
00 29/11/2019 9:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7131 83031 M
IT 143,502.
0 143,502.
0 Workshop Workshop M
itra 29/11/2019 9:00 AM
29/11/2019 10:00 AM
1.
00 1.
00 1.
00 1.
00 29/11/2019 9:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7131 83031 M
IT 143,502.
0 143,502.
0 Workshop Workshop M
itra 29/11/2019 9:00 AM
29/11/2019 10:00 AM
1.
00 1.
00 1.
00 1.
00 29/11/2019 9:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7135 83101 M
IT 115,136.
0 115,136.
0 Workshop Workshop M
itra 29/11/2019 7:00 PM
29/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 29/11/2019 7:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7135 83101 M
IT 115,136.
0 115,136.
0 Workshop Workshop M
itra 29/11/2019 7:00 PM
29/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 29/11/2019 7:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7138 79969 M
IT 99,490.
0 99,490.
0 Workshop Workshop 03/11/2019 7:00 AM
29/11/2019 5:00 PM
634.
00 58.
00 634.
00 58.
00 03/11/2019 7:00 AM
TRITOND/CAB Pelita M
otor
GLX Jaya
VF7138 79969 M
IT 99,490.
0 99,490.
0 Workshop Workshop 03/11/2019 7:00 AM
29/11/2019 5:00 PM
634.
00 58.
00 634.
00 58.
00 29/11/2019 3:30 PM
TRITOND/CAB Pelita M
otor
GLX Jaya
VF7139 82954 M
IT 121,356.
0 121,356.
0 Workshop Workshop M
itra 28/11/2019 10:15 PM
28/11/2019 11:15 PM
1.
00 1.
00 1.
00 1.
00 28/11/2019 10:15 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7139 83034 M
IT 121,395.
0 121,395.
0 Workshop Other 29/11/2019 11:00 AM
29/11/2019 4:00 PM
5.
00 5.
00 5.
00 5.
00 29/11/2019 11:00 AM
TRITOND/CAB
GLX
VF7139 83104 M
IT 121,418.
0 121,418.
0 Workshop Other 29/11/2019 11:00 PM
30/11/2019 12:05 AM
1.
08 1.
08 1.
08 1.
08 29/11/2019 11:00 PM
TRITOND/CAB
GLX
VF7139 83104 M
IT 121,418.
0 121,418.
0 Workshop Other 29/11/2019 11:00 PM
30/11/2019 12:05 AM
1.
08 1.
08 1.
08 1.
08 29/11/2019 11:05 PM
TRITOND/CAB
GLX
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 106 of 349
VF7139 83104 M
IT 121,418.
0 121,418.
0 Workshop Other 29/11/2019 11:00 PM
30/11/2019 12:05 AM
1.
08 1.
08 1.
08 1.
08 29/11/2019 11:05 PM
TRITOND/CAB
GLX
VF7140 82771 M
IT 109,726.
0 109,726.
0 Workshop Workshop M
itra 27/11/2019 11:00 AM
27/11/2019 12:00 PM
1.
00 1.
00 1.
00 1.
00 27/11/2019 11:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7140 82863 M
IT 109,727.
0 109,727.
0 Workshop Workshop M
itra 28/11/2019 5:00 PM
28/11/2019 7:00 PM
2.
00 2.
00 2.
00 2.
00 28/11/2019 5:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7140 83187 M
IT 110,214.
0 110,214.
0 Workshop Workshop M
itra 01/12/2019 4:45 AM
02/12/2019 9:20 AM
28.
58 28.
58 28.
58 28.
58 01/12/2019 4:45 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7140 83187 M
IT 110,214.
0 110,214.
0 Workshop Workshop M
itra 01/12/2019 4:45 AM
02/12/2019 9:20 AM
28.
58 28.
58 28.
58 28.
58 01/12/2019 9:40 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7140 83187 M
IT 110,214.
0 110,214.
0 Workshop Workshop M
itra 01/12/2019 4:45 AM
02/12/2019 9:20 AM
28.
58 28.
58 28.
58 28.
58 02/12/2019 7:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7140 83537 M
IT 110,289.
0 110,289.
0 Workshop Workshop M
itra 03/12/2019 7:20 AM
03/12/2019 7:35 AM
0.
25 0.
25 0.
25 0.
25 03/12/2019 7:20 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7142 82623 M
IT 98,954.
0 98,954.
0 Workshop Workshop 26/11/2019 4:55 PM
27/11/2019 11:50 AM
18.
92 4.
83 18.
92 4.
83 26/11/2019 4:55 PM
TRITOND/CAB M
itsubishi
GLX M
ahakam
Berlian
Samjaya
VF7142 82623 M
IT 98,954.
0 98,954.
0 Workshop Workshop 26/11/2019 4:55 PM
27/11/2019 11:50 AM
18.
92 4.
83 18.
92 4.
83 26/11/2019 5:00 PM
TRITOND/CAB M
itsubishi
GLX M
ahakam
Berlian
Samjaya
VF7142 82819 M
IT 98,165.
0 98,165.
0 Workshop Workshop 27/11/2019 7:45 PM
27/11/2019 8:00 PM
0.
25 0.
25 0.
25 0.
25 27/11/2019 7:45 PM
TRITOND/CAB M
elawan
GLX
VF7142 83225 M
IT 98,393.
0 98,393.
0 Workshop Workshop 30/11/2019 8:15 PM
30/11/2019 9:45 PM
1.
50 1.
50 1.
50 1.
50 30/11/2019 8:15 PM
TRITOND/CAB M
elawan
GLX
VF7142 83268 M
IT 98,409.
0 98,409.
0 Workshop Workshop 01/12/2019 9:20 AM
01/12/2019 9:35 AM
0.
25 0.
25 0.
25 0.
25 01/12/2019 9:20 AM
TRITOND/CAB M
elawan
GLX
VF7145 82772 M
IT 140,432.
0 140,432.
0 Workshop Workshop M
itra 27/11/2019 1:30 PM
28/11/2019 12:00 PM
22.
50 22.
50 22.
50 22.
50 27/11/2019 1:30 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7145 82772 M
IT 140,432.
0 140,432.
0 Workshop Workshop M
itra 27/11/2019 1:30 PM
28/11/2019 12:00 PM
22.
50 22.
50 22.
50 22.
50 27/11/2019 4:25 PM
TRITOND/CAB Pinasthika
GLX M
ustika
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 107 of 349
VF7145 82772 M
IT 140,432.
0 140,432.
0 Workshop Workshop M
itra 27/11/2019 1:30 PM
28/11/2019 12:00 PM
22.
50 22.
50 22.
50 22.
50 27/11/2019 4:25 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7145 82772 M
IT 140,432.
0 140,432.
0 Workshop Workshop M
itra 27/11/2019 1:30 PM
28/11/2019 12:00 PM
22.
50 22.
50 22.
50 22.
50 27/11/2019 4:25 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7145 82950 M
IT 140,512.
0 140,512.
0 Workshop Workshop M
itra 28/11/2019 8:10 PM
28/11/2019 8:15 PM
0.
08 0.
08 0.
08 0.
08 28/11/2019 8:10 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7146 82822 M
IT 100,364.
0 100,364.
0 Workshop Workshop M
itra 27/11/2019 11:10 PM
27/11/2019 11:45 PM
0.
58 0.
58 0.
58 0.
58 27/11/2019 11:10 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7146 82892 M
IT 73,871.
0 73,871.
0 Workshop Workshop M
itra 28/11/2019 1:00 PM
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 28/11/2019 1:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7149 82951 M
IT 99,151.
0 99,151.
0 Workshop Workshop M
itra 28/11/2019 8:20 PM
28/11/2019 8:30 PM
0.
17 0.
17 0.
17 0.
17 28/11/2019 8:20 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7152 83269 M
IT 90,048.
0 90,048.
0 Workshop Workshop M
itra 01/12/2019 4:00 PM
01/12/2019 4:20 PM
0.
33 0.
33 0.
33 0.
33 01/12/2019 4:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7152 83404 M
IT 90,151.
0 90,151.
0 Workshop Workshop M
itra 02/12/2019 10:20 AM
02/12/2019 10:35 AM
0.
25 0.
25 0.
25 0.
25 02/12/2019 10:20 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7153 83536 M
IT 101,579.
0 101,579.
0 Workshop Workshop 03/12/2019 10:10 AM
03/12/2019 11:00 AM
0.
83 0.
83 0.
83 0.
83 03/12/2019 10:10 AM
TRITOND/CAB M
elawan
GLX
VF7156 82731 M
IT TRITON 108,218.
0 108,218.
0 Workshop Workshop M
itra 27/11/2019 11:25 AM
27/11/2019 1:50 PM
2.
42 2.
42 2.
42 2.
42 27/11/2019 11:25 AM
Pinasthika
M
ustika
VF7156 83267 M
IT TRITON 109,126.
0 109,126.
0 Workshop Workshop M
itra 01/12/2019 7:50 AM
01/12/2019 8:05 AM
0.
25 0.
25 0.
25 0.
25 01/12/2019 7:50 AM
Pinasthika
M
ustika
VF7157 82779 M
IT TRITON 74,962.
0 74,962.
0 Workshop Workshop M
itra 27/11/2019 2:10 PM
27/11/2019 2:30 PM
0.
33 0.
33 0.
33 0.
33 27/11/2019 2:10 PM
Pinasthika
M
ustika
VF7157 82952 M
IT TRITON 75,016.
0 75,016.
0 Workshop Workshop M
itra 28/11/2019 9:00 PM
28/11/2019 10:00 PM
1.
00 1.
00 1.
00 1.
00 28/11/2019 9:00 PM
Pinasthika
M
ustika
VF7157 82952 M
IT TRITON 75,016.
0 75,016.
0 Workshop Workshop M
itra 28/11/2019 9:00 PM
28/11/2019 10:00 PM
1.
00 1.
00 1.
00 1.
00 28/11/2019 9:00 PM
Pinasthika
M
ustika
VF7157 83167 M
IT TRITON 60,486.
0 60,486.
0 Workshop Workshop M
itra 30/11/2019 10:00 AM
30/11/2019 2:30 PM
4.
50 4.
50 4.
50 4.
50 30/11/2019 10:00 AM
Pinasthika
M
ustika
VF7157 83224 M
IT TRITON 75,142.
0 75,142.
0 Workshop Workshop M
itra 30/11/2019 7:00 PM
30/11/2019 7:45 PM
0.
75 0.
75 0.
75 0.
75 30/11/2019 7:00 PM
Pinasthika
M
ustika
VF7158 82770 M
IT 100,316.
0 100,316.
0 Electrical Workshop M
itra 27/11/2019 1:10 PM
27/11/2019 1:40 PM
0.
50 0.
50 0.
50 0.
50 27/11/2019 1:10 PM
VF7159 83577 M
IT 115,101.
0 115,101.
0 Workshop Workshop M
itra 03/12/2019 7:00 PM
03/12/2019 8:55 PM
1.
92 1.
92 1.
92 1.
92 03/12/2019 7:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7159 83577 M
IT 115,101.
0 115,101.
0 Workshop Workshop M
itra 03/12/2019 7:00 PM
03/12/2019 8:55 PM
1.
92 1.
92 1.
92 1.
92 03/12/2019 7:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 108 of 349
VF7159 83577 M
IT 115,101.
0 115,101.
0 Workshop Workshop M
itra 03/12/2019 7:00 PM
03/12/2019 8:55 PM
1.
92 1.
92 1.
92 1.
92 03/12/2019 7:00 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7159 83577 M
IT 115,101.
0 115,101.
0 Workshop Workshop M
itra 03/12/2019 7:00 PM
03/12/2019 8:55 PM
1.
92 1.
92 1.
92 1.
92 03/12/2019 7:40 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7161 83033 M
IT 100,702.
0 100,702.
0 Workshop Workshop M
itra 29/11/2019 3:30 PM
29/11/2019 3:40 PM
0.
17 0.
17 0.
17 0.
17 29/11/2019 3:30 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7162 82709 M
IT 99,030.
0 99,030.
0 Workshop Workshop M
itra 27/11/2019 7:30 AM
27/11/2019 8:30 AM
1.
00 1.
00 1.
00 1.
00 27/11/2019 7:30 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7162 82818 M
IT 99,160.
0 99,160.
0 Field Field Shop Pit 27/11/2019 7:25 PM
27/11/2019 7:35 PM
0.
17 0.
17 0.
17 0.
17 27/11/2019 7:25 PM
TRITOND/CAB Tania
GLX
VF7162 83317 M
IT 99,709.
0 99,709.
0 Field Field Shop Pit 01/12/2019 8:35 PM
01/12/2019 10:05 PM
1.
50 1.
50 1.
50 1.
50 01/12/2019 8:35 PM
TRITOND/CAB Tania
GLX
VF7162 83402 M
IT 99,789.
0 99,789.
0 Field Field Shop Pit 02/12/2019 1:00 PM
02/12/2019 1:15 PM
0.
25 0.
25 0.
25 0.
25 02/12/2019 1:00 PM
TRITOND/CAB Tania
GLX
VF7162 83535 M
IT 99,933.
0 99,933.
0 Field Field Shop Pit 03/12/2019 10:40 AM
03/12/2019 11:35 AM
0.
92 0.
92 0.
92 0.
92 03/12/2019 10:40 AM
TRITOND/CAB Tania
GLX
VF7164 83264 M
IT 125,851.
0 125,851.
0 Workshop Workshop M
itra 01/12/2019 8:15 AM
01/12/2019 8:30 AM
0.
25 0.
25 0.
25 0.
25 01/12/2019 8:15 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83265 M
IT 125,851.
0 125,851.
0 Workshop Workshop M
itra 01/12/2019 2:20 PM
01/12/2019 2:30 PM
0.
17 0.
17 0.
17 0.
17 01/12/2019 2:20 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83426 M
IT 126,001.
0 126,001.
0 Workshop Workshop M
itra 02/12/2019 7:25 PM
02/12/2019 10:30 PM
3.
08 3.
08 3.
08 3.
08 02/12/2019 7:25 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83426 M
IT 126,001.
0 126,001.
0 Workshop Workshop M
itra 02/12/2019 7:25 PM
02/12/2019 10:30 PM
3.
08 3.
08 3.
08 3.
08 02/12/2019 7:30 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83426 M
IT 126,001.
0 126,001.
0 Workshop Workshop M
itra 02/12/2019 7:25 PM
02/12/2019 10:30 PM
3.
08 3.
08 3.
08 3.
08 02/12/2019 8:05 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83426 M
IT 126,001.
0 126,001.
0 Workshop Workshop M
itra 02/12/2019 7:25 PM
02/12/2019 10:30 PM
3.
08 3.
08 3.
08 3.
08 02/12/2019 9:05 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7164 83538 M
IT 126,053.
0 126,053.
0 Workshop Workshop M
itra 03/12/2019 2:20 PM
03/12/2019 2:35 PM
0.
25 0.
25 0.
25 0.
25 03/12/2019 2:20 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7166 79006 M
IT 4x2WD 95,392.
0 95,392.
0 Workshop Workshop 26/10/2019 10:30 AM
28/11/2019 10:00 AM
791.
50 27.
00 653.
00 27.
00 01/11/2019 5:00 AM
M
itsubishi
M
ahakam
Berlian
Samjaya
VF7166 82897 M
IT 4x2WD 95,563.
0 95,563.
0 Workshop Workshop 28/11/2019 4:00 PM
28/11/2019 5:00 PM
1.
00 1.
00 1.
00 1.
00 28/11/2019 4:00 PM
M
itsubishi
M
ahakam
Berlian
Samjaya
VF7176 83102 M
IT 4x2WD 100,127.
0 100,127.
0 Workshop Workshop M
itra 29/11/2019 8:45 PM
30/11/2019 4:15 PM
19.
50 19.
50 19.
50 19.
50 29/11/2019 8:45 PM
Pinasthika
M
ustika
VF7176 83102 M
IT 4x2WD 100,127.
0 100,127.
0 Workshop Workshop M
itra 29/11/2019 8:45 PM
30/11/2019 4:15 PM
19.
50 19.
50 19.
50 19.
50 29/11/2019 11:45 PM
Pinasthika
M
ustika
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 109 of 349
VF7176 83102 M
IT 4x2WD 100,127.
0 100,127.
0 Workshop Workshop M
itra 29/11/2019 8:45 PM
30/11/2019 4:15 PM
19.
50 19.
50 19.
50 19.
50 29/11/2019 11:45 PM
Pinasthika
M
ustika
VF7176 83102 M
IT 4x2WD 100,127.
0 100,127.
0 Workshop Workshop M
itra 29/11/2019 8:45 PM
30/11/2019 4:15 PM
19.
50 19.
50 19.
50 19.
50 29/11/2019 11:45 PM
Pinasthika
M
ustika
VF7176 83102 M
IT 4x2WD 100,127.
0 100,127.
0 Workshop Workshop M
itra 29/11/2019 8:45 PM
30/11/2019 4:15 PM
19.
50 19.
50 19.
50 19.
50 29/11/2019 11:45 PM
Pinasthika
M
ustika
VF7176 83223 M
IT 4x2WD 100,178.
0 100,178.
0 Workshop Workshop M
itra 30/11/2019 10:00 PM
30/11/2019 10:15 PM
0.
25 0.
25 0.
25 0.
25 30/11/2019 10:00 PM
Pinasthika
M
ustika
VF7176 83578 M
IT 4x2WD 100,826.
0 100,826.
0 Workshop Workshop M
itra 03/12/2019 10:30 PM
03/12/2019 11:30 PM
1.
00 1.
00 1.
00 1.
00 03/12/2019 10:30 PM
Pinasthika
M
ustika
VF7184 83099 M
IT 80,301.
0 80,301.
0 Workshop Workshop M
itra 29/11/2019 7:00 PM
02/12/2019 3:00 PM
68.
00 68.
00 68.
00 68.
00 29/11/2019 7:00 PM
TRITOND/CAB Pinasthika
HDX M
ustika
VF7184 83099 M
IT 80,301.
0 80,301.
0 Workshop Workshop M
itra 29/11/2019 7:00 PM
02/12/2019 3:00 PM
68.
00 68.
00 68.
00 68.
00 29/11/2019 10:30 PM
TRITOND/CAB Pinasthika
HDX M
ustika
VF7184 83540 M
IT 80,381.
0 80,381.
0 Workshop Workshop M
itra 03/12/2019 7:10 AM
03/12/2019 7:25 AM
0.
25 0.
25 0.
25 0.
25 03/12/2019 7:10 AM
TRITOND/CAB Pinasthika
HDX M
ustika
VF7186 82862 M
IT TRITON 73,877.
0 73,877.
0 Electrical Workshop M
itra 28/11/2019 1:00 PM
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 28/11/2019 1:00 PM
Trade Pinasthika
M
ustika
VF7186 83168 M
IT TRITON 74,053.
0 74,053.
0 Electrical Workshop M
itra 30/11/2019 7:30 AM
30/11/2019 8:00 AM
0.
50 0.
50 0.
50 0.
50 30/11/2019 7:30 AM
Trade Pinasthika
M
ustika
VF7215 83266 M
IT 48,417.
0 48,417.
0 Workshop Workshop M
itra 01/12/2019 2:45 PM
01/12/2019 3:45 PM
1.
00 1.
00 1.
00 1.
00 01/12/2019 2:45 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7215 83542 M
IT 48,652.
0 48,652.
0 Workshop Workshop M
itra 03/12/2019 3:15 PM
03/12/2019 3:30 PM
0.
25 0.
25 0.
25 0.
25 03/12/2019 3:15 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7530 82859 M
IT 70,166.
0 70,166.
0 Workshop Workshop 28/11/2019 1:30 PM
28/11/2019 3:00 PM
1.
50 1.
50 1.
50 1.
50 28/11/2019 1:30 PM
TRITOND/CAB M
elawan
HDX
VF7531 83142 M
IT TRITON 101,188.
0 101,188.
0 Workshop Workshop 30/11/2019 7:30 AM
30/11/2019 8:00 AM
0.
50 0.
50 0.
50 0.
50 30/11/2019 7:30 AM
M
elawan
VF7534 82734 M
IT 72,204.
0 72,204.
0 Workshop Workshop 27/11/2019 8:30 AM
27/11/2019 11:30 AM
3.
00 3.
00 3.
00 3.
00 27/11/2019 8:30 AM
TRITOND/CAB M
elawan
HDX
VF7540 83533 M
IT 69,327.
0 69,327.
0 Workshop Workshop M
itra 03/12/2019 8:00 AM
03/12/2019 8:25 AM
0.
42 0.
42 0.
42 0.
42 03/12/2019 8:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7541 82894 M
IT TRITON 77,243.
0 77,243.
0 Workshop Workshop M
itra 28/11/2019 2:10 PM
28/11/2019 3:10 PM
1.
00 1.
00 1.
00 1.
00 28/11/2019 2:10 PM
Pinasthika
M
ustika
VF7543 83532 M
IT 85,249.
0 85,249.
0 Workshop Workshop M
itra 03/12/2019 9:30 AM
03/12/2019 10:30 AM
1.
00 1.
00 1.
00 1.
00 03/12/2019 9:30 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7544 82890 M
IT 60,279.
0 60,279.
0 Workshop Workshop M
itra 28/11/2019 9:00 AM
28/11/2019 2:15 PM
5.
25 5.
25 5.
25 5.
25 28/11/2019 9:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7544 82890 M
IT 60,279.
0 60,279.
0 Workshop Workshop M
itra 28/11/2019 9:00 AM
28/11/2019 2:15 PM
5.
25 5.
25 5.
25 5.
25 28/11/2019 9:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 110 of 349
VF7544 83166 M
IT 60,486.
0 60,486.
0 Workshop Workshop M
itra 30/11/2019 8:50 AM
30/11/2019 9:30 AM
0.
67 0.
67 0.
67 0.
67 30/11/2019 8:50 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7552 83316 M
IT TRITON 75,225.
0 75,225.
0 Workshop Workshop M
itra 01/12/2019 7:00 PM
01/12/2019 8:15 PM
1.
25 1.
25 1.
25 1.
25 01/12/2019 7:00 PM
Pinasthika
M
ustika
VF7552 83316 M
IT TRITON 75,225.
0 75,225.
0 Workshop Workshop M
itra 01/12/2019 7:00 PM
01/12/2019 8:15 PM
1.
25 1.
25 1.
25 1.
25 01/12/2019 7:00 PM
Pinasthika
M
ustika
VF7554 82953 M
IT 65,555.
0 65,555.
0 Workshop Workshop M
itra 28/11/2019 9:20 PM
28/11/2019 9:25 PM
0.
08 0.
08 0.
08 0.
08 28/11/2019 9:20 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7555 83531 M
IT 55,088.
0 55,088.
0 Workshop Workshop M
itra 03/12/2019 8:00 AM
03/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 03/12/2019 8:00 AM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7558 82777 M
IT TRITON 96,906.
0 96,906.
0 Workshop Workshop 27/11/2019 10:00 AM
27/11/2019 10:35 AM
0.
58 0.
58 0.
58 0.
58 27/11/2019 10:00 AM
Pelita M
otor
Jaya
VF7558 83169 M
IT TRITON 97,313.
0 97,313.
0 Workshop Workshop 30/11/2019 10:00 AM
30/11/2019 10:20 AM
0.
33 0.
33 0.
33 0.
33 30/11/2019 10:00 AM
M
elawan
VF7558 83169 M
IT TRITON 97,313.
0 97,313.
0 Workshop Workshop 30/11/2019 10:00 AM
30/11/2019 10:20 AM
0.
33 0.
33 0.
33 0.
33 30/11/2019 10:00 AM
Pelita M
otor
Jaya
VF7559 83222 M
IT TRITON 150,744.
0 150,744.
0 Workshop Workshop M
itra 30/11/2019 7:00 PM
30/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 30/11/2019 7:00 PM
Pinasthika
M
ustika
VF7559 83222 M
IT TRITON 150,744.
0 150,744.
0 Workshop Workshop M
itra 30/11/2019 7:00 PM
30/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 30/11/2019 7:00 PM
Pinasthika
M
ustika
VF7559 83222 M
IT TRITON 150,744.
0 150,744.
0 Workshop Workshop M
itra 30/11/2019 7:00 PM
30/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 30/11/2019 7:00 PM
Pinasthika
M
ustika
VF7832 82999 M
IT 85,453.
0 85,453.
0 Workshop Other 29/11/2019 7:00 AM
29/11/2019 7:30 AM
0.
50 0.
50 0.
50 0.
50 29/11/2019 7:00 AM
TRITOND/CAB
HDX
VF7833 83000 M
IT 85,378.
0 85,378.
0 Workshop Workshop 29/11/2019 7:00 AM
29/11/2019 8:00 AM
1.
00 1.
00 1.
00 1.
00 29/11/2019 7:00 AM
TRITOND/CAB M
elawan
HDX
VF7833 83143 M
IT 85,556.
0 85,556.
0 Workshop Workshop 30/11/2019 9:00 AM
30/11/2019 9:20 AM
0.
33 0.
33 0.
33 0.
33 30/11/2019 9:00 AM
TRITOND/CAB M
elawan
HDX
VF7833 83369 M
IT 85,762.
0 85,762.
0 Workshop Workshop 02/12/2019 7:00 AM
02/12/2019 7:15 AM
0.
25 0.
25 0.
25 0.
25 02/12/2019 7:00 AM
TRITOND/CAB M
elawan
HDX
VF7844 82758 M
IT 111,529.
0 111,529.
0 Workshop Workshop 27/11/2019 3:30 PM
27/11/2019 5:10 PM
1.
67 1.
67 1.
67 1.
67 27/11/2019 3:30 PM
TRITOND/CAB M
elawan
HDX
VF7844 82758 M
IT 111,529.
0 111,529.
0 Workshop Workshop 27/11/2019 3:30 PM
27/11/2019 5:10 PM
1.
67 1.
67 1.
67 1.
67 27/11/2019 3:30 PM
TRITOND/CAB M
elawan
HDX
VF7860 82730 M
IT 115,032.
0 115,032.
0 Workshop Workshop 27/11/2019 7:30 AM
27/11/2019 10:30 AM
3.
00 3.
00 3.
00 3.
00 27/11/2019 7:30 AM
TRITOND/CAB M
elawan
HDX
VF7860 82730 M
IT 115,032.
0 115,032.
0 Workshop Workshop 27/11/2019 7:30 AM
27/11/2019 10:30 AM
3.
00 3.
00 3.
00 3.
00 27/11/2019 7:30 AM
TRITOND/CAB M
elawan
HDX
VF7862 83193 M
IT 63,491.
0 63,491.
0 Field Other 01/12/2019 2:00 AM
02/12/2019 3:30 PM
37.
50 37.
50 37.
50 37.
50 01/12/2019 2:00 AM
TRITOND/CAB
HDX
VF7862 83193 M
IT 63,491.
0 63,491.
0 Electrical Workshop 01/12/2019 2:00 AM
02/12/2019 3:30 PM
37.
50 37.
50 37.
50 37.
50 02/12/2019 6:00 AM
TRITOND/CAB Trade M
elawan
HDX
VF7870 83145 M
IT 85,168.
0 85,168.
0 Workshop Workshop M
itra 30/11/2019 10:00 AM
30/11/2019 11:30 AM
1.
50 1.
50 1.
50 1.
50 30/11/2019 10:00 AM
TRITOND/CAB Pinasthika
HDX M
ustika
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 111 of 349
VF7903 83541 M
IT 73,058.
0 73,058.
0 Workshop Workshop M
itra 03/12/2019 1:30 PM
03/12/2019 2:20 PM
0.
83 0.
83 0.
83 0.
83 03/12/2019 1:30 PM
TRITOND/CAB Pinasthika
GLX M
ustika
VF7911 83406 M
IT 73,360.
0 73,360.
0 Workshop Workshop 02/12/2019 1:45 PM
02/12/2019 4:20 PM
2.
58 2.
58 2.
58 2.
58 02/12/2019 1:45 PM
TRITOND/CAB Pelita M
otor
GLX Jaya
VF7946 83146 M
IT 4,998.
0 4,998.
0 Workshop Other 30/11/2019 2:00 PM
30/11/2019 3:10 PM
1.
17 1.
17 1.
17 1.
17 30/11/2019 2:00 PM
TRITOND/CAB
HDX
VF7948 82860 M
IT 35,060.
0 35,060.
0 Workshop Workshop 28/11/2019 9:00 AM
28/11/2019 9:55 AM
0.
92 0.
92 0.
92 0.
92 28/11/2019 9:00 AM
TRITOND/CAB M
elawan
HDX
VF7954 82858 M
IT 26,977.
0 26,977.
0 Workshop Workshop 28/11/2019 1:00 PM
28/11/2019 1:10 PM
0.
17 0.
17 0.
17 0.
17 28/11/2019 1:00 PM
TRITOND/CAB M
elawan
HDX
VF7956 82861 M
IT 24,983.
0 24,983.
0 Workshop Workshop 28/11/2019 8:15 AM
28/11/2019 9:10 AM
0.
92 0.
92 0.
92 0.
92 28/11/2019 8:15 AM
TRITOND/CAB M
elawan
HDX
EG1717 82761 ALL 12K-10 37,641.
0 37,641.
0 Field Field Shop Pit 27/11/2019 6:50 PM
27/11/2019 9:05 PM
2.
25 2.
25 2.
25 2.
25 27/11/2019 6:50 PM
M
elawan
EG1717 82887 ALL 12K-10 37,653.
0 37,653.
0 Field Field Shop Pit 28/11/2019 9:05 PM
28/11/2019 9:25 PM
0.
33 0.
33 0.
33 0.
33 28/11/2019 9:05 PM
M
elawan
EG1717 83043 ALL 12K-10 37,668.
0 37,668.
0 Field Field Shop Pit 29/11/2019 11:40 PM
30/11/2019 1:05 AM
1.
42 1.
42 1.
42 1.
42 29/11/2019 11:40 PM
M
elawan
EG1717 83370 ALL 12K-10 37,696.
0 37,696.
0 Field Field Shop Pit 02/12/2019 6:45 PM
02/12/2019 8:00 PM
1.
25 1.
25 1.
25 1.
25 02/12/2019 6:45 PM
M
elawan
EG1718 83057 AIR SDG-25SII 23,143.
0 23,143.
0 Field Field Shop Pit 30/11/2019 3:00 AM
30/11/2019 3:55 AM
0.
92 0.
92 0.
92 0.
92 30/11/2019 3:00 AM
M
elawan
EG1801 83216 ALL 12K-10 5,079.
0 5,079.
0 Workshop Workshop 30/11/2019 11:00 AM
30/11/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 30/11/2019 11:00 AM
M
elawan
M
elawan
M
elawan
Peri
Peri
M
elawan
M
elawan
Trade Tania
EG2290 83492 LIG 20 11,276.
0 11,276.
0 Electrical Field Shop Pit 03/12/2019 5:00 PM
03/12/2019 8:00 PM
3.
00 3.
00 3.
00 3.
00 03/12/2019 5:00 PM
Trade M
elawan
EG2308 83331 LIG 20 13,230.
0 13,230.
0 Field Field Shop Pit 01/12/2019 11:15 AM
01/12/2019 2:15 PM
3.
00 3.
00 3.
00 3.
00 01/12/2019 11:15 AM
Tania
Peri
M
elawan
Peri
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 112 of 349
EG3011 82974 CAT 988 29,751.
0 29,751.
0 Field Field Shop Pit 28/11/2019 9:00 AM
28/11/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 28/11/2019 9:00 AM
M
elawan
M
ustahil
M
elawan
M
elawan
Peri
M
ustahil
M
elawan
Tania
Peri
Trade Peri
EG3100 82768 ALL 12K-10 15,605.
0 15,605.
0 Field Field Shop Pit 27/11/2019 8:00 PM
27/11/2019 9:50 PM
1.
83 1.
83 1.
83 1.
83 27/11/2019 8:00 PM
M
elawan
EG3100 83372 ALL 12K-10 15,660.
0 15,660.
0 Field Field Shop Pit 02/12/2019 7:20 PM
02/12/2019 10:20 PM
3.
00 3.
00 3.
00 3.
00 02/12/2019 7:20 PM
M
elawan
Peri
EG3140 82975 PAT LS3-6000 23,732.
0 23,732.
0 Workshop Workshop 28/11/2019 1:00 PM
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 28/11/2019 1:00 PM
M
elawan
Peri
Tamara
Tania
M
elawan
Tania
Peri
Peri
LO1693 82751 CAT 980H 20,651.
0 20,651.
0 Workshop Workshop 28/11/2019 2:25 AM
28/11/2019 8:10 AM
5.
75 5.
75 5.
75 5.
75 28/11/2019 2:25 AM
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 113 of 349
LO1693 83071 CAT 980H 20,669.
9 20,669.
9 Workshop Workshop 30/11/2019 7:40 AM
30/11/2019 5:20 PM
9.
67 9.
67 9.
67 9.
67 30/11/2019 7:40 AM
M
elawan
LO3009 83160 CAT 980G 25,912.
6 25,912.
6 Workshop Workshop TWS 30/11/2019 11:00 AM
30/11/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 30/11/2019 11:00 AM
PU1554 82692 M
UL M
VFC420 10,755.
9 10,755.
9 Field Field Shop Pit 26/11/2019 7:00 PM
27/11/2019 4:00 PM
21.
00 9.
00 21.
00 9.
00 26/11/2019 7:00 PM
Tania
Peri
Tania
PU1722 83165 SYK HH220iSS 963.
0 963.
0 Field Field Shop Pit 30/11/2019 10:05 PM
30/11/2019 11:45 PM
1.
67 1.
67 1.
67 1.
67 30/11/2019 10:05 PM
Tania
Tania
Tania
Peri
PU1731 83082 SYK CP150 1,397.
6 1,397.
6 Field Other 30/11/2019 8:30 AM
30/11/2019 1:15 PM
4.
75 4.
75 4.
75 4.
75 30/11/2019 8:30 AM
Tania
Tania
PU1734 82981 SYK XH150 93.
1 93.
1 Field Field Shop Pit 29/11/2019 1:55 PM
29/11/2019 3:15 PM
1.
33 1.
33 1.
33 1.
33 29/11/2019 1:55 PM
Tania
Peri
Tania
Tania
Peri
PU2249 83454 KSB DND200 16,437.
0 16,437.
0 Field Field Shop Pit 03/12/2019 9:20 AM
03/12/2019 10:55 AM
1.
58 1.
58 1.
58 1.
58 03/12/2019 9:20 AM
Peri
M
elawan
PU2258 83235 KSB DND200 18,693.
8 18,695.
3 Field Field Shop Pit 01/12/2019 9:50 AM
01/12/2019 1:15 PM
3.
42 3.
42 3.
42 3.
42 01/12/2019 9:50 AM
Tania
Peri
TRAILER 120T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 114 of 349
RD2362 82988 CAT 740 LUBE 19,175.
0 19,175.
0 Electrical Workshop 29/11/2019 8:00 AM
29/11/2019 10:00 AM
2.
00 2.
00 2.
00 2.
00 29/11/2019 8:00 AM
TRUCK Trade M
elawan
RD2362 82988 CAT 740 LUBE 19,175.
0 19,175.
0 Electrical Workshop 29/11/2019 8:00 AM
29/11/2019 10:00 AM
2.
00 2.
00 2.
00 2.
00 29/11/2019 8:00 AM
TRUCK Trade M
elawan
TRUCK Trade M
elawan
TRUCK M
elawan
TRUCK M
elawan
TRUCK M
elawan
TRUCK M
elawan
TRUCK M
elawan
RD2462 83461 CAT 785C 35,939.
4 35,939.
4 Electrical Field Shop Pit 03/12/2019 10:30 AM
03/12/2019 11:45 AM
1.
25 1.
25 1.
25 1.
25 03/12/2019 10:30 AM
Trade M
elawan
Peri
M
elawan
Peri
M
elawan
M
elawan
Trade M
elawan
M
elawan
Tania
Trade M
elawan
Trade M
elawan
Trade M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 115 of 349
RD2484 82842 CAT 785C 35,320.
4 35,322.
1 Workshop Workshop 28/11/2019 1:25 PM
29/11/2019 3:05 PM
25.
67 25.
67 25.
67 25.
67 29/11/2019 7:25 AM
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 116 of 349
RD2549 82282 CAT 785C 20,416.
7 20,416.
7 Workshop Workshop TWS 23/11/2019 9:20 AM
04/12/2019 7:00 PM
273.
67 168.
00 273.
67 168.
00 23/11/2019 10:50 AM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 117 of 349
RD2549 82282 CAT 785C 20,416.
7 20,416.
7 Workshop Workshop TWS 23/11/2019 9:20 AM
04/12/2019 7:00 PM
273.
67 168.
00 273.
67 168.
00 25/11/2019 7:00 AM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 118 of 349
RD2549 82282 CAT 785C 20,416.
7 20,416.
7 Workshop Workshop TWS 23/11/2019 9:20 AM
04/12/2019 7:00 PM
273.
67 168.
00 273.
67 168.
00 28/11/2019 7:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 119 of 349
RD2556 81041 CAT 785C 20,514.
9 20,524.
3 Workshop Workshop TWS 12/11/2019 10:40 PM
28/11/2019 3:50 AM
365.
17 20.
83 125.
17 20.
83 22/11/2019 10:40 PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 120 of 349
RD2556 81041 CAT 785C 20,514.
9 20,524.
3 Workshop Workshop TWS 12/11/2019 10:40 PM
28/11/2019 3:50 AM
365.
17 20.
83 125.
17 20.
83 24/11/2019 7:00 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
Trade M
elawan
Peri
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 121 of 349
RD2570 83107 CAT 785C 18,845.
0 18,845.
0 Electrical Workshop 30/11/2019 9:50 AM
30/11/2019 11:15 AM
1.
42 1.
42 1.
42 1.
42 30/11/2019 9:50 AM
Trade M
elawan
Trade Tania
Trade Tania
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 122 of 349
RD2690 83270 CAT 740B 16,567.
8 16,567.
8 Workshop Workshop 01/12/2019 8:10 PM
02/12/2019 9:25 AM
13.
25 13.
25 13.
25 13.
25 02/12/2019 7:10 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 123 of 349
RD2692 81332 CAT 740B 18,841.
3 18,851.
0 Workshop Workshop TWS 15/11/2019 8:30 AM
28/11/2019 4:20 AM
307.
83 21.
33 139.
83 21.
33 23/11/2019 7:00 AM
M
elawan
Peri
RD3012 82982 CAT 789C 57,911.
0 57,911.
0 Electrical Workshop 29/11/2019 2:00 PM
29/11/2019 5:25 PM
3.
42 3.
42 3.
42 3.
42 29/11/2019 2:00 PM
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 124 of 349
RD3015 83293 CAT 789C 57,891.
8 57,891.
8 Workshop Workshop 02/12/2019 2:00 AM
04/12/2019 7:00 PM
65.
00 53.
00 65.
00 53.
00 02/12/2019 11:00 AM
M
elawan
Peri
M
elawan
Trade Peri
M
elawan
Peri
M
elawan
Peri
RD3032 83108 CAT 785C 67,484.
1 67,484.
1 Field Field Shop Pit 30/11/2019 10:00 AM
30/11/2019 2:30 PM
4.
50 4.
50 4.
50 4.
50 30/11/2019 10:00 AM
Tania
Tania
M
elawan
M
elawan
M
elawan
M
elawan
Trade Tania
RD3039 83202 CAT 785C 56,131.
3 56,132.
4 Workshop Workshop 01/12/2019 7:40 AM
01/12/2019 3:00 PM
7.
33 7.
33 7.
33 7.
33 01/12/2019 7:40 AM
M
elawan
Tania
M
elawan
Tania
Tania
Tania
M
elawan
RD3045 83377 CAT 785C 64,434.
0 64,434.
0 Field Field Shop Pit 02/12/2019 8:25 PM
02/12/2019 10:00 PM
1.
58 1.
58 1.
58 1.
58 02/12/2019 8:25 PM
Tania
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 125 of 349
RD3099 83518 CAT 777D 45,178.
0 45,178.
0 Field Field Shop Pit 03/12/2019 9:50 PM
04/12/2019 1:15 AM
3.
42 3.
42 3.
42 3.
42 03/12/2019 9:50 PM
Peri
M
elawan
M
elawan
M
elawan
M
elawan
Tania
RD3104 83263 CAT 785C 67,186.
2 67,187.
0 Workshop Workshop 01/12/2019 8:00 PM
02/12/2019 2:45 AM
6.
75 6.
75 6.
75 6.
75 01/12/2019 8:00 PM
M
elawan
M
elawan
M
elawan
Tania
RD3110 83179 CAT 785C 67,125.
0 67,125.
0 Workshop Workshop 01/12/2019 2:45 AM
01/12/2019 5:25 AM
2.
67 2.
67 2.
67 2.
67 01/12/2019 2:45 AM
M
elawan
Tania
RD3114 83073 CAT 785C 67,847.
0 67,847.
0 Field Field Shop Pit 30/11/2019 7:50 AM
30/11/2019 8:40 AM
0.
83 0.
83 0.
83 0.
83 30/11/2019 7:50 AM
Tania
M
elawan
M
elawan
M
elawan
Tania
Tania
RD3119 83421 CAT 785C 66,967.
4 66,967.
4 Field Field Shop Pit 03/12/2019 5:10 AM
03/12/2019 7:10 AM
2.
00 2.
00 2.
00 2.
00 03/12/2019 5:10 AM
Tania
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 126 of 349
RD3121 83148 CAT 785C 68,974.
9 68,974.
9 Workshop Workshop 30/11/2019 8:30 PM
01/12/2019 5:00 PM
20.
50 20.
50 20.
50 20.
50 01/12/2019 5:30 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
RD3140 83008 CAT 785C 67,346.
3 67,346.
3 Field Field Shop Pit 29/11/2019 7:00 PM
29/11/2019 7:40 PM
0.
67 0.
67 0.
67 0.
67 29/11/2019 7:00 PM
Tania
M
elawan
Trade Peri
RD3141 83303 CAT 789C 58,179.
1 58,179.
3 Field Field Shop Pit 02/12/2019 7:05 AM
02/12/2019 8:00 AM
0.
92 0.
92 0.
92 0.
92 02/12/2019 7:05 AM
Peri
M
elawan
M
elawan
Trade M
elawan
Peri
Peri
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 127 of 349
RD3142 83447 CAT 789C 59,027.
9 59,027.
9 Workshop Workshop 03/12/2019 8:55 AM
04/12/2019 7:00 PM
34.
08 22.
08 34.
08 22.
08 03/12/2019 8:55 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
Trade M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 128 of 349
RD3218 82747 CAT 789C 50,239.
4 50,239.
4 Field Field Shop Pit 27/11/2019 3:55 PM
27/11/2019 4:45 PM
0.
83 0.
83 0.
83 0.
83 27/11/2019 3:55 PM
Peri
M
elawan
Peri
M
elawan
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
RD3285 82802 CAT 785C 30,347.
2 30,347.
2 Field Field Shop Pit 28/11/2019 2:35 AM
28/11/2019 3:15 AM
0.
67 0.
67 0.
67 0.
67 28/11/2019 2:35 AM
Tania
Tania
M
elawan
M
elawan
M
elawan
Tania
Tania
Tania
M
elawan
Tania
Trade M
elawan
Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 129 of 349
RD3298 83111 CAT 785C 30,705.
2 30,705.
2 Workshop Workshop 30/11/2019 10:40 AM
01/12/2019 1:20 AM
14.
67 14.
67 14.
67 14.
67 30/11/2019 10:40 AM
M
elawan
M
elawan
M
elawan
M
elawan
Peri
RD3319 83147 CAT 785C 51,168.
1 51,168.
1 Field Field Shop Pit 30/11/2019 8:30 PM
30/11/2019 10:30 PM
2.
00 2.
00 2.
00 2.
00 30/11/2019 8:30 PM
Tania
Trade M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 130 of 349
RD3323 83392 CAT 785C 52,221.
2 52,221.
2 Workshop Workshop 02/12/2019 8:55 AM
04/12/2019 7:00 PM
58.
08 46.
08 58.
08 46.
08 02/12/2019 1:55 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
RD3350 83174 CAT 789C 44,327.
3 44,327.
3 Field Field Shop Pit 01/12/2019 1:00 AM
01/12/2019 2:50 AM
1.
83 1.
83 1.
83 1.
83 01/12/2019 1:00 AM
Tania
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 131 of 349
RD3351 83074 CAT 789C 41,125.
0 41,125.
0 Field Other 30/11/2019 8:00 AM
30/11/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 30/11/2019 8:00 AM
Trade
Peri
Peri
Trade Peri
M
elawan
Peri
RD3379 82759 CAT 785C 50,215.
6 50,216.
2 Electrical Field Shop Pit 27/11/2019 5:45 PM
27/11/2019 9:30 PM
3.
75 3.
75 3.
75 3.
75 27/11/2019 5:45 PM
Trade Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Peri
M
elawan
Trade M
elawan
M
elawan
M
elawan
Trade
RD3382 82696 CAT 785C 50,460.
0 50,460.
0 Electrical Workshop 27/11/2019 5:30 AM
27/11/2019 9:25 AM
3.
92 2.
42 3.
92 2.
42 27/11/2019 5:30 AM
Trade M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 132 of 349
RD3382 82961 CAT 785C 50,497.
0 50,497.
0 Field Field Shop Pit 29/11/2019 10:40 AM
29/11/2019 2:20 PM
3.
67 3.
67 3.
67 3.
67 29/11/2019 10:40 AM
Tania
Tania
Trade M
elawan
Trade M
elawan
M
elawan
Peri
Trade M
elawan
Tania
M
elawan
RD3442 82716 KOM
HD7857 35,535.
0 35,535.
0 Workshop Workshop 27/11/2019 9:40 AM
27/11/2019 2:00 PM
4.
33 4.
33 4.
33 4.
33 27/11/2019 10:50 AM
M
elawan
Tania
M
elawan
M
elawan
M
elawan
Trade
RD3914 83259 CAT 777D 26,945.
0 26,945.
0 Electrical Workshop 01/12/2019 7:40 PM
01/12/2019 9:30 PM
1.
83 1.
83 1.
83 1.
83 01/12/2019 7:40 PM
Trade M
elawan
Tania
Peri
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 133 of 349
RD4129 82838 CAT 777D 38,981.
8 38,981.
8 Workshop Workshop TWS 28/11/2019 11:05 AM
30/11/2019 4:35 PM
53.
50 53.
50 53.
50 53.
50 28/11/2019 7:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 134 of 349
RD4134 83172 CAT 777D 1,308.
0 1,308.
0 Workshop Workshop 30/11/2019 11:15 PM
01/12/2019 4:15 AM
5.
00 5.
00 5.
00 5.
00 30/11/2019 11:15 PM
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
Peri
Trade
RD4136 82873 CAT 777D 39,356.
3 39,356.
3 Workshop Workshop 28/11/2019 7:30 PM
29/11/2019 2:30 AM
7.
00 7.
00 7.
00 7.
00 28/11/2019 7:30 PM
M
elawan
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 135 of 349
RD4146 83064 CAT 777D 35,109.
4 35,109.
4 Electrical Workshop 30/11/2019 5:40 AM
30/11/2019 7:40 AM
2.
00 2.
00 2.
00 2.
00 30/11/2019 5:40 AM
Trade M
elawan
M
elawan
Tania
Tania
Tania
Peri
RD4152 83158 CAT 785C 21,890.
9 21,891.
9 Workshop Workshop 30/11/2019 9:25 PM
01/12/2019 4:00 AM
6.
58 6.
58 6.
58 6.
58 30/11/2019 9:25 PM
M
elawan
M
elawan
Trade Tania
Tania
M
elawan
M
elawan
M
elawan
RD4154 83067 CAT 785C 41,929.
0 41,929.
0 Field Other 30/11/2019 7:30 AM
30/11/2019 12:00 PM
4.
50 4.
50 4.
50 4.
50 30/11/2019 7:30 AM
Tania
Tania
M
elawan
RD4156 83363 CAT 785C 41,973.
8 41,973.
8 Workshop Workshop 02/12/2019 3:20 PM
02/12/2019 5:00 PM
1.
67 1.
67 1.
67 1.
67 02/12/2019 3:20 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 136 of 349
RD4160 82726 CAT 785C 28,737.
5 28,737.
5 Field Other 27/11/2019 10:55 AM
27/11/2019 12:55 PM
2.
00 2.
00 2.
00 2.
00 27/11/2019 10:55 AM
Peri
Tania
Trade Tania
Trade M
elawan
Tania
Peri
M
elawan
M
elawan
Tania
M
elawan
Trade M
elawan
Trade M
elawan
RD4167 83097 CAT 785C 35,046.
0 35,046.
0 Electrical Workshop 30/11/2019 9:35 AM
30/11/2019 11:50 AM
2.
25 2.
25 2.
25 2.
25 30/11/2019 10:30 AM
Trade M
elawan
M
elawan
RD4167 83247 CAT 785C 35,066.
8 35,066.
8 Workshop Workshop 01/12/2019 2:50 PM
02/12/2019 1:50 AM
11.
00 11.
00 11.
00 11.
00 01/12/2019 7:00 PM
M
elawan
M
elawan
M
elawan
RD4301 82699 CAT 777D 30,791.
7 30,791.
7 Workshop Workshop 27/11/2019 7:30 AM
29/11/2019 2:30 AM
43.
00 43.
00 43.
00 43.
00 27/11/2019 7:30 AM
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 137 of 349
RD4301 82699 CAT 777D 30,791.
7 30,791.
7 Workshop Workshop 27/11/2019 7:30 AM
29/11/2019 2:30 AM
43.
00 43.
00 43.
00 43.
00 27/11/2019 1:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade
RD4302 82739 CAT 777D 46,523.
1 46,523.
1 Workshop Workshop TWS 27/11/2019 5:00 PM
27/11/2019 10:10 PM
5.
17 5.
17 5.
17 5.
17 27/11/2019 5:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 138 of 349
RD4332 82934 CAT 777D 28,706.
0 28,706.
0 Workshop Workshop 29/11/2019 7:20 AM
29/11/2019 11:15 AM
3.
92 3.
92 3.
92 3.
92 29/11/2019 7:20 AM
M
elawan
M
elawan
Peri
Peri
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade
RD4342 83313 CAT 777D 29,946.
4 29,946.
4 Workshop Workshop 02/12/2019 8:00 AM
03/12/2019 2:30 AM
18.
50 18.
50 18.
50 18.
50 02/12/2019 8:00 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 139 of 349
RD4344 82881 CAT 777D 28,539.
0 28,539.
0 Workshop Workshop 28/11/2019 8:30 PM
29/11/2019 10:05 AM
13.
58 13.
58 13.
58 13.
58 29/11/2019 9:20 AM
M
elawan
M
elawan
M
elawan
Tania
Tania
RD4368 82715 VOL A40G 9,425.
0 9,425.
0 Field Other 27/11/2019 9:40 AM
27/11/2019 10:25 AM
0.
75 0.
75 0.
75 0.
75 27/11/2019 9:40 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 140 of 349
RD4369 83155 VOL A40G 9,592.
0 9,598.
0 Electrical Workshop 30/11/2019 9:25 PM
02/12/2019 1:45 PM
40.
33 40.
33 28.
33 28.
33 30/11/2019 9:25 PM
Trade M
elawan
M
elawan
M
elawan
Trade
M
elawan
Trade Tania
RD4390 83226 CAT 745 5,230.
0 5,230.
0 Workshop Workshop 01/12/2019 8:40 AM
01/12/2019 2:20 PM
5.
67 5.
67 5.
67 5.
67 01/12/2019 8:40 AM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 141 of 349
RD4392 82991 CAT 745 5,001.
1 5,001.
1 Workshop Workshop 29/11/2019 4:00 PM
30/11/2019 2:55 AM
10.
92 10.
92 10.
92 10.
92 29/11/2019 11:00 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 142 of 349
RD4520 83261 CAT 777E 2,503.
0 2,503.
0 Workshop Workshop 01/12/2019 7:25 PM
02/12/2019 10:15 AM
14.
83 14.
83 14.
83 14.
83 01/12/2019 7:25 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Trade Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
Tania
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
RD4559 83080 CAT 745 1,221.
4 1,221.
5 Workshop Workshop 30/11/2019 8:00 AM
30/11/2019 3:00 PM
7.
00 7.
00 7.
00 7.
00 30/11/2019 8:00 AM
M
elawan
M
elawan
Tania
RD4585 83442 VOL A40G 741.
0 741.
0 Field Other 03/12/2019 8:35 AM
03/12/2019 10:30 AM
1.
92 1.
92 1.
92 1.
92 03/12/2019 8:35 AM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 143 of 349
RD5081 83359 CAT 777D 28,909.
9 28,909.
9 Workshop Workshop 02/12/2019 2:35 PM
02/12/2019 8:35 PM
6.
00 6.
00 6.
00 6.
00 02/12/2019 2:35 PM
M
elawan
M
elawan
M
elawan
M
elawan
M
elawan
VT1031 82799 VOL FM
400 38,456.
0 38,456.
0 Workshop Workshop 27/11/2019 7:00 PM
28/11/2019 12:00 AM
5.
00 5.
00 5.
00 5.
00 27/11/2019 10:10 PM
M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 144 of 349
VT1040 82908 VOL F12 13,114.
0 13,114.
0 Workshop Workshop TWS 28/11/2019 2:00 PM
29/11/2019 12:00 AM
10.
00 10.
00 10.
00 10.
00 28/11/2019 2:00 PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 145 of 349
VT1212 82909 VOL FM
330 3,792.
0 3,792.
0 Workshop Workshop TWS 28/11/2019 1:00 PM
29/11/2019 2:00 AM
13.
00 13.
00 12.
83 12.
83 28/11/2019 5:00 PM
M
elawan
M
elawan
M
elawan
Trade M
elawan
330 4x4
M
ANHAUL
TRUCK
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 146 of 349
VT2109 83153 REN KERAX 9,481.
6 9,481.
6 Workshop Workshop TWS 30/11/2019 11:00 AM
30/11/2019 5:00 PM
6.
00 6.
00 6.
00 6.
00 30/11/2019 11:00 AM
330 4x4
M
ANHAUL
TRUCK
330 4x4
M
ANHAUL
TRUCK
330 4x4
M
ANHAUL
TRUCK
330 4x4
M
ANHAUL
TRUCK
M
elawan
M
elawan
VT2304 79940 M
IT FE74S 1,926.
0 1,926.
0 Workshop Workshop TWS 03/11/2019 9:00 AM
27/11/2019 3:00 PM
582.
00 8.
00 562.
00 8.
00 03/11/2019 9:00 AM
VT2304 82944 M
IT FE74S 1,931.
0 1,931.
0 Workshop Workshop TWS 28/11/2019 8:00 PM
28/11/2019 10:00 PM
2.
00 2.
00 2.
00 2.
00 28/11/2019 8:00 PM
VT2304 83026 M
IT FE74S 1,939.
0 1,939.
0 Workshop Workshop TWS 29/11/2019 7:00 AM
29/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 29/11/2019 7:00 AM
VT2304 83516 M
IT FE74S 2,045.
0 2,045.
0 Workshop Workshop TWS 03/12/2019 1:00 PM
03/12/2019 2:00 PM
1.
00 1.
00 1.
00 1.
00 03/12/2019 1:00 PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 147 of 349
VT2305 82946 M
IT FE74 1,575.
0 1,575.
0 Workshop Workshop 29/11/2019 1:00 AM
29/11/2019 3:00 AM
2.
00 2.
00 2.
00 2.
00 29/11/2019 1:00 AM
M
elawan
VT2305 83027 M
IT FE74 1,589.
0 1,589.
0 Workshop Workshop 29/11/2019 11:00 AM
29/11/2019 5:00 PM
6.
00 6.
00 6.
00 6.
00 29/11/2019 11:00 AM
M
elawan
VT2305 83027 M
IT FE74 1,589.
0 1,589.
0 Workshop Workshop 29/11/2019 11:00 AM
29/11/2019 5:00 PM
6.
00 6.
00 6.
00 6.
00 29/11/2019 1:00 PM
M
elawan
VT2305 83212 M
IT FE74 1,593.
7 1,598.
0 Workshop Workshop 30/11/2019 9:00 PM
01/12/2019 11:00 AM
14.
00 14.
00 14.
00 14.
00 30/11/2019 9:00 PM
M
elawan
VT2305 83510 M
IT FE74 1,645.
0 1,645.
0 Workshop Workshop 03/12/2019 11:00 AM
03/12/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 03/12/2019 11:00 AM
M
elawan
VT2305 83510 M
IT FE74 1,645.
0 1,645.
0 Workshop Workshop 03/12/2019 11:00 AM
03/12/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 03/12/2019 11:00 AM
M
elawan
VT2305 83510 M
IT FE74 1,645.
0 1,645.
0 Workshop Workshop 03/12/2019 11:00 AM
03/12/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 03/12/2019 11:00 AM
M
elawan
VT2307 82906 M
IT FE74S 2,475.
5 2,475.
5 Workshop Workshop TWS 28/11/2019 1:00 PM
01/12/2019 10:00 AM
69.
00 69.
00 69.
00 69.
00 28/11/2019 1:00 PM
VT2307 82906 M
IT FE74S 2,475.
5 2,475.
5 Workshop Workshop TWS 28/11/2019 1:00 PM
01/12/2019 10:00 AM
69.
00 69.
00 69.
00 69.
00 28/11/2019 4:00 PM
VT2307 83380 M
IT FE74S 2,515.
0 2,515.
0 Workshop Workshop TWS 02/12/2019 8:00 AM
02/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 02/12/2019 8:00 AM
VT2308 83154 M
IT FE74S 2,114.
5 2,114.
5 Workshop Workshop TWS 30/11/2019 2:00 PM
01/12/2019 2:00 AM
12.
00 12.
00 12.
00 12.
00 30/11/2019 2:00 PM
VT2308 83154 M
IT FE74S 2,114.
5 2,114.
5 Workshop Workshop TWS 30/11/2019 2:00 PM
01/12/2019 2:00 AM
12.
00 12.
00 12.
00 12.
00 30/11/2019 2:00 PM
VT2308 83154 M
IT FE74S 2,114.
5 2,114.
5 Workshop Workshop TWS 30/11/2019 2:00 PM
01/12/2019 2:00 AM
12.
00 12.
00 12.
00 12.
00 30/11/2019 2:25 PM
VT2308 83278 M
IT FE74S 2,113.
0 2,113.
0 Workshop Workshop TWS 01/12/2019 8:00 AM
01/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 01/12/2019 8:00 AM
VT2309 83029 M
IT COLT 1,344.
5 1,344.
5 Workshop Workshop TWS 29/11/2019 9:00 AM
29/11/2019 1:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 9:00 AM
DIESEL 4X4
VT2309 83029 M
IT COLT 1,344.
5 1,344.
5 Workshop Workshop TWS 29/11/2019 9:00 AM
29/11/2019 1:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 9:00 AM
DIESEL 4X4
VT2309 83029 M
IT COLT 1,344.
5 1,344.
5 Workshop Workshop TWS 29/11/2019 9:00 AM
29/11/2019 1:00 PM
4.
00 4.
00 4.
00 4.
00 29/11/2019 10:15 AM
DIESEL 4X4
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 148 of 349
VT2523 83085 M
IT FE74S 1,533.
0 1,533.
0 Workshop Workshop TWS 29/11/2019 7:00 PM
29/11/2019 8:00 PM
1.
00 1.
00 0.
73 0.
73 29/11/2019 7:00 PM
VT2523 83383 M
IT FE74S 1,600.
0 1,600.
0 Workshop Workshop TWS 02/12/2019 10:00 AM
02/12/2019 3:00 PM
5.
00 5.
00 5.
00 5.
00 02/12/2019 10:00 AM
VT2523 83383 M
IT FE74S 1,600.
0 1,600.
0 Workshop Workshop TWS 02/12/2019 10:00 AM
02/12/2019 3:00 PM
5.
00 5.
00 5.
00 5.
00 02/12/2019 10:00 AM
VT2524 82785 M
IT FE74S 2,199.
0 2,199.
0 Workshop Workshop TWS 27/11/2019 1:00 PM
27/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 27/11/2019 1:00 PM
VT2524 83379 M
IT FE74S 2,325.
0 2,325.
0 Workshop Workshop TWS 02/12/2019 7:00 AM
02/12/2019 8:00 AM
1.
00 1.
00 1.
00 1.
00 02/12/2019 7:00 AM
VT2525 83386 M
IT COLT 1,875.
0 1,875.
0 Workshop Workshop TWS 02/12/2019 10:00 AM
02/12/2019 5:00 PM
7.
00 7.
00 7.
00 7.
00 02/12/2019 10:00 AM
DIESEL 4X4
VT2525 83386 M
IT COLT 1,875.
0 1,875.
0 Workshop Workshop TWS 02/12/2019 10:00 AM
02/12/2019 5:00 PM
7.
00 7.
00 7.
00 7.
00 02/12/2019 2:00 PM
DIESEL 4X4
VT2526 83084 M
IT COLT 1,409.
0 1,409.
0 Workshop Workshop TWS 29/11/2019 8:00 PM
29/11/2019 9:00 PM
1.
00 1.
00 1.
00 1.
00 29/11/2019 8:00 PM
DIESEL 4X4
VT2526 83387 M
IT COLT 1,486.
0 1,486.
0 Workshop Workshop TWS 02/12/2019 2:00 PM
02/12/2019 3:00 PM
1.
00 1.
00 1.
00 1.
00 02/12/2019 2:00 PM
DIESEL 4X4
M
ANHAUL
TRUCK
M
ANHAUL
TRUCK
M
ANHAUL
TRUCK
M
P240E31W M
elawan
M
elawan
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 149 of 349
Plant DownTime Detail
Task End Time Total Period Total Period Status Work Reported Fault/Job Description of Repair Tradesma
Task Task Task Task Order No. Description n
Maint. Maint. Downtime Downtime
Duration Duration Duration Duration
(08+09) (08+09)
04/12/2019 7:00 PM
1634.
50 168.
00 1634.
50 168.
00 Open 5082836 Engine can't running In-progress at BPN ( waiting quote from vendor TBA )
04/12/2019 7:00 PM
96.
00 84.
00 96.
00 84.
00 Open Raw Length ERROR 02/12/2019 D12: M
anpower : Triyadi, Daniel30/11/2019 N12: M
an
power : Bayu, Nuryanto, 30/11/19 NS : Checked error occurred
while swing to right side, check error sensor raw length, check
wiring and sensor.
04/12/2019 7:00 PM
2028.
00 168.
00 2028.
00 168.
00 Open Transmission 1st gear Waiting Transmission ETA : 26 Nov 2019
abnormal, can't move
04/12/2019 10:20 AM
12.
00 8.
67 12.
00 8.
67 Open Inspection follow up : Track 03/12/2019 N12: M
anpower : Wil, Yosep, Kurniawan,M
unawir,
roller worn out 03/12/19 NS : Remove roller pos 1 and 2 rhs, install roller pos 1
and 2 rhs and torque cap roller, take out bolt roller cap due to
broken
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 150 of 349
04/12/2019 7:00 PM
3624.
92 168.
00 168.
00 168.
00 Open Unit tip over 01/08/2019 D12: 01/08/19 DS : Continue remove Cable At cabin
(support mechanic job remove cabin) ( Feri, Anjas )01/08/2019
D12: Disconnect all electric system in cabin, disconnect fire
supression system, clean up mud on tower frame (M
anpower :
Samsul ,saiful)01/08/2019 N12: Drain water radiator, remove hose
radiator, remove hose oil cooler, remove hose fuel cooler, remove
guard radiator, remove mounting radiator, remove radiator assy
(M
anpower : A.
Subur, Janta, Supriyanto)
02/08/2019 D12: Clean up mud on tower frame (M
anpower :
App)02/09/2019 N12: subhan ,saiful ,machinist
04/08/2019 D12: Clean up cabin, clean up radiator, fabricate stand
cabin and radiator, clean up tower (M
anpower : Elman,
Tri)06/07/2019 N12: M
an power : Herawan , Joko , Sigit , Andri ,
Hermansyah06/09/2019 D12: Risky, Abner07/07/2019 D12: Ashri,
Nursyamsu, Saiful
07/07/2019 N12: Remove tower pinning, remove hose rotation
motor, remove pin cylinder mast, remove bulk hose.
M
an power : Subur, robinson, Supriyanto, Bahrum,
Janta08/07/2019 D12: Remove tower mast, recovery unit tip over
(M
anpower : Elman, Tri, Bagus)08/07/2019 N12: unloading tower
frame from longbed,pluged lines hydrolic,top up oil hyd 100 ltrs,top
up oil compresore 80 ltrs,check oil engine level,test turn engine by
turning tool,repair cable of batteray,test engine to starter.
(M
an
power : Herianto, Eko, Luqman, Ferry, Aco)
09/07/2019 D12: Prepared the unit for sending to workshop.
(M
an
power : Elman, Tri,Bagus, Harmono)
12/11/2019 N12: M
anpower : welder crew, samsu, rizky,
luqman14/09/2019 D12: Yudi15/10/2019 D12: M
anpower :
Rizky,Riyadi16/07/2019 D12: Repair Crack at tower Support,
Repair Step Ladder CS,Repair Adapter M
otor rotation,Completed
line rotation motor ( Aco,Jefri,Fajar, Suban )
18/10/2019 D12: M
anpower : Janta, Robinson, Bahrum,
supriyanto19/08/2019 D12: M
anpower : samsul ,luqman ,maikel
sianipar ,khamid19/10/2019 D12: M
anpower : Janta, Robinson,
Bahrum, supriyanto20/08/2019 D12: M
anpower : nursyamsu,
khamid, M
aaikel20/10/2019 D12: M
anpower : Janta, Robinson,
Bahrum, supriyanto21/08/2019 D12: M
anpower : Samsul
,luqman21/08/2019 N12: Janta, Joko
21/10/2019 D12: M
anpower : Welder21/11/2019 N12: M
anpower :
Samsu ,andi m23/08/2019 D12: M
anpower : Elman,
Harmono23/08/2019 N12: M
anpower : samsul ,luqman23/11/2019
N12: manpower : Elman, Bagus, Supriadi24/08/2019 D12:
M
anpower : Elman, Harmono, Ari24/10/2019 N12: M
anpower :
Welder crew ,samsu ,rizky ,luqman25/08/2019 D12: Supriyanto,
yudi26/08/2019 D12: yudi, Supriyanto26/10/2019 D12:
M
anpower : Elman, Riski, Tri26/11/2019 D12: M
anpower :
Samsu ,rizky ,andi ,fitra27/08/2019 D12: Supriyanto,
janta27/10/2019 N12: Elman, Tri
29/11/2019 D12: :anpower : Yudi , M
ech : WIP Team31/07/2019
N12: Remove rotary table, clean up rotary table, remove Kelly bar,
remove deck drill, remove gearbox pull-down, remove feed motor,
remove sprocket upper tower, remove cluster gear, remove box
evaporator and washing ( Elman, Tri, Istamar, Dheri, Bagus, Eki ) ,
Remove battery, clean up oil spill
Recovery hyd oil and rotary table oil, disconnected hose rotation
motor, hose pulldown motor, hose grease, bulk hose
Repair Crack at tower Support, Repair Step Ladder CS,Repair
Adapter M
otor rotation,Completed line rotation motor
06/08/19 DS : Covering old core cabin, send tower frame to TWS
06/08/19 NS : clean up mud on tower frame
04/12/2019 7:00 PM
122.
67 110.
67 122.
67 110.
67 Open DCS track roller and idler worn 01/12/2019 D12: M
anpower : Elman, Henry, Pujiyono01/12/2019
out N12: M
anpower : Samsu ,luqman03/12/2019 N12: M
anpower :
Line boring crew, Elman ,Syarif29/11/2019 N12: M
anpower :
Samsu ,luqman30/11/2019 D12: M
anpower : Bagus, Elman, Tri,
Syarif30/11/2019 N12: M
anpower : Ferry, samsu, luqman
,novan ,supriyadi, 29/11/19 NS : washing unit, pick up unit to w/s
30/11/19 DS : Remove RH Track Rollers, Remove RH Track
Chain, Remove RH Track shoe
30/11/19 NS : Remove pin equalizer bar, remove RHs track frame,
remove RHs idler, fabricate track guide, disconnect LHs track link
01/12/19 DS : Remove Equalizer bar, remove track shoe, repair
threat for mounting bolt track roller
01/12/19 NS : Flashing oil compressor, repair equalizer bar, repair
tread hole bolts for track roller
02/12/19 DS : 'Tap thread mounting track roller
02/12/19 NS : Clean up unit, line boring equalizer bar, repaired
frame crack
03/12/19 DS : Replace idler, Rebuild and line boring equalizer bar
03/12/19 NS : Install bushing equalizer bar cs , line boring
equalizer bar, rebuild pin equalizer bar 1 ea
04/12/2019 7:00 PM
120.
00 108.
00 119.
57 108.
00 Open M
onitor controller missing 30/11/19 DS : Vandalism.
WOP panel monitor and complete the
harness
02/12/19 NS : Checked M
onitor panel stolen, running unit
03/12/19 NS : Checked M
onitor panel stolen, running unit
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 151 of 349
04/12/2019 7:00 PM
1002.
00 168.
00 1001.
57 168.
00 Open Display monitor, rotary lamp 26/11/2019 D12: M
anpower : Arif, Taufik28/11/2019 N12:
and lamp on the cab missing M
anpower : Huda, Aswan
, 26/11/19 DS : Installed monitor and wiring harness to monitor,
cleaned line air ducting from rubbish
27/11/19 DS : Install display and panel monitoring
28/11/19 NS : Check fuel system, check fuel condition check fuel
filter, found filter is clogging.
Replace fuel filter
29/11/19 NS : Continue install display and panel monitoring
04/12/2019 7:00 PM
139.
83 127.
83 139.
40 127.
83 Open 5149854 Track roller worn out (due has 01/12/2019 D12: M
anpower : Victor, Puji, welder : Eko02/12/2019
more than 50% of travelling N12: M
anpower : Elman, Tri Utomo, Syarif28/11/2019 N12:
activities) M
anpower : Sigit, joko, bahrum
30/11/2019 D12: M
anpower : Eki, Kaswadi, Istamar, 28/11/19 NS :
Check undercarriage, FOUND : All track worn out due has more
than 50% of travelling activities (standard travelling is 20%)
therefore pin and bushing track link worn out, sprocket worn out
30/11/19 DS : Welder remove bolt mounting track roller due to
broken, Clean Up Bucket
01/12/19 DS : Remove Broken bolts of track roller mounting and
repair threat of Rhs bolt mounting Track roller
01/12/19 NS : Line boring bucket
02/12/19 NS : Install engine hood, tab bolt adapter lock pin backet
holes, re-bushing main pin bucket
03/12/19 DS : Adjust shim bucket,
04/12/2019 7:00 PM
36.
00 24.
00 0.
00 0.
00 Open Engine blow by 03/12/2019 D12: M
anpower : Robinson, Bahrum
, 03/12/19 DS : measure engine blow by pressure : 8 Kpa, clean
up machine
04/12/2019 7:00 PM
59.
42 47.
42 59.
25 47.
42 Open TJ Rent : Cylinder boom 03/12/2019 D12: M
anpower : M
arkus, 03/12/19 DS : Repair boom
crack, Loc Pengapuran peri frame crack
03/12/819 NS : Continue repair boom crack, Install work lamp on
boom 1ea, painting after repair crack
04/12/2019 7:00 PM
118.
00 106.
00 117.
83 106.
00 Open TJ Rent : M
onitor panel 30/11/19 DS : Vandalism.
WOP panel monitor and complete the
missing harness.
Checked M
onitor panel stolen, replaced fuse for main
power supply, sent unit to workshop
04/12/2019 7:00 PM
23.
67 11.
67 23.
67 11.
67 Open Engine White smoke
04/12/2019 7:40 PM
30.
00 17.
33 24.
33 12.
33 Open 5153923 Backlog Repair Replace seal door
04/12/2019 7:40 PM
30.
00 17.
33 0.
00 0.
00 Open Backlog repair 03/12/2019 D12: M
anpower : Irwan, Khairun, Arapik
, 03/12/19 DS : Remove cutting edge
04/12/2019 7:40 PM
24.
67 12.
00 0.
00 0.
00 Open Backlog repair 03/12/2019 N12: M
anpower : Sukarno, fajar, Danang, Syariff,
03/12/19 DS : Remove spindle position 1 and 2, replace bearing
spindle 1 and 2, install spindle 1 and 2, pre load spindle 1 and 2,
fill oil spindle position 1
04/12/2019 7:00 PM
45.
67 33.
67 45.
67 33.
67 Open TC895 : System voltage low
04/12/2019 7:00 PM
132.
00 120.
00 132.
00 120.
00 Open TC900 : 4WD problem (Used
Loan Car TC970)
29/12/2019 7:00 PM
901.
00 168.
00 901.
00 168.
00 Open TC925 : 4 WD Problem (Used Replace Chain Transfer, Battery.
Create case,
Loan Car TC884) Pengajuan approval, Waiting approval, est Approval : 20/12/19
12/12/2019 7:00 PM
1308.
00 168.
00 1308.
00 168.
00 Open TC950 : 4 WD Problem (Used In-progress replace rear propeller shaft broken at M
itsubishi
Loan Car TC886) M
ahakam
26/11/19 DS : Waiting approval, est Approval : 08/12/19
04/12/2019 7:00 PM
122.
67 110.
67 122.
67 110.
67 Open 5174105 Starting motor fail
04/12/2019 7:00 PM
196.
50 168.
00 196.
50 168.
00 Open 5118312 Skid worn rogress Repair Skid
04/12/2019 7:00 PM
132.
00 120.
00 0.
00 0.
00 Open Housing lamp LE 600W fail
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 152 of 349
04/12/2019 7:00 PM
217.
00 168.
00 217.
00 168.
00 Open 5168134 Generator fail Prepare sent to BSF
04/12/2019 7:00 PM
36.
00 24.
00 36.
00 24.
00 Open Over run : Continue repair bulk
water pump
04/12/2019 7:00 PM
250.
00 168.
00 250.
00 168.
00 Open Fan cooling + radiator broken, 24/11/2019 D12: M
anpower : Santoso, Sofiansyah
Loc.
BE Pond , 24/11/19 DS : Check coolant leak : found radiator core leak due
to hit by cooling fan.
Radiator cooling fan broken caused by lizard
stay at radiator ramp.
And the pump operator running the pump by
remote, he did not saw if there were a lizard over there.
25/11/19 DS : check coolant leak : found radiator core leak and fan
radiator broken hit to Godzila/biawak
03/01/2020 1:00 PM
1440.
00 168.
00 726.
00 168.
00 Open 4987249 Schedule repair engine, 05/11/2019 D12: Huda, Aswan23/11/2019 D12: M
anpower :
planned 1440 Hrs Santoso, Sofiansyah
25/11/2019 D12: M
anpower : Herawan, Yadi
27/11/2019 N12: M
anpower : Santoso, Yadi
28/11/2019 N12: M
anpower : santoso, Yadi
, Remove wet end, remove engine GP, Wash engine
( Waiting Engine )
23/11/19 DS : Prepare pontoon for towing, move component and
part on pontoon to workshop
24/11/19 DS : Towing unit to RL 90
27/11/19 NS : Remove cover pontoon, remove hand rail
03/12/19 DS : Repair pontoon
04/12/2019 7:00 PM
60.
00 48.
00 60.
00 48.
00 Open Stuffing box leaks 02/12/2019 D12: KSB, Replace muffler and replace shaft sleeve,
replace Stuffing box gasket
04/12/2019 7:00 PM
34.
00 22.
00 34.
00 22.
00 Open 5176599 Bottom A-frame cracks 40CM
04/12/2019 7:00 PM
33.
67 21.
67 33.
67 21.
67 Open Over run : Engine completion 03/12/2019 N12: M
anpower : Jusriadi, Harnowo, Suhadi, Irwanto,
installation 03/12/19 DS : Installed hose cylinder hoist,test running and
leveling all oil
03/12/19 NS : Prepare and completed post major unit change
component, Install hose line air system at rear cabin and front of
unit, inspect all air hose and check for leaking, Pressurize coolant
system
04/12/2019 7:00 PM
33.
67 21.
67 0.
00 0.
00 Open Over run : Continue electrical 03/12/2019 D12: M
anpower : Imam03/12/2019 N12: M
anpower :
inspection Bambang S, Edi S, 03/12/19 DS : Replaced low pressure switch
A/C compressor, installed and reconnected solenoid grease pump,
installed seal rear cover cabin, tidied up wiring at rear cabin
03/12/19 NS : Final check electrical system, change out
electrical horn, Test AC for cooling cab, Checked battery
charging and condition
04/12/2019 7:00 PM
33.
67 21.
67 0.
00 0.
00 Open Over run : Continue backlog 03/12/19 DS : Replace parking brake release valve, replace air
repair ( Brake ) relay grease valve, replace air relay brake chamber and
air relay horn
04/12/2019 7:00 PM
33.
67 21.
67 0.
00 0.
00 Open Over run : Continue backlog Re-o ring tube transmission filter
repair ( Transmission )
04/12/2019 7:00 PM
33.
67 21.
67 0.
00 0.
00 Open Over run : Continue backlog Replace hose steering charging
repair
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 153 of 349
09/12/2019 2:15 PM
240.
00 112.
75 124.
75 112.
75 Open Schedule wheel hub pos 2 and 01/12/2019 D12: M
anpower : Arifin, Jusman, Abd Saad, Zuhri,
ride strut pos 4, Planned 240 Nova03/12/2019 N12: M
anpower : Arifin, Jusman, Zuhri,
Hrs Ashar29/11/2019 D12: M
anpower : 'Arifin, Jusman, Abd
Saad30/11/2019 D12: M
anpower : Arifin, Jusman, Abd Saad,
Zuhr30/11/2019 N12: M
anpower : Yuspa, Alex, Yuspa NI, 29/11/19
DS : Pre-entry inspection
30/11/19 DS : Removed pos 2, remove steering arm pos 2.
09/12/2019 2:15 PM
240.
00 112.
75 0.
00 0.
00 Open Electrical inspection 02/12/2019 D12: M
anpower : Ilyas03/12/2019 D12: M
anpower :
Ilyas and Ilyas03/12/2019 N12: manpower : Bambang S, Edi,
Suwito29/11/2019 D12: M
anpower : Bambang S, Oki S29/11/2019
N12: M
anpower : Joko30/11/2019 D12: M
anpower : Bambang,
Oki, 29/11/19 DS : Performed electrical Inspection, and checked
electrical defect due to pre-entry inspection
29/11/19 NS : Continue pre entry inspection, checked electrical
defect
30/11/19 DS : Checked fire supresion module, Checked and fixed
connector for fire supression module, Recompleted fuse cover
panel, Removed front cover cabin, Service AC evaporator,
Checked idle timer module, cleaned up module idle timer, fixed
connector for idle timer system, Removed lower starter motor, Test
starter motor, Removed and recharge battery
02/12/19 DS : Protected cable B+ starting motor with silicone
sleeve, checked electrical for idle timer function, clean up
connector
02/12/19 NS : Continued protect B+ cable to starter motor with
silicon sleeve, installed B+ cable from junction to starter motor and
completed P clamps along the lines, protected wiring after cooler
temp.
sensor, reconnected T/M
oil temperature sensor, manual
lowering dump body.
09/12/2019 2:15 PM
235.
25 108.
00 0.
00 0.
00 Open 4183289 Schedule RHS hydraulic hoist 29/11/2019 N12: M
an power : Yuspa, Alex, Eriyanto30/11/2019
cylinder replacement D12: M
anpower : Arifin, Jusman, Abd Saad, Zuhr30/11/2019 N12:
M
anpower : Yuspa, Alex, Yuspa NI, 29/11/19 NS : Washing
machine, set up machine to bay 8 and install front stand, remove
hoist cylinder RHs
30/11/19 DS : Prepare part for hoist cylinder R/H and install to unit,
Reconnect upper pin hoist, Completed hose line hydraulic cylinder
and grease line, Perform test for circle time
30/11/19 NS : Reseal hoist screen and complete lines
03/12/19 NS : Remove hoist cylinder hose 1ea.
09/12/2019 2:15 PM
223.
25 96.
00 0.
00 0.
00 Open Backlog repair 30/11/2019 D12: M
anpower : Burhan, Firmansyah, Gerson,
30/11/19 DS : Repair RH/LH rear frame dump body
02/12/19 NS : Lowering dump body manual
09/12/2019 2:15 PM
216.
75 89.
50 0.
00 0.
00 Open Backlog repair 30/11/2019 D12: M
anpower : Arifin, Jusman, Abd Saad, Zuhri,
30/11/19 DS : Reseal hose rear brake cooling RH
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 154 of 349
09/12/2019 2:15 PM
211.
25 84.
00 0.
00 0.
00 Open Backlog repair 01/12/2019 D12: M
anpower : Arifin, Jusman, Abd Saad, Zuhri,
Nova02/12/2019 D12: M
anpower : Ari,Herman, Fresky, Hamzah,
Hoiry30/11/2019 N12: M
anpower : Yuspa, Alex, Yuspa NI,
30/11/19 NS : Reseal diverter valve, lock up t/c
01/12/19 DS : Completed hose line hydraulic, Transmission and
TC and clean up pump drive box
02/12/19 DS : Re-o ring mounting transmission and hoist pump
02/12/19 NS : Continue re-completed hose line for pump PTO
pump group, Connect drive shaft PTO, re-completed cover drive
shaft PTO, Transmission,
09/12/2019 2:15 PM
211.
25 84.
00 0.
00 0.
00 Open Backlog repair 03/12/2019 N12: M
anpower : Arifin, Jusman, Zuhri30/11/2019
N12: M
anpower : Yuspa, Alex, Yuspa NI, 30/11/19 NS : Reoring
cover cylinder head pos 11
01/12/19 NS : Removed engine bottom guard, drained engine oil,
remove engine oil pan
02/19 DS : Cleaned up oil pan, clean up pump drive box, install
pump drive box,install engine oil pan
02/12/19 NS : Continue rertorque bolt mounting engine oil pan,
leveling engine oil
03/12/19 NS : Replace thermostat.
replace hoses coolant service.
09/12/2019 2:15 PM
211.
25 84.
00 0.
00 0.
00 Open Schedule body crack repairs 02/12/2019 D12: M
anpower : Yusuf, M
ongan30/11/2019 N12:
M
anpower : M
iki, Agus Sigit, Jhony, Timotius, 30/11/19 NS : Repair
Rh rear frame dump body tray rib crack.
Repair RH rear dump
body crack
01/12/19 NS : Repair RH inside frame hitch area crack with
following welding procedure
02/012/19 DS : Repair lh frame dump body crack
02/12/19 NS : Repair Rubber mounting bracket PTO shaft ; Repair
LH rear frame dump body
03/12/19 NS : M
odify bracket battery .
09/12/2019 2:15 PM
211.
25 84.
00 0.
00 0.
00 Open Schedule crack repairs 01/12/2019 D12: M
anpower : Burhan, Yusuf, Bangun,
Firmansyah02/12/2019 D12: M
anpower : Yusuf,
M
ongan30/11/2019 N12: M
anpower : M
iki, Agus Sigit, Jhony,
Timotius, 30/11/19 NS : Repair LH inside frame mounting dump
body crack.
Repair duck tail broken.
Repair RH bottom stiffener
axle crack.
Install cover fast fill
01/12/19 DS : Replace LH handrail walk way, Repair LH small
front walk way, Repair RH inside frame hitch area
02/12/19 DS : Repair rh inside frame hitch area crack
with following welding procedure
02/12/19 NS : , Install burst protection and connect to steering
HM
U after fabricated, Remove bushing rear suspension
04/12/2019 7:00 PM
33.
50 21.
50 33.
50 21.
50 Open Engine oil leaks 03/12/2019 D12: M
anpower : Triono, Yoel, Check and FOUND :
Suspect coolant mixed with engine oil
03/12/19 DS : Check engine oil leaks come out through reservoir
tank suspect water radiator mixed with coolant, sent to W,shop for
further check
04/12/2019 7:00 PM
15.
17 3.
17 15.
17 3.
17 Open Error Transmisi
04/12/2019 7:00 PM
47.
00 35.
00 47.
00 35.
00 Open 5138065 Center A frame crack 25 cm 03/12/19 DS : Weld / repair A frame crack
03/12/19 NS : Continue repair center a frame cracks
03/12/2019 2:40 PM
7.
42 7.
42 7.
42 7.
42 Open 5099190 Tyre position 4 leaks 03/12/2019 D12: Harum Balla, Tyre position 4 blow out due impact
from hazard material / rock ad tread area first.
Cause inner linner
broken / separation.
Comp life : 6479HRS.
Replace tyre position 4
04/12/2019 7:00 PM
14.
67 2.
67 2.
67 2.
67 Open Suspension pos 1 leak Check and FOUND : Rod suspension position 1 leaks
04/12/2019 7:00 PM
26.
08 14.
08 26.
08 14.
08 Open Over run : Continue backlog
repair
04/12/2019 7:00 PM
46.
08 34.
08 46.
08 34.
08 Open 5125936 LH mount rear pin suspension 02/12/2019 N12: M
anpower : Yan B, Junaidi, Fahrizal, 02/11/19
crack 17CM
and RH bottom NS : Remove suspension position 3 to repair cracks, repair LH
axle crack and leaks 13 cm rear lower suspension mount cracks, drain differential oil to repair
bottom axle cracks
03/12/19 DS : Cont.
repair axle housing crack
03/12/19 NS : Continue repair lower mounting suspension position
3 cracks
04/12/2019 7:00 PM
13.
17 1.
17 12.
73 1.
17 Open Hydraulic oil leaks
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 155 of 349
04/12/2019 10:50 AM
9.
00 5.
17 9.
00 5.
17 Open 5134205 PM
2000HRS Service 03/12/2019 N12: Nyoto, Irwan, Toha, Heri, Performed PM
06/12/2019 3:30 AM
60.
00 15.
50 27.
50 15.
50 Open 5062382 Schedule final drive POS 3 03/12/19 NS : Pre Entry Inspection, Washing unit
replacement, planned 60 Hrs
06/12/2019 3:30 AM
56.
50 12.
00 0.
00 0.
00 Open 4426501 Schedule Ride strut POS 3 03/12/2019 N12: M
anpower : Andre, Agus, Junius,
replacement SudarmanM
anpower , 03/12/19 NS : Jacking ball stud post 6+7,
Set up rear stand
06/12/2019 3:30 AM
56.
50 12.
00 0.
00 0.
00 Open 4167569 Schedule pump hoist and 03/12/2019 N12: M
anpower : Andre, Agus, Junius,
pump steering replacement Sudarman03/12/2019 N12: M
anpower : Firmansyah, 03/12/19
NS : Drain steering and hydraulic oil and welding inspection;
Remove bolts stud steering stuck
06/12/2019 3:30 AM
56.
50 12.
00 0.
00 0.
00 Open 4998544 Schedule pump drive box 03/12/2019 N12: M
anpower : Andre, Agus, Junius, Sudarman,
replacement 03/12/19 NS : Remove PTO Shaft+disconnect front main drive
shaft,
06/12/2019 3:30 AM
56.
50 12.
00 0.
00 0.
00 Open 4480896 Schedule torque converter 03/12/2019 N12: M
anpower : Andre, Agus, Junius, Sudarman,
replacement 03/12/19 NS : Disconnect T/C lines, Remove Torque Converter
06/12/2019 3:30 AM
56.
50 12.
00 0.
00 0.
00 Open Electrical inspection 03/12/19 NS : Performing Electrical pre entry inspection, Check
AC system and charging system, make defect list, retightened
push button emergency stop switch, removed front cover cabin,
cover evaporator and motor blower.
04/12/2019 7:00 PM
71.
08 59.
08 71.
08 59.
08 Open 5174936 A frame cap pin bolts broken 02/12/2019 D12: M
anpower : Arif, Rendi02/12/2019 N12:
(Comp life : 80%) M
anpower : Ahsan,Othniel,Rozi03/12/2019 D12: M
anpower : Arif,
Sappe,Rendi, Agus03/12/2019 N12: M
anpower :
Ahsan,Septadi,Sahruni04/12/2019 D12: M
anpower : Tabang,
Hamka, 02/12/19 DS : Reposition A frame, doubling mounting cap
A frame, prepare moving to work shop
02/12/19 NS : Disconnected main drive shaft, disconnected hose
lines hydraulic brake and transmission
03/12/19 DS : Install stand at centre cross tube, cont.
disconnect
hose and remove pin and A frame bearing
03/12/19 NS : Remove pin center a frame, pre service inspection,
replace tube rear LH brake cooling bent, replace hose
transmission fatigue, replace hose brake cooling fatigue
04/12/19 DS : Remove block mounting cap A frame
04/12/2019 7:00 PM
34.
75 22.
75 34.
58 22.
75 Open Engine oil leaks, Loc.
Rehab
M
arunda
04/12/2019 7:00 PM
225.
08 168.
00 24.
00 12.
00 Open Unit tip over 25/11/2019 D12: M
anpower : Juharman, sulistyo 25/11/2019 N12:
M
anpower : Aries, abdi26/11/2019 D12: manpower : Ikshan
26/11/2019 N12: M
anpower : Danu, lidin, aries, juharman,
sulistyo27/11/2019 D12: M
anpower : Suli, Ikhsan, Agus27/11/2019
N12: M
anpower : Juharman, sulistyo30/11/2019 D12: M
anpower :
Denny, ardiansyah, 25/11/19 DS : Prepare unit to be sent to TWS
25/11/19 NS : Checked unit incident, checked engine area, replace
engine oil filter 1 ea, cutting engine oil filter rating A,test engine
running, moving unit to Fuel Station M
elawan
26/11/19 DS : M
echanical inspection,checkced operation, checked
brake and s/t condition, sent and escort unit to TWS
26/11/19 NS : M
echanical inspection after accident
27/11/19 DS : Removed fifth wheel gp, clean up fifth wheel surface
and test NDT, removed transmission floor, removed front grill and
core heater
27/11/19 NS : Remove front bumper
28/11/19 DS : Disassembly bracket fifth wheel crack ( Repair fifth
wheel accident by TBM
)
30/11/19 DS : Fill up coolant radiator, test performance brake and
steering, connect hose air supply to VZ3145, test performance
brake and P/Brake
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 156 of 349
04/12/2019 7:00 PM
24.
00 12.
00 24.
00 12.
00 Open Parking brake indicator ON
04/12/2019 7:00 PM
47.
00 35.
00 47.
00 35.
00 Open Alternator noise 02/12/2019 N12: M
anpower : Aries 02/12/2019 N12: M
anpower :
Yosef, Edi sutarta, 02/12/19 NS : Checked engine noise,check
turbo condition, check V belt remove V-Belt, test engine running
check engine noise, alternator noise removed it
03/12/19 DS : Performed electrical inspection, checked lighting,
service battery and A/C evaporator, test load battery, checked and
dissemble alternator found bearing failure
04/12/2019 7:00 PM
372.
00 168.
00 372.
00 168.
00 Open Rear bevel gear fail WOP REAR bevel gear
04/12/2019 7:00 PM
213.
00 168.
00 0.
00 0.
00 Open Propeller shaft worn 25/11/2019 N12: M
anpower : Abdi, denny, ardi, 25/11/19 NS :
Remove propeller shaft, remove drum parking brake, checked
condition, lining parking brake worn out
04/12/2019 7:00 PM
49.
58 37.
58 49.
58 37.
58 Open PTO for service module failure 02/12/2019 N12: M
anpower : Aries, Ardiansyah 03/12/2019 D12:
M
anpower : Juharman,sulistyo, 02/12/19 NS : washing area hose
real, repair air hose and fitting hose real, re-position hose real, test
motor hose real stuck
03/12/19 DS : Remove air motor hose reel 3 ea stuck, check
condition motor hose rail 3 ea stuck, repair exhaust pipe
muffler,replace front diff seal shaft, replace fitting air dryer
03/12/19 NS : Replace side glass hydraulic oil level, washing
pump oil SAE 85.
04/12/2019 7:00 PM
30.
00 18.
00 0.
00 0.
00 Open Electrical inspection 03/12/2019 D12: M
anpower : Dimas, Januar, Oki, Performed
electrical inspection, checked lighting, service battery and AC
evaporator, checked air compressor can't start, checked wiring
harness and power for control panel air compressor, fixed
connection for panel dashboard, checked battery and charging
system
04/12/2019 7:00 PM
192.
00 168.
00 192.
00 168.
00 Open Unit tip over Progress repair body crack
04/12/2019 7:00 PM
2818.
00 168.
00 2818.
00 168.
00 Open 5031181 Engine particle often shutdown n-progress at BPN
16/12/2019 7:00 PM
3204.
00 168.
00 3204.
00 168.
00 Open 5000694 Fan blade broken and block ( Waiting rectifier block ETA : 16/12/2019 )
rectifier fail
04/12/2019 7:00 PM
32.
17 20.
17 32.
17 20.
17 Open Engine can't start
30/01/2020 7:00 PM
3180.
00 168.
00 3180.
00 168.
00 Open 4921995 Welding system generator fail n-Progress at BPN
04/12/2019 7:00 PM
540.
00 168.
00 540.
00 168.
00 Open 5103693 Welding system generator fail In-progres at BPN ( testing at BSF workshop )
11/12/2019 7:00 PM
708.
00 168.
00 708.
00 168.
00 Open 5097626 Crank shaft seal leaks n progress at BPN
11/12/2019 7:00 PM
732.
00 168.
00 732.
00 168.
00 Open 5142418 Travo 24 volt control failure WOP Trafo control 24 volt, ETA 11-12-2019 )
16/12/2019 7:00 PM
852.
00 168.
00 852.
00 168.
00 Open 5143397 Switch module polarity broken OP Switch mode polarity ETA : 11-12-2019
03/12/2019 5:00 AM
3.
00 3.
00 3.
00 3.
00 Complete Engine can't start Checked air compressor can't start,repaired wiring B+ to key
d switch,test jump start battery
28/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5144354 PM
2000HRS Service, 28/11/2019 D12: M
anpower : Taufan, Jhondi, Heri, Performed PM
29/11/2019 7:15 AM
96.
25 48.
25 0.
00 0.
00 Complete Electrical inspection 25/11/2019 D12: M
anpower : Satrio, Sofyan, 25/11/19 DS : Check
d coolant temperature sender, make new adapter coolant temp
sender shaky.
29/11/2019 3:00 AM
6.
00 6.
00 6.
00 6.
00 Complete 5118609 PM
250HRS service, planned 28/11/2019 N12: M
anpower : Heri, Pairul, Performed PM
250HRS
d 6 hrs service
01/12/2019 9:40 PM
2.
67 2.
67 2.
67 2.
67 Complete Indicator battery flash ON 01/12/2019 N12: M
anpower Ignatius,Budi
d , Check indicator battery ON, check charging 12,2volt, adjust belt
alternator loose, test running and check charging 13,6volt
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 157 of 349
03/12/2019 8:10 AM
60.
67 60.
67 60.
67 60.
67 Complete Water coolant leaks 03/12/2019 D12: Feri, Repair hose radiator
d
03/12/2019 8:10 AM
22.
17 22.
17 0.
00 0.
00 Complete Engine can't start Trouble shoot check engine can’t start, battery voltage 12.
3 volt,
d inspect cable start from ignition switch to terminal S starter motor,
Power supply drop until 8 volt in terminal s starter motor.
Install
new relay starting motor, and repair cable horn at witch.
Performance test
28/11/2019 1:50 AM
5.
00 5.
00 5.
00 5.
00 Complete 5140899 PM
500HRS service (Duration 27/11/2019 N12: M
anpower : Pairul,Yadi, Performed PM
500HRS
d 5 hrs) and backlog repair, service
planned 12 hrs
28/11/2019 8:50 AM
7.
00 7.
00 7.
00 7.
00 Complete Electrical inspection 27/11/19 NS : Electrical inspection, battery maintenance, remove
d cover evaporator, repaired front and LH washer wiper, support
mechanic removed radiator, disconnect hose ac condensor,
disconnect wiring travel alarm, disconnect wiring cylinder lamp,
disconnect harness electric horn, remove travel alarm
28/11/2019 8:50 AM
7.
00 7.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 N12: M
anpower : Bambang, Indra, Aris, Hendrik,
d Wahyu, 27/11/19 NS : Remove engine hood, Remove Radiator for
rebushing pin
28/11/2019 8:50 AM
7.
00 7.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 N12: M
anpower : Bambang, Indra, Aris, Hendrik,
d Wahyu, 27/11/19 NS : Disconnect Lift blade cylinder
28/11/2019 8:50 AM
7.
00 7.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 N12: M
anpower : Bambang, Indra, Aris, Hendrik,
d Wahyu, 27/11/19 NS : Remove TC outlet valve, Remove hose TC
inlet
28/11/19 DS : Reseal TC outlet valve
29/11/2019 5:15 PM
32.
42 32.
42 32.
42 32.
42 Complete Over run : pin mounting 28/11/2019 D12: M
anpower : Amiruddin, Fahmil, Saharuddin,
d radiator bush worn out Rocky, Yonatan29/11/2019 D12: M
anpower : Syarif, Will, Yosep,
Sabbaruddin, ismail, 28/11/19 DS : Remove radiator gp,
Rebushing radiator cone and frame, Repair radiator cone due to
crack
29/11/19 DS : Install frame radiator, install engine hood RH-LH,
install exhaust muffler, install belly guard, fill up coolant pressurize
radiator
29/11/2019 5:15 PM
32.
42 32.
42 0.
00 0.
00 Complete Over run : TC hose leaks 28/11/2019 D12: M
anpower : Amiruddin, Fahmil, Saharuddin,
d Rocky, Yonatan, 28/11/19 DS : Replace TC hose, Replace
transmission filter hose
29/11/2019 5:15 PM
32.
42 32.
42 0.
00 0.
00 Complete Over run : Ripper cylinder 28/11/2019 D12: M
anpower : Amiruddin, Fahmil, Saharuddin,
d hose leaks Rocky, Yonatan, 28/11/19 DS : Replace ripper cylinder hose
29/11/2019 5:15 PM
32.
42 32.
42 0.
00 0.
00 Complete Over run : Tip ripper worn out 28/11/2019 D12: M
anpower : Amiruddin, Fahmil, Saharuddin,
d Rocky, Yonatan, 28/11/19 DS : Replace tip ripper
29/11/2019 5:15 PM
10.
25 10.
25 0.
00 0.
00 Complete Over run : track roller No 7 LH 29/11/2019 D12: M
anpower : Syarif, Will, Yosep, Sabbaruddin,
d worn ismail, 29/11/19 DS : Replace track roller No 7 LH, adjust track
30/11/2019 10:30 AM
8.
08 8.
08 8.
08 8.
08 Complete Hydraulic oil leak 30/11/2019 D12: imam, joko, replace hose lift cylinder ripper, fill up
d hyd oil 55 litrs
30/11/2019 10:15 PM
2.
25 2.
25 2.
25 2.
25 Complete Operator seat failure 30/11/2019 N12: Hasrul, Arafah, Repair lock nut operator seat
d adjuster, repair operator seat belt mounting
30/11/2019 9:15 AM
13.
58 13.
58 13.
58 13.
58 Complete 2x Front work lamp and 1x RH 30/11/2019 D12: ongky, amin, Installed + completed work lamp 3
d rear lamp missing ea
01/12/2019 12:20 AM
0.
33 0.
33 0.
33 0.
33 Complete Transmission SOS follow up 30/11/2019 N12: Hasrul, Arafah, Performed Transmission SOS
d follow up
03/12/2019 9:10 PM
0.
83 0.
83 0.
83 0.
83 Complete Lights 03/12/2019 N12: amin, halman, Tightenning RHs front lamp bolt
d mounting
30/11/2019 8:40 PM
25.
00 25.
00 25.
00 25.
00 Complete 2x Front and rear work lamp 30/11/2019 N12: Alfan, Installed and completed worklamp and
d missing bracket
01/12/2019 12:40 AM
4.
00 4.
00 4.
00 4.
00 Complete 5120058 PM
250HRS service, Planned 30/11/2019 N12: Yunus, Hasrul, Alfan, Performed PM
250 hrs
d 4 hrs service
02/12/2019 9:10 PM
1.
00 1.
00 1.
00 1.
00 Complete Wiper not function 02/12/2019 N12: amin, halman, Temporary repair rear wiper,
d operated until replacement part ready
28/11/2019 1:50 PM
0.
50 0.
50 0.
50 0.
50 Complete Engine can't running 28/11/2019 D12: Daniel M
anda', ROOT CAUSE : Incorrect
d Reported Fault.
Checked and tested, NO problem was FOUND
28/11/2019 11:55 PM
2.
75 2.
75 2.
75 2.
75 Complete 5122085 PM
250HRS service, planned Performed PM
250HRS service
d 4 hrs
28/11/2019 3:25 PM
2.
00 2.
00 2.
00 2.
00 Complete 5144627 PM
250HRS service, Planned 28/11/2019 D12: Yunus, Ennos, Alfan, Performed PM
250HRS
d 4 hrs Service
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 158 of 349
02/12/2019 4:10 PM
5.
00 5.
00 5.
00 5.
00 Complete 5148204 PM
500HRS Service (Duration Performed PM
500HRS service
d 5 Hrs) and Backlog Repair,
Planned 23 Hrs
03/12/2019 10:10 AM
21.
17 21.
17 18.
00 18.
00 Complete Backlog repair 02/12/19 DS : M
ovement check, Remove belly guard and install
d stand for replace minor bogie
03/12/19 DS : Remove minor bogie pos #2 LH, Install new minor
bogie pos #2 LH
03/12/2019 10:10 AM
21.
17 21.
17 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Aris, M
argianto
d , 02/12/19 DS : Replace seal crank shaft, drain fuel, Remove fire
suppression tank for remove fuel tank
02/12/19 NS : replace front crank shaft seal, install engine
damper and pulley, drain fuel disconnect fuel lines, remove fuel
tank, replace fuel tank rubber, mounting install fuel tank, connect
fuel lines and fill fuel, install fire suppression tank
03/12/2019 10:10 AM
21.
17 21.
17 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Leo, 02/12/19 DS : Replace door
d striker
03/12/2019 10:10 AM
21.
17 21.
17 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Hendrik, Sabaruddin
d , 02/12/19 DS : Reseal lower cover ripper C/V
03/12/2019 10:10 AM
19.
17 19.
17 0.
00 0.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Aziz, Irham, Rofiq, 02/12/19 DS :
d Performed electrical inspection, maintenance battery, check
charging and lighting system, clean up A/C filter, install guard A/C
filter inner
03/12/2019 10:10 AM
15.
17 15.
17 0.
00 0.
00 Complete Backlog repair 02/12/19 NS : Remove bogie minor lhs position 2 inner outer,
d install new minor bogie
03/12/2019 5:40 PM
7.
50 7.
50 7.
50 7.
50 Complete Over run : minor bogie pos #2 03/12/2019 D12: M
anpower : Bambang, Aris, Hendrik, Abidin,
d LH broken rocky, M
utazzam
03/12/2019 5:40 PM
7.
50 7.
50 0.
00 0.
00 Complete Over run : Continue backlog 03/12/2019 D12: M
anpower : Bambang, Aris, Hendrik, Abidin,
d repair rocky, M
utazzam, 03/12/19 DS : Running test and inspect leak,
Washing radiator core
29/11/2019 1:45 PM
24.
00 24.
00 24.
00 24.
00 Complete Backlog repair 28/11/2019 D12: M
anpower :Yonathan, Rocky, M
argondo,
d Raditya28/11/2019 N12: Sunarno, Simon, 28/11/19 DS : Washing
machine, movement check, remove belly guard, mechanical
inspection
29/11/2019 1:45 PM
18.
75 18.
75 0.
00 0.
00 Complete Electrical inspection 28/11/2019 N12: M
an power : Sudirman, Wahyudi, 28/11/19 NS :
d Replace V-belt alternator, tidy up LH cylinder lamp, repair cover
evaporator, replace filter ac inner & outer, replace p/s
transmission, check lighting system
29/11/2019 3:30 AM
7.
00 7.
00 0.
00 0.
00 Complete 5140425 PM
1000HRS service 28/11/2019 N12: M
an power : Simon, Sunarno, Performed PM
30/11/2019 4:30 PM
26.
75 26.
75 26.
75 26.
75 Complete Over run : Continue Backlog 29/11/2019 D12: M
anpower : Sapto, M
unawir, Rocky, 29/11/19 DS
d repair : install seal equalizer bar, install bolt mounting seal pibot shaft
RH-LH, install pin equalizer bar and torque bolt, remove all
cylinder bar, remove ripper shank GP, remove main frame ripper
GP
30/11/2019 4:30 PM
21.
50 21.
50 0.
00 0.
00 Complete Over run : Continue backlog 29/11/2019 N12: M
anpower : Amirudin, Radi ,Pahmil,
d repair Yonathan30/11/2019 D12: M
anpower : Yosef, Syarif, Roby, Sapto,
Ismail, 29/11/19 NS : Rebushing ripper box, replace bushing ripper
main frame, Assembly ripper frame, Installed ripper frame
30/11/19 DS : Install rear transmission guard, Install belly guard,
Install all ripper hose, M
anual greasing all ripper hose, Install
shank ripper
30/11/2019 4:30 PM
12.
50 12.
50 0.
00 0.
00 Complete Over run : Continue Electrical 29/11/2019 N12: M
anpower : Hendra, Lailul, 29/11/19 NS : Install
d inspection loto box and tidy up wiring lotobox
30/11/2019 4:30 PM
9.
50 9.
50 0.
00 0.
00 Complete Over run : Continue backlog 30/11/2019 D12: M
anpower : Yosef, Syarif, Roky, Sapto, Ismail,
d repair 30/11/19 DS : Replace gasket of air cleaner housing and torque
bolts, Completed RHs enclosure, Washing radiator and engine
area
29/11/2019 10:55 AM
0.
75 0.
75 0.
75 0.
75 Complete 5140870 PM
250HRS Service, Planned 29/11/2019 D12: M
anpower : Eko, Angga, Performed PM
250HRS
d 4 hrs Service
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 159 of 349
29/11/2019 2:10 PM
3.
25 3.
25 3.
25 3.
25 Complete M
echanical inspection 29/11/2019 D12: kurniwan, Performed M
echanical inspection
d
29/11/2019 3:00 PM
0.
83 0.
83 0.
83 0.
83 Complete Over run : Continue 29/11/2019 D12: imam, joko, Continue M
echanical inspection
d M
echanical inspection
28/11/2019 3:55 AM
41.
25 20.
92 41.
25 20.
92 Complete A/C 26/11/2019 D12: M
anpower : Anjas, Novan, Ari
d 26/11/2019 N12: M
anpower : Ilyas, Fajrin, Rohmad27/11/2019
N12: M
anpower : Ilyas, Sofyan, Dirman, 26/11/19 DS : Checked
AC hot, checked belt alternator and AC compressor not available,
checked AC compressor failure mounting broken, release AC
pressure, removed RH side cover engine, removed AC
compressor.
03/12/2019 11:05 PM
13.
08 13.
08 13.
08 13.
08 Complete Blade stabilizer crack 03/12/19 DS : Install LH trunion blade stopper
d 03/12/19 NS : Repair blade support due to crack
28/11/2019 10:00 PM
6.
58 6.
58 6.
58 6.
58 Complete TJ Rent : Blade hose leaks 28/11/2019 N12: TJ rent, Retighten hose tilt blade and top up oil
d hydraulic 10 ltrs
29/11/2019 10:55 AM
1.
00 1.
00 1.
00 1.
00 Complete TJ Rent : Transmission oil Replace transmission oil
d replacement
30/11/2019 11:45 AM
0.
33 0.
33 0.
33 0.
33 Complete TJ Rent : Hydraulic oil leaks Reoring hose tilt blade
d
03/12/2019 2:35 AM
6.
50 6.
50 6.
50 6.
50 Complete TJ Rent : Engine low power adjust alternator belt, clean up screen fuel tank, add transmission
d oil 20 litrs
27/11/2019 3:25 PM
20.
17 8.
42 20.
17 8.
42 Complete Track roller loose 26/11/2019 N12: M
anpower : Aris, Indra, Hendrik27/11/2019 D12:
d M
anpower : Wiryo, Amiruddin, Pahmil, 26/11/19 NS : Send unit to
W/s, Cleanup undercarriage
27/11/19 DS : Replace RHs track roller POS 2, 3, 4, 5, and LHs
track roller POS 3, 4
27/11/2019 3:25 PM
4.
42 4.
42 0.
00 0.
00 Complete LHs end bit bolts broken 27/11/2019 D12: M
anpower : Wiryo, Amiruddin, Pahmil, Replace
d LHs end bit bolts
30/11/2019 3:00 PM
11.
75 11.
75 11.
75 11.
75 Complete Hydraulic oil leaks 30/11/2019 D12: jaya, danang, Replace RHs hose lift cylinder
d ripper, fill up hyd oil 60 litrs
29/11/2019 3:20 PM
16.
67 16.
67 16.
67 16.
67 Complete TC Rent : Transmission hard 29/11/2019 D12: tunas jaya, Replace bearing, adjust cable linkage
d to upshift transmission, add hyd oil 10 litrs
03/12/2019 3:25 PM
5.
17 5.
17 5.
17 5.
17 Complete 5083819 TJ Rent : PM
1000HRS 03/12/2019 D12: TJ Rent, Performed PM
1000HRS service
d service (Duration 7 hrs) and
Backlog repair, planned 12 hrs
27/11/2019 3:40 PM
2.
42 2.
42 2.
42 2.
42 Complete 5140892 PM
250HRS service, Planned 27/11/2019 D12: Yunus sampe, Hasrul, Alfan, Performed PM
250
d 4 hrs hrs service
30/11/2019 4:00 PM
5.
08 5.
08 5.
08 5.
08 Complete A/C 30/11/2019 D12: amin, ongky, Replaced V belt AC compressor
d and give spacer for bracket AC compressor
03/12/2019 1:00 AM
13.
58 13.
58 13.
58 13.
58 Complete A/C 02/12/2019 D12: M
anpower : Kaharudin, yaniwan02/12/2019 N12:
d M
anpower : budi, rendra, 02/12/19 DS : Check AC warm, v-belt
AC compressor broken, inspect pulley AC compressor and pulley
engine not alignment.
Continue
02/12/19 NS : V belt AC compressor worn out, it causes by pulley
AC compressor misalignment.
Alignment bracket AC compressor
and give spacer for mounting adjuster AC compressor
01/12/2019 9:25 AM
1.
58 1.
58 1.
58 1.
58 Complete LTR Steering Error 01/12/2019 D12: budi, rendra, Adjust LHs steering lever, perform
d test
03/12/2019 4:20 PM
3.
33 3.
33 3.
33 3.
33 Complete 5152008 PM
250HRS service, planned 03/12/2019 D12: Jemmy K, Performed PM
250HRS service
d 4 hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 160 of 349
02/12/2019 11:20 PM
0.
75 0.
75 0.
75 0.
75 Complete 5142391 PM
1000HRS Service, 02/12/2019 N12: eko, angga, Performed PM
1000HRS Service
d Planned 1 hrs (Engine only)
29/11/2019 9:50 PM
13.
58 13.
58 13.
58 13.
58 Complete LHs Idler Problem 29/11/2019 D12: M
anpower : Fajar, M
argianto29/11/2019 N12:
d M
anpower : Tonyes, Raitya, Sulaiman, Disconnected track
position 1, remove idler position 2
29/11/19 NS : Install/Replace Idler pos 3, Connected LHs track link
27/11/2019 11:25 PM
2.
58 2.
58 2.
58 2.
58 Complete Cabin door problem 27/11/2019 N12: M
Zaini,Anggi, Repair lock door and striker for
d operator seat
30/11/2019 1:00 AM
1.
00 1.
00 1.
00 1.
00 Complete 5143301 PM
500HRS Service (Duration 29/11/2019 N12: Yunus sampe, Performed PM
500HRS service
d 5 Hrs) and Backlog Repair, (Change engine oil and engine oil filter)
Planned 18 Hrs
01/12/2019 3:00 PM
5.
00 5.
00 5.
00 5.
00 Complete 5143301 PM
500HRS Service (Duration 01/12/2019 D12: M
anpower : Fathur, Fajar, Danu, Abdi, Performed
d 5 Hrs) and Backlog Repair, PM
500HRS Service
Planned 18 Hrs
02/12/2019 3:30 AM
16.
50 16.
50 12.
50 12.
50 Complete Electrical inspection 01/12/2019 D12: M
anpower : Petrus, M
arsianto, Rofiq01/12/2019
d N12: M
anpower : Andri, Imam, 01/12/19 DS : Electrical inspection,
maintenance battery, repaired wiring motor blower speed 1, wash
evaporator, replace front wiper blade repaired connector rear
camera, check charging system, replace A/C filter inner
01/12/19 NS : Performed electrical inspection continue, replaced
rear wiper blade, replaced front cylinder led lamp 1ea, replaced
bulb front work lamp and ripper lamp, adjusted belt alternator.
02/12/2019 3:30 AM
12.
50 12.
50 0.
00 0.
00 Complete 5110874 Backlog repair 01/12/2019 D12: M
anpower : Sapto, Fajar, M
unawir,
d Rocky01/12/2019 N12: M
anpower : Amiruddin, sulaiman, wiryo,
01/12/19 DS : movement check.
mechanical inspection.
remove
belly guards.
drain fuel.
replace fuel shut off and breather.
remove
hose fatique
01/12/19 NS : Replace coolant hose for murphey gauge, Replace
breather and shut off valve for fuel tank, Refill fuel tank
02/12/2019 3:30 AM
4.
75 4.
75 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Amiruddin, sulaiman, wiryo, 01/12/19
d NS : Recondition operator seat spring mechanism
03/12/2019 9:50 PM
0.
67 0.
67 0.
67 0.
67 Complete A/C 03/12/2019 N12: amin, halman, Check AC motor blower speed 1
d and 2 short to ground.
Temporary disconnection speed 1 and 2.
28/11/2019 4:20 PM
7.
33 7.
33 0.
00 0.
00 Complete TJ Rent : Transmission oil Re o-ring cover element transmission
d leaks
28/11/2019 4:20 PM
7.
33 7.
33 0.
00 0.
00 Complete TJ Rent : AC lean up blower AC noise.
Replace AC relay
d
30/11/2019 11:00 AM
0.
92 0.
92 0.
92 0.
92 Complete TJ Rent : Hydraulic oil leaks 30/11/2019 D12: tunas jaya, Reoring hose tilt blade
d
01/12/2019 10:40 AM
1.
33 1.
33 1.
33 1.
33 Complete 5127068 TJ Rent : PM
250HRS 01/12/2019 D12: tunas jaya, Performed PM
250HRS Service
d Service, Planned 6 Hrs
02/12/2019 9:40 AM
1.
92 1.
92 1.
92 1.
92 Complete TJ Rent : Hydraulic oil low 02/12/2019 D12: TJ Rent, Check oil leaks and top up oil hydraulic
d level 10 ltrs
28/11/2019 9:30 PM
1.
17 1.
17 1.
17 1.
17 Complete Lights 28/11/2019 N12: TJ Rent, Replace and retighten work lamp 2 ea
d
27/11/2019 10:55 AM
1.
25 1.
25 1.
25 1.
25 Complete 5071081 PM
2000HRS service, 27/11/2019 D12: Tunas Jaya, Performed PM
2000 hrs service
d Planned 12 hrs
30/11/2019 4:30 PM
0.
50 0.
50 0.
50 0.
50 Complete Fuel low level 30/11/2019 D12: imam, top up fuel, bleeding fuel system
d
30/11/2019 11:00 AM
5.
00 5.
00 5.
00 5.
00 Complete 5137536 PM
1000HRS Service 30/11/2019 D12: M
an power : Fathur, Abraham, Performed PM
01/12/2019 3:50 AM
21.
83 21.
83 16.
83 16.
83 Complete Backlog Repair 30/11/2019 D12: M
anpower : Kurniawan, Will, Sukarno, Fajar,
d 30/11/19 DS : Remove belly guard, Performed engine valve tune
01/12/2019 3:50 AM
14.
50 14.
50 0.
00 0.
00 Complete Backlog repair 30/11/19 DS : Re-oring tilt blade hose
d
01/12/2019 3:50 AM
14.
50 14.
50 0.
00 0.
00 Complete Backlog repair 30/11/19 DS : Replace tip ripper 3 ea
d
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 161 of 349
01/12/2019 3:50 AM
8.
83 8.
83 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Amiruddin, Sulaiman, Wiryo, Tonyes,
d 30/11/19 NS : Replace sprocket both side, washing machine
installed belly guards, completed engine enclosure
01/12/2019 3:50 AM
4.
92 4.
92 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Amiruddin, Sulaiman, Wiryo,
d Tonyes , 30/11/19 NS : Replace hose outlet, Replace hose grease
and repaired fitting grease
03/12/2019 11:30 PM
0.
67 0.
67 0.
67 0.
67 Complete Indicator engine warning flash 03/12/2019 N12: imam, joko, Clean up air cleaner
d ON
27/11/2019 11:00 AM
12.
00 4.
00 12.
00 4.
00 Complete Backlog repair 26/11/2019 N12: M
anpower : Leo, Khairip, Kudrot, Irwan, 26/11/19
d NS : Remove Belly guard, Replace end bit and turn over cutting
edge
27/11/2019 11:00 AM
12.
00 4.
00 0.
00 0.
00 Complete Backlog repair 26/11/2019 N12: M
anpower : Leo, Khairip, Kudrot,
d Irwan27/11/2019 D12: M
anpower : Yonatan, Ismail, 26/11/19 NS :
Replace breather damper engine due to broken
27/11/19 DS : Reseal fuel reciever, Washing machine, Install belly
guard
27/11/2019 11:00 AM
8.
00 4.
00 0.
00 0.
00 Complete 5125026 PM
2000HRS service 27/11/2019 D12: M
anpower : Herman, Untung,
d (Duration 9 hrs) and Backlog M
argareta27/11/2019 D12: M
anpower : Pairul, Heri, Performed
repair, planned 12 hrs PM
2000HRS service
27/11/2019 11:00 AM
4.
00 4.
00 0.
00 0.
00 Complete Electrical inspection 27/11/2019 D12: M
anpower : hendra,imam, 27/11/19 DS :
d Electrical inspection,adjust belt AC compressor,maintenance
battery,CO rh blade wiper,top up washer tank,check LH motor
wiper off,check radio
comm&FM
,replaced bulb work lamp 4ea
03/12/2019 8:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Hydraulic oil leaks 03/12/2019 N12: imam, joko, Oil leakage at relief control valve
d implement, check oil level, perform test, OK
01/12/2019 6:55 PM
9.
75 9.
75 9.
75 9.
75 Complete A/C Warm Repair AC system
d
02/12/2019 12:00 AM
5.
00 5.
00 5.
00 5.
00 Complete 5123188 PM
500HRS service (Duration 01/12/2019 N12: M
anpower : Herman, Agus, Performed PM
02/12/2019 2:30 AM
6.
75 6.
75 2.
50 2.
50 Complete AC service 01/12/2019 N12: M
anpower : Eko,Hendra,lailul, 01/12/19 NS :
d Performed electrical inspection, maintenance battery,adjusted belt
AC compressor, replaced AC
hose from condensor to dryer, tested leakage by pressure nitrogen
250 Psi,tested vacuum and
injected refrigerant 1 kg,tested AC performance,LP 15 psi,Hp 180
psi ducting temperature 6* C.
02/12/2019 4:00 AM
4.
00 4.
00 1.
50 1.
50 Complete M
echanical inspection 01/12/2019 N12: M
anpower :Anton, Yonathan, Tonyes, Performed
d mechanical inspection
01/12/2019 6:00 AM
4.
58 4.
58 4.
58 4.
58 Complete 5140895 PM
500HRS Service (Duration 30/11/2019 N12: M
anpower : Hisbul, Agus, Herman, Performed
d 6 hrs) and backlog repair, PM
500HRS service
Planned 8 hrs
01/12/2019 8:30 AM
4.
92 4.
92 2.
50 2.
50 Complete Backlog repair 01/12/2019 D12: M
anpower : Sapto, Fajar, M
unawir30/11/2019
d N12: M
anpower : Anton, 30/11/19 NS : Replace ladder left side
01/12/19 DS : Replace LHs step ladder and replace bogie whip
01/12/2019 8:30 AM
1.
50 1.
50 0.
00 0.
00 Complete Electrical inspection 01/12/2019 D12: M
anpower : Petrus, M
arsianto, Rofiq, Electrical
d Inspection, washing evaporator, Replace A/C filter inner and outer,
check grease pump, Final check
01/12/2019 2:50 PM
1.
83 1.
83 1.
83 1.
83 Complete Indicator air cleaner flash ON 01/12/2019 D12: fajar, hendy
d , clean up air cleaner and housing
30/11/2019 11:05 AM
68.
50 68.
50 68.
50 68.
50 Complete M
ining request for install LED 28/11/2019 D12: M
anpower : Samsu, luqman, andi, sarif,
d trial for tower lamp, Planned subhan28/11/2019 N12: M
anpower : markus, 28/11/19 DS : Install
72 hrs bracket LED lamp
28/11/19 NS : Install bracket tower lamp
29/11/19 DS : Continue Install Wiring and LED Lamp
29/11/19 NS : Trial install LED lamp on tower frame
30/11/2019 11:05 AM
68.
50 68.
50 0.
00 0.
00 Complete Schedule rotate kelly bar 27/11/2019 D12: M
anpower : Samsu, luqman, andi
d ,fitra27/11/2019 N12: M
anpower : Robinson, Janta, supriyanto
28/11/2019 N12: M
anpower : Robinson, Janta, supriyanto
29/11/2019 N12: M
anpower : Ferry, samsu, luqman, novan,
27/11/19 DS : Set up unit for remove top sub, remove top sub, test
pressure triple pump p1 and p2
27/11/19 NS : Remove bottom sub, rotate kelly bar
29/11/19 NS : Top up oil rotary table
30/11/2019 11:05 AM
52.
08 52.
08 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Samsu, luqman, andi, sarif,
d subhan28/11/2019 N12: M
anpower : Robinson, Janta, supriyanto
, 28/11/19 DS : Block top sub, install bottom sub
28/11/19 NS : install drive shaft guard
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 162 of 349
30/11/2019 11:05 AM
52.
08 52.
08 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Samsu, luqman, andi, sarif, subhan,
d 28/11/19 DS : Inspect and flushing PTO oil, Replace bearing shaft
PTO due to broken
28/11/2019 10:05 PM
3.
08 3.
08 0.
00 0.
00 Complete Backlog repair Replace operator seat
d
29/11/2019 11:25 PM
1.
92 1.
92 1.
92 1.
92 Complete Bulk hose leak 29/11/2019 N12: Heryanto, Cut off upper bulk hose
d
29/11/2019 10:50 AM
20.
00 20.
00 20.
00 20.
00 Complete A/C 28/11/2019 D12: M
anpower : Aco ,jefry28/11/2019 N12: M
anpower
d : Ari R.
Andri
29/11/2019 D12: M
anpower : eki29/11/2019 D12: M
anpower : Eki,
Kaswadi, istamar, 28/11/19 DS : Replace alternator vee belt
28/11/19 NS : replace AC compressor, Flushing hoses AC system,
adjust freon
29/11/19 DS : repost H block ac compressor, charging freon
28/11/19 NS : Continue replace A/C compressor stuck (comp
hours: 2302, due: 32%, last fitted: 29/5/19, freg: 7000 hours).
03/12/2019 10:50 AM
3.
00 3.
00 3.
00 3.
00 Complete Engine Shutdown 03/12/2019 D12: Andri, Troubleshooting shutdown system and
d replace relay for emergency stop
03/12/2019 10:20 PM
3.
00 3.
00 3.
00 3.
00 Complete Fuel low level Top up fuel
d
30/11/2019 4:15 AM
8.
50 8.
50 8.
50 8.
50 Complete Handle Travel Failure 29/11/2019 N12: M
anpower : Herianto ,aco, 29/11/19 NS :
d Remove strocker main pump, inspect and clean up strocker main
pump
30/11/2019 8:15 AM
1.
00 1.
00 1.
00 1.
00 Complete Schedule daily Inspection, 30/11/2019 D12: kaswadi, Performed Daily Inspection and Top Up
d Planned 1 hrs Compressor Oil 2 Liters
30/11/2019 11:00 PM
1.
08 1.
08 1.
08 1.
08 Complete Track Stuck 30/11/2019 N12: Heryanto, Aco, Inspect and clean up strocker
d main pump but still cant move.
Swap strocker main pump from
DR0889
02/12/2019 3:50 PM
7.
75 7.
75 7.
75 7.
75 Complete Pull down pressure too low 02/12/2019 D12: M
anpower : Sigit, 02/12/19 DS : Bleeding
d hydraulic system, check leaks and add hydraulic oil 65 ltrs
27/11/2019 10:50 PM
6.
00 6.
00 6.
00 6.
00 Complete 5084187 PM
500HRS service, planned 27/11/2019 N12: Jemmy K, Performed PM
500HRS service
d 6 hrs
28/11/2019 3:40 AM
4.
83 4.
83 4.
83 4.
83 Complete Over Run : Jack cylinder CS 27/11/2019 N12: Herawan, Joko, Andri
d drift , Replace O-ring holding valve jack cylinder CS
28/11/2019 3:40 AM
4.
83 4.
83 0.
00 0.
00 Complete Over Run : V-belt alternator 27/11/2019 N12: Herawan, Joko, Andri
d fatigue , Replace V-belt alternator and AC compressor, replace
emergency stop
29/11/2019 4:45 PM
1.
25 1.
25 1.
25 1.
25 Complete Hydraulic oil leaks 29/11/2019 D12: ida bagus, reoring motor rotation hose, add hyd
d oil 40 litrs
30/11/2019 11:50 PM
1.
00 1.
00 1.
00 1.
00 Complete Sliding fork stuck 30/11/2019 N12: M
anpower : Herianto, aco, FOUND : too much
d mud on deck bushing.
Clean up deck bushing
02/12/2019 4:00 PM
4.
33 4.
33 4.
33 4.
33 Complete Drill pipe problem 02/12/2019 D12: Haromansyah, Check thread drill pipe no 1 and
d 2, check drill chuck on carousel : drill chuck is worn out, measure
drill rotation speed 100-110 rpm.
Keep unit operation use 1 drill
pipe
03/12/2019 4:40 AM
2.
25 2.
25 2.
25 2.
25 Complete M
ain pump leaks 02/12/2019 N12: kaswadi, Reseal main pump DCS
d
03/12/2019 3:30 PM
1.
17 1.
17 1.
17 1.
17 Complete Engine SOS follow up Performed Engine SOS follow up ( Check engine oil pressure,
d performance test engine performance, check engine oil level and
condition )
03/12/2019 3:30 PM
1.
08 1.
08 0.
00 0.
00 Complete Final drive SOS Follow up 03/12/2019 D12: M
anpower : Herawan, Santoso, Yadi
d , Check floating seal condition, check oil leak and posibble dirt
entry, remove cover final drive to inspect inner part condition,
change oil final drive
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 163 of 349
28/11/2019 3:00 AM
5.
42 5.
42 5.
42 5.
42 Complete Engine cant start 27/11/2019 N12: M
anpower : Fajrin, Ari R.
03/12/2019 10:00 AM
3.
00 3.
00 0.
00 0.
00 Complete Final drive SOS follow up 03/12/2019 D12: M
anpower : Supriyanto,Janta, yadi, Sofiansyah
d , Follow SOS final drive RH
29/11/2019 3:45 AM
4.
92 4.
92 4.
92 4.
92 Complete Hydraulic oil leaks 28/11/2019 N12: Eko H,Seppo, Replace rubber coupling pipe
d control valve and weld bracket coupling return control valve, top
up oil 270 ltr and washing unit
01/12/2019 1:15 PM
1.
25 1.
25 1.
25 1.
25 Complete 5152070 PM
250HRS Service, Planned 01/12/2019 D12: saroji, Performed PM
250HRS Service
d 2 hrs
01/12/2019 1:15 PM
0.
92 0.
92 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Saroji, Ahmad, Nugroho, Puji,
d Rhesa, Supri, Engkus, Install emergency Ladder cabin operator
02/12/2019 9:40 PM
1.
75 1.
75 1.
75 1.
75 Complete Cylinder past fill leaks 02/12/2019 N12: armadhan, mustapa, Replace LHs fast fill
d cylinder, perform test
03/12/2019 3:30 PM
0.
50 0.
50 0.
50 0.
50 Complete Boom low power, Indicator oil 03/12/2019 D12: Eko H, ROOT CAUSE : Incorrect Reported Fault.
d hydraulic flash ON Checked error code and test performance boom, NO problem was
FOUND
27/11/2019 2:50 PM
11.
83 7.
83 11.
83 7.
83 Complete 5145916 PM
500HRS service, planned 26/11/2019 N12: M
anpower : Rahman, Hersam, Nupin, Adit,
d 12 hrs Alpian, Flo, Performed PM
500HRS service
27/11/2019 2:50 PM
7.
83 7.
83 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d T, Luqman, Iswantoro, Adi S, Bambang, 27/11/19 DS : Drain
coolant for support Altrak repair coolant leaks, Re-gasket pipe
coolant thermostat, Removed Ram radiator, replace Vee Belt
engine and adjusted the tension, Reinstall ram radiator, Fill up
coolant, Greasing air compressor horn, Washing machine, Test
Performance and final check
27/11/2019 9:00 AM
2.
00 2.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Alexander T, Luqman, Replace
d operator seat
27/11/2019 2:50 PM
7.
83 7.
83 0.
00 0.
00 Complete Electrical inspection 27/11/2019 D12: M
anpower : Iswantoro, Adi S, Bambang, 27/11/19
d DS : Repair OEM
cable scun, Replace gland seal pressure switch
grease, Tidy up wiring RHs camera, Replace gland seal valve
close limit switch 1 EA
02/12/2019 4:00 PM
1.
42 1.
42 1.
42 1.
42 Complete Joystick stuck 02/12/2019 D12: Eko W, Check and FOUND : Sensor guide block
d failure, replace sensor guide lock
29/11/2019 5:00 PM
0.
92 0.
92 0.
92 0.
92 Complete LHs Track Stuck 29/11/2019 D12: harmoko, Adjust lh track tension, Check carrier
d roller and track roller worn out, Check idler LH worn out, perform
test
27/11/2019 8:20 PM
1.
08 1.
08 1.
08 1.
08 Complete Engine oil leaks 27/11/2019 N12: Eko H, Check and install cap engine oil reservoir
d tank
30/11/2019 9:50 PM
2.
33 2.
33 2.
33 2.
33 Complete Hydraulic low power 30/11/2019 N12: M
anpower : M
uh Yatto, M
uh Iqbal, M
uh Ikhsan,
d Check hydraulic low power.
FOUND : Cylinder bucket roll in
operation due to drifting.
Check make up valve for cylinder bucket
roll in on.
Found 1 EA make valve on CV pos 3 Stuck open and 1
EA make up valve bolt loosen and broken on CV pos 4.
Replace 2
EA make up valve for cylinder bucket roll in operation.
Test
performance after replacing the makeup valve bucket roll in not
drifting anymore.
01/12/2019 8:00 AM
0.
67 0.
67 0.
67 0.
67 Complete Indicator engine warning flash 01/12/2019 D12: bobby, Download data ECM
, fixing connector
d ON injector no 4, 9, 12, check ground ECM
engine
03/12/2019 11:50 PM
4.
58 4.
58 4.
58 4.
58 Complete Indicator engine warning flash 03/12/2019 N12: Armadhan, Wahyu, Altrak, Clean up ECM
29/11/2019 3:30 PM
5.
00 5.
00 5.
00 5.
00 Complete RHs Track loose 29/11/2019 D12: M
anpower : Harmoko, Haerudin, Reinstall track
d RH, Remove guard track roller RH 1 ea.
Continue to schedule
service
30/11/2019 3:30 AM
12.
00 12.
00 12.
00 12.
00 Complete 5143147 PM
2000HRS Service, 29/11/2019 D12: M
anpower : Hendra, Jacob, Armanto, Performed
d Planned 12 hrs PM
2000HRS service
30/11/2019 3:30 AM
12.
00 12.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Hendra, Jacob, Armanto29/11/2019
d N12: M
anpower : Ponco Santoso, M
arkus T, Alexander T, Luqman,
Iswantoro, Adi, 29/11/19 DS : Performed grease audit
29/11/19 NS : Continue audit grease system.
Clean up grease on
stick frame.
Replace hose grease injector 5 ea
30/11/2019 3:30 AM
8.
50 8.
50 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d T, Luqman, Iswantoro, Adi, 29/11/19 NS : Regasket cover rocker
arm pos 4.
Completed bolt bracket elbow intake manifold.
30/11/2019 3:30 AM
8.
50 8.
50 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d T, Luqman, Iswantoro, Adi, 29/11/19 NS : Weld boost wiring boom
foot.
Weld grease line on arm crack
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 164 of 349
30/11/2019 3:30 AM
8.
50 8.
50 0.
00 0.
00 Complete Electrical inspection 29/11/2019 N12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d T, Luqman, Iswantoro, Adi, 29/11/19 NS : Check wiring starter
motor and alternator.
Check all solenoid attachment & connector.
30/11/2019 3:30 AM
8.
50 8.
50 0.
00 0.
00 Complete Air Cond'r Service 29/11/2019 N12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d T, Luqman, Iswantoro, Adi, 29/11/19 NS : Replace outer and inner
filter AC
30/11/2019 3:30 PM
12.
00 12.
00 12.
00 12.
00 Complete Over run : Continue backlog 29/11/2019 N12: M
anpower : Ponco Santoso, M
arkus T, Alexander
d repair T, Luqman, Iswantoro, Adi30/11/2019 D12: M
anpower : Hendra,
Jacob, Armanto, feri, supri, nur, 30/11/19 DS : Remove track guide
broken bolt, Install RH rear track guard, Adjust RH and LH track
tension
30/11/2019 3:30 PM
8.
50 8.
50 0.
00 0.
00 Complete Over run : Continue backlog 30/11/2019 D12: M
anpower : Hendra, Jacob, Armanto, feri, supri,
d repair nur, 30/11/19 DS : Replace plug arc hose block, Retighten joystick
bolt Rh and LH
30/11/2019 3:30 PM
5.
00 5.
00 0.
00 0.
00 Complete Over run : Continue backlog 30/11/2019 D12: M
anpower : Hendra, Jacob, Armanto, feri, supri,
d repair nur, 30/11/19 DS : Replace engine gas strut engine hood, Reoring
engine breather, Replace fuel actuator
30/11/2019 3:30 PM
5.
00 5.
00 0.
00 0.
00 Complete Over run : Continue backlog 30/11/2019 D12: M
anpower : Hendra, Jacob, Armanto, feri, supri,
d repair nur, 30/11/19 DS : Adjust pressure switch grease pump,
Reposition swing pump discharge hose
01/12/2019 2:25 PM
0.
92 0.
92 0.
92 0.
92 Complete Daily inspection follow up : 01/12/2019 D12: haisal, Cut bolt bent on slew ring gear 1 ea
d Slew ring mounting bolts lower
broken 1ea
03/12/2019 2:20 PM
0.
58 0.
58 0.
58 0.
58 Complete Daily inspection Follow up : 03/12/2019 D12: Eko H, Check grease leaking at bucket and
d Grease injector leaks found grease injector at bucket leaking, replace grease injector at
bucket 2 ea, final check
27/11/2019 3:05 PM
5.
50 5.
50 5.
50 5.
50 Complete Swing excessive noise 27/11/2019 D12: M
anpower : M
uh Yatto, M
uh Ikhsan, M
uh Iqbal,
d Handryo, Troubleshooting : Check swing excessive noise, Found
Swing teeth pump and lubrication system not function, power
pump swing teeth malfunction, Found fuse pump swing teeth due
to fail, M
ake sure wiring from short circuit (wiring good), Test
Performance, M
anual grease swing teeth and daily inspection
01/12/2019 10:25 AM
0.
58 0.
58 0.
58 0.
58 Complete Engine low power 01/12/2019 D12: harmoko, haerudin, Replace fuel filter, replace
d outer air cleaner, bleeding fuel, test performance
28/11/2019 11:00 AM
12.
00 12.
00 12.
00 12.
00 Complete 5138438 PM
500HRS service (Duration 27/11/2019 N12: M
anpower : Rahman, Hersam, Nupin, Adit,
d 12 hrs) and Backlog repair, Alpian, Flo, Performed PM
500HRS service
planned 24 hrs
28/11/2019 11:00 PM
24.
00 24.
00 12.
00 12.
00 Complete Backlog repair 27/11/2019 N12: M
anpower : Rahman, Hersam, Nupin, Adit,
d Alpian, Flo28/11/2019 D12: M
anpower : Imam Sulistyono, Yanto
Serang kasy, M
elky, herman, resky, achmad28/11/2019 N12:
M
anpower : Andarias, Hersam, Nupin, Flo, Alpian, Adit, Farid,
27/11/19 NS : Check physic for travel with sleipner, Install sleipner
for moving unit, Reposition machine for washing machine,
Washing machine, Remove cover injector grease link bucket
28/11/19 DS : Perform grease audit, Replace injector grease 1 ea
28/11/19 NS : Replace grease injector for boom cylinder.
Replace
grease injector for slew ring 2 ea
28/11/2019 11:00 PM
16.
00 16.
00 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Imam Sulistyono, Yanto Serang
d kasy, M
elky, herman, resky, achmad28/11/2019 N12: M
anpower :
Andarias, Hersam, Nupin, Flo, Alpian, Adit, Farid, 28/11/19 DS :
Change out Arch hose position 4, 5, Re oring HPS 2 ea, change
out reoring block arch hose upper leaking.
28/11/2019 11:00 PM
16.
00 16.
00 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Imam Sulistyono, Yanto Serang
d kasy, M
elky, herman, resky, achmad28/11/2019 N12: M
anpower :
Andarias, Hersam, Nupin, Flo, Alpian, Adit, Farid, 28/11/19 DS :
Removed and install radiator, Removed repair and install muffler,
Weld and repair bracket clamp muffler
28/11/19 NS : Tapping hole bolt mounting radiator.
Install radiator.
28/11/2019 11:00 PM
16.
00 16.
00 0.
00 0.
00 Complete Crack repair 28/11/2019 N12: M
anpower : Andarias, Hersam, Nupin, Flo,
d Alpian, Adit, Farid, 28/11/19 DS : Repair boom crack, Removed
repair install ladder
28/11/19 NS : Repair lock door radiator room
29/11/2019 11:35 AM
12.
58 12.
58 12.
58 12.
58 Complete Over run : Continue backlog 29/11/2019 D12: M
anpower : Imam S, Yanto, M
elky, Abner, Arya,
d repair Amin, Ardi, 29/11/19 DS : Continue grease audit, Replace hose
grease RHS arm cylinder rod pin, Install cover link, Clean up boom
and stick frame, Washing machine, Performance test
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 165 of 349
29/11/2019 11:35 AM
4.
58 4.
58 0.
00 0.
00 Complete Over run : Continue backlog 29/11/2019 D12: M
anpower : Imam S, Yanto, M
elky, Abner, Arya,
d repair Amin, Ardi, 29/11/19 DS : Replace engine oil breather 1 ea
28/11/2019 3:20 AM
5.
00 5.
00 5.
00 5.
00 Complete Pump can't suck 27/11/2019 N12: Aswan, Performance test drag flow pump, check
d gap impeller
27/11/2019 9:35 AM
0.
92 0.
92 0.
92 0.
92 Complete Bucket pin comes out 27/11/2019 D12: M
anpower : Aco, jefry, Re-install pin lock for
d bucket link
03/12/2019 2:25 AM
0.
92 0.
92 0.
92 0.
92 Complete 5143169 PM
250HRS Service, Planned 02/12/2019 N12: eko, angga, Performed PM
250HRS Service
d 4 hrs
03/12/2019 5:00 AM
2.
58 2.
58 2.
58 2.
58 Complete Backlog repair 02/12/2019 N12: M
anpower : Riady ,Dhery , Lewi, Checked inner
d parts both final drive
27/11/2019 5:20 PM
98.
08 10.
33 98.
08 10.
33 Complete M
ining request to replace 24/11/2019 N12: M
an power : Asma, Fernanda,
d bucket from log grib to Sahnang25/11/2019 N12: M
anpower : Sahnang26/11/2019 D12:
standard bucket M
anpower : khamid, sarif , supriyadi26/11/2019 N12: M
anpower :
Robinson, Sofiansyah
27/11/2019 D12: M
anpower : Nur rochmat, 23/11/19 NS : Remove
log crab, clean up stick end and H-link
24/11/19 NS : Line boring stick end, rebuild pin bucket
25/11/19 NS : Rebuild pin bucket
26/11/19 DS : Change out log grip to bucket, Replace bushing
stick end
26/11/19 NS : reposition bushing stick end, install dust seal,
Rebuild main pin bucket
27/11/19 DS : Repair pin H link at M
ACHINIST
29/11/2019 10:50 PM
2.
83 2.
83 2.
83 2.
83 Complete Rotary lamp OFF 29/11/2019 N12: Fajar, Fery, Replace fuse for rotary lamp
d
01/12/2019 3:40 AM
2.
67 2.
67 2.
67 2.
67 Complete 5151440 PM
1000HRS Service, 30/11/2019 N12: Yunus, Fajar, Fery, Performed PM
1000HRS
d Planned 4 hrs Service
28/11/2019 10:55 PM
3.
33 3.
33 3.
33 3.
33 Complete Hydraulic oil leaks 28/11/2019 N12: M
anpower : Sigit, Replace hose stick cylinder
d
28/11/2019 10:55 PM
0.
92 0.
92 0.
00 0.
00 Complete Final drive SOS Follow up 28/11/2019 N12: M
anpower : Sigit, Follow up SOS final drive
d POS.
1
01/12/2019 3:00 PM
4.
17 4.
17 4.
17 4.
17 Complete A/C 01/12/2019 D12: eki, Adjust shim AC clutch compressor
d
27/11/2019 5:05 PM
6.
50 6.
50 6.
50 6.
50 Complete TJ Rent : RH track loose 27/11/2019 D12: Done by Tunas Jaya, 27/11/19 DS : Remove
d track adjuster, inspect track adjuster for leaks
01/12/2019 9:20 AM
304.
33 98.
33 304.
33 98.
33 Complete TJ Rent : Over run : Final 30/11/2019 N12: M
anpower : Tunas Jaya mech, khamid, andi,
d drive hub fail 30/11/19 NS : Install RHs final drive, torque final drive bolts, fill up
final drive oil, install travel hose lines, repair fitting of travel hose
01/12/19 DS : Install RH Track Link, replace valve adjuster due to
leaking, adjust both track tension
28/11/2019 10:30 AM
1.
75 1.
75 1.
75 1.
75 Complete TJ Rent : Track loose Check seal track adjuster RH.
Reposition track link on carrier roller
d and adjust LH track.
Adjust track link
02/12/2019 2:40 PM
21.
08 21.
08 21.
08 21.
08 Complete TJ Rent : Swing oil leaks 02/12/2019 D12: TJ Rent, Check hydraulic oil leaks and top up oil
d hydraulic 60 ltr, top up oil swing 5 ltrs
03/12/2019 4:15 PM
5.
67 5.
67 5.
67 5.
67 Complete TJ Rent : Lhs Track loose 03/12/2019 D12: TJ Rent, Check and reposition track Rhs
d
27/11/2019 3:25 PM
1.
08 1.
08 1.
08 1.
08 Complete 5138420 TJ Rent : PM
250HRS 27/11/2019 D12: Tuns jaya, Performed PM
250 hrs sevivce
d Service, Planned 6 hrs
28/11/2019 3:30 AM
9.
17 9.
17 9.
17 9.
17 Complete TJ Rent : Track Loose Install idler LH and install track link LH, adjust track LH
d
30/11/2019 10:15 PM
8.
50 8.
50 8.
50 8.
50 Complete TJ Rent : Track loose 30/11/2019 N12: Tunas Jaya, Reposition track link on carrier roller,
d adjust track link
03/12/2019 5:35 PM
7.
50 7.
50 7.
50 7.
50 Complete TJ Rent : LHs Track loose eseal lh track adjuster, instll and adjust lh track link,
d
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 166 of 349
28/11/2019 10:20 PM
38.
67 38.
67 38.
67 38.
67 Complete Implement pump fail 27/11/2019 D12: M
anpower M
uh Yatto, M
uh Ikhsan, M
uh Iqbal,
d Handryo28/11/2019 D12: M
anpower: Suparman, M
arkus Tanan,
Alexander Tandilangi, Luqman, Iswantoro, Adi, 27/11/19 DS :
Check hydraulic low power, Found imp pump position 2 engine 2
due to produce particle, Implement pump hours: 3617 Hrs (30%),
HAP manpower Check warranty implement pump,
27/11/19 NS : Drain oil hydraulic, Disconnect all lines main pump,
Remove implement pump no 2 engine 2, Install implement pump
engine 2
28/11/19 DS : Continue flashing drain case lines for remove
particle in system, Flushing sub tank, return filter, and hydraulic
tank, change out HPS Filter imp pump 2 engine 2, Fill Hydraulic
oil, Kidney loop hydraulic oil, change out Hose return drain case
imp pump 2, Continue completed imp pump pos 2 engine 2,
Repair and connect connector CSU main pump 9 and 10,
28/11/19 NS : Top up hydraulic oil 300 ltrs.
Completed imp pump
lines.
Performance test and final check
28/11/2019 10:20 PM
15.
33 15.
33 0.
00 0.
00 Complete Electrical inspection 28/11/2019 D12: M
anpower: Alexander Tandilangi, Luqman,
d Iswantoro, Adi28/11/2019 N12: Eko Welas, 28/11/19 DS : Repair
and connect connector CSU main pump 9 and 10, Removed cover
alternator engine 1, Protect with rubber for jump start cable,
Replace cable seri b + starter engine 1, Retightened terminal
battery position 5 and 6, Test performance.
electric inspection and
test performance
28/11/19 NS : Replace boom lamp and repair cable boom lamp
29/11/2019 3:20 AM
3.
67 3.
67 3.
67 3.
67 Complete Hydraulic oil leaks Replace oring hose discharge main pump 2 for engine 2 and
d washing unit
30/11/2019 9:50 AM
1.
83 1.
83 1.
83 1.
83 Complete Hydraulic oil leaks 30/11/2019 D12: harmoko, haerudin, Replace hose pilot regulator
d main pump 1st engine 1 ea, 2nd engine 2 ea, repositioning
coupling pipe drain case swing motor
03/12/2019 11:50 AM
0.
50 0.
50 0.
50 0.
50 Complete Engine 1 low power 03/12/2019 D12: Eko W, Check and replace speed sensor for
d engine 1, test performance engine
28/11/2019 9:50 AM
0.
75 0.
75 0.
75 0.
75 Complete Indicator autolube flash ON 28/11/2019 D12: M
uh Yatto, M
uh Ikhsan , ROOT CAUSE :
d Operator misuse.
FOUND : Grease pump switch at tank is OFF.
30/11/2019 1:55 AM
3.
00 3.
00 3.
00 3.
00 Complete Hydraulic oil leaks 29/11/2019 N12: M
uh.
Yatto, M
uh Ikhsan, Check hydraulic oil leak.
30/11/2019 4:50 PM
14.
25 14.
25 14.
25 14.
25 Complete LHs bucket cylinder leaks 29/11/2019 N12: M
anpower : M
uh Yatto, M
uh Ikhsan30/11/2019
d D12: M
anpower : M
asrani, Sette, Dismantle crew, replace Lhs
hydraulic bucket cylinder
03/12/2019 2:50 AM
1.
83 1.
83 1.
83 1.
83 Complete PM
2000HRS Service, 02/12/2019 N12: saroji, Performed PM
2000HRS Service
d Planned 2 hrs
27/11/2019 3:55 PM
2.
92 2.
92 2.
92 2.
92 Complete Daily inspection finding follow 27/11/2019 D12: Boy, M
uh Yatto, Adjust travel motor, tightened
d up : motor travel leaks mounting bolts travel motor, replace fast fill hose swing box
( Clean up dirt upper lhs travel motor guard, Removed travel motor
guard, Retighten bolt mounting position LHs rear travel motor,
Replace hose fast fill swing box LH rear leaking, Install travel
motor guard, replace hose pilot travel mode leaking, Test
performance and final check
29/11/2019 1:50 PM
2.
83 2.
83 2.
83 2.
83 Complete Hydraulic oil leaks 29/11/2019 D12: haerudin, replace hose pilot under cabin
d
30/11/2019 3:05 AM
4.
25 4.
25 4.
25 4.
25 Complete Operator seat failure 29/11/2019 N12: M
uh Yatto, M
uh Ikhsan, Replace operator seat
d
02/12/2019 2:30 PM
0.
75 0.
75 0.
75 0.
75 Complete Water coolant temperature too 02/12/2019 D12: Eko H, ROOT CAUSE : Incorrect Reported Fault.
28/11/2019 10:40 PM
0.
83 0.
83 0.
83 0.
83 Complete Radio communication OFF Check radio 2 way can’t transmit, replace PTT radio 2 way.
d Performance test
30/11/2019 1:50 AM
1.
83 1.
83 1.
83 1.
83 Complete 5119667 PM
250HRS Service, Planned 29/11/2019 N12: Suparman, Performed PM
250HRS service
d 2 hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 167 of 349
30/11/2019 1:50 AM
1.
83 1.
83 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Suparman, Handryo, Boyke, Hendrik
d toding, Perform SOS final drive rhs & flush the oil due to bad.
Test
Performance and Final check
30/11/2019 1:50 AM
1.
83 1.
83 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Suparman, Handryo, Boyke, Hendrik
d toding, Adjusted track rhs due to loosen.
Test Performance.
Final
check.
01/12/2019 4:20 AM
0.
83 0.
83 0.
83 0.
83 Complete Unit can't swing 30/11/2019 N12: M
anpower : M
uh Yatto, M
uh Iqbal, M
uh Ikhsan,
d Check unit cannot swing.
FOUND : Swing stop solenoid stuck
closed.
Clean up the solenoid.
Test performance (Good).
Daily
Inspection
28/11/2019 4:10 PM
0.
67 0.
67 0.
67 0.
67 Complete Bucket teeth pin comes out 28/11/2019 D12: Bakrie, Fitra, Replace bucket teeth pin pos 1
d
29/11/2019 9:00 AM
1.
25 1.
25 1.
25 1.
25 Complete Bucket opened it's self 29/11/2019 D12: yakob, ROOT CAUSE : Incorrect Reported Fault.
29/11/2019 3:00 PM
0.
75 0.
75 0.
75 0.
75 Complete Teeth bucket worn out 29/11/2019 D12: M
anpower : Haisal, Pantas, Yohanis, Replace
d teeth bucket all position
30/11/2019 3:20 PM
2.
08 2.
08 2.
08 2.
08 Complete Engine excessive noise 30/11/2019 D12: harmoko, haeruddin, Completed clamp and
d tightened hose hump after cooler.
02/12/2019 9:30 PM
12.
00 12.
00 12.
00 12.
00 Complete 5142371 PM
1000HRS Service 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d (Duration 12 Hrs) and Backlog mardaus, Tegar, Herman, Riandi, Wendri, Performed PM
04/12/2019 11:30 AM
50.
00 45.
50 38.
00 33.
50 Complete Schedule grease system audit 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d mardaus, Tegar, Herman, Riandi, Wendri03/12/2019 N12:
M
anpower : Sette, Robin, Asep, Faldis, Alfin, Toto, Sulis, Lebang,
02/12/19 DS : Performed Audit grease system
03/12/19 DS : Replace grease pump front, replace injector grease
slew ring,
03/12/19 NS : Replace pipe lubrication RH boom frame 4EA,
Clean up grease injector R/L H link, Remove hose grease LH H
link
04/12/2019 11:30 AM
50.
00 45.
50 0.
00 0.
00 Complete Schedule RH Idler 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d replacement mardaus, Tegar, Herman, Riandi, Wendri02/12/2019 N12:
M
anpower : Sette, Robin, Alfin, Faldis, Asep, Toto, Nur, 02/12/19
DS : Washing machine, Performance test.
Disconnect RH track,
remove RH idler
02/12/19 NS : Remove yoke idler RH, Install RH idler, Install
stopper idler
04/12/2019 11:30 AM
50.
00 45.
50 0.
00 0.
00 Complete Schedule bucket replacement 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d mardaus, Tegar, Herman, Riandi, Wendri, 02/12/19 DS : Remove
bucket
03/12/19 DS : Install bushing stick end
04/12/2019 11:30 AM
50.
00 45.
50 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d mardaus, Tegar, Herman, Riandi, Wendri03/12/2019 N12:
M
anpower : Sette, Robin, Asep, Faldis, Alfin, Toto, Sulis, Lebang,
02/12/19 DS : Replace lock door main pump room 1 ea, replace
pipe pilot control valve position 1
02/12/19 NS : Change out front swing motor, Replace hose drain
case swing motor 2 ea
03/12/19 DS : Replace arc hose position 12, re-gasket cylinder
head, lean up travel motor guard both side
Remove travel motor guard, Replace relief valve for travel
balance, replace ball valve swing box
03/12/19 NS : Clean up rotary joint, Washing rotary joint,
04/12/2019 11:30 AM
50.
00 45.
50 0.
00 0.
00 Complete Schedule check engine white 02/12/2019 D12: M
anpower : Budi, mukhtar, Andi, Yanto,
d smoke mardaus, Tegar, Herman, Riandi, Wendri03/12/2019 N12:
M
anpower : Sette, Robin, Asep, Faldis, Alfin, Toto, Sulis, Lebang,
02/12/19 DS : Remove bolt mounting walk way upper PTO
03/12/19 DS : Replace adjuster bolt tensioner pulley
03/12/19 NS : Replace adaptor block fuel, Install rocker housing,
install fuel block, Install after cooler LH front, Install T hose,
Replace hose return cooling turbo,
04/12/2019 11:30 AM
16.
50 12.
00 0.
00 0.
00 Complete Backlog repair 03/12/2019 N12: M
anpower : Sette, Robin, Asep, Faldis, Alfin,
d Toto, Sulis, Lebang, 03/12/19 NS : Replace PTO oil cooler,
Replace hose cooler PTO,
04/12/2019 11:30 AM
16.
50 12.
00 0.
00 0.
00 Complete AC service 03/12/2019 N12: M
anpower : Sette, Robin, Asep, Faldis, Alfin,
d Toto, Sulis, Lebang, 03/12/19 NS : Flashing AC front and rear,
Connect hose AC hose, Vacuum Ac front and rear, Install relay
DRL AC
04/12/2019 11:30 AM
16.
50 12.
00 0.
00 0.
00 Complete Schedule crack repair 03/12/2019 N12: M
anpower : Sulis.
Lebang, 03/12/19 NS : Repair
d LH H link crack, Welding RH outside trust plate
30/11/2019 9:00 AM
24.
00 24.
00 24.
00 24.
00 Complete 5148005 PM
250HRS Service (Duration Performed PM
250HRS service
d 12 Hrs) and Backlog Repair,
Planned 24 Hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 168 of 349
30/11/2019 9:00 AM
24.
00 24.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras29/11/2019 D12: M
anpower :
Sette, Alfin, Asep, Robin, Andri, Faldis, Toto, Sulis, Peni, 29/11/19
DS : Disconnect track RH and LH, Remove stopper idler Rh,
Remove idler RH, Remove track roller LH pos 1 and 2, Remove
track roller RH pos 8
29/11/19 NS : Install idler yoke RHs.
Replace Idler Rhs.
Install
track roller pos 8 RHs.
Install track roller pos 1 & 2 Lhs and torque
the bolt.
Connected track both sides.
Install lock pin track pad.
30/11/2019 9:00 AM
24.
00 24.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras29/11/2019 D12: M
anpower :
Sette, Alfin, Asep, Robin, Andri, Faldis, Toto, Sulis, Peni, 29/11/19
DS : Welding side wall boom frame
29/11/19 NS : Install arm rest operator seat.
Replace cable
adjuster operator seat
30/11/2019 9:00 AM
19.
58 19.
58 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras29/11/2019 D12: M
anpower :
Sette, Alfin, Asep, Robin, Andri, Faldis, Toto, Sulis, Peni, 29/11/19
DS : Re o-ring block HPS main pump 5 and 7, Remove hose pilot
panel 1 EA
29/11/19 NS : Reseal cover HPS M
P 5:7.
Replace hose pilot panel
1 ea.
Replace hose drain case 1 ea
30/11/19 DS : Replace hose HIC RH 2EA, Replace adapter pipe
HIC 1EA, Repair cover pipe HIC, Replace hose delivery fan pump
2EA, Replace hose pilot filter 1EA
30/11/2019 9:00 AM
19.
58 19.
58 0.
00 0.
00 Complete Electrical inspection 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras, 29/11/19 NS : Replace
Electric horn.
Replace starter motor.
Lube Air compressor horn.
30/11/2019 9:00 AM
14.
00 14.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras, 29/11/19 NS : Clean up
cartridge grease front and rear
30/11/19 DS : Remove cover grease H link, Replace hose grease
lubrication rod end RH bucket cylinder, Washing machine
29/11/2019 8:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Andika AJS, M
arwan Dinata, Hendra,
d Boy, Jator, Ari, M
Kherdin, Juni Pras, 29/11/19 NS : Install oring
main pin bucket
30/11/2019 3:15 PM
6.
25 6.
25 6.
25 6.
25 Complete Over run : Continue backlog 30/11/2019 D12: sette, replace hose delivery main pump, replace
d repair hose track adjuster
02/12/2019 8:55 PM
0.
58 0.
58 0.
58 0.
58 Complete Hydraulic oil leaks 02/12/2019 N12: armadhan, Re o-ring block vent valve pilot filter
d
03/12/2019 10:00 PM
2.
67 2.
67 0.
00 0.
00 Complete Final drive SOS follow up 03/12/2019 N12: M
anpower : Harmoko, Haerudin, Follow up SOS
d final drive
28/11/2019 9:20 PM
24.
42 24.
42 24.
42 24.
42 Complete Indicator fire suppression flash 27/11/2019 N12: M
anpower : Eko, Basil28/11/2019 D12: M
uh
d ON Ikhsan28/11/2019 N12: Eko H, 27/11/19 NS : Check fire
suppression blown up, replace hose activator fire suppression
28/11/19 DS : Re-charge fire supression
29/11/19 NS : Replace fitting hose activator and recharger fire
suppression
28/11/2019 4:30 PM
19.
58 19.
58 0.
00 0.
00 Complete M
uffler pipe broken 27/11/2019 N12: M
anpower : Eko, Basil28/11/2019 D12: M
uh
d Ikhsan, 27/11/19 NS : Remove guard muffler engine for check
leaking exhaust, Inspect visually pipe muffler engine and found
broken at pipe, remove muffler for repair
28/11/19 DS : Replace drum exhaust muffler, re-oring plug FRONT
LH turbo
29/11/2019 3:15 AM
1.
00 1.
00 1.
00 1.
00 Complete Indicator fire suppression flash 28/11/2019 N12: Eko H, Check and temporary reset module fire
d ON suppression, test performance
04/12/2019 12:40 AM
1.
50 1.
50 1.
50 1.
50 Complete Indicator auto lube flash ON 03/12/2019 N12: M
anpower : Harmoko, Haerudin, Replace
d injector front attachment 2 ea.
Cycle time grease pump and test
performance
30/11/2019 3:45 AM
4.
00 4.
00 4.
00 4.
00 Complete Horn failure 29/11/2019 N12: M
uh Yatto, M
uh Ikhsan, Check horn off.
Replace
d membrane air horn, repair fitting air horn
30/11/2019 2:10 PM
1.
17 1.
17 1.
17 1.
17 Complete Engine oil 150 Hrs SOS 30/11/2019 D12: saroji, perform resampling engine oil
d Follow up
04/12/2019 3:50 AM
1.
67 1.
67 1.
67 1.
67 Complete Indicator PTO flash ON 03/12/2019 N12: M
anpower : Harmoko, Haerudin, Replace PTO
d oil, top up engine oil 40 liters, performance test
01/12/2019 9:25 AM
2.
25 2.
25 2.
25 2.
25 Complete Swing stuck 01/12/2019 D12: harmoko, haerudin, Replace swing stop solenoid
d valve, perform test
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 169 of 349
03/12/2019 4:55 PM
2.
25 2.
25 2.
25 2.
25 Complete Water coolant temperature too 03/12/2019 D12: Jaya Sepo, ROOT CAUSE : Incorrect Reported
d high Fault.
Download vims and check coolant temperature, test
performance and NO problem was FOUND
03/12/2019 4:55 PM
1.
33 1.
33 1.
33 1.
33 Complete Indicator autolube flash ON 03/12/2019 D12: Eko H, Check re-tighten swivel grease for link
d bucket LHs
30/11/2019 4:20 AM
1.
25 1.
25 1.
25 1.
25 Complete Indicator autolube flash ON 29/11/2019 N12: M
uh Yatto, M
uh Ikhsan, Check indicator autolube
d flash ON.
Check cycle time grease pump.
Check grease line and
component for leaking.
Found grease injector slew ring bearing
bypassing 1 ea.
Replace grease injector.
Test Performance and
cycle time (good)
03/12/2019 2:25 PM
1.
42 1.
42 1.
42 1.
42 Complete Teeth bucket worn out 03/12/2019 D12: Anton, Remove pin teeth bucket broken 2 ea and
d Replace teeth bucket all position, blocked pin teeth bucket all
position
30/11/2019 9:45 PM
1.
25 1.
25 1.
25 1.
25 Complete Indicator engine warning flash 30/11/2019 N12: M
anpower : Heryadi, Handryo, Iswantoro, Check
d ON indicator engine warning flash ON.
Download ECM
.
FOUND : Lift
pump current high.
Repair lift fuel pump connector due to current
short high.
Test performance (Good)
04/12/2019 3:05 AM
6.
75 6.
75 6.
75 6.
75 Complete Indicator fire suppression flash 03/12/2019 N12: M
anpower : Armadhan, Wahyu, Replace fire
d ON suppression pressure gauge 2 ea, recharging fire suppression,
perform test
28/11/2019 3:25 PM
7.
58 7.
58 7.
58 7.
58 Complete Ladder lock pin comes out 28/11/2019 D12: M
anpower: M
uh Yatto, M
uh Ikhsan, M
uh Iqbal,
d Handryo, 28/11/19 DS : Check pin ladder missing 1 ea, Fabricate
pin ladder in machinist (RFU on 13.
30), Completed pin ladder, Test
performance and daily inspection
28/11/2019 8:20 PM
1.
17 1.
17 1.
17 1.
17 Complete Engine can't start 28/11/2019 N12: Hugo, ROOT CAUSE : Incorrect Reported Fault.
02/12/2019 1:25 AM
28.
00 28.
00 16.
00 16.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Jacob, Hendra, Robin, Feri, M
asrani,
d Puji, Armanto, Faldis, Dismantle crew30/11/2019 N12: M
anpower :
Ponco Santoso, M
arkus T, Alexander T, Luqman, Boy, Ari,
Iswantoro, Adi, 30/11/19 NS : Disconnected track Lhs.
Removed
track roller pos 6 Lhs
01/12/19 DS : Install track roller LH pos 6 and torque, Replace
track adjuster reducing valve
01/1/18 NS : Connected track LHs, Install lock pin track, Adjusted
track both side, Install cover adjuster track LHs,
02/12/2019 1:25 AM
28.
00 28.
00 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Jacob, Hendra, Robin, Feri, M
asrani,
d Puji, Armanto, Faldis, Dismantle crew01/12/2019 N12: M
anpower:
Ponco Santoso, M
arwan Dinata, M
arkus T, Alexander T, Luqman,
Boy, Ari, Iswantoro, Adi30/11/2019 N12: M
anpower : Ponco
Santoso, M
arkus T, Alexander T, Luqman, Boy, Ari, Iswantoro, Adi,
30/11/19 NS : Test Performance.
Slew ring deflection inspection.
02/12/2019 1:25 AM
18.
42 18.
42 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Jacob, Hendra, Robin, Feri, M
asrani,
d Puji, Armanto, Faldis, Dismantle crew, 01/12/19 DS : Replace
hose reservoir tank radiator, Repair LH and RH turbo guard,
Retighten fitting coolant turbo center, Replace cap seal fuel tank
02/12/2019 1:25 AM
18.
42 18.
42 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Jacob, Hendra, Robin, Feri, M
asrani,
d Puji, Armanto, Faldis, Dismantle crew01/12/2019 N12: M
anpower:
Ponco Santoso, M
arwan Dinata, M
arkus T, Alexander T, Luqman,
Boy, Ari, Iswantoro, Adi, 01/12/19 DS : Replace injector grease
boom frame 4 ea, Remove stick frame injector grease
01/12/19 NS : Change out pipe grease slewring 2 ea due to
leaking, change out grease injector on stick frame follow up audit
grease 1 ea bypassing, Completed grease line after weld repair,
Top up grease, Repair manifold grease for main pin bucket in stick
fram both side
02/12/2019 1:25 AM
11.
50 11.
50 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
anpower : Jacob, Hendra, Robin, Feri, M
asrani,
d Puji, Armanto, Faldis, Dismantle crew, 01/12/19 DS : Performed
CIP emergency step ladder, Remove first step stairway
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 170 of 349
02/12/2019 1:25 AM
6.
42 6.
42 0.
00 0.
00 Complete Electrical inspection 01/12/2019 N12: M
anpower : Boy, Ari, Iswantoro, Adi, 01/12/19 NS
d : Removed Loto box and make bracket emergency stop, Repair
bolt clamp ducting ac rear, Repair housing ducting ac side at
evaporator, Replace connector skun ladder switch, Install cover
AC and battery, Completed seal connector prelube pressure
switch,
02/12/2019 3:45 AM
2.
33 2.
33 2.
33 2.
33 Complete Over run : Final inspection 01/12/2019 N12: .
, Washing machine, Test Performance and final
d check
29/11/2019 2:55 AM
65.
92 43.
92 65.
92 43.
92 Complete Over run : LH front travel 26/11/2019 D12: M
anpower : Heryadi, M
arwan Dinata, Agustinus
d motor leaks parangan, Boy, Jator passarin,, Sony, Saiful, Ari, Ikhsan, Yanto,
melky, Abner, Tegar, Hendra, Zainuri, Andi, 27/11/2019 D12:
M
anpower : Imam Setyono, Yanto serang, Andi, Amin, jator , Ari,
Boy, Bambang, Dona, Junaidi27/11/2019 N12: M
anpower : Budi,
M
ardaus, M
ukhtar, Safrudin, Arnold, Hugo, Piter28/11/2019 D12:
M
anpower : Heryadi, M
arwan dinata, Jator pasarin, Boy Ramadani
fatli, Ari, sony, hendro, arya,, 26/11/19 DS : Removed Tumbler
LHs, Reseal tumbler LHs, Install Lhs tumbler, install final drive
Lhs, Preload Bearing outer shaft tumbler lhs, install Travel motor
lhs rear, replace hose discharge mp 2, replace hose delivery mp
1, 3, Reoring block HPS mp 5, re oring plug block arch hose lower,
Completed clamp pipe suction imp pump 2, Reoring adapter T
Pilot under CV, Reoring adapter hose pilot EHC upper CV, Reoring
adapter hose pilot and drain case imp pump 3.
4, replace Relieve
valve Travel motor 4 EA,
27/11/19 DS : Install travel motor LHs front, Install travel guard,
Install ring guard, replace valve fast fill swing box LHs rear,
replace relief valve ac motor, replace hose ac motor lines 6 ea,
replace hydraulic motor ac and pulley as well, replace hose
suction gear pump engine cooling fan
27/11/19 NS : Top up oil PTO, Install hose travel motor LHS
28/11/19 DS : Check travel motor LHs noise, Found LH rear travel
motor fail, Removed guard travel motor LHs, Check pressure pilot
for brake travel motor, Removed hose and travel motor LHs rear,
29/11/2019 2:55 AM
65.
92 43.
92 0.
00 0.
00 Complete Over un : Continue engine 26/11/2019 D12: M
anpower : Heryadi, M
arwan Dinata, Agustinus
d replacement parangan, Boy, Jator passarin,, Sony, Saiful, Ari, Ikhsan, Yanto,
melky, Abner, Tegar, Hendra, Zainuri, Andi, 26/11/2019 N12:
M
anpower : Budi, M
ardaus, M
ukthar, Safrudin, Arnold, Hugo,
Piter27/11/2019 N12: M
anpower : Budi, M
ardaus, M
ukthar,
Safrudin, Arnold, Hugo, Piter28/11/2019 D12: M
anpower : Altrak
team , 26/11/19 DS : Removed reservoir tank radiator, Swap fan
motor all position to new radiator, Completed engine related part,
Torque bolt mounting engine front, Install shaft PTO, replace
Rubber mounting fuel racor due to broken
26/11/19 NS : Remove radiator position 1 and 2, Install fire wall
engine to radiator, Install new radiator 1 and 2, Torque bolt
mounting radiator, Completed pipe and hose radiator, Install
reservoir radiator, Install old core radiator to stand 1 ea
27/11/19 NS : Replace air cleaner inner and outer, Replace
coolant filter, Bleeding fuel system, Install breather valve for
cylinder arm RHS, Test running (can’t start), Trouble shooting
engine can’t start
28/11/19 DS : Commissioning engine by ALTRAK team
28/11/19 NS : Recharge fire suppression
27/11/2019 8:00 AM
1.
00 1.
00 0.
00 0.
00 Complete Over run : grease pump fail Replace rear grease pump
d 28/11/19 DS : Perform Audit grease
29/11/2019 2:55 AM
43.
92 43.
92 0.
00 0.
00 Complete Over run : Continue backlog 27/11/2019 D12: M
anpower : Imam Setyono, Yanto serang, Andi,
d repair Amin, jator , Ari, Boy, Bambang, Dona, Junaidi27/11/2019 N12:
M
anpower : Budi, M
ardaus, M
ukhtar, Safrudin, Arnold, Hugo, Piter,
27/11/19 DS : Fill up final drive LHs make sure the leak after
reseal (good not leak), Repair clamp ring final drive due to bent
27/11/19 NS : Torque bolt guard final drive, Connected track lhs,
Install lock pin track pad,
29/11/2019 2:55 AM
43.
92 43.
92 0.
00 0.
00 Complete Over run : Continue crack 27/11/2019 D12: M
anpower : Imam Setyono, Yanto serang, Andi,
d repair Amin, jator , Ari, Boy, Bambang, Dona, Junaidi, 27/11/19 DS :
Repair RHs mounting lower cylinder boom, Repair box on cabin
operator, Install LOTO Box
27/11/19 NS : Install fender front RH
29/11/2019 2:55 AM
7.
92 7.
92 0.
00 0.
00 Complete Over run : Continue backlog 28/11/2019 N12: M
an power : Budi, M
ardaus, M
ukhtar, Safrudin,
d repair Arnold, Replace rear LHS travel motor.
Install bolt lock pin track
LHS 1 ea.
Adjust track.
Install travel motor guard.
Performance
test.
Final check
30/11/2019 2:15 PM
1.
08 1.
08 1.
08 1.
08 Complete Hydraulic oil leaks 30/11/2019 D12: agustinus, reoring cover kidney lube filter,
d tightening hose supply fan motor radiator
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 171 of 349
02/12/2019 1:00 AM
1.
00 1.
00 1.
00 1.
00 Complete 5172001 Initial service 50 hrs after 01/12/2019 N12: Suparman, Performed Initial service 50 hrs after
d change out engine, Planned 2 change out engine
hrs
29/11/2019 8:00 AM
0.
83 0.
83 0.
83 0.
83 Complete Engine 2 smell smoke 29/11/2019 D12: haerudin, Check and FOUND : RHs and LHs
d engine vee belt worn, perform test
03/12/2019 1:30 AM
12.
00 12.
00 12.
00 12.
00 Complete 5152111 PM
500HRS Service (Duration 02/12/2019 D12: M
anpower : Andarias, Adint, Nupin, Hersam,
d 12 Hrs) and Backlog Repair, Amin, Alpian, Flo, Performed PM
500HRS service
Planned 18 Hrs
03/12/2019 7:30 AM
18.
00 18.
00 6.
00 6.
00 Complete M
echanical inspection 02/12/2019 D12: M
anpower : Andarias, Adint, Nupin, Hersam,
d Amin, Alpian, Flo, Performance test, mechanic, electric, welder
inspection
03/12/2019 7:30 AM
18.
00 18.
00 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Andarias, Adint, Nupin, Hersam,
d Amin, Alpian, Flo02/12/2019 N12: M
anpower : Hendra, Jacob,
Saroji, Armanto, Feri, Nugroho, Drain coolant engine 1, replace V
belt engine 1, remove all hose lines water pump
02/12/19 NS : Change out water pump engine 1, Completed pipe
and hose water pump engine 1, Install filter base coolant filter
engine 1, replace fan belt engine 1
03/12/2019 7:30 AM
18.
00 18.
00 0.
00 0.
00 Complete Audit grease 02/12/2019 D12: M
anpower : Andarias, Adint, Nupin, Hersam,
d Amin, Alpian, Flo02/12/2019 N12: M
anpower : Hendra, Jacob,
Saroji, Armanto, Feri, Nugroho, Performed audit grease
02/12/19 NS : Completed hose lubrication grease link bucket
LHS , RHS, Completed hose supply grease link bucket LHS and
RHS, change out injector grease LH boom frame 2 ea, Completed
hose lubrication grease attachment LHS , RHS,
02/12/2019 11:15 PM
4.
25 4.
25 0.
00 0.
00 Complete Schedule crack repair 02/12/2019 N12: M
anpower : Hendra, Jacob, Saroji, Armanto,
d Feri, Nugroho, 02/12/19 NS : Remove hose travel and fire
supresssion for repair crack
03/12/2019 7:30 AM
8.
25 8.
25 0.
00 0.
00 Complete Schedule crack repair Repair crack
d
03/12/2019 7:40 PM
12.
17 12.
17 12.
17 12.
17 Complete Over run : Continue backlog 03/12/2019 D12: M
anpower : Andarias, Hersam, Basilius,
d repair Replace hose coupling return control valve 1 ea, re-tighten clamp
under hydraulic oil cooler (clamp pipe coupling), re-oring pump
reserve tank, replace hose coupling return control valve 1 ea,
03/12/2019 7:40 PM
12.
17 12.
17 0.
00 0.
00 Complete Over run : Continue backlog 03/12/2019 D12: M
anpower : Andarias, Hersam, Basilius,
d repair 03/12/19 DS : Install pulley water pump engine 1, install rum,
install hose rotary joint PTO LHs, re-gasket pipe deep stick PTO
engine 2.
03/12/2019 9:45 PM
2.
08 2.
08 2.
08 2.
08 Complete Over run : bucket cant opened 03/12/2019 N12: hendra, Replace connector EHC bucket roll in
d
03/12/2019 9:45 PM
2.
08 2.
08 0.
00 0.
00 Complete Over run : Continue backlog 03/12/2019 N12: M
anpower : Hendra, Saroji, Armanto, Nugroho,
d repair M
asrani, Replace connector intake temperature, Replace
connector EHC bucket roll in, Performance test
29/11/2019 2:35 AM
0.
42 0.
42 0.
42 0.
42 Complete Bucket lock pin bolt comes out 28/11/2019 N12: Arnol, Re-tighten bolt cover pin bucket RHs
d
30/11/2019 11:50 AM
0.
83 0.
83 0.
83 0.
83 Complete Bucket excessive noise 30/11/2019 D12: harmoko, haerudin, check output grease
d lubricating to main pin bucket, good, tightening stopper main pin
bucket, perform test
30/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 Complete 5126528 PM
2000HRS service, Performed PM
2000HRS service
d Planned 2 hrs (Opportune
time/Unit stand by)
02/12/2019 1:20 AM
5.
33 5.
33 5.
33 5.
33 Complete 5084153 PM
1000HRS service, 01/12/2019 N12: M
anpower : Herianto ,aco, Sardi, Fajri,
d Planned 6 hrs Performed PM
1000HRS service
28/11/2019 1:45 PM
3.
58 3.
58 3.
58 3.
58 Complete 5138462 PM
250HRS Service, Planned 28/11/2019 D12: Yunus, heru,abu ,rolis, Performed PM
250HRS
d 4 hrs Service
29/11/2019 9:50 AM
0.
25 0.
25 0.
25 0.
25 Complete Pre Service Inspection, 29/11/2019 D12: ida bagus, Performed Pre Service Inspection
d Planned 1 hrs
04/12/2019 2:55 AM
0.
75 0.
75 0.
75 0.
75 Complete 5167846 PM
250HRS Service, Planned 03/12/2019 N12: eko, angga, Performed PM
250HRS Service
d 6 hrs
04/12/2019 4:10 AM
1.
25 1.
25 1.
25 1.
25 Complete M
echanical inspection 03/12/2019 N12: M
anpower : Riady, Dhery, Lewi, Performed
d M
echanical inspection
30/11/2019 10:15 AM
1.
00 1.
00 1.
00 1.
00 Complete Pre Service Inspection, 30/11/2019 D12: kaswadi, Performed Pre Service Inspection
d Planned 1 hrs
28/11/2019 12:00 AM
2.
00 2.
00 2.
00 2.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Triyadi and Januar, Perform
d electrical Inspection, Checked lighting system, starting system,
charging system, Service battery,adjust vee belt alternator, test
electrical system and final check
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 172 of 349
29/11/2019 8:15 AM
0.
08 0.
08 0.
08 0.
08 Complete Daily inspection 29/11/2019 D12: jaya, Performed Daily inspection
d
29/11/2019 2:40 PM
1.
42 1.
42 1.
42 1.
42 Complete Engine oil leaks check engine oil leakage by trakindo
d
29/11/2019 11:05 PM
4.
08 4.
08 4.
08 4.
08 Complete Engine oil leaks 29/11/2019 N12: M
anpower : Andi Baso (TU M
ech), Re-gasket
d turbo lubrication tube
27/11/2019 10:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5145555 PM
250HRS service, Planned 27/11/2019 N12: M
anpower : Pairul,Yadi, Performed PM
250HRS
d 8 hrs service
27/11/2019 10:40 PM
3.
67 3.
67 0.
67 0.
67 Complete Backlog repair 27/11/2019 N12: M
anpower : kudrot , leo, Irwan , Replace LH tie
d road ball joint due to worn out
27/11/2019 8:45 PM
1.
75 1.
75 0.
00 0.
00 Complete Baklog repair 27/11/2019 N12: M
anpower : kudrot , leo, Irwan , Replace fitting
d grease
27/11/2019 10:40 PM
3.
67 3.
67 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Budiono, Wahyudi, Electrical
d inspection, clean up filter ac, battery maintenance
27/11/2019 10:40 PM
1.
92 1.
92 0.
00 0.
00 Complete M
echanical inspection 27/11/2019 N12: M
anpower : kudrot , leo, Irwan , Washing radiator
d core due to blocked
28/11/2019 10:30 AM
0.
50 0.
50 0.
50 0.
50 Complete Transmission SOS follow up 28/11/2019 D12: Ennos Barrung, Performed transmission SOS
d follow up
30/11/2019 5:45 PM
4.
00 4.
00 4.
00 4.
00 Complete 5144713 PM
250HRS Service (Duration 30/11/2019 D12: M
an power : Nyoto.
Irwan, Performed PM
02/12/2019 1:45 AM
36.
00 36.
00 32.
00 32.
00 Complete 4783421 Backlog Repair 01/12/2019 D12: M
anpower : syariff, wil, sukarno, yosep,
d sabarudin30/11/2019 N12: M
anpower : Raditya, Yonathan, Pahmil,
Radi, 30/11/19 DS : Remove tyre pos 3,4,5,6, remove chain
tandem
01/12/19 DS : replace chain tandem 4ea
02/12/2019 1:45 AM
24.
67 24.
67 0.
00 0.
00 Complete 5155595 Backlog repair 01/12/2019 D12: M
anpower : syariff, wil, sukarno, yosep,
d sabarudin30/11/2019 N12: M
anpower : Raditya, Yonathan, Pahmil,
Radi, 30/11/19 NS : Replace brake pos 5
01/12/19 DS : torque bolt mounting brake pos 5.
fill tandem oil
both side.
install tyre pos 3, 4, 5, 6.
install fender.
bleeding brake
02/12/2019 1:45 AM
6.
75 6.
75 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Raditya, Pahmil, radi, 01/12/19 NS :
d Install cap of LHs lift cylinder
02/12/2019 1:45 AM
6.
75 6.
75 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Raditya, Pahmil, radi, 01/12/19 NS :
d Washing radiator core, completed cover of engine enclosure
02/12/2019 1:45 AM
6.
75 6.
75 0.
00 0.
00 Complete Electrical inspection 01/12/2019 N12: M
anpower : Hendra,Lilul
d , 01/12/19 NS : Performed electrical inspection continue, replaced
LH motor wiper, repaired rear check valve washer wiper block,
repaired nozzle washer wiper, jumper connector operator seat
present, repaired wiring motor suspension operator seat, replaced
starter motor.
02/12/2019 9:50 AM
0.
83 0.
83 0.
83 0.
83 Complete Schedule retoque tyre 02/12/2019 D12: Sugeng, Performed retorque tyre position 3, 4, 5,
d 6
27/11/2019 10:05 AM
1.
17 1.
17 1.
17 1.
17 Complete Indicator air filter restriction 27/11/2019 D12: Agus Royanni, Replace air cleaner
d flash ON
29/11/2019 9:20 AM
2.
08 2.
08 2.
07 2.
07 Complete Strip wear loose 29/11/2019 D12: M
anpower : Kurniwan, Hendy F, Replace strip
d wear
29/11/2019 9:20 AM
1.
33 1.
33 0.
00 0.
00 Complete Grease leaks 29/11/2019 D12: M
anpower : Kurniwan, Hendy F, Replace hose
d grease 2 ea
29/11/2019 8:40 PM
1.
17 1.
17 1.
17 1.
17 Complete Engine can't start 29/11/2019 N12: Yulianus, Daniel, ROOT CAUSE : Operator
d M
isuse.
Engine cant start due to emergency stop switch is ON.
27/11/2019 10:05 PM
2.
75 2.
75 2.
75 2.
75 Complete Operator seat can't adjust 27/11/2019 N12: Khoirun, Install elbow output motor air bag
d operator seat
02/12/2019 10:30 AM
3.
25 3.
25 3.
25 3.
25 Complete Operator seat cant adjust 02/12/2019 D12: M
anpower : Yaniwan, Kaharudin, Check operator
d seat drop and can’t adjust to raise.
Inspect motor compressor and
wiring.
FOUND : M
otor compressor operator seat fail (fitting air
hose broken).
Replace motor compressor it and performance test
27/11/2019 11:10 PM
3.
92 3.
92 3.
92 3.
92 Complete O-ring leak tyre pos 3 27/11/2019 N12: Sugeng, Replace o-ring tyre, replace spud and
d valve tyre
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 173 of 349
03/12/2019 6:40 PM
5.
00 5.
00 5.
00 5.
00 Complete 5148144 PM
500HRS Service (Duration Performed PM
500HRS service
d 5 Hrs) and Backlog Repair,
Planned 30 Hrs
29/11/2019 2:20 PM
0.
25 0.
25 0.
25 0.
25 Complete Door lock malfunction 29/11/2019 D12: joko, Repair and adjust LHs RHs door
d
02/12/2019 4:25 AM
58.
42 58.
42 58.
42 58.
42 Complete 4936744 Schedule engine midlife, 30/11/2019 D12: M
anpower : Anton, Irwanto, Asbudi.
Khoiri,
d planned 60 Hrs Surya30/11/2019 N12: M
anpower : Suradi, Nony, Lewi, 29/11/19
NS : Pre entry inspection, washing machine, drain coolant, replace
thermostat, replace water pump, replace stud and gasket exhaust
manifold, replace turbocharger
30/11/19 DS : Performed engine valve tune, Completed exhaust
tube and air intake, Prelube turbo charge, Change engine oil
30/11/19 NS : Bleeding fuel system, test running and check leak,
tighten hose bulk tube air induction loose
02/12/2019 4:25 AM
57.
42 57.
42 0.
00 0.
00 Complete 4936744 Electrical inspection 29/11/2019 N12: M
an power : Suradi, Nony, Lewi29/11/2019 N12:
d M
an power : Yonathan, Sugianto30/11/2019 D12: M
anpower : Adi,
Edi, Novick30/11/2019 N12: M
anpower : Bayu, Nuryanto, 29/11/19
NS : Pre entry electrical inspection, checked electrical defect.
30/11/2019 2:00 PM
7.
00 7.
00 0.
00 0.
00 Complete PM
1000HRS service 30/11/2019 D12: M
anpower : Anton, Irwanto, Asbudi, Khoiri,
d Surya, Performed PM
1000HRS service
02/12/2019 4:25 AM
33.
42 33.
42 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Suradi, Nony, Lewi30/11/2019 N12:
d TBM
M
anpower : Budiman, 30/11/19 NS : Replace strip wear
draw-bar and adjust home place strip wear circle shoe, adjust
shim and torque bolt, adjust insert cap blade lift both sides
30/11/19 NS : TBM
: Repair rh/lh safety hook blade holder
02/12/2019 4:25 AM
27.
42 27.
42 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Suradi, Nony, Lewi, 30/11/19 NS :
d Replace cutting edge and torque bolt
01/12/2019 5:00 PM
10.
00 10.
00 0.
00 0.
00 Complete Schedule TA 2 01/12/2019 D12: M
anpower : Anton, Irwanto, Asbudi, Khoiri, Surya
d , Performed TA2, Check all hydraulic, Steering, Transmission,
Accumulator pressure, Grounding test, grounding test machine,
checked auto lube system
27/11/2019 4:40 PM
0.
75 0.
75 0.
75 0.
75 Complete Engine oil low level 27/11/2019 D12: M
uh Istana, Inspect engine to check external
d leaks and top up engine oil 4 liters
03/12/2019 2:00 AM
4.
33 4.
33 4.
33 4.
33 Complete 5151996 PM
250HRS Service (Duration 02/12/2019 N12: M
anpower : Fajar, Heri, Performed PM
250HRS
d 4 Hrs) and Backlog Repair, Service
Planned 10 Hrs
03/12/2019 5:30 AM
3.
50 3.
50 3.
50 3.
50 Complete Backlog repair Replace strip wear circle 1ea, replace circle shoe bolts doe broken
d
03/12/2019 5:30 AM
3.
50 3.
50 0.
00 0.
00 Complete Backlog repair 02/12/2019 N12: M
anpower : Fajar, Danang, Completed bolt
d mounting grease tank, tightened hose line grease front axle
03/12/2019 7:20 AM
1.
83 1.
83 1.
83 1.
83 Complete Tyre inspection Adjust tyre pressure position 3 and 4
d
27/11/2019 1:35 PM
8.
08 6.
58 8.
08 6.
58 Complete Fast fill problem 27/11/2019 D12: M
anpower : M
argianto, Tonyes, 27/11/19 DS :
d Check and replace fuel shut off valve
29/11/2019 4:55 PM
3.
25 3.
25 3.
25 3.
25 Complete A/C 29/11/2019 D12: andik, didik
d , FOUND : AC high pressure system too high (350 psi), LP 25 psi.
Wash AC condenser
29/11/2019 1:40 AM
11.
50 11.
50 11.
50 11.
50 Complete Backlog repair 28/11/2019 D12: M
anpower : Tonyes, ismail, Raditya, 28/11/19 DS
d : Remove cutting edge
28/11/19 NS : Replace cutting edge
28/11/2019 9:30 PM
5.
00 5.
00 0.
00 0.
00 Complete 5142176 PM
500HRS service (Duration 28/11/2019 D12: M
anpower : Herman, Hisbul, Agus, Performed
d 5 hrs) and backlog repair, PM
500HRS service
Planned 12 hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 174 of 349
28/11/2019 9:30 PM
2.
50 2.
50 0.
00 0.
00 Complete Electrical inspection 28/11/2019 N12: M
anpower : Budi, Irham, Performed electrical
d inspection, replace relay with sealed protector for DLR, protect AC
low hose articulated
30/11/2019 4:10 AM
1.
25 1.
25 1.
25 1.
25 Complete Cutting edge worn out 29/11/2019 N12: M
anpower : Raditya, Tonyes, Sualiman, 29/11/19
d NS : Replace cutting edge
29/11/2019 11:10 PM
0.
50 0.
50 0.
50 0.
50 Complete Radio communication not 29/11/2019 N12: Yulianus, Daniel, Replace FRONT panel radio
d function communication
30/11/2019 2:00 AM
1.
00 1.
00 1.
00 1.
00 Complete TC895 : Lights 29/11/2019 N12: M
anpower : Totong S, Replace Lamp
d Combination Up RH 1 Set (Ex-used).
Repair Wiring Lamp.
Repair
Wiring Rotary
02/12/2019 9:20 PM
12.
00 12.
00 12.
00 12.
00 Complete TC895 : Seat belt broken Repair RH seat belt due to failure
d
27/11/2019 2:05 PM
0.
42 0.
42 0.
42 0.
42 Complete TC896 : Schedule retorque 27/11/2019 D12: M
anpower : Bagus S, Performed retorque tyre
d tyre POS.
1 and 2
29/11/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 Complete TC896 : Engine guard broken 29/11/2019 D12: M
anpower : Nehru, Gandhi, Replace Engine
d Bottom Guard
29/11/2019 3:00 PM
1.
83 1.
83 0.
00 0.
00 Complete TC896 : Electrical inspection 29/11/2019 D12: M
anpower : Nehru, Gandhi, Clean Socket
d Combination Lamp.
Additional job : Repair Fr Lh Power Window,
Repair Vacuum Solenoid Throttle
29/11/2019 3:00 PM
0.
75 0.
75 0.
00 0.
00 Complete TC896 : Tyre worn out 29/11/2019 D12: M
anpower : Nehru, Gandhi, Replace Tyre (Ex-
d used tyre) Post 1
02/12/2019 2:45 PM
0.
25 0.
25 0.
25 0.
25 Complete TC896 : Schedule re-torque 02/12/2019 D12: M
anpower : Watiman, Performed re-torque tyre
d tyre position FR LH
27/11/2019 8:25 PM
0.
25 0.
25 0.
25 0.
25 Complete TC897 : Rotary Lamp OFF 27/11/2019 N12: M
anpower : Agus, Repair rotary lamp wiring
d
29/11/2019 10:00 AM
1.
00 1.
00 1.
00 1.
00 Complete TC897 : Suspension problem 29/11/2019 D12: M
anpower : Gandhi, Nehru, Replace REAR LHs
d Bushing Shock
29/11/2019 10:00 AM
1.
00 1.
00 0.
00 0.
00 Complete TC897 : Tail lamp OFF 29/11/2019 D12: M
anpower : Gandhi, Nehru, Repair Wiring Tail
d Lamp Upper
29/11/2019 10:00 AM
1.
00 1.
00 0.
00 0.
00 Complete TC897 : Fuel pipe leaks 29/11/2019 D12: M
anpower : Gandhi, Nehru, Repair fuel pipe
d
29/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 Complete TC901 : PM
5.
000KM
Service 29/11/2019 N12: M
an power : Bagus S.
Totong S, Performed PM
d 5.
000KM
Service
29/11/2019 9:00 PM
2.
00 2.
00 0.
00 0.
00 Complete TC901 : Backlog repair 29/11/2019 N12: M
an power : Bagus S.
Totong S, Adjust Park
d Brake.
29/11/2019 5:00 PM
634.
00 58.
00 634.
00 58.
00 Complete TC905 : Body broken (Used epair body at PELITA M
OTOR
d Loan Car TC970)
29/11/2019 3:40 PM
0.
17 0.
17 0.
00 0.
00 Complete TC905 : Head Lamp OFF 29/11/2019 D12: M
anpower : Gandhi, Replace Bulb Head Lamp 1
d Pcs
28/11/2019 11:15 PM
1.
00 1.
00 1.
00 1.
00 Complete TC906 : Brake problem 28/11/2019 N12: M
an power : Watiman, Agus, Replace Piston
d Caliper Brake.
Replace Seal Kit Brake 1Pcs.
Replace Clip Shim
Brake FR 1Set.
Bleeding Brake.
Replace Fluid Brake 1 Pcs
29/11/2019 4:00 PM
5.
00 5.
00 5.
00 5.
00 Complete TC906 : AC 29/11/2019 D12: Done by Galant AC, Add Refrigerant
d
30/11/2019 12:00 AM
1.
00 1.
00 1.
00 1.
00 Complete TC906 : Lights 29/11/2019 N12: M
an power : Bagus S, Replace Lamp K2 1Pc.
30/11/2019 12:05 AM
1.
00 1.
00 0.
08 0.
08 Complete TC906 : Retorque Tyre 29/11/2019 N12: M
an power : Bagus S, Performed retorque tyre
d position 1
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 175 of 349
30/11/2019 12:05 AM
1.
00 1.
00 0.
00 0.
00 Complete TC906 : Engine oil low level 29/11/2019 N12: M
an power : Bagus S, Add Engine Oil 1,5Liters
d
27/11/2019 12:00 PM
1.
00 1.
00 1.
00 1.
00 Complete TC907 : AC 27/11/2019 D12: M
anpower : Bagus, Change refrigerant
d
28/11/2019 7:00 PM
2.
00 2.
00 2.
00 2.
00 Complete TC907 : park brake too low adjust parking brake
d
01/12/2019 9:40 AM
4.
92 4.
92 4.
92 4.
92 Complete TC907 : PM
10.
000KM
01/12/2019 D12: M
anpower : Gandhi, Nehru, Performed PM
d Service 10.
000KM
Service
02/12/2019 9:20 AM
23.
67 23.
67 23.
67 23.
67 Complete TC907 : Backlog repair 01/12/2019 D12: M
anpower : Gandhi, Nehru, 01/12/19 DS :
d Replace FRONT spider kit 2 pc, Change Oil T/F Gear, Replace
Spider Kit RR 1 pc
02/12/2019 9:00 AM
2.
00 2.
00 0.
00 0.
00 Complete TC907 : Tyre leaks 02/12/2019 D12: M
anpower : Suyitno, Agus, Replace Tyre
d
03/12/2019 7:35 AM
0.
25 0.
25 0.
25 0.
25 Complete TC907 : Schedule re-torque 03/12/2019 D12: Watiman, Performed re-torque tyre position RR
d tyre RH
27/11/2019 11:50 AM
18.
92 4.
83 18.
92 4.
83 Complete TC909 : Brake lamp OFF 27/11/2019 D12: M
PM
, Repair wiring brake lamp
d
27/11/2019 11:50 AM
18.
83 4.
83 0.
00 0.
00 Complete TC909 : Engine low power 27/11/2019 D12: M
PM
, Replace fuel filter
d
27/11/2019 8:00 PM
0.
25 0.
25 0.
25 0.
25 Complete TC909 : Tyre worn out 27/11/2019 N12: M
anpower : Watiman, Suyitno, Replace savero
d tyre with the new one 2 Pcs
30/11/2019 9:45 PM
1.
50 1.
50 1.
50 1.
50 Complete TC909 : Lights 30/11/2019 N12: M
an power : Totong S, Replace Lamp
d Combination Up 2Set (New)
01/12/2019 9:35 AM
0.
25 0.
25 0.
25 0.
25 Complete TC909 : Parking brake too 01/12/2019 D12: M
anpower : Nehru, Adjust parking brake
d high
27/11/2019 4:25 PM
2.
92 2.
92 2.
92 2.
92 Complete TC912 : PM
20.
000KM
service 27/11/2019 D12: M
anpower : Totong S, Deni S, Bagus S,
d Performed PM
20.
000KM
service
28/11/2019 4:25 AM
12.
00 12.
00 12.
00 12.
00 Complete TC912 : Backlog repair 27/11/2019 D12: M
anpower : Totong S, Deni S, Bagus
d S27/11/2019 N12: M
anpower : Watiman, Agus, Suyitno, 27/11/19
DS : Change Oil Transfer, Install Propeller Shaft
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 176 of 349
28/11/2019 4:25 AM
12.
00 12.
00 0.
00 0.
00 Complete TC912 : Backlog repair 27/11/2019 D12: M
anpower : Totong S, Deni S, Bagus S, 27/11/19
d DS : Replace Bearing FR 2Pc (FR RH+LH), Replace Seat
Suspension RR+RH.
28/11/2019 12:00 PM
19.
58 19.
58 7.
58 7.
58 Complete TC912 : Backlog repair 27/11/2019 D12: M
anpower : Totong S, Deni S, Bagus S, 27/11/19
d DS : Check Brake Pad and Brake Shoe
28/11/2019 8:15 PM
0.
08 0.
08 0.
08 0.
08 Complete TC912 : Schedule retorque 28/11/2019 N12: M
an power : Watiman, Performed retorque tyre
d tyre all position
27/11/2019 11:45 PM
0.
58 0.
58 0.
58 0.
58 Complete TC913 : FR RH door handle 27/11/2019 N12: M
anpower : Watiman, Repair Handle of FR RH
d malfunction Door
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete TC947 : Timing belt failure Replace Balancer Timing, Replace Valve Timing, Replace Adjuster
d Timing, Replace Arm Tensioner, Replace Pulley Timing Belt
28/11/2019 8:30 PM
0.
17 0.
17 0.
17 0.
17 Complete TC916 : Engine oil low level 28/11/2019 N12: M
an power : Watiman, Add Oil Engine 2 Liter
d
01/12/2019 4:20 PM
0.
33 0.
33 0.
33 0.
33 Complete TC919 ; Tire Leak 01/12/2019 D12: M
anpower : Nehru, Replace Tire Pos 1 (with
d spare tire)
02/12/2019 10:35 AM
0.
25 0.
25 0.
25 0.
25 Complete TC919 : Schedule re-torque 02/12/2019 D12: M
anpower : Watiman, Performed re-torque tyre
d tyre position FR LH
03/12/2019 11:00 AM
0.
83 0.
83 0.
83 0.
83 Complete TC920 : Regulator Power 03/12/2019 D12: Suyitno, Repair Regulator Power Window FR RH
d Window Noise
27/11/2019 1:50 PM
2.
42 2.
42 2.
42 2.
42 Complete TC921 : Engine excessive 27/11/2019 D12: M
PM
team, Check and repair engine noise
d noise
01/12/2019 8:05 AM
0.
25 0.
25 0.
25 0.
25 Complete TC921 : Parking brake too 01/12/2019 D12: M
anpower : Nehru, Adjust Parking Brake
d high
27/11/2019 2:30 PM
0.
33 0.
33 0.
33 0.
33 Complete TC922 : Schedule retorque 27/11/2019 D12: M
anpower : Bagus S, Performed retorque tyre
d tyre POS.
1 and 2
28/11/2019 10:00 PM
1.
00 1.
00 1.
00 1.
00 Complete TC922 : PM
5.
000KM
Service 28/11/2019 N12: M
an power : Watiman, Suyitno, Performed PM
d 5.
000KM
Service
28/11/2019 10:00 PM
1.
00 1.
00 0.
00 0.
00 Complete TC922 : Electrical inspection 28/11/2019 N12: M
an power : Watiman, Suyitno, Replace Bulb K2
d 1Pcs
30/11/2019 2:30 PM
4.
50 4.
50 4.
50 4.
50 Complete TC922 : Engine low power 30/11/2019 D12: M
anpower : Nehru, Clean Solenoid Throttle
d Valve, Clean Air Filter, Clean Fuel Filter, Check All Lamp, Clean
APS
30/11/2019 7:45 PM
0.
75 0.
75 0.
75 0.
75 Complete TC922 : Tyre Leak 30/11/2019 N12: M
an power : Totong S, Repair Tubles Tyre 2Pc
d
27/11/2019 1:40 PM
0.
50 0.
50 0.
50 0.
50 Complete TC923 : Schedule retorque 27/11/2019 D12: M
anpower : Bagus, Performed retorque tyre 2,3,
d tyre and 4
03/12/2019 8:35 PM
1.
58 1.
58 1.
58 1.
58 Complete TC924 : PM
5.
000KM
service 03/12/2019 N12: M
anpower : Gandhi, Nehru, Performed PM
d 5.
000KM
service
03/12/2019 7:40 PM
0.
67 0.
67 0.
00 0.
00 Complete Electrical inspection Check Battery, Replace Bulb k2 1pc
d
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 177 of 349
03/12/2019 8:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Backlog repair Adjust Parking Brake
d
03/12/2019 8:55 PM
1.
25 1.
25 0.
33 0.
33 Complete AC service Clean AC Filter,
d
29/11/2019 3:40 PM
0.
17 0.
17 0.
17 0.
17 Complete TC926 : Head Lamp OFF 29/11/2019 D12: M
anpower : Nehru, Replace Bulb of Head Lamp
d 1 Pcs
27/11/2019 8:30 AM
1.
00 1.
00 1.
00 1.
00 Complete TC927 : Tyre POS 1 leaks 27/11/2019 D12: Hamka, Jonianto, Replace tyre pos 1
d
27/11/2019 7:35 PM
0.
17 0.
17 0.
17 0.
17 Complete TC927 : Tyre Leak 27/11/2019 N12: M
anpower : Suyitno, Replace Tyre Savero (Ex-
d used tyre)
01/12/2019 10:05 PM
1.
50 1.
50 1.
50 1.
50 Complete TC927 : Tyre POS.
2 leaks eplace tyre POS.
2 leaks
d
02/12/2019 1:15 PM
0.
25 0.
25 0.
25 0.
25 Complete TC927 : Schedule re-torque 02/12/2019 D12: M
anpower : Watiman, Performed re-torque tyre
d tyre position FR RH
03/12/2019 11:35 AM
0.
92 0.
92 0.
92 0.
92 Complete TC927 : Seat Belt RR LH 03/12/2019 D12: Watiman, Replace Seat Belt RR LH
d Broken
01/12/2019 8:30 AM
0.
25 0.
25 0.
25 0.
25 Complete TC929 : Battery low voltage 01/12/2019 D12: M
anpower : Gandhi, Nehru, Replace Battery (ex-
d used part TC884)
01/12/2019 2:30 PM
0.
17 0.
17 0.
17 0.
17 Complete TC929 : Wiper problem 01/12/2019 D12: M
anpower : Gandhi, Nehru, Clean up nozzle
d wiper
02/12/2019 10:30 PM
3.
08 3.
08 3.
08 3.
08 Complete TC929 : PM
125.
000KM
02/12/2019 N12: M
anpower : Gandhi, Nehru, Performed
d service PM
125.
000KM
service
02/12/2019 8:05 PM
0.
58 0.
58 0.
00 0.
00 Complete TC929 : Backlog repair Replace shock absorber operator seat
d
02/12/2019 9:05 PM
1.
00 1.
00 0.
00 0.
00 Complete TC929 : Backlog repair Add Water Battery 2btl, Replace Bulb K2 2pc
d ,Replace Bulb K2 2pc, Replace Bulb K2 2pc, Replace Fuse 7,5 A
(ex TC 928) 1pc
02/12/2019 10:30 PM
1.
42 1.
42 0.
00 0.
00 Complete TC929 : Backlog repair Replace Spider Kit FR 2pc, Change Oil T/F Gaer
d
03/12/2019 2:35 PM
0.
25 0.
25 0.
25 0.
25 Complete TC929 : Schedule re-torque 03/12/2019 D12: Suyitno, Performed re-torque tyre position FR
d tyre LH/FR RH
28/11/2019 10:00 AM
653.
00 27.
00 653.
00 27.
00 Complete TC931 : 4 WD Problem (Used Replace RH LH drive shaft
d Loan Car TC937)
28/11/2019 5:00 PM
1.
00 1.
00 1.
00 1.
00 Complete TC931 : Rotary lamp OFF Replace Relay (Ex), Replace Rotary (Ex TC869)
d
29/11/2019 11:45 PM
3.
00 3.
00 3.
00 3.
00 Complete TC960 : PM
20.
000KM
29/11/2019 N12: M
an power : Totong S, Bagus S, Performed PM
d Service 20.
000KM
Service
30/11/2019 4:15 PM
16.
50 16.
50 16.
50 16.
50 Complete TC960 : Electrical inspection 29/11/2019 N12: M
an power : Totong S, Bagus S, Repair Lamp
d Combination Up .
Replace M
otor Washer Wiper.
Repair Nozzle
Wiper
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 178 of 349
30/11/2019 4:15 PM
16.
50 16.
50 0.
00 0.
00 Complete TC960 : Backlog repair 29/11/2019 N12: M
an power : Totong S, Bagus S30/11/2019 D12:
d M
anpower : Gandhi, Replace Spider Kit FR 1Pc.
Replace Spider
Kit RR
30/11/2019 4:15 PM
16.
50 16.
50 0.
00 0.
00 Complete TC960 : Backlog repair 29/11/2019 N12: M
an power : Totong S, Bagus S, Check Brake
d All.
Adjust Park Brake
30/11/2019 4:15 PM
16.
50 16.
50 0.
00 0.
00 Complete TC960 : Backlog repair 29/11/2019 N12: M
an power : Totong S, Bagus S, Replace Tie
d Rod And FR+LH
30/11/2019 10:15 PM
0.
25 0.
25 0.
25 0.
25 Complete TC960 : Schedule retorque 30/11/2019 N12: M
an power : Deni S, Performed retorque tyre
d tyre position 1
03/12/2019 11:30 PM
1.
00 1.
00 1.
00 1.
00 Complete TC960 : Head lamp OFF Replace Bulb H4 1pc
d
29/11/2019 10:30 PM
3.
50 3.
50 3.
50 3.
50 Complete TC945 : PM
20.
000KM
Performed PM
20.
000KM
Service
d Service
02/12/2019 3:00 PM
64.
50 64.
50 64.
50 64.
50 Complete TC945 : Brake System (Used 29/11/2019 N12: M
an power : Deni S30/11/2019 D12: M
anpower :
d Loan Car TC937) Nehru, 29/11/19 NS : Adjust Park Brake.
Replace Brake Pad
02/12/19 DS : Replace Brake Pad Fr Lh, Greasing Pin Claiper Lh,
Replace Brake Pad Fr Rh, Replace Piston Caliper Rh, Replace
Seal Piston Rh, Bleeding Brake
03/12/2019 7:25 AM
0.
25 0.
25 0.
25 0.
25 Complete TC945 : Schedule retorque 03/12/2019 D12: Watiman, Performed re-torque tyre position FR
d tyre LH/FR RH
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete TC947 : Timing belt fail Replace Timing belt assy
d
30/11/2019 8:00 AM
0.
50 0.
50 0.
50 0.
50 Complete TC947 : Parking brake 30/11/2019 D12: M
anpower : Gandhi, Adjusted parking brake
d problem
01/12/2019 3:45 PM
1.
00 1.
00 1.
00 1.
00 Complete TC952 : 4WD problem 01/12/2019 D12: M
anpower : Gandhi, Replace Spider Kit FR 1pc,
d Change transfer Gear oil
03/12/2019 3:30 PM
0.
25 0.
25 0.
25 0.
25 Complete TC952 : Lights 03/12/2019 D12: Watiman, Replace Bulb H4 1 Pcs, Replace Fuse
d 20 A 1 Pcs, Repair Horn
28/11/2019 3:00 PM
1.
50 1.
50 1.
50 1.
50 Complete TC019 : PM
70.
000KM
service 28/11/2019 D12: Done by Transcone, Performed PM
70.
000KM
d service
30/11/2019 8:00 AM
0.
50 0.
50 0.
50 0.
50 Complete TC021 : Lights 30/11/2019 D12: Done by Transcone, Replace head lamp,
d Replace H4 lamp 1 ea
27/11/2019 11:30 AM
3.
00 3.
00 3.
00 3.
00 Complete TC018 : Rear back door fail Repair Rear back door fail.
Repair guard front broken
d (Used Loan Car TC031)
03/12/2019 8:25 AM
0.
42 0.
42 0.
42 0.
42 Complete TC967 : Lights 03/12/2019 D12: Watiman, Replace Bulb K2 1 Pcs
d
28/11/2019 3:10 PM
1.
00 1.
00 1.
00 1.
00 Complete TC966 : Engine bottom guard Repaired engine bottom guard
d failure
03/12/2019 10:30 AM
1.
00 1.
00 1.
00 1.
00 Complete TC965 : PM
500KM
Service 03/12/2019 D12: Watiman, Suyitno, Performed PM
500KM
d Service
28/11/2019 2:15 PM
5.
25 5.
25 5.
25 5.
25 Complete TC963 : PM
20.
000KM
service erformed PM
20.
000KM
service
d
28/11/2019 10:50 AM
1.
83 1.
83 0.
00 0.
00 Complete TC963 : Backlog repair Replace propeller shaft
d
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 179 of 349
30/11/2019 9:30 AM
0.
67 0.
67 0.
67 0.
67 Complete TC963 : Rotary Lamp OFF 30/11/2019 D12: M
anpower : Nehru, Repair Wiring of rotary lamp
d
01/12/2019 8:15 PM
1.
25 1.
25 1.
25 1.
25 Complete TC959 : PM
5000KM
service erformed PM
5000KM
service
d
01/12/2019 8:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Backlog repair djusted brake system
d
28/11/2019 9:25 PM
0.
08 0.
08 0.
08 0.
08 Complete TC957 : Lights 28/11/2019 N12: M
an power : Agus, Replace Bulb H4 1Pcs
d
03/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete TC956 : PM
500KM
Service 03/12/2019 D12: M
anower : Watiman, Suyitno, Performed PM
d 500KM
Service
27/11/2019 10:35 AM
0.
58 0.
58 0.
58 0.
58 Complete TC953 : Schedule retorque 27/11/2019 D12: M
anpower : Bagus, Performed retorque tyre all
d tyre position
30/11/2019 10:20 AM
0.
33 0.
33 0.
33 0.
33 Complete TC953 : Lights 30/11/2019 D12: M
anpower : Gandhi, Replace Bulb of Stop Lamp
d 1 Pcs
30/11/2019 10:20 AM
0.
33 0.
33 0.
00 0.
00 Complete TC953 : Engine low power 30/11/2019 D12: M
anpower : Gandhi, Bleeding Fuel Pump
d
30/11/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 Complete TC951 : PM
10.
000KM
30/11/2019 N12: M
an power : Bagus S, Deni S, Performed PM
d Service 10.
000KM
Service
30/11/2019 9:00 PM
2.
00 2.
00 0.
00 0.
00 Complete TC951 : Backlog repair 30/11/2019 N12: M
an power : Bagus S, Deni S, Adjust Park Brake
d
30/11/2019 9:00 PM
2.
00 2.
00 0.
00 0.
00 Complete TC951 : Electrical inspection 30/11/2019 N12: M
an power : Bagus S, Deni S, Replace Back
d Buzzer.
Check All Lamp.
Add Water Battery 1Btl.
Clean Filter Ac
29/11/2019 7:30 AM
0.
50 0.
50 0.
50 0.
50 Complete TC026 : Rotary lamp OFF 29/11/2019 D12: Transkon, Replace rotary lamp OFF
d
29/11/2019 8:00 AM
1.
00 1.
00 1.
00 1.
00 Complete TC030 : PM
5000KM
Service 29/11/2019 D12: Transkon, Performed PM
5000KM
Service
d
30/11/2019 9:20 AM
0.
33 0.
33 0.
33 0.
33 Complete TC030 : Horn fail 30/11/2019 D12: Done by Transcone, Replace horn 1 ea
d
02/12/2019 7:15 AM
0.
25 0.
25 0.
25 0.
25 Complete TC030 : Engine oil low level Top up engine oil
d
27/11/2019 5:10 PM
1.
67 1.
67 1.
67 1.
67 Complete TC029 : RH front drive shaft Repair RH front drive shaft
d fail (Used Loan dCar TC032)
27/11/2019 4:30 PM
1.
00 1.
00 0.
00 0.
00 Complete TC029 : RH front boot shaft Replace RH front boot shaft inner fail
d inner fail (Used Loan dCar
TC032)
27/11/2019 10:30 AM
3.
00 3.
00 3.
00 3.
00 Complete TC025 : PM
110.
000KM
27/11/2019 D12: Done by Transcone, Performed PM
110.
000KM
d service service
27/11/2019 10:30 AM
3.
00 3.
00 0.
00 0.
00 Complete TC025 : Backlog repair 27/11/2019 D12: Done by Transcone, Replace FRONT spider kit,
d Replace FRONT RHs drive shaft joint bearing
02/12/2019 7:15 AM
29.
25 29.
25 29.
25 29.
25 Complete TC022 : Tyre pos 4 leak (Used Replace Tyre pos 4 leak
d Loan Car TC032)
02/12/2019 3:30 PM
9.
50 9.
50 8.
25 8.
25 Complete TC022 : Battery broken (Used Replace battery
d Loan Car TC032)
30/11/2019 11:30 AM
1.
50 1.
50 1.
50 1.
50 Complete TC023 : PM
85.
000KM
service 30/11/2019 D12: Done by Transcone, Performed PM
85.
000KM
d service
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 180 of 349
03/12/2019 2:20 PM
0.
83 0.
83 0.
83 0.
83 Complete TC973 : Engine Low Power 03/12/2019 D12: Watiman, Clean solenoid Throttle Valve, Replace
d Bulb K2Pcs, Adjust Parking Brake
02/12/2019 4:20 PM
2.
58 2.
58 2.
58 2.
58 Complete TC972 : Engine Low Power 02/12/2019 D12: M
anpower : Suyitno, Replace Fuel Filter
d
30/11/2019 3:10 PM
1.
17 1.
17 1.
17 1.
17 Complete TC004 : PM
5.
000KM
service 30/11/2019 D12: Done by Transcone, Performed PM
5.
000KM
d service
28/11/2019 9:55 AM
0.
92 0.
92 0.
92 0.
92 Complete TC011 : PM
35.
000KM
service 28/11/2019 D12: Done by Transcone, Performed PM
35.
000KM
d service
28/11/2019 1:10 PM
0.
17 0.
17 0.
17 0.
17 Complete TC007 : Lights 28/11/2019 D12: Done by Transcone, Replace low beam lamp 1
d ea
28/11/2019 9:10 AM
0.
92 0.
92 0.
92 0.
92 Complete TC013 : PM
24.
000KM
service 28/11/2019 D12: Done by Transcone, Performed PM
24.
000KM
d service
27/11/2019 9:05 PM
2.
25 2.
25 2.
25 2.
25 Complete Engine Shutdown 27/11/2019 N12: Syahruddin, Check and FOUND : Coolant buble,
d temporary top up coolant 2 ltrs
28/11/2019 9:25 PM
0.
33 0.
33 0.
33 0.
33 Complete Engine Shutdown 28/11/2019 N12: Syahruddin, Check and bleeding morvi gauge
d
30/11/2019 1:05 AM
1.
42 1.
42 1.
42 1.
42 Complete Engine shutdown 29/11/2019 N12: M
uh M
asdar, M
usa, Bleeding fuel system
d
02/12/2019 8:00 PM
1.
25 1.
25 1.
25 1.
25 Complete Engine cant running 02/12/2019 N12: thomson, Top up coolant, bleeding murphy
d
30/11/2019 3:55 AM
0.
92 0.
92 0.
92 0.
92 Complete Engine shutdown 29/11/2019 N12: M
usa, M
uh M
asdar, Top up radiator, bleeding
d murphey gauge
30/11/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5143783 PM
500HRS Service, Planned 30/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
27/11/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5156000 PM
1000HRS service, 27/11/2019 D12: M
anpower : Heri, Jondi, Taufan, Performed PM
30/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5141212 PM
2000HRS Service, 30/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
27/11/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5140407 PM
250HRS service, Planned 27/11/2019 D12: M
anpower : Heri, Jondi, Taufan, Performed PM
29/11/2019 2:05 AM
2.
67 2.
67 2.
67 2.
67 Complete Fuel low level 28/11/2019 N12: Syahruddin, Top up fuel 173 ltr and bleeding fuel
d system
29/11/2019 5:00 PM
1.
50 1.
50 1.
50 1.
50 Complete Engine cant start 29/11/2019 D12: rully, ROOT CAUSE : Operator M
isuse.
FOUND :
d Check and found starting switch at ON position, causing battery
low, jumper battery
29/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5141189 PM
250HRS Service, Planned 29/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
02/12/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5144339 PM
500HRS Service, planned 02/12/2019 D12: M
uhaimin, Gunawan, Parlin, Performed PM
03/12/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5140422 PM
500HRS Service, planned 03/12/2019 D12: M
anpower : M
uhaimin, Gunawan, Parlin,
d 3 hrs Performed PM
500HRS service
28/11/2019 9:55 PM
2.
67 2.
67 2.
67 2.
67 Complete Engine can't running 28/11/2019 N12: Syahruddin, Check and Sensor coolant failure,
d temporary jump sensor coolant level
03/12/2019 8:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Engine can't start jump battery to start
d
01/12/2019 2:15 PM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS service, planned 01/12/2019 D12: M
anpower : Azer, David, Parlin, Performed PM
02/12/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5153131 PM
250HRS Service, planned 02/12/2019 D12: M
anpower : M
uhaimin, Gunawan, Parlin,
d 3 hrs Performed PM
250HRS service
02/12/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5142494 PM
500HRS Service, planned erformed PM
500HRS service
d 3 hrs
03/12/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5165368 PM
500HRS Service, planned 03/12/2019 D12: mapower : M
uhaimin, Gunawan, Parlin ,
d 3 hrs Performed PM
500HRS service
29/11/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5133747 PM
500HRS Service, Planned 29/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
01/12/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS service, planned 01/12/2019 D12: M
anpower : Azer, David, Performed PM
250HRS
d 3 hrs Service
29/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5144358 PM
250HRS Service, Planned 29/11/2019 D12: Parlin, Performed PM
250HRS Service
d 3 Hrs
29/11/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5156038 PM
250HRS Service, Planned 29/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 181 of 349
28/11/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5124834 PM
500HRS Service, Planned 28/11/2019 D12: Performed PM
500HRS service, Performed PM
29/11/2019 9:45 PM
1.
67 1.
67 1.
67 1.
67 Complete BCS_Engine can't start 29/11/2019 N12: M
uh M
asdar, Replace starter motor relay
d
02/12/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5137393 PM
250HRS Service, planned 02/12/2019 D12: M
anpower : M
uhaimin, Gunawan, Parlin,
d 3hrs Performed PM
250HRS service
27/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5141159 PM
250HRS service, Planned 27/11/2019 D12: M
anpower : Heri, Jondi, Taufan, Performed PM
30/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5143780 PM
250HRS Service, Planned 30/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
30/11/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5141223 PM
1000HRS Service, 30/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5135405 PM
500HRS Service, Planned 28/11/2019 D12: M
anpower : Taufan, Jhondi, Heri, Performed PM
02/12/2019 12:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5142395 PM
250HRS Service, planned 02/12/2019 D12: M
anpower : M
uhaimin, Gunawan, Parlin,
d 3 hrs Performed PM
250HRS service
01/12/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS service, planned 01/12/2019 D12: Azer, David, Parlin, Performed PM
250HRS
d 3 hrs service
29/11/2019 1:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5133666 PM
250HRS Service, Planned 29/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
30/11/2019 8:45 PM
1.
75 1.
75 1.
75 1.
75 Complete BCS_Battery low voltage 30/11/2019 N12: M
uh M
asdar, M
usa, Battery low voltage.
Jumped
d battery to start
27/11/2019 9:50 PM
1.
83 1.
83 1.
83 1.
83 Complete Engine Shutdown 27/11/2019 N12: Syahruddin, Check and reposition radiator out of
d its holder
02/12/2019 10:20 PM
3.
00 3.
00 3.
00 3.
00 Complete Fuel low level 02/12/2019 N12: thomson, Top up fuel, bleeding fuel system
d
30/11/2019 9:10 AM
16.
17 16.
17 16.
17 16.
17 Complete Lamp OFF 30/11/2019 D12: saulan, Check lamp breaker, repair lamp off
d
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5141179 PM
500HRS Service, Planned 28/11/2019 D12: M
anpower : Taufan, Jhondi, Heri, Performed PM
27/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5127994 PM
250HRS service, Planned 27/11/2019 D12: M
anpower : Heri, Jondi, Taufan, Performed PM
02/12/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5153063 PM
250HRS Service, planned 02/12/2019 D12: M
anpower : Gunawan, M
uhaimin, Parlin,
d 3 hrs Performed PM
250HRS service
01/12/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS service, planned 01/12/2019 D12: M
anpower : David, Azer, David, Performed PM
02/12/2019 10:50 PM
2.
17 2.
17 2.
17 2.
17 Complete Engine shutdown 02/12/2019 N12: thomson, Washing radiator core
d
03/12/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5128002 PM
500HRS Service, planned 03/12/2019 D12: M
anpower : M
uhaimin, Gunawan, Parlin,
d 3 hrs Performed PM
500HRS service
28/11/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5150374 PM
2000HRS Service, 28/11/2019 D12: M
anpower : Taufan, Jhondi, Heri, Performed PM
03/12/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5144452 PM
250HRS Service, planned 03/12/2019 D12: M
anpower : M
uhaimin, Gunawa, Performed PM
01/12/2019 1:00 PM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS service, planned erformed PM
250HRS service
d 3 hrs
29/11/2019 11:00 AM
3.
00 3.
00 3.
00 3.
00 Complete 5150464 PM
500HRS Service, Planned 29/11/2019 D12: M
anpower : Azer, David, Taufan, Performed PM
28/11/2019 12:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Fuel low level 27/11/2019 N12: Tasri, Top up fuel 120 ltr
d
03/12/2019 9:45 PM
1.
42 1.
42 1.
42 1.
42 Complete Engine can't running 03/12/2019 N12: thomson, Bleeding fuel system
d
28/11/2019 5:25 AM
3.
00 3.
00 3.
00 3.
00 Complete 5150298 PM
250HRS service (Duration 27/11/2019 N12: M
anpower : Sinabang,Edi, Performed PM
28/11/2019 5:25 AM
2.
75 2.
75 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : budiono, wahyudi, Electrical
d inspection, clean up AC filter, battery maintenance
28/11/2019 8:10 AM
2.
75 2.
75 2.
75 2.
75 Complete M
echanical inspection 28/11/2019 D12: M
anpower : Novry, Sultani, Performed
d mechanical inspection
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 182 of 349
30/11/2019 5:20 PM
9.
67 9.
67 9.
67 9.
67 Complete Blade noise 30/11/2019 D12: fajar, top up grease
d
30/11/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Electrical inspection 30/11/2019 D12: M
anpower : Dimas, Edi Sutarta, Daniel,
d Performed electrical inspection, Checked lighting, AC and charging
system, Service battery, Test load battery
02/12/2019 9:35 AM
7.
58 7.
58 7.
58 7.
58 Complete Tyre handler not work 01/12/2019 N12: M
anpower : Zetting, Ari, 01/12/19 NS : Checked
d rotation tyre handler not work, checked wiring at junction
connector and replaced pin
connector for tyre rotation (cable cut off)
28/11/2019 7:30 AM
12.
50 12.
50 12.
50 12.
50 Complete Brake chamber loose 27/11/19 NS : Replaced chamber brake dolly pos 4 leak, Repair
d rod chamber brake pos 11 and 12 due to bend
28/11/2019 7:30 AM
12.
50 12.
50 0.
00 0.
00 Complete Ram door mounting crack 27/11/2019 N12: M
anpower : Agus, Sigit, Repair mounting ram
d door due to crack
27/11/2019 4:00 PM
21.
00 9.
00 21.
00 9.
00 Complete Schedule radiator 26/11/2019 N12: M
anpower : Huda, Aswan, Santoso, Yadi
d replacement, planned 24 hrs 27/11/2019 D12: M
anpower : Herianto ,eko, 26/11/19 NS : install
radiator, install canopy, Install, A-frame, install hose upper/lower
tank radiator
27/11/19 DS : Install hose turbo to after cooler,fill up coolant
radiator 40 ltrs, complete bolts canopy, install clamp hose reservoir
tank, test engine running
03/12/2019 7:00 AM
336.
00 144.
00 336.
00 144.
00 Complete 5148547 Schedule repair bulk water Repair and return bulk water pump to BSF
d pump, planned 336 Hrs
30/11/2019 10:25 AM
1.
00 1.
00 1.
00 1.
00 Complete Engine oil low level 30/11/2019 D12: riadi, fill up engine oil 10 litrs
d
30/11/2019 11:45 PM
1.
67 1.
67 1.
67 1.
67 Complete Engine oil low level 30/11/2019 N12: M
anpower : Heru, abu, jefry, Top up engine oil 4
d liter (no found leaking.
Indication : engine oil consumption)
01/12/2019 11:15 AM
0.
75 0.
75 0.
75 0.
75 Complete PM
250HRS Service, Planned 01/12/2019 D12: eko, angga, Performed PM
250HRS Service
d 6 Hrs
01/12/2019 3:15 PM
4.
00 4.
00 4.
00 4.
00 Complete 5174038 M
echanical inspection 01/12/2019 D12: M
anpower : Dheri, Eko, Replace hose discharge
d vacuum compressor, Replace hose lube vacuum compressor,
Replace hose cooling vacuum compressor, washing unit
01/12/2019 10:45 PM
1.
92 1.
92 1.
92 1.
92 Complete Engine low power 01/12/2019 N12: M
anpower : Heru ,abu ,jefry, Clean up fuel filter
d and fuel racor
30/11/2019 1:15 PM
4.
75 4.
75 4.
75 4.
75 Complete Engine cant run 30/11/2019 D12: agung, ROOT CAUSE : Incorrect Reported Fault.
28/11/2019 2:25 PM
3.
67 3.
67 3.
67 3.
67 Complete Pump can't suck 28/11/2019 D12: Abu Pattiroi, ROOT CAUSE : Incorrect Reported
d Fault.
After check and performance test, NO problem was found
28/11/2019 11:00 PM
2.
75 2.
75 2.
75 2.
75 Complete Engine low power 28/11/2019 N12: M
anpower : Agung, Replace fuel filter and fuel
d separator
29/11/2019 3:15 PM
1.
33 1.
33 1.
33 1.
33 Complete Pump cant suck 29/11/2019 D12: agung, ROOT CAUSE : Incorrect Reported Fault.
03/12/2019 4:00 AM
2.
17 2.
17 2.
17 2.
17 Complete Pump can't suck Adjust gland seal
d
30/11/2019 2:30 PM
1.
00 1.
00 1.
00 1.
00 Complete 5147984 PM
500HRS Service (Duration 30/11/2019 D12: eko, angga, Performed PM
500HRS Service
d 6 Hrs) and Backlog Repair,
Planned 48 Hrs
02/12/2019 1:30 PM
47.
00 47.
00 47.
00 47.
00 Complete Schedule flushing fuel tank 01/12/2019 D12: M
anpower : Riadi ,Lewi01/12/2019 N12:
d M
anpower : Heru ,abu ,jefry02/12/2019 D12: Huda30/11/2019
N12: M
anpower : Heru, abu, jefry, 30/11/19 NS : Drain fuel,
Performed flushing fuel tank.
04/12/2019 9:30 AM
8.
25 5.
75 8.
25 5.
75 Complete Error 11 04/12/2019 D12: Ari Rintoko, Clean up sensor rail pressure
d
03/12/2019 10:55 AM
1.
58 1.
58 1.
58 1.
58 Complete 5157172 PM
250HRS service, planned 6 03/12/2019 D12: KSB M
ech, Performed PM
250HRS service
d hrs
30/11/2019 4:40 AM
17.
42 17.
42 17.
42 17.
42 Complete Reducer outlet pipe leaks 29/11/2019 N12: Done by KSB, 29/11/19 NS : Repair and install
d back reducer outlet pipe
01/12/2019 1:15 PM
3.
42 3.
42 3.
42 3.
42 Complete PM
250HRS Service, Planned Performed PM
250HRS Service
d 6 Hrs
03/12/2019 1:20 AM
5.
33 5.
33 5.
33 5.
33 Complete Pump cant suck Replace gland seal
d
29/11/2019 3:00 AM
9.
00 9.
00 9.
00 9.
00 Complete 5160071 Schedule bi weekly inspection, Performed bi weekly inspection
d Planned 10 Hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 183 of 349
29/11/2019 10:00 AM
2.
00 2.
00 2.
00 2.
00 Complete Check grease pump high 29/11/2019 D12: M
anpower : Faisal,Avy,Fajar, Performed Check
d pressure grease pump high pressure
29/11/2019 10:00 AM
2.
00 2.
00 0.
00 0.
00 Complete Coolant pump due to low 29/11/2019 D12: M
anpowqer : Faisal,Avy,Fajar, Performed coolant
d pressure pump due to low pressure
29/11/2019 10:00 AM
2.
00 2.
00 0.
00 0.
00 Complete Ignition key fail Replace ignition key
d
30/11/2019 4:30 PM
2.
50 2.
50 2.
50 2.
50 Complete 5079478 PM
250HRS Service (Duration 30/11/2019 D12: M
an power : Djemik, Fajar, Performed PM
01/12/2019 1:00 AM
8.
50 8.
50 8.
50 8.
50 Complete Backlog Repair 30/11/2019 N12: M
anpower : Jaka, Haris, Roy, 30/11/19 NS :
d Check and repair PTO some times stuck (ok), Adjust grease pump
module pressure, replace flow meter oil SAE 85
01/12/2019 7:30 PM
11.
00 11.
00 11.
00 11.
00 Complete PTO pump problem 01/12/2019 D12: M
an power : Faisal, Avy, Fajar, 01/12/19 DS :
d Check PTO pump suddenly low rotation, check and reseal
cartridge solenoid control PTO pump, check pressure hoist supply
30/11/2019 6:30 AM
7.
50 7.
50 7.
50 7.
50 Complete Waste oil pump module low 29/11/2019 N12: M
anpower : Bakhtiar, Budi, Agung, 29/11/19 NS :
d Replace service module waste oil pump assy, clean up grease
around grease pump module area, replace service module grease
pump
02/12/2019 9:00 PM
6.
00 6.
00 6.
00 6.
00 Complete Grease pump for service 02/12/2019 N12: M
anpower : Avy,Apri,Fajar, Repair grease pump
d module fail high volume stuck,test performance
03/12/2019 11:45 AM
1.
25 1.
25 1.
25 1.
25 Complete Unit can't move forward and 03/12/2019 D12: M
atius.
Erwanta, Retighten connector gear
d reverse selector sensor and test performance
01/12/2019 8:10 AM
1.
00 1.
00 1.
00 1.
00 Complete BCS_Engine can't start 01/12/2019 D12: budi, rendra, ROOT CAUSE : Operator M
isuse.
30/11/2019 9:40 AM
7.
00 7.
00 7.
00 7.
00 Complete Water coolant leaks 29/11/2019 N12: M
anpower : Rizal, Andi30/11/2019 D12:
d M
anpower : ahsan, junaidi, 30/11/19 DS : Drain/refill coolant
radiator, remove and repair tube LH cooling turbo cracks and leaks
01/12/2019 10:50 AM
4.
67 4.
67 4.
67 4.
67 Complete Sidewall cut cracking tyre pos 01/12/2019 D12: M
anpower : M
.
Arif, enos tinting, Heppy, Replace
d 3 tyre pos 3 with spare tyre and matching tyre pos 4
03/12/2019 11:45 AM
1.
33 1.
33 1.
33 1.
33 Complete TKPH high 03/12/2019 D12: Sudirman,Sofyan, Check TKPH warm high, RTR
d suspension pressure sensor error.
FOUND: Connector RTR
suspension pressure sensor disconnection (connector can’t lock).
27/11/2019 11:55 AM
0.
58 0.
58 0.
58 0.
58 Complete LH cabin door failure 27/11/2019 D12: Djunaedy, Adjust streker LH cabin door
d
29/11/2019 9:15 AM
1.
25 1.
25 1.
25 1.
25 Complete A/C 29/11/2019 D12: rahmad, check wiring and AC compressor clutch
d power, check cable AC low pressure switch cut off, cable not fix,
replace AC low pressure switch
29/11/2019 9:35 AM
0.
33 0.
33 0.
33 0.
33 Complete Transmission oil low level 29/11/2019 D12: budi, Fill up transmission oil
d
29/11/2019 4:55 PM
0.
33 0.
33 0.
33 0.
33 Complete Door Lock M
alfunction 29/11/2019 D12: anang, adjust LHs door latch
d
03/12/2019 2:00 AM
5.
00 5.
00 5.
00 5.
00 Complete 5147847 PM
500HRS Service (Duration 02/12/2019 N12: M
anpower : Nyoto, Sunarno, Performed PM
03/12/2019 9:00 AM
7.
00 7.
00 7.
00 7.
00 Complete Inspection FOUND : A-frame Check A-frame cracks
d cracks
03/12/2019 9:00 AM
2.
00 2.
00 0.
00 0.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Basri, Amos, Noris, M
ursafah,
d 03/12/19 DS : Change out main drive shaft
03/12/2019 12:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Over run : Replace main drive 03/12/2019 D12: M
anpower : Basri, Amos, Noris, M
ursafah,
d shaft 03/12/19 DS : Replace main drive shaft.
28/11/2019 6:25 PM
5.
00 5.
00 5.
00 5.
00 Complete 5134365 PM
500HRS service (Duration 28/11/2019 D12: M
anpower : Syair, Angga, Abraham,
d 5 hrs) and backlog repair, Untung28/11/2019 N12: M
anpower : Pasili, Yadi, Performed PM
29/11/2019 7:25 AM
13.
00 13.
00 13.
00 13.
00 Complete Schedule engine valve tune 28/11/2019 N12: M
anpower : Basri, Haris, Noris, 28/11/19 NS :
d Performed initial engine valve tune
29/11/2019 7:25 AM
12.
42 12.
42 0.
00 0.
00 Complete Electrical inspection 28/11/2019 N12: M
anpower : Dimas, Aziz, Performed electrical
d inspection, replace A/C filter, wash up evaporator, battery
maintenance, replace bulb H3, replace relay retarder and relay
DLR with seald relay, replace overtaking lamp, replace bulb for
front brake lamp, tighten bracket radio communication, final check
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 184 of 349
29/11/2019 3:05 PM
7.
67 7.
67 7.
67 7.
67 Complete Over run : Continue electrical 29/11/2019 D12: fitri, 29/11/19 DS : Check wiring wheel speed
d inspection sensor
29/11/2019 3:05 PM
7.
67 7.
67 0.
00 0.
00 Complete Over run : Continue backlog 29/11/2019 D12: M
anpower : Erwin,Yunus,B Wibowo, 29/11/19 DS
d repair : Perform TA2 full power train align with valve tune, replace hose
28/11/2019 2:20 AM
4.
58 4.
58 4.
58 4.
58 Complete Tyre position 1 sidewall 27/11/2019 N12: Sugeng, Replace tyre pos 1 with new tyre and
d bulging matching tyre pos 2.
03/12/2019 9:20 AM
240.
00 146.
33 240.
00 146.
33 Complete 4723970 Schedule engine and radiator 23/11/2019 D12: M
anpower : Khoirul, Candra23/11/2019 N12:
d replacement, planned 240 Hrs M
anpower : Jusriadi, Harnowo, Suhadi24/11/2019 D12: M
anpower
: Khoirul, Chandra, Sumadi, Yanto, Hamzah, Febri25/11/2019 D12:
M
anpower : Khoirul, Chandra, Sumadi, Yanto, Hamzah, Fandi,
Ade, Haoiry25/11/2019 N12: M
anpower : Jusriadi, Harnowo,
Suhadi26/11/2019 D12: M
anpower : Yuspa, Febri, Alex, Yulius,
Chandra, Hoiry, Ifan26/11/2019 N12: M
anpower : Khoirul, Sumadi,
Ade, Priono 27/11/2019 D12: M
anpwer : Yulius, Faisal, Chandra,
Febri, Yuspa27/11/2019 N12: M
anpower : Khoirul, Priono, Toding,
Yudi, Fresky, Ifan29/11/2019 D12: M
anpower : Jusriadi, Harnowo,
Suhadi, febri, Abd Saad, Yanto,, Arifin, Jusman30/11/2019 D12:
M
anpower : Jusriadi, Harnowo, Suhadi, Febri, Yanto , 23/11/19 DS
: Washing unit.
Loosen and jacking ball stud pos 3-8.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 185 of 349
03/12/2019 9:20 AM
238.
50 146.
33 0.
00 0.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Imam02/12/2019 N12: M
anpower :
d Bambang S, Edi suwito23/11/2019 N12: M
anpower : Adi Nugroho,
Edi, Suwito24/11/2019 D12: M
anpower : Novick, Imam24/11/2019
N12: M
anpower : Edi Suwito25/11/2019 N12: M
anpower : Adi
nugroho, Edi suwito27/11/2019 N12: M
anpower : Imam29/11/2019
D12: M
anpower : Hendra, Novick29/11/2019 N12: M
anpower :
Bayu, Nuryanto, 23/11/19 DS : Pre entry inspection, checked
electrical system, maked defect list and washing batteries
23/11/19 NS : Disconnected wiring harness for front work lamps
and other accessories, dumped refrigerant, disconnected ac hoses
and removed ac condenser, removed motor fan blower, removed
batteries and charged, removed engine lamp both side, removed
relay prelube, disconnected wiring harness engine
24/11/19 DS : Continue disconnected wiring harness engine,
removed manifold hose ac compressor, removed accumulator and
ac hose, washing accumulator AC, condenser and motor
blower,disconnected wiring harness T/M
, TGS and TOSS,painting
bracket accumulator, support mechanic removed engine
24/11/19 NS : Removed all front work-lamps and cleaned up
lenses also clamps
25/11/19 DS : Recompleted parts and protected new engine wiring
harness, Replaced cable ground engine and alternator, Replaced
DLR press switch, Reclamp engine wiring harness, Protected and
tidied up wiring turbo inlet press sensor both side
25/11/19 NS : Replace blade wiper, resealed starting motors and
installed to new engine, continued recompleted wiring harness to
new engine and TC
27/11/19 NS : M
aked cable ground starting motor and installed,
reconnected and re-clamp wiring for relay starting motor, refilled oil
accumulator ac 300 ml then installed, installed P clamp cable B +
receptacle jump start, reconnected wiring for wheel speed sensor
28/11/19 NS : Reconnected wiring for external front brake lamp,
retarder and vims, replaced differential oil level switch LHs,
disconnected wiring transmission, TOS and TGS, installed pre-
lube relay and reconnect wiring
29/11/19 DS : Painted for LOTO box, completed/replace clamps
for B+ cable onto P clamp, Replace DLR pressure switch
29/11/19 NS : Fixed seal rear cover cabin, reconnect wiring
harness transmission, reclamp wiring harness at A frame ( after
mech job rebearing A frame).
03/12/2019 9:20 AM
230.
33 146.
33 0.
00 0.
00 Complete Schedule crack repair 23/11/2019 N12: Burhan, Firman 24/11/2019 D12: M
anpower :
d (Chassis) Yusuf.
M
, Rizal24/11/2019 N12: M
anpower : Burhan25/11/2019
N12: M
anpower : Burhan29/11/2019 D12: M
anpower : Agus Sigit,
Budiman, 23/11/19 NS : Pre entry welding inspection ; Repair lh
handle step ladder access to climb up to unit ; Repair hinge of
cover fast fill ; Repair top cover Radiator ; Repair rh gate handrail .
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 186 of 349
03/12/2019 9:20 AM
194.
33 146.
33 0.
00 0.
00 Complete Schedule steering ball stud, 25/11/2019 D12: M
anpower : Khoirul, Chandra, Sumadi, Yanto,
d ride strut POS 4 and rear axle Hamzah, Fandi, Ade, Haoiry25/11/2019 N12: M
anpower : Jusriadi,
dog bone stud replacement Harnowo, Suhadi26/11/2019 D12: M
anpower : Yuspa.
Febri, Alex,
Yulius28/11/2019 D12: M
anpower : Rizali, Fandi, Fresky, Eri,
Priono, Khoirul, Sumadi, Ade29/11/2019 N12: M
anpower : Semra,
Faisal, Dapit30/11/2019 D12: M
anpower : Jusriadi, Harnowo,
Suhadi, Febri, Yanto 30/11/2019 N12: M
anpower : Semra, Faisal,
Dapit, Wardi, Jefri, Ifan, 25/11/19 DS : Disconnected steering
lines.
Removed steering cylinder RH.
Removed steering link both
side.
Replaced ball stud steering pos 5-8.
Rebearing Y link piece.
03/12/2019 9:20 AM
194.
33 146.
33 0.
00 0.
00 Complete 4184331 Schedule transmission 01/12/2019 D12: M
anpower : Jusriadi, Harnowo, Suhadi, Febri,
d replacement Yanto, Huda25/11/2019 D12: M
anpower : Khoirul, Chandra,
Sumadi, Yanto, Hamzah, Fandi, Ade, Haoiry26/11/2019 N12:
M
anpower : Khoirul, Sumadi, Ade, Priono29/11/2019 D12:
M
anpower : Jusriadi, Harnowo, Suhadi, Febri , Abd Saad, Yanto,
Arifin, Jusman , 25/11/19 DS : Replaced
hose cooler transmission.
Reseal tube bypass transmission oil
cooler
26/11/19 NS : Disassembly and assembly transmission
27/11/19 NS : Installed transmission include bevel gear.
Torque
bolt mounting bevel gear
29/11/19 DS : Recompleted transmission cooler and line
01/12/19 DS : Regasket hydraulic and transmission tank with
replace sight glass oil level
01/12/19 NS : Replace transmission hoses 4 ea
02/12/19 DS : Installed tube suction T/M
pump swap from
RD2561, complete install lines hydraulic T/M
and
steering
02/12/19 NS : Trouble shoot with TC pressure display gauge 0 PSI
03/12/2019 9:20 AM
194.
33 146.
33 0.
00 0.
00 Complete 4820677 Schedule pump drive box and 25/11/2019 D12: M
anpower : Khoirul, Chandra, Sumadi, Yanto,
d drive shaft replacement Hamzah, Fandi, Ade, Haoiry25/11/2019 N12: M
anpower : Jusriadi,
Harnowo, Suhad26/11/2019 N12: M
anpower : Khoirul, Sumadi,
Ade, Priono, 25/11/19 DS : Disassmebly and assembly pump drive
box.
03/12/2019 9:20 AM
158.
33 146.
33 0.
00 0.
00 Complete 4184324 Schedule bevel gear 26/11/2019 N12: M
anpower : Khoirul, Sumadi, Ade, Priono,
d replacement 26/11/19 NS : Disassembly and assembly bevel gear.
Torque bolt
mounting bevel gear
27/11/19 NS : Replaced stud bevel gear mounting
03/12/2019 9:20 AM
158.
33 146.
33 0.
00 0.
00 Complete 4184319 Schedule Wheel bearing POS 26/11/2019 N12: M
anpower : Khoirul, Sumadi, Ade, Priono
d 1 and POS 2 final drive 28/11/2019 D12: M
anpower : Rizali, Fandi, Fresky, Eri, Priono,
replacement Khoirul, Sumadi, Ade, 26/11/19 DS : Remove final drive position
2,replace wheel hub position 1, torque bolts retainer, connect
steering arm, completed lines brake cooling and brake
26/11/19 NS : Swap related part final drive
27/11/19 NS : Flushing axle housing.
Installed final drive pos 2,
28/11/19 DS : Replace bolt mounting final drive position 2 and
torque bolt, install axle shaft both side position 2 new],fill up oil
axle, connect drive lines install brake hose final drive position 2
28/11/19 NS : Installed and adjusted tyre pos 2,5,6.
Removed all
stand unit.
Disconnected A frame.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 187 of 349
03/12/2019 9:20 AM
110.
33 110.
33 0.
00 0.
00 Complete Schedule Air Cond'r Service 28/11/2019 D12: M
anpower : Imam29/11/2019 D12: M
anpower :
d Hendra, Novick, 28/11/19 NS : Test Leaks AC lines with pressure
nitrogen 250 psi, vacuum AC lines 3 hours, refilled refrigerant R
134 A 3 kg, installed switch high and low AC compressor
29/11/19 DS : Replace ac filter both side, completed cover
evaporator bolt and closed front cab cover
03/12/2019 9:20 AM
110.
33 110.
33 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Rizali, Fandi, Fresky, Eri, Priono,
d Khoirul, Sumadi, Ade, 28/11/19 NS : Replaced retarder valve.
03/12/2019 9:20 AM
98.
33 98.
33 0.
00 0.
00 Complete Schedule crack repair (Body) 29/11/2019 D12: M
anpower : Burhan, Firmansyah, Firnanda,
d M
.
Asma, 29/11/19 DS : Repair LH rocker box dump body, Repair
RH frame pad dump body, Repair RH rocker box dump body
03/12/2019 9:20 AM
38.
33 38.
33 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Semra, Faisal, Davit,
d Wardi02/12/2019 D12: M
anpower : Rizaly, Ifan, Priono, Khoirul,
SAAD, Asbudi, Fandi, 01/12/19 NS : Remove upper pin hoist
cylinder RHs and disconnect lines.
02/12/2019 10:00 PM
3.
00 3.
00 0.
00 0.
00 Complete TA2 component erformed TA 2 component
d
28/11/2019 5:35 AM
9.
00 9.
00 9.
00 9.
00 Complete 5121644 PM
4000HS service, planned 27/11/2019 N12: M
anpower : Simon,Narno, Performed PM
28/11/2019 5:35 AM
7.
33 7.
33 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Aziz, dimas, Electrical inspection,
d battery maintenance, Replace ac filter, Replace bulb H3 10 ea,
Replace ac thermostat, Replace ac pressure switch high and low,
repair wiring LH reverse lamp, wash evaporator
28/11/2019 5:35 AM
4.
50 4.
50 0.
00 0.
00 Complete Backlog repair 7/11/19 NS : Replace LH lower front brake cooling hose
d
28/11/2019 4:00 PM
10.
42 10.
42 10.
42 10.
42 Complete Over run : Steering HM
U 28/11/2019 D12: M
anpower : Dafiq, Suryo, 28/11/19 DS : Replace
d supply hose leaks steering HM
U supply hose
28/11/2019 4:00 PM
9.
00 9.
00 0.
00 0.
00 Complete Over run : Brake cooling hose 28/11/2019 D12: M
anpower : Dafiq, Suryo, 28/11/19 DS : Replace
d leaks RHs rear brake cooling supply and return hoses
30/11/2019 3:15 AM
44.
25 44.
25 35.
25 35.
25 Complete 5061482 RH inside frame near tail 28/11/2019 N12: M
anpower : Bayu, Ahmadi29/11/2019 N12:
d casting crack 40CM
due to M
anpower : Dafiq, Ardi, 28/11/19 NS : Cont.
perform repair RH tail
spike index casting crack
29/11/19 DS : Continue repair RH inside tail casting cracks
29/11/19 NS : Install brake cooling supply hose, Install RHs REAR
brake cooling return hose
29/11/2019 10:00 PM
0.
50 0.
50 0.
00 0.
00 Complete Over run : Electrical inspection 29/11/2019 N12: M
anpower : Zetting, ari, Check all front work
d lamp off, check and found DLR pressure switch open
circuit,replaced DLR pressure switch cannibal from RD3321,check
all lighting.
30/11/2019 9:35 AM
0.
33 0.
33 0.
33 0.
33 Complete Schedule retorque tyre 30/11/2019 D12: supri, Performed retorque tyre position 6
d
28/11/2019 3:50 AM
125.
17 20.
83 125.
17 20.
83 Complete Over run : Continue completed 26/11/2019 D12: M
anpower : Semra, Faisal, Yuspa,
d related part after engine Ifan27/11/2019 D12: M
anpower : Dafiq, Dedi, Anton,
replacement Topo27/11/2019 N12: M
anpower : Dimas, Noris, 24/11/19 DS :
Replaced air hoses 3ea
24/11/19 NS : Adjust and charging pressure fire suppression
system, Install APAR 2 ea for lower and upper unit
26/11/19 DS : TA2 engine, replace desicant air dryer and
completed lines
27/11/19 DS : Install dump body
27/11/19 NS : Replace RH cap shunk tank radiator
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 188 of 349
28/11/2019 3:50 AM
125.
17 20.
83 0.
00 0.
00 Complete Over run : Continue electrical 22/11/2019 N12: manpower : Joko, Yonathan 23/11/2019 D12:
d inspection M
anpower : Sampurno and Daniel23/11/2019 N12: M
anpower :
Bambang, Hendra24/11/2019 D12: M
anpower : Sampurno,
Novick24/11/2019 N12: M
anpower : Bambang, Edi, Suwito, Adi
N25/11/2019 D12: M
anpower : Sudarman and Daniel25/11/2019
N12: M
anpower : Adi nugroho, Edi suwito, 22/11/19 NS : Cont.
reclamp and connect wiring for rear axle sensor and A frame,
clean connection switch and sensor at rear axle, adjust and
reconnect RH and LH wheel speed sensor
23/11/19 DS : Washing bracket battery and painting, installed
battery 4 ea and bracket, reconnected cable
23/11/19 NS : Replaced clamps for disconnect switch loto box
wire, protected B+ cable on edge strip with rubber and completed
ladder clamps also tidy up cable B+
24/11/19 DS : Proctec cable B+ starting motor, installed boss bolt
then clamp cable with P clamp, reveted and fixed glass loto box
24/11/19 NS : Tidy up B+ cable near battery, reconnected battery
and test crank, checked emergency stop switch connection,
replaced connector and cable emergency stop.
28/11/2019 3:50 AM
116.
83 20.
83 0.
00 0.
00 Complete Over run : Continue backlog 23/11/2019 D12: M
anpower : Ari, Fresky, Hamzah, Ifan23/11/2019
d repair N12: M
anpower : Andre Agus Junius Sudarman24/11/2019 D12:
M
anpower : Ari, Fresky, Hamzah, Ifan25/11/2019 D12: M
anpower :
Ari, Fresky, Ifan26/11/2019 D12: M
anpower : Semra,Faisal Yuspa
Ni, Ifan26/11/2019 N12: M
anpower : Ari, Ifan27/11/2019 N12:
M
anpower : Basri, Haris, Dimas, Noris, 23/11/19 DS : Installed
tyre pos 3.
Adjusted tyre pressure position 3- assembly ride strut
to spindle.
Adjusted shim retainer and torque.
Filled up oil
suspension (not completed).
Swap charging valve both side.
Re-
position contact hoses.
Re-bushing upper pin suspension position
4
23/11/19 NS : Install wheel bearing and suspension group position
1,torque mounting and cap suspension, Fill up and leveling
suspension oil with charging nitrogen, Reconnect arm steering L/H
side
24/11/19 DS : Flushing rear suspension both side.
Adjusted
nitrogen rear suspension both side, Filled up oil front hub both
side.
Installed step ladder engine
25/11/19 DS : Installed pad cover rear suspension pos 4.
installed
guard steering HM
U.
Reposition contact hoses.
Check all brakes
wear.
Installed sticker suspension.
Completed cap charging valve
all suspension.
Removed front stand unit.
Leveling all oil
26/11/19 DS ": Replace bolts retainer suspension position 1 and
final torque, clean up RHs frame chasis, reposition hose contact
and complete clamp
26/11/19 NS : Balancing all suspension.
Leveling all oil.
Grounding
test and check leaks.
Retorque bolt retainer.
final checked.
Washing unit.
Completed post inspection
27/11/19 NS : Reconnect both upper pin hoist cylinder, reconnect
lines grease and manual greasing, Fabrication lock pin pivot and
pin hoist cylinder, test performance
28/11/2019 3:50 AM
116.
83 20.
83 0.
00 0.
00 Complete Over run : Continue backlog 23/11/2019 D12: M
anpower : Ari, Fresky, Hamzah, Ifan25/11/2019
d repair N12: M
anpower : Andre, Agus, Junius, Sudarman , 23/11/19 DS :
Completed transmission lines.
Adjusted rear stopper bevel gear.
28/11/2019 3:50 AM
104.
83 20.
83 0.
00 0.
00 Complete Over run : Continue backlog 24/11/2019 N12: 24/11/19 NS : Andre, Agus, junius,Sudarman
d repair 25/11/2019 D12: M
anpower : Ari, Fresky, Ifan25/11/2019 N12:
M
anpower : Andre, Agus, Junius, Sudarman, 23/11/19 NS :
Recompleted hose line brake cooling front R/H, Replace lines
hose brake chamber,Install lines hose diff flow
24/11/19 DS : Filled up oil hydraulic, steering, Replaced hose
steering HM
U1ea, Removed hose steering HM
U1ea.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 189 of 349
28/11/2019 3:50 AM
92.
83 20.
83 0.
00 0.
00 Complete Over run : Continue crack 24/11/2019 D12: M
anpower : Ryan, Roges24/11/2019 N12:
d repair M
anpower : Firmansyah, 24/11/19 DS : NDT all Welded joint of
Chasis, Remove broken bolt mounting step ladder middle frame,
Install boss bolt stater motor, M
ake hole walkway top engine.
28/11/2019 3:05 PM
0.
50 0.
50 0.
50 0.
50 Complete Schedule retorque tyre 28/11/2019 D12: Hamka, Nober, Performed retorque tyre all
d position
02/12/2019 11:45 PM
0.
67 0.
67 0.
67 0.
67 Complete Tyre low pressure 02/12/2019 N12: lamuda, Adjust tyre pressure position 3, 5, 6
d
27/11/2019 9:15 AM
4.
67 2.
25 4.
67 2.
25 Complete Engine can't start 27/11/2019 D12: Zetting, Ignatius, Check fatigue latching
d sometimes off,check wiring monitor fatigue latching OK,Replaced
relay module fatigue latching
29/11/2019 4:30 PM
5.
83 5.
83 5.
83 5.
83 Complete Both rear suspension drop 29/11/2019 D12: M
anpower : Yan B,Septadi, Check and adjust
d rear suspension pressure low
27/11/2019 3:40 PM
1.
50 1.
50 1.
50 1.
50 Complete 5132739 Pre-service inspection, 27/11/2019 D12: Surya, Yulianus, Performed pre-service
d Planned 2 hrs inspection
03/12/2019 11:10 AM
2.
17 2.
17 2.
17 2.
17 Complete Brake oil leaks 03/12/2019 D12: M
anpower : Khoyik, Triono, Herwin, Replace
d hose from rear brake chamber to rear slack adjuster due to leaks
29/11/2019 1:20 AM
1.
92 1.
92 1.
92 1.
92 Complete Fatigue latching error 28/11/2019 N12: Erwanta, M
atius, Replace alarm fatigue latching
d low sound
01/12/2019 4:35 PM
0.
67 0.
67 0.
67 0.
67 Complete Indicator coolant level flash 01/12/2019 D12: budi, rendra, repair pin connector engine coolant
d ON sensor, replace pin dutch 4 pin
03/12/2019 12:35 AM
2.
00 2.
00 2.
00 2.
00 Complete 5141986 Pre Service Inspection, 02/12/2019 N12: yulianto, amri, Performed Pre Service Inspection
d Planned 2 hrs
29/11/2019 10:15 AM
0.
25 0.
25 0.
25 0.
25 Complete LHs front suspension too high 29/11/2019 D12: rizal, Adjust LHs front suspension pressure
d
30/11/2019 2:10 AM
3.
42 3.
42 3.
42 3.
42 Complete Brake cooling oil leak 29/11/2019 N12: Djunaedy, Replace FRONT brake cooling diverter
d valve
29/11/2019 3:15 AM
7.
00 7.
00 7.
00 7.
00 Complete 5140419 PM
1000HRS service 28/11/2019 N12: Pasili, Yadi, Performed PM
1000HRS service
d (Duration 7 hrs) and Backlog
repair, planned 9 hrs
29/11/2019 3:15 AM
7.
00 7.
00 0.
00 0.
00 Complete Electrical inspection 28/11/2019 N12: M
anpower : Dimas, Aziz, Performed electrical
d inspection, replace A/C filter, wash up evaporator, battery
maintenance, replace bulb H3, replace relay retarder and relay
DLR with seal relay, replace overtaking lamp, replace bulb for front
brake lamp, tighten bracket radio communication, final check
29/11/2019 4:55 AM
1.
67 1.
67 1.
67 1.
67 Complete M
echanical inspection 28/11/2019 N12: M
anpower : Erwin, Ilyasa, Performed M
echanical
d inspection
01/12/2019 2:10 AM
9.
33 9.
33 9.
33 9.
33 Complete Tyre pos 6 sidewall cut 30/11/2019 N12: M
anpower : Ardianto, wawan, andri, Replace tyre
d cracking pos 6 with spare tyre and matching tyre pos 5
30/11/2019 11:30 PM
1.
17 1.
17 1.
17 1.
17 Complete Lights 30/11/2019 N12: Zetting, Ignatius, Replace relay for FRONT
d RH/LH high beam lamp
03/12/2019 11:05 AM
2.
00 2.
00 2.
00 2.
00 Complete 5144155 Pre service inspection, Performed pre service inspection
d planned 2 hrs
03/12/2019 4:50 PM
5.
75 5.
75 5.
75 5.
75 Complete Over run : TC filter leaks 03/12/2019 D12: M
anpower : Rahman, Rudi, Rendi, 03/12/19 DS :
d Re O-ring TC filter due to leaks ,replace switch TC filter
03/12/2019 4:50 PM
5.
75 5.
75 0.
00 0.
00 Complete Over run : LH hand rail and 03/12/2019 D12: M
anpower : Tabang, 03/12/19 DS : Follow up
d walk way crack finding repair LH hand rail and walk way mounting crack
28/11/2019 4:50 PM
1.
83 1.
83 1.
83 1.
83 Complete TC speed sensor failure 28/11/2019 D12: Alfan, Yulianus, Replace TC speed sensor (take
d from RD3321)
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 190 of 349
30/11/2019 11:15 AM
1.
42 1.
42 1.
42 1.
42 Complete TC Out Speed error 30/11/2019 D12: erwin, sandy
d , Check wire tc speed sensor resistance is good (0,8 ohm), TC
speed sensor resistance 1,56k Ohm, replaced TC speed sensor
03/12/2019 11:50 AM
2.
00 2.
00 2.
00 2.
00 Complete Transmission can't up shift and 03/12/2019 D12: Pirsalem, Check and FOUND : Hydraulic oil
d down shift transfer to transmission, temporary leveling oil transmission and
top up hydraulic oil 34 ltrs
03/12/2019 5:20 PM
5.
50 5.
50 5.
50 5.
50 Complete Transmission can't up shift and 03/12/2019 D12: Sofyan,Sudirman, check transmission
d down shift intermittent can’t reverse, TC speed sensor error fmi 02.
Inspect
cable and TC speed sensor.
FOUND: Connector XM
SN beside
cabin for TC speed sensor loose and dusty.
Remove connector,
clean-up, and tighten it.
Performance test
30/11/2019 7:50 AM
0.
42 0.
42 0.
42 0.
42 Complete Indicator seat belt flash ON 30/11/2019 D12: budi, found seat belt sensor connector was lose,
d reintalling it
30/11/2019 6:00 AM
4.
00 4.
00 4.
00 4.
00 Complete 5143515 PM
250HRS service (Duration 29/11/2019 N12: M
anpower : Herman, Agus, Performed PM
30/11/2019 8:00 AM
5.
00 5.
00 2.
00 2.
00 Complete Electrical inspection Electrical inspection, check all lighting and A/C performance,
d cleaned AC filter inner and outer, maintenance battery
30/11/2019 1:15 PM
5.
25 5.
25 5.
25 5.
25 Complete Over run : Repair bracket RH 30/11/2019 D12: TBM
, Repair bracket RH fender crack
d fender crack
30/11/2019 1:15 PM
5.
25 5.
25 0.
00 0.
00 Complete Over run : hose case drain 30/11/2019 D12: M
anpower : Faisal, Avy, Fajar, Replace hose
d PTO pump leak case drain PTO pump leak, replace hose supply PTO pump leak
30/11/2019 9:00 AM
1.
00 1.
00 0.
00 0.
00 Complete Over run : grease pump fail 30/11/2019 D12: M
anpower : Faisal, Avy, Fajar, Repair grease
d pump and replace pressure gauge grease pump, test
performance, final check
01/12/2019 8:30 AM
4.
50 4.
50 4.
50 4.
50 Complete Grease pump module stuck 01/12/2019 D12: M
an power : Faisal, Avy, Fajar, 01/12/19 DS :
d Repair grease pump unit, replace pressure gauge grease pump
leak, torque bolt mounting cylinder steering RHs, final check
27/11/2019 11:55 PM
2.
92 2.
92 2.
92 2.
92 Complete RH pin dog bone comes out 27/11/2019 N12: M
anpower : Agus, Eko, 27/11/19 NS : Reposition
d RH pin dog bone, install stopper RH pin dog bone
28/11/2019 1:00 AM
1.
08 1.
08 1.
08 1.
08 Complete Grease leaks 27/11/2019 N12: M
anpower : Eko, Agus, Clean up grease tank,
d repair grease line leak
28/11/2019 2:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Coolant low level Add coolant 5 ltrs, check not leaks FOUND
d
29/11/2019 10:45 PM
0.
83 0.
83 0.
83 0.
83 Complete Automatic Retarder Unfunction 29/11/2019 N12: Jumanto, Clean up cartridge ARC system
d
01/12/2019 11:35 PM
44.
58 44.
58 44.
58 44.
58 Complete Automatic retarder problem 01/12/2019 D12: M
an power : Sunari, Ardiles01/12/2019 N12:
d M
anpower : Budi, Fakhmil30/11/2019 N12: M
anpower : Budi,
Fakhmil, 30/11/19 NS : Check and repair Automatic retarder air
lines, swap retarder block valve
01/12/19 DS : Troubleshooting ARC error ,repair ARC control,
replace cartridge valve service brake leak, test performance ARC
system
01/12/19 NS : Check and repair ARC sensor flash ON
(troubleshooting), check ARC block valve, check air system supply
and output pressure, repair ARC relay valve
28/11/2019 10:40 PM
1.
75 1.
75 1.
75 1.
75 Complete Engine oil fast fill loosen 28/11/2019 N12: Rajanson,Gatot, Install cap fast fill engine oil and
d top up engine oil
02/12/2019 12:00 AM
3.
83 3.
83 3.
83 3.
83 Complete 5100533 PM
250HRS service (Duration 01/12/2019 N12: M
anpower : Eko, Hisbul, Performed PM
250HRS
d 4 hrs) and backlog repair, service
Planned 11 hrs
02/12/2019 7:10 AM
7.
17 7.
17 7.
17 7.
17 Complete Backlog repair 01/12/2019 N12: M
anpower : Bakhtiar, Agung, 01/12/19 NS :
d Repair brake cooling tube pos 3
02/12/2019 7:10 AM
7.
17 7.
17 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Bakhtiar, Agung, 01/12/19 NS : Re-
d oring ATAAC pump suction
02/12/2019 5:15 AM
5.
25 5.
25 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Eko, Budi, Electrical inspection,
d check all electrical system and AC performance, maintenance
battery, cleaned AC filter and outter, removed cover LOTO box
and repaired by welder
02/12/2019 7:10 AM
4.
33 4.
33 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Bakhtiar, Agung, 01/12/19 NS :
d Replace Fire extinguisher
02/12/2019 7:10 AM
4.
33 4.
33 0.
00 0.
00 Complete Backlog repair 01/12/19 NS : Re-oring ATAAC pump suction, Reseal steering
d compensator fitting
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 191 of 349
02/12/2019 9:25 AM
2.
25 2.
25 2.
25 2.
25 Complete Over run : Repair bracket 02/12/2019 D12: M
anpower : Aziz, Irham, Rofiq, 02/12/19 DS :
d LOTO box Installed LOTO box after welder repaired bracket LOTO box,
repaint loto box, replaced bolt mounting LOTO box, final check
27/11/2019 11:00 AM
7.
00 4.
00 7.
00 4.
00 Complete Electrical inspection 26/11/2019 N12: M
anpower : Dimas, azis, 26/11/19 NS : Electrical
d inspection, maintenance battery, replace ac filter, reseal camp
speed sensor.
27/11/2019 11:00 AM
4.
00 4.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, Replace hose brake
d cooling front LHS
27/11/2019 11:00 AM
4.
00 4.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, Replace grease hose to
d RH pin pivot dump body, Replace grease pump due to low
27/11/2019 11:00 AM
4.
00 4.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, Adjust Front suspension
d due to low pressure
27/11/2019 8:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Grease pump problem 27/11/2019 N12: M
anpower : Abdul, Eko.
Agus, Replace grease
d Pump, test performance grease pump, final check
01/12/2019 11:15 AM
5.
75 5.
75 5.
75 5.
75 Complete Radio PTT Communication 01/12/2019 D12: budi, reinstalling new PTT
d M
issing
28/11/2019 4:20 AM
139.
83 21.
33 139.
83 21.
33 Complete Over run : Continue completed 22/11/2019 D12: M
anpower : Arifin, Suryansyah, Yanto, Ashar,
d related part engine Jusman, Jusri23/11/2019 N12: M
anpower : Arifin, Suryansyah,
replacement Jusman 25/11/2019 D12: M
anpower : Priono, Laote, Rizali,
22/11/19 DS : Continue recompleted line at transmission, engine
area, Install main drive shaft transfer case to front axle, Install
main drive shaft transmission to transfer case, Clean up and
washing radiator
22/11/19 NS : Install radiator and torque bolt mounting, remove
hose bulk coolant
23/11/19 DS : Installed fender both side.
Installed hose coolant,
Completed lines hydraulic and engine.
Installed clamp exhaust
muffler.
28/11/2019 4:20 AM
139.
83 21.
33 0.
00 0.
00 Complete Over run : Continue electrical 22/11/2019 D12: M
anpower : Adi, Edi Swito22/11/2019 N12:
d inspection M
anpower : Huda23/11/2019 D12: M
Anpower : Imam and
Novick23/11/2019 N12: M
anpower : Bambang24/11/2019 D12:
M
anpower : Imam, Novick24/11/2019 N12: M
anpower : Bambang,
Edi, Suwito, 22/11/19 DS : Repositioned ac hoses, cleaned up
evaporator, checked and cleaned up area around fan motor blower
due to some plastic make some unusual noise for blower motor,
installed engine speed sensor
22/11/19 NS : install inclination sensor
23/11/19 DS : Reclamp and reconnected wiring rhs side cabin,
reconnected hoses ac, reposition, reclamp and reconnected cable
loto box, installed loto box
23/11/19 NS : Reconnected wiring LOTO box, completed
receptacle jumper mounting bolts, installed batteries and complete
bracket, installed rotary light, reconnected wiring for washer pump
also tidy up hoses for washer pump and fuel level sender,
reconnected wiring harness for grease pump
24/11/19 DS : Test leak ac lines, vacuum ac lines 2 hours then
charge refrigerant R 134 A 2.
1 kg,installed cover battery, installed
air filter A/C inner, monitoring start up engine.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 192 of 349
28/11/2019 4:20 AM
117.
33 21.
33 0.
00 0.
00 Complete Over run : Continue backlog 23/11/2019 D12: M
anpower : Priono, Fandi, Rizali24/11/2019 D12:
d repair M
anpower : Priono, Fandi, Rizal25/11/2019 N12: M
anpower :
Arifin, Suryansyah, Jusman , 23/11/19 DS : Completed steering
HM
U lines, Reseal block brake cooling rear LH.
Installed hoses
accumulator.
Filled up oil hydraulic and steering
23/11/19 NS : Continue re-completed hose line at cabin area and
re-position clamp, burs protection and rubbing hose
24/11/19 DS : Leveling oil hydraulic.
Test running and check leaks,
Connected oil lines for supply grease pump leaks.
Connected
hose steering pump case drain
24/11/19 NS : Replace hose line hydraulic 1 ea, Repaired oil leak
from fitting hydraulic hose
25/11/19 NS : Check and add hydraulic oil low, Install dump body,
Reconnect lower pin hoist cylinder both side and connect hose,
Continue TA 2 hydaulic system, Replace motor hydraulic ATAAC
fan
26/11/19 DS : Reseal hose hoist cylinder lower LH.
Checked and make sure oil leaks from hoist control valve.
28/11/2019 4:20 AM
93.
33 21.
33 0.
00 0.
00 Complete Over run : Continue backlog 24/11/2019 D12: M
anpower : Priono, Fandi, Rizal26/11/2019 D12:
d repair M
anpower : Wardi,Tahan, Jefri, Davit26/11/2019 N12: M
anpower :
Rizali, Hamzah, 24/11/19 DS : Replaced charging valve front
suspension position 2.
Flushing oil suspension position 2.
28/11/2019 4:20 AM
79.
67 21.
33 0.
00 0.
00 Complete Over run : Continue backlog 25/11/2019 D12: M
anpower : Priono, Laote, Rizali27/11/2019 D12:
d repair M
anpower : Wardi, Jefri, Bleeding brake system
25/11/19 DS : Bleeding steering system.
Bleeding brakes system.
02/12/2019 4:20 PM
23.
77 23.
77 23.
77 23.
77 Complete Artic pin Loose 02/12/2019 D12: Abdul, Lailia, Ripqi
d , Install new upper pin artic, torque bolt upper pin artic
30/11/2019 10:50 AM
1.
25 1.
25 1.
25 1.
25 Complete A/C 30/11/2019 D12: andik, didik, FOOUND : AC blower low.
it cause
d by ac inner filter blocked.
Replaced filter ac inner cabin
29/11/2019 5:25 PM
3.
42 3.
42 3.
42 3.
42 Complete Engine Low Power Engine 29/11/2019 D12: erwin, sandy
d Dirate 20 % , FOUND : 5 volt supply error.
check wire 977 to all sensor are
good (0,3 ohm), check possible short to ground engine harness is
good.
replaced pin 36 and 41 J1 Engine ECM
28/11/2019 3:00 PM
5.
00 5.
00 5.
00 5.
00 Complete Schedule POD follow up, 28/11/2019 D12: M
anpower : Sunanto, Rizal, Hari, Syafrul, Adjust
d planned 6 Hrs suspension all position and calibrate payload
01/12/2019 10:45 AM
4.
67 4.
67 4.
67 4.
67 Complete Schedule POD follow up, 01/12/2019 D12: M
an power : Sahruni, Tarojim, 01/12/19 DS :
d planned 6 Hrs Flushing and adjust all suspension pressure weighed not passed,
calibration
01/12/2019 10:45 AM
3.
75 3.
75 0.
00 0.
00 Complete Inspection, FOUND : Water 01/12/2019 D12: M
an power : Sahruni, Tarojim, 01/12/19 DS :
d coolant leaks Repair tube cooling turbo cracks and leaks, additional coolant
radiator
02/12/2019 11:00 AM
9.
00 9.
00 9.
00 9.
00 Complete 5145275 PM
2000HRS Service 01/12/2019 N12: M
anpower : Syair,Fuad, Angga02/12/2019 D12:
d (Duration 9 hrs) and backlog M
anpower : Simon,Fasili,Join APP, Performed PM
2000HRS
repair, Planned 18 hrs service
02/12/2019 5:00 PM
14.
00 14.
00 6.
00 6.
00 Complete Electrical inspection 01/12/2019 N12: M
anpower : Imam02/12/2019 D12: M
anpower :
d Dimas P, Dimas ES, Dwi, 01/12/19 NS : Electrical inspection,
check all lighting and AC performance, maintenance battery
02/12/19 DS : Electrical inspection, maintenance battery, replaced
bulb work lamp 6 ea, replaced ac filter inner and outer, replaced
battery 2 ea, wash evaporator, replaced connector electric horn,
replaced connector washer pump, clean up connector cabin side
wall, protect and tidy up harness A frame, repair bracket battery,
install glass cover loto box, repair wiring RH reverse lamp,
tightened bracket LH reverse lamp, replace clamp upper low beam
lamp, replaced washer pump, check charging system low 26.
2
volt, replaced cable charging system from rear engine to main
relay, tightened nut main relay
02/12/2019 8:00 PM
9.
00 9.
00 3.
00 3.
00 Complete Backlog repair 02/12/19 DS : Replace hose lock up TC 2 ea , reseal out put shaft
d TC
02/12/19 NS : Continue Reseal TC output seal leaking,, replace
hose TC lock up signal
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 193 of 349
02/12/2019 8:00 PM
9.
00 9.
00 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Romy, Haris, Doni, 02/12/19 DS :
d Replace hose discharge steering pump
28/11/2019 11:05 PM
1.
00 1.
00 1.
00 1.
00 Complete LTF brake temp sensor fail 28/11/2019 N12: M
anpower : Jhoni P, Pirsalem, yoel, Check LTF
d FM
I 04 brake temp sensor error, inspect wiring and sensor.
FOUND : LTF
brake temp sensor fail FM
I 04.
Replace it and performance test
29/11/2019 9:40 AM
6.
58 6.
58 6.
58 6.
58 Complete Brake over stroke 29/11/2019 D12: M
anpower : Yan B,Septadi
d , Remove and reseal front brake chamber internal leaks, perform
bleeding brake
29/11/2019 3:20 PM
1.
25 1.
25 1.
25 1.
25 Complete TCS Speed Error 29/11/2019 D12: budi, rendra, Repair cable 452 purple, repair
d cable J762 blue, repair cable 709 orange for TC out speed sensor
03/12/2019 4:00 AM
1.
50 1.
50 1.
50 1.
50 Complete Operator seat suspension 02/12/2019 N12: anang, yahya, Replace operator seat kit shock
d leaks absorber
29/11/2019 7:45 AM
2.
42 2.
42 2.
42 2.
42 Complete Engine can't start 29/11/2019 D12: rizal, ROOT CAUSE : Operator M
isuse.
29/11/2019 4:00 PM
6.
00 6.
00 6.
00 6.
00 Complete Schedule POD follow up, 29/11/2019 D12: M
anpower : Syaifudin,Tarojim, Performed
d planned 6 Hrs Flushing and adjust all suspension pressure weighed not passed,
calibration
29/11/2019 8:00 PM
1.
50 1.
50 1.
50 1.
50 Complete Engine cant start 29/11/2019 N12: Djunaedy, Clean up relief valve of main air tank
d due to plugged.
jumped air pressure to start
30/11/2019 12:00 PM
2.
00 2.
00 2.
00 2.
00 Complete 5128294 Pre Service Inspection, 30/11/2019 D12: yulianto, amri, perform Pre Service Inspection
d Planned 2 hrs
30/11/2019 2:30 PM
2.
50 2.
50 2.
50 2.
50 Complete Over run : continue backlog 30/11/2019 D12: yulianto, amri, replace pressure tap Transmission
d repair pump oil pressure
01/12/2019 11:05 AM
7.
58 7.
58 7.
58 7.
58 Complete Differentials filter hit by 01/12/2019 D12: M
an power : Yan B, Septadi, Fahrizal (APP),
d materials 01/12/19 DS : Replace housing differential filter bent, hit by
material (rock), add differential oil
28/11/2019 11:50 PM
14.
42 14.
42 14.
42 14.
42 Complete Transmission oil leaks 28/11/2019 D12: M
anpower : Trisno, Syafrul, Dedi, Tri, 28/11/19
d DS : Reseal transmission charging filter
28/11/2019 8:00 PM
6.
42 6.
42 0.
00 0.
00 Complete Grease hose for steering Y link 28/11/2019 D12: M
anpower : Trisno, Syafrul, Dedi,.
Tri, 28/11/19
d leaks DS : Replace Grease hose for steering Y link
28/11/19 NS : Replace hose grease at pivot dump
28/11/2019 11:50 PM
4.
83 4.
83 0.
00 0.
00 Complete RH block valve accumulator 28/11/2019 N12: M
anpower : Romy, M
ursafah, Agung, 28/11/19
d leaks NS : Reseal valve block RH accumulator steering, add steering oil
29/11/2019 10:25 AM
1.
67 1.
67 1.
67 1.
67 Complete Coolant flow too low 29/11/2019 D12: ongky, amin, Check coolant level, good, check
d and re-positioning coolant level sensor, perform test
01/12/2019 3:00 PM
7.
33 7.
33 7.
33 7.
33 Complete Air pressure cant raise 01/12/2019 D12: M
an power : TET, Hizam, Sahruni, Tarojim,
d 01/12/19 DS : Drain/flushing some water and oil at air system,
check and repair air starting relay valve.
Replace oring solenoid
ARC
03/12/2019 10:15 PM
1.
67 1.
67 1.
67 1.
67 Complete Engine cant start 03/12/2019 N12: rizal, qoirul, ROOT CAUSE : Operator M
isuse.
01/12/2019 10:30 AM
2.
00 2.
00 2.
00 2.
00 Complete 5134210 Pre Service Inspection, 01/12/2019 D12: yulianto, amri, Performed Pre Service Inspection
d Planned 2 hrs
01/12/2019 11:45 AM
1.
25 1.
25 1.
25 1.
25 Complete Over run : Brake cooling hose 01/12/2019 D12: yulianto, amri, replace LHs front lower hose
d leaks brake cooling
01/12/2019 11:45 AM
1.
25 1.
25 0.
00 0.
00 Complete Over run : Transmission oil Reseal transmission charging filter
d leaks
28/11/2019 3:40 PM
4.
58 4.
58 4.
58 4.
58 Complete Tyre pos 3 leaks 28/11/2019 D12: M
anpower : Ricky, Replace core housing and
d oring of tyre POS 3
02/12/2019 10:00 PM
1.
58 1.
58 1.
58 1.
58 Complete Engine cant start 02/12/2019 N12: rizal, ROOT CAUSE : Operator M
isuse.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 194 of 349
04/12/2019 1:15 AM
3.
42 3.
42 3.
42 3.
42 Complete Retarder sticky 03/12/2019 N12: ato, erik, Replace service brake valve cartridge
d
29/11/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Dump body snubbing 29/11/2019 D12: M
anpower : Hizam, Otniel, Gazaly, Re-install
d dump body pad POS 1
29/11/2019 5:00 PM
2.
50 2.
50 0.
00 0.
00 Complete LHs fender mounting worn out 29/11/2019 D12: Hizam, Otniel, Gazaly, Welder, Repair LHs fender
d mounting.
Additional job : Reinstall LHs door seal
30/11/2019 4:30 AM
1.
00 1.
00 1.
00 1.
00 Complete Suspension guard pos 4 loose 29/11/2019 N12: Djunaedy, Re-completed bolts for suspension
d guard pos 4
03/12/2019 4:20 PM
8.
25 8.
25 8.
25 8.
25 Complete LHs Front Suspension Leaks 03/12/2019 D12: M
anpower : Romi, Haris, Doni, 03/12/19 DS :
d Add oil suspension POS.
1, re-adjusted suspension and calibration
27/11/2019 4:25 PM
1.
00 1.
00 1.
00 1.
00 Complete Suspension pressure too hard 27/11/2019 D12: Surya arapenta sembiring, Reduce pressure of
d FRONT LH suspension from 440 psi to 400 psi, FRONT RH
suspension from 420 psi to 380 psi.
And reduce pressure REAR
LH from 290 psi to 270 psi andd REAR RH from 296 psi to 270 psi
30/11/2019 4:35 AM
3.
58 3.
58 3.
58 3.
58 Complete Engine oil leaks 29/11/2019 N12: Djunaedy, Re-oring tube outlet engine filter base
d
01/12/2019 5:25 AM
0.
92 0.
92 0.
92 0.
92 Complete Dump body snubbing 30/11/2019 N12: Sunanto, Erasmus, 30/11/19 NS : Adjusted dump
d body pad
01/12/2019 4:55 PM
8.
58 8.
58 8.
58 8.
58 Complete Engine oil filter base tube 01/12/2019 D12: M
an power : Yan B, Septadi, Junaidi, 01/12/19
d block leaks DS : Reseal tube engine oil filter base leaking
01/12/2019 10:55 PM
2.
92 2.
92 2.
92 2.
92 Complete Dump body snubbing 01/12/2019 N12: M
anpower : Sunanto, Hari, Johan, Adjust angle
d dump body pad, Repair dump body pin lock mounting
02/12/2019 2:45 AM
3.
83 3.
83 3.
83 3.
83 Complete Bolt retainer for REAR RH 01/12/2019 N12: M
anpower : Sunanto, Hari, Johan, Replace bolt
d suspension pin broken retainer for REAR RH suspension pin, Check lower suspension
pin
03/12/2019 4:45 PM
1.
92 1.
92 1.
92 1.
92 Complete Dump body shaking 03/12/2019 D12: Khoyik, Check and install shim pad dump body
d angle LHs, test performance
29/11/2019 10:10 PM
2.
75 2.
75 2.
75 2.
75 Complete Fuel lines leak 29/11/2019 N12: Djunaedy, Replace air starting lubricator
d
01/12/2019 5:25 AM
2.
67 2.
67 2.
67 2.
67 Complete Brake slack adjuster failure 30/11/2019 N12: Sunanto, Replace REAR RH brake slack adjuster
d
03/12/2019 8:40 AM
1.
00 1.
00 1.
00 1.
00 Complete Engine low power 03/12/2019 D12: M
anpower : Khoyik, Herwin, Triono, Replace air
d filter 2ea due to plug (Replaced with R1 type)
30/11/2019 8:40 AM
0.
83 0.
83 0.
83 0.
83 Complete RHs rubber door loose 30/11/2019 D12: anang, qoirul, reinstall RHs rubber door
d
04/12/2019 3:30 AM
6.
58 6.
58 6.
58 6.
58 Complete 5145283 PM
1000HRS Service, 03/12/2019 N12: M
an power : Djemik, Fajar, Budi, Performed PM
04/12/2019 3:30 AM
2.
50 2.
50 0.
00 0.
00 Complete Inspection FOUND : Front 03/12/2019 N12: M
anpower : B Sulasno,Suparmadi, Replace front
d brake cooling hose fatigue brake cooling hose
04/12/2019 3:55 AM
0.
42 0.
42 0.
42 0.
42 Complete Electrical inspection erformed Electrical inspection
d
28/11/2019 1:40 AM
10.
08 10.
08 10.
08 10.
08 Complete Steering hose leak 27/11/2019 N12: M
anpower : Khoyik, Triono, Herwin, Replace
d hose discharge steering and top up oil hydraulic 70 ltr
29/11/2019 3:45 AM
4.
17 4.
17 4.
17 4.
17 Complete O-ring leak tyre pos 4 leak 28/11/2019 N12: M
anpower : Asrano,Harum,Ronatal, Yusva,
d M
.
Ripai, Replace oring tyre position 3 and 4
03/12/2019 7:10 AM
2.
00 2.
00 2.
00 2.
00 Complete Engine can't start 02/12/2019 N12: Joni P, ROOT CAUSE : Operator M
isuse.
03/12/2019 9:30 AM
6.
58 6.
58 6.
58 6.
58 Complete Tyre Pos 5 Shoulder 03/12/2019 D12: Sugeng, Replace tyre position 5 and 6
d Separation
01/12/2019 5:30 AM
9.
00 9.
00 9.
00 9.
00 Complete 5132019 PM
4000HRS service 30/11/2019 N12: M
anpower : Fuad, Syair, Performed PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 195 of 349
01/12/2019 4:30 PM
11.
00 11.
00 11.
00 11.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Ahsan, Syaifudin, Gasali, Junaidi,
d 01/12/19 DS : Reseal engine oil base filter leaks
01/12/2019 4:30 PM
9.
50 9.
50 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Ahsan, Syaifudin, Gasali, Junaidi,
d 01/12/19 DS : Replace grease pump not working
01/12/2019 4:30 PM
9.
50 9.
50 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Ahsan, Syaifudin, Gasali, Junaidi,
d 01/12/19 DS : inspected ball stud from worn out
01/12/2019 2:00 PM
7.
00 7.
00 0.
00 0.
00 Complete Electrical inspection 01/12/2019 D12: M
anpower : Dani, Wahyudi, Garuda, Dimas,
d Alijen, Continue electrical inspection, replaced and adjusted RH
wheel speed sensor, cleaned and tidy up connector beside cabin,
replaced DLR relay and retarder relay with seal relay, Replaced
RH reverse lamp assy, Final Check
01/12/2019 5:00 PM
0.
50 0.
50 0.
50 0.
50 Complete Over run : Continue backlog 01/12/2019 D12: M
an power : Ahsan, Syaifudin, Gasali, Junaidi,
d repair reseal engine filter base
03/12/2019 3:15 PM
7.
00 7.
00 7.
00 7.
00 Complete 5145280 PM
1000HRS service, planned 03/12/2019 D12: M
anpower : Epriyadi, Pasili, Abdi, Performed PM
03/12/2019 4:30 PM
1.
25 1.
25 1.
25 1.
25 Complete Over run : Continue backlog 03/12/2019 D12: M
arkus, Herwin, Reposition tube turbo inlet RH
d repair
29/11/2019 11:30 PM
4.
33 4.
33 4.
33 4.
33 Complete Engine ECM
error 29/11/2019 N12: Zetting, Ignatius, Vims main ECM
error (049 811
d 12), check error code, check harness cabin display from short
circuit found cable E707, C413, C414 for VIM
S display short to
ground, repaired wiring and protect wiring vims display.
additional
job: check reverse lamp off, replaced switch reverse lamp, test
performance.
28/11/2019 9:55 PM
2.
00 2.
00 2.
00 2.
00 Complete 5135874 Pre service inspection, 28/11/2019 N12: Bahruddin,M
arkus, Performed pre service
d planned 2 hrs inspection
28/11/2019 10:25 PM
0.
50 0.
50 0.
50 0.
50 Complete Over run : hydraulic oil low 28/11/2019 N12: Jhoni P, Add hydraulic oil 83 ltrs due indication
d leve transfer into transmission
01/12/2019 3:00 PM
5.
58 5.
58 5.
58 5.
58 Complete axle oil transfer to 01/12/2019 D12: tarojim, levelling transmission oil
d Transmission, Transmission oil
over fill
01/12/2019 2:20 PM
2.
83 2.
83 0.
00 0.
00 Complete LTR Brake temperature error 01/12/2019 D12: didik, taufik
d , repair wiring brake temperature sensor LHs rear
27/11/2019 7:40 PM
8.
00 8.
00 8.
00 8.
00 Complete 5145044 Schedule NDT RIM
tyre POS Performed NDT RIM
tyre POS 5
d 5, Planned 8 hrs
27/11/2019 9:00 PM
1.
33 1.
33 1.
33 1.
33 Complete Over run : Continue NDT RIM
Continue NDT RIM
tyre POS 5
d tyre POS 5
28/11/2019 4:45 PM
7.
00 7.
00 7.
00 7.
00 Complete Oring tyre POS 5 leak 28/11/2019 D12: Hamka, Jonianto, Replace tyre pos 5 with spare
d tyre
29/11/2019 7:40 PM
0.
67 0.
67 0.
67 0.
67 Complete Dump body excessive 29/11/2019 N12: Surya, Alapson, ROOT CAUSE : Incorrect
d vibration Reported Fault.
After check and performance test, NO problem
was found
01/12/2019 4:20 PM
8.
90 8.
90 8.
90 8.
90 Complete Hoist pump pressure low 01/12/2019 D12: M
an power : Erwin, Othniel, Yunus, 01/12/19
d DS : Remove/install hose lines hoist pump, repair/reseal hoist
pump low pressure and found particle
29/11/2019 8:50 PM
2.
33 2.
33 2.
33 2.
33 Complete Engine shutdown 29/11/2019 N12: Rully, Alfan, Repair power cable for fire
d suppression module.
02/12/2019 8:00 AM
0.
92 0.
92 0.
92 0.
92 Complete Engine can't start 02/12/2019 D12: khoyik, ROOT CAUSE : Operator M
isuse.
02/12/2019 9:30 PM
2.
33 2.
33 2.
33 2.
33 Complete Engine cant start 02/12/2019 N12: rizal, qoirul, ROOT CAUSE : Operator M
isuse.
29/11/2019 9:20 PM
0.
33 0.
33 0.
33 0.
33 Complete LH rear view mirror failure 29/11/2019 N12: Djunaedy, Replace bolts and adjust LH rear view
d mirror
30/11/2019 1:15 PM
5.
58 5.
58 5.
58 5.
58 Complete Schedule POD follow up, 30/11/2019 D12: hizam, ghazali
d planned 6 Hrs , Flushing & adjust all suspension pressure weighed not passed,
calibration
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 196 of 349
03/12/2019 10:55 AM
2.
00 2.
00 2.
00 2.
00 Complete 5141820 Pre service inspection, 03/12/2019 D12: Baharuddin,M
arkus, Performed Pre service
d planned 2 hrs inspection
03/12/2019 4:55 PM
6.
00 6.
00 6.
00 6.
00 Complete Schedule POD follow up, 03/12/2019 D12: M
anpower : Bahar, M
arkus, Tahir, 03/12/19 DS :
d planned 6 Hrs POD follow up check and flushing oil all suspension, re adjusted
pressure and pay load calibration
30/11/2019 11:45 PM
1.
83 1.
83 1.
83 1.
83 Complete Lhs Side mirror bolt broken 30/11/2019 N12: M
anpower : Dedi, Trisno, 30/11/19 NS : Repair
d LHs mirror mounting bolts
01/12/2019 2:45 AM
3.
00 3.
00 3.
00 3.
00 Complete 5167276 Schedule DM
G follow up, 30/11/2019 N12: M
anpower : Dedi, Trisno, Performed DM
G follow
d Planned 3 hrs up : Check and repair intake manifold pressure (KPA) LHs
01/12/2019 9:10 AM
1.
58 1.
58 1.
58 1.
58 Complete Engine can't start 01/12/2019 D12: rizal, qoirul, ROOT CAUSE : Operator M
isuse.
01/12/2019 10:30 PM
7.
58 7.
58 7.
58 7.
58 Complete Engine Derate 21% 01/12/2019 N12: M
anpower : Ignatius, Budi01/12/2019 N12:
d Zetting, Ignatius, Check altitude derate and engine derate
21%,check error code and found RH turbo inlet pressure sensor
incorrect reading, replaced RH turbo inlet pressure sensor,
calibration analog sensor, additional job: replaced check valve
washer wiper, test performance.
02/12/2019 2:45 PM
4.
75 4.
75 4.
75 4.
75 Complete Engine low power 02/12/2019 D12: M
anpower : Satrio, Sudirman, Check engine
d derate 21%, attitude derate.
Check turbo inlet pressure sensor
with ET.
FOUND: LT turbo inlet pressure sensor not reading.
03/12/2019 11:05 PM
11.
83 11.
83 11.
83 11.
83 Complete Engine low power 03/12/2019 D12: M
anpower : Satrio,Deni03/12/2019 N12:
d M
anpower : Erwin, Sandy, 03/12/19 DS : Trouble shoot check
engine low power derate 21% and 5 volt power supply error,
inspect engine sensor and front engine harness
03/12/19 NS : FOUND: 5 volt supply for Engine sensors some
time missing, check possible short to ground wire 997 engine
sensory, continuity wire 997 to engine sensory, check wire 993
ground return from engine ECM
to engine sensors are goof, found
pin 993 at engine ECM
loosed, replaced pin 30 for wire 993
01/12/2019 5:30 PM
8.
33 8.
33 8.
33 8.
33 Complete 5135394 PM
4000HRS Service, 01/12/2019 D12: M
anpower : Djemik, Untung, Nyoto, Performed
d Planned 9 Hrs PM
4000HRS Service
01/12/2019 5:00 PM
7.
50 7.
50 0.
00 0.
00 Complete Electrical inspection 01/12/2019 D12: M
anpower : Andry, Dwi, Electrical inspection,
d maintenance battery, check charging and lighting system, replaced
bulb work lamp 10 ea, replaced ac high pressure switch, replaced
ac thermostat, replaced ac filter inner and outer, wash evaporator,
Clean up hose drainage AC
01/12/2019 6:10 PM
0.
67 0.
67 0.
67 0.
67 Complete M
echanical inspection Performed M
echanical inspection
d
04/12/2019 2:00 PM
67.
83 60.
83 67.
83 60.
83 Complete 5123304 Center A-Frame crack due to 03/12/2019 D12: M
anpower : Tabang, Hamka, 02/12/19 DS : TBM
04/12/2019 2:00 PM
67.
00 60.
00 0.
00 0.
00 Complete Over run : Water pump 01/12/2019 N12: M
anpower : Tri, Anton, Bayu, Ardi, 01/12/19 NS :
d auxiliary cover Reseal drive alternator, Reseal water pump auxiliary cover
04/12/2019 2:00 PM
67.
00 60.
00 0.
00 0.
00 Complete Over run : transmission tube 01/12/2019 N12: M
anpower : Tri, Anton, Bayu, Ardi02/12/2019
d clamp loose D12: M
anpower : Rahman, Rudi.
Agung, 01/12/19 NS : Remove
transmission suction hose, Disconnect REAR brake cooling hose,
Remove TCS hose, Completed transmission charging filter
mounting, Completed transmission tube clamp
02/12/19 DS : Replace hose TC lock up TC leaks, install clamp
tube transmission 2 ea
04/12/2019 2:00 PM
55.
00 48.
00 0.
00 0.
00 Complete Over run : Rear bladder 02/12/2019 D12: Rahman, Rudi, Agung, 02/12/19 DS : Remove
d steering accumulator leaks rear bladder steering accumulator leaks
02/12/019 NS : Replace,install steering accumulator leaks,
readjust pressure nitrogen
03/12/19 NS : Replace bleeder steering accumulator, readjust
nitrogen
28/11/2019 11:40 PM
8.
33 8.
33 8.
33 8.
33 Complete Tyre pos 5 leaks 28/11/2019 N12: Asrano,Harum Bala, Ronatal, Yusva, M
.
Ripai,
d Replace tyre pos 5 and matching tyre pos 6 ( Tread Cut separation
tyre pos 5 )
28/11/2019 11:10 PM
0.
67 0.
67 0.
67 0.
67 Complete Transmission oil leaks 28/11/2019 N12: Akhoyik, Triono, Herwinsyah, Re-tightening plug
d tube lubrication Transmission
28/11/2019 11:10 PM
0.
67 0.
67 0.
00 0.
00 Complete Hydraulic oil leaks Reoring Hose Discharge Hoist Pump
d
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 197 of 349
27/11/2019 4:45 PM
0.
83 0.
83 0.
83 0.
83 Complete Hydraulic oil leak 27/11/2019 D12: Djunaedy, Re-oring hose hoist screen, top up
d hydraulic oil
28/11/2019 2:05 PM
5.
83 5.
83 5.
83 5.
83 Complete Schedule POD follow up, 28/11/2019 D12: M
anpower : Tri, Simon, Dafiq, Budi, Flushing
d planned 6 Hrs FRONT suspension, adjust all suspension, Calibrate suspension
payload
28/11/2019 8:40 PM
1.
17 1.
17 1.
17 1.
17 Complete Axle oil leaks 28/11/2019 N12: M
anpower : A.
Khoyik, Triono, Herwin, Check
d and inspect oil leaks at axle housing, FOUND : Upper axle
housing crack near diff.
lube control valve, still safe for operation
due to oil still level
02/12/2019 2:45 AM
5.
08 5.
08 5.
08 5.
08 Complete Schedule weighing follow up, 01/12/2019 N12: M
anpower : Daviq, Trisno, Suryo, Flushing and
d Planned 6 hrs Adjust suspension all position, Calibrate payload
02/12/2019 10:30 AM
2.
25 2.
25 2.
25 2.
25 Complete Hydraulic oil leaks 02/12/2019 D12: Khoyik, Check and FOUND : Axle Flow control
d valve small leaks and temporary top up oil axle 183 ltr
30/11/2019 12:35 AM
2.
00 2.
00 2.
00 2.
00 Complete 5114429 Pre-service inspection, 29/11/2019 N12: M
anpower : Hardiman, Tri, Anton, Rahmadi,
d Planned 2 hrs Performed pre-service inspection
30/11/2019 12:35 AM
2.
00 2.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Hardiman, Tri, Anton, Rahmadi,
d 29/11/19 NS : Replace hoist control valve pilot hose
30/11/2019 12:35 AM
2.
00 2.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Hardiman, Tri, Anton, Rahmadi,
d 29/11/19 NS : Replace grease injector for suspension POS 4 and
dog bone
30/11/2019 1:30 AM
2.
50 2.
50 0.
92 0.
92 Complete Electrical inspection 29/11/2019 N12: M
anpower : Nataniel, imam, Lailul, Electrical
d inspection, check all lighting and A/C performance, cleaned AC
filter inner and outer, maintenance battery, replaced washer wiper
pump
30/11/2019 4:30 AM
3.
92 3.
92 3.
00 3.
00 Complete Schedule weighing follow up, 29/11/2019 N12: M
anpower : Hardiman, Tri, Anton, Rahmadi,
d Planned 6 hrs 29/11/19 NS : Flushing and adjusted suspension all position,
Calibrate suspension, Add axle oil
02/12/2019 2:10 PM
1.
00 1.
00 1.
00 1.
00 Complete Engine can't start 02/12/2019 D12: Khoyik, Check and reseal manual retarder, jump
d air pressure to start
28/11/2019 3:15 AM
0.
67 0.
67 0.
67 0.
67 Complete Brake over stroke 27/11/2019 N12: Joni P, Bleeding and reset brake chamber
d position 3
28/11/2019 10:05 PM
2.
75 2.
75 2.
75 2.
75 Complete Engine can't start 28/11/2019 N12: M
anpower : Joni P, Salim, Yoel, Check lines air
d starting, inspect and repair relay air starting, reposition and
tightened nut rotor air starting, jump air pressure to start
29/11/2019 10:15 PM
11.
00 11.
00 11.
00 11.
00 Complete Brake over stroke 29/11/2019 N12: M
anpower : Rizal, Simon, Replace shuttle valve
d for REAR brake cooling, Bleeding brake system
30/11/2019 3:15 PM
7.
58 7.
58 7.
58 7.
58 Complete Brake over stroke pos 2 and 3 30/11/2019 D12: M
anpower : Erwin, Tarojim, Othniel30/11/2019
d D12: tarojim, 30/11/19 DS : Trouble shooting brake POS 3 over
stroke, found brake chamber seal POS 3 broken than replace it,
perform bleeding brake
30/11/2019 5:00 PM
7.
50 7.
50 7.
50 7.
50 Complete Hydraulic oil leaks 30/11/19 DS : Replace hose front RH upper hydraulic oil cooler
d leaks
29/11/2019 11:15 AM
2.
00 2.
00 2.
00 2.
00 Complete 5123726 Pre Service Inspection, 29/11/2019 D12: M
anpower : Yuli, Performed Pre Service
d Planned 2 hrs Inspection
29/11/2019 3:00 PM
3.
75 3.
75 3.
75 3.
75 Complete Over run : Transmission oil 29/11/2019 D12: yulianto, Replace hose Transmission lubricating
d leaks
28/11/2019 10:30 AM
1.
50 1.
50 1.
50 1.
50 Complete Suspension guard pos 4 loose 28/11/2019 D12: Surya arapenta sembiring, Re-tightened
d suspension guard pos 4
29/11/2019 10:25 AM
7.
08 7.
08 7.
08 7.
08 Complete TRN Lube temperature too 29/11/2019 D12: M
anpower : Andik and didik, Inspected wiring and
d high sensor, found transmission oil mixed with differential oil, flushing
and replace transmission oil
29/11/19 DS : FOUND : ground wire TM
lube sensor fail.
it cause
by hose front RH brake cooling incorrect position.
Replaced TM
29/11/2019 8:50 PM
0.
50 0.
50 0.
50 0.
50 Complete Engine can't start 29/11/2019 N12: Djunaedy, ROOT CAUSE : Operator M
isuse.
Air
d pressure low due to operator forgot to close manual air valve on
air tank.
Jumped air pressure to start
01/12/2019 4:25 AM
6.
42 6.
42 6.
42 6.
42 Complete TC temperature sensor error 30/11/2019 N12: Zetting, Ignatius, Replace TC outlet temperature
d sensor, replace transmission oil temperature sensor
29/11/2019 4:00 AM
2.
00 2.
00 2.
00 2.
00 Complete 5132703 Pre Service inspection, 28/11/2019 N12: Baharuddin,M
arkus, Performed Pre Service
d planned 2 hrs inspection
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 198 of 349
01/12/2019 1:20 AM
14.
67 14.
67 14.
67 14.
67 Complete Tyre pos 4 blow out 30/11/2019 N12: M
anpower : Wawan, andik, andri, Replace tyre
d pos 4 with spare tyre, replace defuzer and tighten spud valve tyre
pos 3
01/12/2019 6:50 AM
1.
33 1.
33 1.
33 1.
33 Complete Schedule retorque tyre 30/11/2019 N12: lamuda, Performed retorque tyre position 3
d
03/12/2019 9:05 PM
4.
67 4.
67 4.
67 4.
67 Complete Tyre position 3 leaks 03/12/2019 N12: lamuda, Replace diffuser and reseal position 3
d
04/12/2019 6:50 AM
1.
08 1.
08 1.
08 1.
08 Complete Schedule retorque tyre 03/12/2019 N12: Rifai, Performed retorque tyre position 3
d
28/11/2019 3:35 PM
1.
67 1.
67 1.
67 1.
67 Complete Water coolant low level 28/11/2019 D12: Alfan Rully, Replace wiring signal after cooler
d level sensor due to corrosion
30/11/2019 10:30 PM
2.
00 2.
00 2.
00 2.
00 Complete 5141901 Pre-service inspection, 30/11/2019 N12: Hardiman, Rahmadi, Performed pre service
d Planned 2 hrs inspection
03/12/2019 2:15 PM
3.
00 3.
00 3.
00 3.
00 Complete 5169160 Schedule DM
G follow up, 03/12/2019 D12: Sofyan,Sudirman, 03/12/19 DS : Repair wiring
d Planned 3 Hrs signal RTR brake temperature sensor
03/12/2019 3:25 PM
1.
17 1.
17 1.
17 1.
17 Complete Over run : Continue DM
G 03/12/2019 D12: Sofyan,Sudirman, Follow up WO DM
G : RTR
d Follow up brake temperature sensor high, inspect sensor and wiring.
FOUND: Cable signal RTR brake temp sensor cut off in A frame
area, continue check RTR exhaust temperature sensor error fmi
08, replace sensor it and performance test
27/11/2019 9:30 AM
4.
92 2.
50 4.
92 2.
50 Complete Electrical inspection 6/11/19 NS : Electrical inspection, maintenance battery, clean-up
d air filter ac
27/11/19 DS : Continue electrical inspection,adjust belt
alternator,repaired cover AC
30/11/2019 4:30 PM
79.
00 79.
00 79.
00 79.
00 Complete 5120374 M
ount bevel gear axle housing 27/11/2019 D12: M
anpower : Sunanto, Syafrul, Bayu27/11/2019
d crack N12: M
anpower : Romy, M
ursafah, Agung28/11/2019 D12:
M
anpower : Anton, Syafrul, Sunoto28/11/2019 N12: M
anpower :
Rahman, Amos, Doni, Tahir, 27/11/19 DS : Drain axle oil,
Disconnect axle shaft, Remove main drive shaft, Remove
transmission include bevel gear
27/11/19 NS : Reseal bevel gear, Inspect plug at pinion bevel gear,
replace hose lubrication bevel gear, re assembly bevel gear to
transmission
28/11/19 DS : Remove bevel gear mounting bolt stud 2 ea
28/11/19 NS : Disconnect both axle shaft, cont.
remove bevel gear
, disassembly bevel gear fro transmission, assembly new bevel
gear to transmission
29/11/19 DS : Repair mounting bevel gear and center cross tube
cracks
30/11/19 DS : Torque bolt mounting transmission and bevel gear,
install both axle shaft, connected main drive shaft, reconnected
hose lines transmission, refill transmission and differential oil, final
check
27/11/2019 2:30 PM
5.
00 5.
00 0.
00 0.
00 Complete Over run : Electrical inspection 27/11/2019 D12: M
anpower : Eko,widayah,anj as,alijen, 27/11/19
d DS : Cont.
repaired cover AC
compressor,replaced emergency stop switch,wash
evaporator,check charging system at batt 26,88volt alternator
27,2volt, disconnect TM
harness,
30/11/2019 4:30 PM
69.
50 69.
50 0.
00 0.
00 Complete 5120374 Cross tube crack 27/11/2019 N12: M
anpower : Tabang28/11/2019 N12: M
anpower :
d Tabang30/11/2019 D12: M
anpower : Yan B, Syaifudin, Septadi,
Fahrizal(APP), 27/11/19 NS : Weld / repair crack at center cross
tube
28/11/19 DS : Cont.
repair ( cross tube and axle housing crack
30/11/19 DS : Torque bolt mounting transmission and bevel gear,
install both axle shaft, connected main drive shaft, reconnected
hose lines transmission, refill transmission and differential oil, final
check
28/11/2019 7:15 AM
12.
25 12.
25 0.
00 0.
00 Complete Over run : Inspection 27/11/2019 N12: manpower : Sappe, Rendi, Taher28/11/2019 D12:
d FOUND : Transmission input M
anpower : Anton, Syafrul, Sunoto, 28/11/19 DS : Reseal
shaft seal leaks transmission input shaft
02/12/2019 1:55 PM
5.
00 5.
00 5.
00 5.
00 Complete 5147843 PM
500HRS Service (Duration 02/12/2019 D12: M
anpower : Yadi,Edi,Retha APP, Performed PM
02/12/2019 3:00 PM
6.
00 6.
00 1.
08 1.
08 Complete Electrical inspection 02/12/2019 D12: M
anpower : Aziz, Irham, Rofiq, Performed
d electrical inspection, clean up battery and test load battery, check
lighting system and charging system, check ac compressor belt
and alternator belt, clean up ac filter inner and outer, reseal TC
filter PLGD switch, tightened bolt bracket monitor fatigue latching,
check motor blower speed 1 not function, check resistor motor
blower, check wiring motor blower, check switch motor blower
intermittent off, final check
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 199 of 349
02/12/2019 8:55 PM
7.
00 7.
00 5.
92 5.
92 Complete Backlog repair 02/12/2019 D12: M
anpower : Arif, Ilyasa, Tahir, 02/12/19 DS :
d Inspect pin sling and replace pin, adjusted trust pin differential
02/12/2019 8:55 PM
7.
00 7.
00 0.
00 0.
00 Complete Backlog repair 2/12/19 DS : Reseal transmission filter due to leaks
d
02/12/2019 2:45 PM
0.
83 0.
83 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Arif, Ilyasa, Tahir, Completed hand
d rail bolts due to missing
02/12/2019 8:55 PM
6.
17 6.
17 0.
00 0.
00 Complete 5125936 LH mount rear pin suspension 02/12/2019 D12: M
anpower : Arif, Ilyasa, Tahir, 02/12/19 DS :
d crack 17CM
and RH bottom Drain axle oil for TBM
repair crack
axle crack and leaks 13 cm
27/11/2019 8:55 AM
0.
25 0.
25 0.
25 0.
25 Complete Plate dump body crack 27/11/2019 D12: Setyo Prabowo, Check plate dump body
d condition.
Ensure it's safe for operation
01/12/2019 4:15 PM
6.
42 6.
42 6.
42 6.
42 Complete Steering oil leaks 01/12/2019 D12: M
an power : B Wibowo, Rozi, 01/12/19 DS :
d Reseal steering bleeder valve leaking
29/11/2019 2:35 AM
4.
33 4.
33 4.
33 4.
33 Complete Schedule POD follow up, 28/11/2019 N12: Arif,Agung,, Flushing FRONT suspension, adjust
d planned 6 Hrs all suspension, Calibrate suspension payload
30/11/2019 6:00 AM
5.
00 5.
00 5.
00 5.
00 Complete 5132746 PM
500HRS Service (Duration 29/11/2019 N12: M
anpower : Eko, Hisbul, Angga, Performed PM
30/11/2019 5:00 AM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 29/11/2019 N12: M
anpower : Eko, Hendra, Electrical inspection,
d check all lighting and A/C performance, replaced AC filter inner
and outer, maintenance battery, adjust belt AC compressor, protect
harness work lamp under radiator rubbing, completed clamp
housing reverse lamp, tidy up wiring TC screen and TM
filter plgd
switch
30/11/2019 9:00 AM
3.
00 3.
00 3.
00 3.
00 Complete M
echanical inspection Performed mechanical inspection
d
03/12/2019 5:00 AM
68.
00 68.
00 68.
00 68.
00 Complete LH Inside frame hitch area 02/12/2019 D12: M
anpower : Ahmadi, Bayu02/12/2019 N12:
d crack M
anpower : Hizam,Septadi,Agus30/11/2019 N12: M
anpower : Tri,
Anton, Ardi, Bayu, 30/11/19 DS : Disconnected hose lines LH rear
brake cooling, remove clamp hose fuel lines for repair cracks,
TBM
-Repair LH frame hitch area cracks
30/11/19 NS : Remove brake chamber POS 1, Remove make up
tank, Re-position hydraulic hose
02/12/19 DS : TBM
repair crack.
03/12/2019 5:00 AM
51.
92 51.
92 0.
00 0.
00 Complete Over run : Check coolant leak 02/12/2019 D12: M
anpower : Basri, M
ursafah, Noris30/11/2019
d thru water manifold LH side N12: M
anpower : Tri, Anton, Ardi, Bayu, 30/11/19 NS : Pressurize
cooling system, Tightened clamp of thermostat lines
02/12/19 DS : Drain coolant, test pressurize coolant system,
reseal tube coolant front coolant, repair fitting cooling turbo LH,
RH leaks, fill up coolant
03/12/2019 5:00 AM
22.
00 22.
00 0.
00 0.
00 Complete Over run : hose hoist pump to 02/12/2019 D12: M
anpower : Basri, M
ursafah, Noris, 02/12/19
d screen leaks DS : Replace hose hoist pump to screen
02/12/2019 11:00 AM
4.
00 4.
00 0.
00 0.
00 Complete Over run : Electrical inspection 02/12/2019 D12: M
anpower : Irham, Electrical inspection, replace
d differential oil level switch, install TC and TM
temperature sensor
29/11/2019 2:55 AM
0.
75 0.
75 0.
75 0.
75 Complete Tyre position 2 side wall crack 28/11/2019 N12: Harum Balla, Check and FOUND :Tyre position 2
d side wall crack,Next schedule for repair
29/11/2019 5:00 PM
8.
92 8.
92 8.
92 8.
92 Complete 5134368 PM
5000HRS Service 29/11/2019 D12: M
anpower : Nyoto, Djemik, Abraham, Performed
d (Duration 9 Hrs) and Backlog PM
4000HRS Service
Repair, Planned 12 Hrs
29/11/2019 8:05 PM
3.
08 3.
08 3.
08 3.
08 Complete M
echanical inspection 29/11/2019 D12: M
anpower : B Sulasno, Suparmadi29/11/2019
d N12: M
anpower : Dedi, Topo, Performed M
echanical inspection ,
Grounding test
03/12/2019 8:50 PM
2.
25 2.
25 2.
25 2.
25 Complete Engine cant start 03/12/2019 N12: rizal, qoirul, Check and FOUND : Starting switch
d intermittently disconnect, it causing air pressure low for starting
27/11/2019 2:30 PM
4.
33 4.
33 4.
33 4.
33 Complete Hose valve tyre pos 3 broken 27/11/2019 D12: Nober, Hamka, Replace valve tyre pos 3, adjust
d air pressure for tyre all position
01/12/2019 2:50 AM
1.
83 1.
83 1.
83 1.
83 Complete 5141867 Pre-Service inspection, 30/11/2019 N12: Hardiman, Rahmadi, Performed pre-service
d Planned 2 hrs inspection
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 200 of 349
30/11/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete 5135910 Pre Service Inspection, 30/11/2019 D12: yulianto, Performed Pre Service Inspection
d Planned 3 hrs
30/11/2019 11:55 PM
0.
33 0.
33 0.
33 0.
33 Complete Engine shutdown 30/11/2019 N12: Done by Junaidi, Tightened connector fire
d suppression module
03/12/2019 2:25 AM
2.
58 2.
58 2.
58 2.
58 Complete Engine cant start 02/12/2019 N12: rizal, qoirul, ROOT CAUSE : Operator M
isuse.
03/12/2019 9:55 PM
2.
67 2.
67 2.
67 2.
67 Complete Engine cant start 03/12/2019 N12: rizal, qoirul, Check and FOUND : Starting switch
d intermittently disconnect, it causing air pressure low for starting
27/11/2019 11:15 PM
4.
00 4.
00 4.
00 4.
00 Complete Engine can't running 27/11/2019 N12: M
anpower : Jhoni P, Pirsalem, Yoel , Check and
d FOUND : Pipe suction to fuel tank failure, Top up fuel 3012 and
bleeding fuel system and jumper air for start
02/12/2019 1:00 AM
1.
92 1.
92 1.
92 1.
92 Complete Air system leaks 01/12/2019 N12: Djunaedy, Re-seal air starting
d
27/11/2019 9:30 PM
3.
75 3.
75 3.
75 3.
75 Complete Lights 27/11/2019 N12: M
atius,Erwanta, Check all work lamp off, and
d breaker for reverse lamp tripped.
Inspect wiring and bulb work
lamp.
FOUND : Cable power RH reverse work lamp short with
lens work lamp.
Replace bulb work lamp it, protect cable and
performance test
30/11/2019 4:20 AM
6.
33 6.
33 6.
33 6.
33 Complete Fatigue latch error 29/11/2019 N12: Zetting, Ignatius, M
onitor fatigue latching off,
d check wiring monitor fatigue latching, repaired wiring monitor
fatigue latching, replaced relay module fatigue
30/11/2019 12:40 PM
2.
00 2.
00 2.
00 2.
00 Complete 5134240 Pre Service Inspection 30/11/2019 D12: M
anpower : Erwin, Yunus, Agus, TBM
,
d (Duration 2 Hrs) and Backlog Performed Pre Service Inspection
Repair, Planned 72 Hrs
03/12/2019 5:00 AM
64.
33 64.
33 64.
33 64.
33 Complete 5079536 Bottom axle crack and leaks 01/12/2019 N12: M
anpower : Topo, Dedi02/12/2019 D12:
d due to spike index too high M
anpower ; Rahmat, Zaenal30/11/2019 D12: M
anpower : Erwin,
Yunus, Agus, TBM
, 30/11/19 DS : Perform pre service inspection,
drain differential oil to repair bottom axle cracks
01/12/19 DS : Repair LH/RH bottom axle cracks and leaks
01/12/19 NS : Remove grease hose to repair rear axle crack
02/12/19 DS : TBM
Repair axle housing due to crack
02/12/19 NS : Finishing repair bottom axle, refill differential oil after
repair bottom axle cracks, repair guards grease suspension bent,
repair RH front hand rill bent
03/12/2019 5:00 AM
58.
00 58.
00 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Erwin, Yunus, Rozi30/11/2019 N12:
d M
anpower : Topo, Dedi, Johan, Trisno, 30/11/19 NS : Replace
transmission charging hose, Replace transmission lubrication filter
hose, Completed transmission lubrication clamp
01/12/19 DS : Reseal tube by pass transmission oil filter leaks
03/12/2019 5:00 AM
58.
00 58.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Topo, Dedi, Johan, Trisno, 30/11/19
d NS : Reseal LHs hoist screen, Reseal steering tank cap
03/12/2019 5:00 AM
34.
00 34.
00 0.
00 0.
00 Complete Backlog repair 01/12/2019 N12: M
anpower : Topo, Dedi02/12/2019 N12:
d M
anpower : Erwin,Yunus,Sahruni, 01/12/19 NS : Reseal brake
slack adjuster
02/12/19 NS : Reseal and install rear slack adjuster after swapping
to RD3110, performed bleeding brake, final check
03/12/2019 5:00 AM
22.
00 22.
00 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Sappe, Amos, 02/12/19 DS : Reseal
d and adjusted trust pin, install diff.
filter housing and replace filter
28/11/2019 2:25 PM
0.
67 0.
67 0.
67 0.
67 Complete Dump body snubbing 28/11/2019 D12: Djunaedy, ROOT CAUSE : Incorrect Reported
d Fault.
After check and performance test, NO problem was found
28/11/2019 11:20 PM
7.
33 7.
33 7.
33 7.
33 Complete Dump body snubbing 28/11/2019 N12: manpower : Sappe, Rudi, 28/11/19 NS : Inspect
d shim pad dump body, re-shim RH pivot dump, check and adjusted
suspension, inspect dog bone movement
02/12/2019 10:25 PM
1.
42 1.
42 1.
42 1.
42 Complete Lights 02/12/2019 N12: yulianto, kanaan
d , Repair head lamp relay and combination lamp relay
28/11/2019 3:00 AM
1.
25 1.
25 1.
25 1.
25 Complete 5141807 Pre service inspection, 27/11/2019 N12: M
anpower : Baharuddin,M
arkus, Rudi,
d planned 2 hrs Performed Pre service inspection
28/11/2019 3:00 AM
1.
17 1.
17 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : budiono, wahyudi, Electrical
d inspection, clean up AC filter, battery maintenance, Replace seal
washer pump, top up washer tank
29/11/2019 10:10 PM
1.
67 1.
67 1.
67 1.
67 Complete Engine low power 29/11/2019 N12: Yulianus, Alfan, Replace RH turbo inlet sensor
d
27/11/2019 9:25 AM
3.
92 2.
42 3.
92 2.
42 Complete Fatigue latch OFF 27/11/2019 D12: Zetting, Ignatius, Check fatigue latching monitor
d off,repaired wiring and replaced monitor fatigue latching open
circuit
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 201 of 349
29/11/2019 12:40 PM
2.
00 2.
00 2.
00 2.
00 Complete 5122301 Pre Service Inspection, 29/11/2019 D12: M
anpower : Yuli, Performed Pre Service
d Planned 2 hrs Inspection
29/11/2019 2:20 PM
1.
67 1.
67 1.
67 1.
67 Complete Over run : Continue backlog 29/11/2019 D12: yulianto, Check and adjust steering column
d repair
27/11/2019 9:45 PM
7.
00 7.
00 7.
00 7.
00 Complete LTR Suspension cylinder error 27/11/2019 D12: Alfan27/11/2019 N12: Arif,Rahman,Amos,
d indicator flash ON Replace REAR RH suspension sensor and adjust pressure rear
suspension
27/11/2019 9:45 PM
1.
92 1.
92 0.
00 0.
00 Complete Inspection FOUND : leaks 27/11/2019 N12: M
anpower : Rahman, Haris, Amos, Replace final
d from final drive bolt POS.
2 drive bolt 2 ea due to broken, add axle oil 51 ltrs.
01/12/2019 4:10 AM
11.
92 11.
92 11.
92 11.
92 Complete Sidewall cut cracking tyre pos 30/11/2019 N12: Hamka, Jonianto, 30/11/19 NS : Replace tyre pos
d 5 5 with spare tyre
27/11/2019 2:20 PM
5.
33 5.
33 5.
33 5.
33 Complete Hydraulic oil leak 27/11/2019 D12: Harnidy, Re-oring discharge hose steering pump,
d add hydraulic oil
27/11/19 DS : Replace Oring HPS filter, add hydraulic oil 22 litre
27/11/2019 9:50 PM
5.
00 5.
00 5.
00 5.
00 Complete Can't spraying 27/11/2019 N12: M
anpower : Ferry, Ade, Taufik, Febri
d , Check water pump can't spray, repair solenoid module control
valve water sprayer, leveling oil hydraulic 10 liter, washing unit,
test performance
29/11/2019 8:35 PM
3.
25 3.
25 3.
25 3.
25 Complete Hydraulic oil leak 29/11/2019 N12: Harnidy, ROOT CAUSE : M
aterials flaw.
After
d check, FOUND : Small leak at sprayer control valve.
Temporary
check oil level then keep unit in operation under monitoring while
waiting for the next service schedule to fix it
27/11/2019 2:00 PM
4.
33 4.
33 4.
33 4.
33 Complete Hydraulic pump hose 27/11/2019 D12: M
anpower : Bakhtiar, harris, Replace Fitting lines
d cooler sprayer due to corossion
27/11/2019 2:00 PM
3.
17 3.
17 0.
00 0.
00 Complete LHs brake cooling hose leaks 27/11/2019 D12: M
anpower :Bakhtiar, harris, Replace LHs brake
d cooling hose
02/12/2019 2:40 PM
3.
08 3.
08 3.
08 3.
08 Complete Hydraulic oil leaks Replace oring hose motor sprayer 2 ea
d
29/11/2019 2:30 AM
13.
08 13.
08 13.
08 13.
08 Complete Water sprayer malfunction 28/11/2019 D12: M
anpower : Irwan, Agung, 28/11/19 DS : Check
d water pump operation, disconnect water pump coupling (hydraulic
motor stuck), remove hydraulic sprayer motor
28/11/19 NS: Repair motor sprayer due to stuck, install motor
sprayer, alignment motor sprayer and water pump sprayer, install
rubber coupling, test motor sprayer, check pressure and found
high idle 1800 psi than adjust pressure to HI 1250 psi, test
performance and final check
28/11/2019 9:20 PM
2.
33 2.
33 0.
00 0.
00 Complete Engine oil low level op up engine oil 30 ltr and check leaks
d
03/12/2019 11:00 AM
2.
25 2.
25 2.
25 2.
25 Complete Lhs Door can't lock 03/12/2019 D12: Rajanson, Repair linkage LHs door lock
d
28/11/2019 8:50 PM
1.
42 1.
42 1.
42 1.
42 Complete Radio communication OFF 28/11/2019 N12: Rizal, Check and FOUND : Radio converter fail.
27/11/2019 10:55 PM
1.
92 1.
92 1.
92 1.
92 Complete Lights 27/11/2019 N12: Kaharuddin,Yaniwan, Check and FOUND : DLR
d pressure switch failure.
Temporary jump DLR pressure switch
03/12/2019 10:45 AM
2.
25 2.
25 2.
25 2.
25 Complete Horn Problem 03/12/2019 D12: M
atius,Erwanta, Check air horn continue ON,
d inspect switch and solenoid air horn.
FOUND: Cut ridge solenoid
air horn plugged by particle.
Clean-up it and performance test
29/11/2019 11:05 PM
36.
00 36.
00 36.
00 36.
00 Complete 4245772 Schedule ride strut POS 3 28/11/2019 D12: M
anpower : Ari, Erik, Ifan, Yudi,
d replacement, Planned 36 hrs Toding28/11/2019 D12: M
anpower : Wardi, Tahan, Dapit,
Ifan29/11/2019 D12: M
anpower : Andre, Sudarman, Junius, Agus,
Zuhri, 28/11/19 DS : Pre Entry Inspection, Washing machine, set
up to bay 8.
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 202 of 349
29/11/2019 11:05 PM
28.
08 28.
08 0.
00 0.
00 Complete 4932142 Schedule pump drive box 28/11/2019 D12: M
anpower : Ari, Erik, Ifan, Yudi, Toding, 28/11/19
d replacement NS : Drain oil hydraulic, transmission, and steering.
Disconnected
all lines to pump hydraulic, steering, transmission.
Removed pump
drive GP.
Swap all pump to new pump drive.
Installed pump drive
GP.
Completed all lines to hydraulic, steering and transmission
pump.
filled up oil hydraulic, transmission, steering.
Test running
and check leaks.
29/11/2019 11:05 PM
28.
08 28.
08 0.
00 0.
00 Complete Schedule Air Cond'r service 28/11/2019 D12: M
an power : Sampurno29/11/2019 D12:
d M
anpower : Bambang S, Oki S, 28/11/19 NS : Recovery ac
system, replaced AC compressor and receiver dryer, test leaks AC
lines with pressure nitrogen 250 psi, leveling oil AC compressor,
vacuum AC lines 2 hours, refilled refrigerant R 134A 2.
1 kg,
replaced roller throttle pedal and kit treadle, recompleted bolt front
cover cabin
29/11/19 DS : Replace ac compressor belt
29/11/2019 11:05 PM
16.
08 16.
08 0.
00 0.
00 Complete Electrical inspection 29/11/2019 D12: M
anpower : Bambang S, Oki S, 29/11/19 DS :
d Cleaned up housing RHs payload lamp, completed screw for plate
download port, tidy up jigsaw antenna wiring
29/11/2019 11:05 PM
16.
08 16.
08 0.
00 0.
00 Complete Schedule crack repair 29/11/2019 D12: M
anpower : Bangun , 29/11/19 DS : Repair LH
d mounting handrail fender / crack 2
position
30/11/2019 4:35 PM
17.
50 17.
50 17.
50 17.
50 Complete Over run : Elbow muffler has 29/11/2019 N12: M
an power : Wardi, Jefri, Yuspa NI30/11/2019
d been canibal to the other unit D12: M
anpower : Andre, Sudarman, Junius, Agus , 29/11/19 NS :
replace coolant level gauge from RD2561
30/11/19 DS : Install elbow exhaust muffler
30/11/2019 4:35 PM
17.
50 17.
50 0.
00 0.
00 Complete Over run : Continue backlog 29/11/2019 N12: M
an power : Wardi, Jefri, Yuspa NI, 29/11/19
d repair NS : Follow up TA2 result, adjust park brake release press.
30/11/2019 4:35 PM
17.
50 17.
50 0.
00 0.
00 Complete Over run : Continue backlog 29/11/2019 N12: M
an power : Wardi, Jefri, Yuspa NI30/11/2019
d repair D12: M
anpower : Andre, Sudarman, Junius, Agus, 29/11/19 NS :
Follow up TA2 result, Adjust T/C lock up and steering low
pressure.
install PTO shaft guard
30/11/19 DS : Adjust shim stopper bevel gear, Reoring base filter
steering filter base, adjust all injector grease bank, add oil s/t and
hyd, Take oil sample grounding test,final check , washing unit
30/11/2019 4:35 PM
17.
50 17.
50 0.
00 0.
00 Complete Over run : Continue electrical 29/11/2019 N12: M
an power : Bayu, Nuryanto30/11/2019 D12:
d inspection M
anpower : Bambang, Oki, 29/11/19 NS : Check RH red pay load
lamp off, check bulb and wiring, repair connection and replace
bulb RH red pay load lamp, check washer wiper not spray,
replace motor washer wiper fail, clean up washer wiper tank,
repair nozzle washer wiper blocked, final check electrical system,
check lighting charging and AC system
30/11/19 DS : Replaced washer wiper pump, Final checked
electrical system
30/11/2019 12:30 AM
5.
08 5.
08 5.
08 5.
08 Complete 5116831 PM
500HRS Service (Duration 29/11/2019 N12: M
anpower : Syair, Fuad, Performed PM
500HRS
d 5 Hrs) and Backlog Repair, service
Planned 12 Hrs
30/11/2019 2:00 AM
4.
50 4.
50 1.
50 1.
50 Complete Electrical inspection 29/11/2019 N12: M
anpower : Eko, Hendra, Electrical inspection,
d check all lighting and AC performance, replaced AC filter inner and
outer, maintenance battery, adjust belt AC compressor, repaired
wiring TM
filter plgd switch, reconnect connector wheel speed
sensor and test with ET.
30/11/2019 7:25 AM
6.
92 6.
92 5.
42 5.
42 Complete Backlog repair 29/11/2019 N12: M
anpower : Irwan, Jaka, farid, 29/11/19 NS :
d Reseal scavenge pump cover, reseal diverter valve
30/11/2019 7:25 AM
6.
92 6.
92 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Irwan, Jaka, farid, 29/11/19 NS :
d Replace steering oil filter
30/11/2019 7:25 AM
6.
92 6.
92 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Irwan, Jaka, farid, 29/11/19 NS :
d Reseal Pump drive return elbow
30/11/2019 7:25 AM
6.
92 6.
92 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Irwan, Jaka, farid, 29/11/19 NS :
d Adjust front suspension
30/11/2019 1:25 PM
6.
00 6.
00 6.
00 6.
00 Complete Schedule POD follow up, Performed flush and adjust suspension cylinder pressure
d planned 6 Hrs
30/11/2019 11:05 PM
9.
67 9.
67 9.
67 9.
67 Complete Over run : pump drive gear 30/11/2019 D12: M
anpower : Adrianus, Nelson, Idrus30/11/2019
d box making particle N12: M
anpower : Irwan, Erikson, 30/12/19 DS : Replace pump
drive gear box assy due to making particle, completed hose line
hydraulic pump, transmission pump and steering pump, fill up hyd
oil and steering oil
30/11/19 NS : Prelube pump drive, install cabin front cover, add
hydraulic oil, test performance, calibration payload, final check
30/11/2019 2:25 PM
1.
00 1.
00 0.
00 0.
00 Complete Over run : service brake pedal 30/11/2019 D12: M
anpower : Adrianus, Nelson, Idrus, 30/12/19
d shaky DS : Repair service brake pedal shaky
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 203 of 349
01/12/2019 4:15 AM
5.
00 5.
00 5.
00 5.
00 Complete 5136173 PM
500HRS Service (Duration 30/11/2019 N12: M
anpower : Eko, Angga, Performed PM
500HRS
d 5 hrs) and backlog repair, service
Planned 12 hrs
01/12/2019 4:15 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Bakhtiar.
Agung, 30/11/19 NS :
d replace operator seal door
01/12/2019 4:15 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Bakhtiar.
Agung, 30/11/19 NS :
d Replace grease injector
01/12/2019 4:15 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Bakhtiar.
Agung, 30/11/19 NS : repair
d retarder mounting
02/12/2019 10:05 PM
6.
33 6.
33 6.
33 6.
33 Complete Indicator transmission flash 02/12/2019 N12: M
anpower : Andik,Erick,Atto, Amin, Halman,
d ON Check transmission screen rating A,replace transmission oil filter 1
ea,FOUND : cable transmission oil pressure switch broken, repair
cable transmission oil pressure switch
03/12/2019 5:05 PM
4.
08 4.
08 4.
08 4.
08 Complete Schedule POD Follow up, 03/12/2019 D12: M
anpower : Lailia, Agus, Novi, 03/12/19 DS :
d planned 6 hrs Follow up DOD error, adjusted suspension and calibrdation
02/12/2019 9:15 PM
0.
92 0.
92 0.
92 0.
92 Complete Operator seat can't adjusted 02/12/2019 N12: ato, erik, Repair operator seat back rest
d
28/11/2019 9:10 AM
1.
08 1.
08 1.
08 1.
08 Complete Engine can't start 28/11/2019 D12: Jufry, After check, FOUND : Battery low voltage.
30/11/2019 9:45 AM
1.
42 1.
42 1.
42 1.
42 Complete Front Brake Sticky 30/11/2019 D12: ato, erik, bleeding front brake system, perform
d test
01/12/2019 9:55 PM
1.
75 1.
75 1.
75 1.
75 Complete Indicator engine warning flash 01/12/2019 N12: Harnidy, Jumanto, Replace air cleaner
d ON
02/12/2019 2:30 AM
2.
92 2.
92 2.
92 2.
92 Complete Engine coolant temperature 01/12/2019 N12: Harnidy, Replace engine oil filter
d high
02/12/2019 8:25 AM
1.
17 1.
17 1.
17 1.
17 Complete Seat belt problem 02/12/2019 D12: Wayan, Replace seat belt operator
d
01/12/2019 12:00 PM
4.
58 4.
58 4.
58 4.
58 Complete 5143532 PM
500HRS Service (Duration 01/12/2019 D12: M
anpower : Nyoto, Fajar, Performed PM
01/12/2019 10:00 AM
2.
50 2.
50 0.
00 0.
00 Complete Electrical inspection 01/12/2019 D12: M
anpower : Petrus, M
arsi, Rofiq, Yusran,
d Electrical inspection, maintenance battery, check charging system
and lighting system, Replace A/C inner and outer, check arc
pressure switch, clean up glass work lamp, check V belt alternator
and ac compressor, Final check
01/12/2019 5:25 PM
5.
42 5.
42 5.
42 5.
42 Complete Backlog Repair 01/12/2019 D12: M
an power : Yuli, Idrus, 01/12/19 DS : Check
d and adjust all grease injector
01/12/2019 5:25 PM
5.
42 5.
42 0.
00 0.
00 Complete Backlog Repair 01/12/2019 D12: M
an power : Yuli, Idrus, 01/12/19 DS : Replace
d hose return brake cooling
01/12/2019 5:25 PM
5.
42 5.
42 0.
00 0.
00 Complete Backlog Repair 01/12/2019 D12: M
an power : Yuli, Idrus, 01/12/19 DS : Repair K-
d Frame LHs Crack
03/12/2019 3:45 AM
34.
33 34.
33 34.
33 34.
33 Complete 5069342 LH Outside K Frame crack 02/12/2019 N12: M
anpower : Kopral,Eko ,Sunari,Ardiles, 01/12/19
d 40CM
NS : Repair K-frame crack both side
02/12/19 DS : Continue repair K frame crack
02/12/19 NS : Continue repair LHs walk way crack,repair LHs K-
Frame crack 40 cm,repair RHs K-Frame crack
03/12/2019 11:00 AM
2.
00 2.
00 2.
00 2.
00 Complete 5140952 PM
250HRS service (Duration 03/12/2019 D12: M
anpower : Pairul, Abraham, Performed PM
03/12/2019 5:00 PM
6.
00 6.
00 6.
00 6.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Safri, Imam, Febri, Replace brake
d cooling hose
03/12/2019 5:00 PM
3.
83 3.
83 0.
00 0.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Safri, Imam, Febri, Replace
d hydraulic hose 1 ea
03/12/2019 5:00 PM
1.
58 1.
58 0.
00 0.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Safri, Imam, Febri, Adjusted grease
d injector
03/12/2019 5:30 PM
0.
50 0.
50 0.
50 0.
50 Complete Over run : Continue backlog Replace hose transmission pump for cooler
d repair
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 204 of 349
30/11/2019 7:40 AM
2.
00 2.
00 2.
00 2.
00 Complete Dashboard lamp OFF 30/11/2019 D12: andik, didik
d , Replace dashboard lamp 3 ea
30/11/2019 3:25 AM
42.
00 42.
00 42.
00 42.
00 Complete 5168152 Upper bolt mounting bevel 28/11/2019 D12: M
anpower : Erasmus, Bayu, Anton,
d gear crack Johan29/11/2019 D12: M
anpower : Ahsan, Fahrizal,
Junaidi29/11/2019 N12: M
anpower : Bayu, Hasyim, Suryo, Johan,
28/11/19 DS : Drain axle oil, Remove axle shaft both side,
Disconnect transmission lines, Remove transmission include bevel
gear
29/11/19 DS : Repair top axle cracks, Replace / install
transmission include bevel gear, torque bolt mounting,
reconnected main drive shaft, reconnected hose lines
transmission, reinstall both axle shaft
29/11/19 NS : Connect transmission lines, Top up transmission oil,
Connect main drive shaft and torque the bolts, Grounding test,
Install guard of suspension POS 3 and 4
02/12/2019 10:20 PM
0.
33 0.
33 0.
33 0.
33 Complete LHs door cant opened 02/12/2019 N12: anang,yahya, Repair LHs door lock
d
03/12/2019 7:45 AM
0.
58 0.
58 0.
58 0.
58 Complete Differential breather loose 03/12/2019 D12: Joni P, Reposition and re-install clamp differential
d breather
03/12/2019 7:45 AM
0.
58 0.
58 0.
00 0.
00 Complete LH door lock hard to open 03/12/2019 D12: M
anpower : Khoyik, Erwin, Repair LH door lock
d hard to open
28/11/2019 12:00 AM
3.
33 3.
33 3.
33 3.
33 Complete Engine low power 27/11/2019 N12: M
anpower : khoyik, Triono, Herwin , Check and
d clean up fuel screen and performance test
01/12/2019 3:25 AM
6.
00 6.
00 6.
00 6.
00 Complete Schedule weighing follow up, 30/11/2019 N12: M
anpower : Daviq, Suryo, Hasyim, Syafrul,
d Planned 6 hrs 30/11/19 NS : Flushing and adjusted suspension all position,
Calibrate payload
01/12/2019 4:00 AM
0.
58 0.
58 0.
58 0.
58 Complete Over run : Fuel screen blocked 30/11/2019 N12: M
anpower : Daviq, Suryo, Hasyim, Syafrul,
d 30/11/19 NS : Check and clean up fuel screen
01/12/2019 9:30 PM
1.
00 1.
00 1.
00 1.
00 Complete Radio communication failure 01/12/2019 N12: Yulianus, Tightened antenna radio
d communication
01/12/2019 10:25 PM
0.
92 0.
92 0.
92 0.
92 Complete Grease leak 01/12/2019 N12: Djunaedy, Clean up grease tank due to overfill
d
04/12/2019 2:50 AM
0.
17 0.
17 0.
17 0.
17 Complete Rear view mirror cant adjusted 03/12/2019 N12: anang, yahya, Adjust LHs RHs mirror
d
29/11/2019 11:30 PM
7.
67 7.
67 7.
67 7.
67 Complete Turn up ply separation tyre 29/11/2019 N12: M
anpower : Ardianto, Wawan, andri, Replace
d pos 4 tyre pos 4 with spare tyre
30/11/2019 4:25 AM
0.
67 0.
67 0.
67 0.
67 Complete Engine shutdown 29/11/2019 N12: Djunaedy, Repair relay air starting due to stuck
d
30/11/2019 12:00 PM
4.
50 4.
50 4.
50 4.
50 Complete Transmission oil low level 30/11/2019 D12: rizal, found transmission oil transferred into
d hydraulic, fill up transmission oil, leveling hyd oil
02/12/2019 10:20 PM
1.
83 1.
83 1.
83 1.
83 Complete After cooler low level Tightening LHs cooling turbo pipe leaks, Top up coolant 20 liters
d
30/11/2019 11:40 AM
1.
58 1.
58 1.
58 1.
58 Complete Operator seat cant adjusted 30/11/2019 D12: rizal, amri, swap seat adjuster from trainer seat
d
30/11/2019 11:25 PM
4.
25 4.
25 4.
25 4.
25 Complete Brake over stroke 30/11/2019 N12: M
anpower : Sunanto, Hari, 30/11/19 NS :
d Performed TA2 for brake, Replace brake shuttle valve
02/12/2019 5:00 PM
1.
67 1.
67 1.
67 1.
67 Complete 5141852 Pre service inspection, 02/12/2019 D12: Baharuddin,M
arkus, Performed Pre service
d planned 2 hrs inspection
27/11/2019 3:55 PM
5.
17 5.
17 5.
17 5.
17 Complete 5145271 PM
500HRS Service (Duration 27/11/2019 D12: M
anpower : Herman, Untung, Hisbul, Abraham,
d 5 hrs) and backlog repair, Performed PM
500HRS service
Planned 10 hrs
27/11/2019 3:00 PM
3.
58 3.
58 0.
00 0.
00 Complete Electrical inspection 27/11/2019 D12: M
anpower : Nataniel,rinda,lai lul,rofiq, Electrical
d inspection,maintenance battery,cleaned AC filter,check all lighting
and AC performance,adjust AC compressor belt,reseal DLR
pressure switch,repaired
nozle washer wiper.
27/11/2019 4:50 PM
0.
92 0.
92 0.
92 0.
92 Complete Backlog repair 27/11/2019 D12: M
anpower : Rizal, Gesang, Ridwan, Budi,
d 27/11/19 DS : Inspect grease system, Replace grease injector 5
ea
27/11/2019 4:50 PM
0.
92 0.
92 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Rizal, Gesang, Ridwan, Budi,
d 27/11/19 DS : Adjusted fire supression
27/11/2019 9:25 PM
4.
50 4.
50 4.
50 4.
50 Complete Horn Sticky 27/11/2019 N12: M
anpower : Satrio, Huda, Check air horn
d continue ON, clean-up catridge solenoid air horn, flushing line
hose air horn.
Performance test
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 205 of 349
27/11/2019 12:55 PM
2.
00 2.
00 2.
00 2.
00 Complete 5135859 Pre-Service inspection, 27/11/2019 D12: Hardiman, Yulianus, Surya, Performed pre-
d Planned 2 hrs service inspection
28/11/2019 10:50 PM
0.
42 0.
42 0.
42 0.
42 Complete Dump body snubbing 28/11/2019 N12: M
anpower.
Yoel, Pirsalem, Adjusted shim pad
d dump body
29/11/2019 4:30 AM
4.
83 4.
83 4.
83 4.
83 Complete Dump body snubbing 28/11/2019 N12: Joni P, Adjust shim pad dump body angle and
d test performance
27/11/2019 8:50 PM
0.
25 0.
25 0.
25 0.
25 Complete Engine guard bolt loosen 27/11/2019 N12: Khoyik, Check and replace bolt bottom guard
d engine missing
28/11/2019 3:00 PM
1.
58 1.
58 1.
58 1.
58 Complete Operator seat failure 28/11/2019 D12: Djunaedy, Repair air hose operator seat
d
30/11/2019 1:45 PM
3.
00 3.
00 3.
00 3.
00 Complete Engine can't start 30/11/2019 D12: rizal, Check and FOUND : starting system
d intermittent disconnect.
jump started
04/12/2019 4:05 AM
0.
75 0.
75 0.
75 0.
75 Complete Engine low power 03/12/2019 N12: erwm,sandy
d , FOUND: Rt Turbo inlet pressure sensor error,,,check harness RT
turbo inlet pressure sensor voltage 5 volt is good,,,check signal
voltage is good,,Replaced RT turbo inlet pressure sensor
28/11/2019 11:00 AM
2.
50 2.
50 2.
50 2.
50 Complete Brake cooling hose leak 28/11/2019 D12: Djunaedy, Replace brake cooling return hose pos
d 1 and 3, add hydraulic oil 100 litres
30/11/2019 9:55 AM
2.
33 2.
33 2.
33 2.
33 Complete Fuel leaks 30/11/2019 D12: anang, fuel tank small crack, operated until next
d repair schedule
02/12/2019 2:50 AM
10.
67 10.
67 10.
67 10.
67 Complete Dog bone pin comes out 01/12/2019 N12: M
anpower : Erasmus, Hasyim, Syafrul, 01/12/19
d NS : Repair dog bone hole pin, Install dump body pin, Repair
mounting guard of bevel gear filter, M
anual greasing dog bone pin
01/12/2019 10:50 PM
3.
83 3.
83 0.
00 0.
00 Complete Inspection FOUND : washer 01/12/2019 N12: M
anpower : Ignatius,Budi, 01/12/19 NS :
d pump not spray Checked washer pump not spray, checked washer pump ok,
checked check valve line wiper
clogged, replaced check valve line wiper
03/12/2019 11:35 AM
0.
50 0.
50 0.
50 0.
50 Complete Front suspension excessive 03/12/2019 D12: M
anpower : Jhoni P, Pirsalem, Yoel, Check
d noise FOUND : Suspension pin dry due to grease pump fail.
Temporary
manual grease both rod front suspension and test performance
27/11/2019 5:05 PM
2.
00 2.
00 2.
00 2.
00 Complete Suspension pos 2 too low 27/11/2019 D12: Suwandy, Adjust suspension pos 2
d
29/11/2019 2:20 PM
10.
50 10.
50 10.
50 10.
50 Complete Indicator engine oil pressure 29/11/2019 D12: M
anpower : Hizam, Othniel, Gasali, Washing
d flash ON around engine area, reseal engine oil filter base leaking, perform
test, replace hose front RH brake cooling leaking
30/11/2019 10:30 AM
0.
92 0.
92 0.
92 0.
92 Complete Indicator engine oil pressure 30/11/2019 D12: M
anpower : Yusran and Andry, Replace engine
d flash ON oil filter pressure sensor sensor
30/11/2019 11:50 AM
1.
33 1.
33 1.
33 1.
33 Complete Air cleaner blocked Replace air cleaner
d
02/12/2019 1:50 AM
11.
00 11.
00 11.
00 11.
00 Complete Fuel breather fail 01/12/2019 N12: M
anpower : Rizal, Johan, Replace fuel breather
d and hose, Check engine oil pressure
01/12/2019 8:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Electrical inspection 01/12/2019 N12: M
anpower : Arif.
Anjas , 01/12/19 NS : Check
d engine oil pressure sensor error, check filtered and unfiltered
pressure sensor reading by
ET and found filtered pressure sensor incorrect reading (3psi when
engine running), replaced
filtered engine oil pressure sensor cannibal from RD3347, repaired
wiring differential pluged switch
27/11/2019 11:20 AM
0.
75 0.
75 0.
75 0.
75 Complete Schedule retorque tyre 27/11/2019 D12: Hamka, Jonianto, Performed retorque tyre pos 3
d and 6
01/12/2019 5:30 AM
2.
75 2.
75 2.
75 2.
75 Complete Indicator engine warning flash 30/11/2019 N12: Jumanto, Nur Andy, Replace air cleaner outer
d ON filter 2 ea, add engine oil 40 litres
27/11/2019 4:30 PM
9.
00 9.
00 9.
00 9.
00 Complete 5130689 PM
2000HRS service 27/11/2019 D12: M
anpower : Agus, Angga, Abraham, Performed
d (Duration 9 hrs) and backlog PM
2000HRS service
repair, Planned 12 hrs
27/11/2019 3:00 PM
7.
00 7.
00 0.
00 0.
00 Complete Electrical inspection 27/11/2019 D12: M
anpower : Eko,widayah,garuda, Electrical
d inspection,maintenance battery,replaced AC filter inner and
outer,check all lighting and AC performance,wash
evaporator,replaced bulb reverse lamp,replaced belt AC
compressor
27/11/2019 7:30 PM
6.
50 6.
50 3.
00 3.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, 27/11/19 DS : Replace
d injector grease to dog bone bearing
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 206 of 349
27/11/2019 7:30 PM
6.
50 6.
50 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, 27/11/19 DS : Replace
d hose make up tank due to fatigue
27/11/2019 7:30 PM
6.
50 6.
50 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: M
anpower : Andi, Nova, 27/11/19 DS : Reoring
d Plug outlet Lines TC and scav pump
27/11/2019 7:30 PM
0.
50 0.
50 0.
00 0.
00 Complete Backlog repair 27/11/19 NS : Reseal tube by pass transmission oil cooler, change
d hose transmission pump to transmission oil cooler
29/11/2019 2:30 AM
31.
00 31.
00 31.
00 31.
00 Complete 5095135 RH out side K-frame crack 27/11/2019 N12: M
anpower : Sapri28/11/2019 D12: M
anpower :
d Budi, Nur Andy, fakhmil, Farid, 27/11/19 NS : Repair K Frame
Crack
28/11/19 DS : Continue repair Rhs K-frame out side due to crack
28/11/19 NS : Fabricate stopper Y link,
29/11/2019 2:30 AM
7.
50 7.
50 0.
00 0.
00 Complete Over run : Pin Y-Link shaky Removed pin Y Link, inspect pin Y Link due to shaky, inspect lock
d pin Y link, replace lock pin Y link, test performance and final check
30/11/2019 9:20 PM
0.
58 0.
58 0.
58 0.
58 Complete Retarder loose 30/11/2019 N12: Jumanto, Re-install lever retarder
d
27/11/2019 10:10 PM
5.
17 5.
17 5.
17 5.
17 Complete Transmission oil temperature 27/11/2019 N12: M
anpower : Sampurno, Checked electrical for
d too high T/M
oil temperature high, checked sensor and error code, make
sure temperature at CM
S, clear log event.
Additional job : checked
POD display problem found module payload meter failure (Waiting
part), Performanced test
01/12/2019 10:30 AM
65.
00 65.
00 65.
00 65.
00 Complete Brake temperature too high 01/12/2019 D12: M
anpower : Aji, Asa, Gunawan28/11/2019 N12:
d M
anpower : Leo, Erwin, Arizal
29/11/2019 D12: M
anpower : Aji, Asa, Gunawan29/11/2019 N12:
M
anpower : Agus, Taufik, Haris30/11/2019 D12: M
anpower : Aji,
Asa, Gunawan30/11/2019 N12: M
anpower : Agus, Taufik ,
28/11/19 NS : Continue trouble shooting brake active by self
Ground Test for operation
29/11/19 DS : Troubleshooting check brake sticky, replace filter
parking brake and check particle, measurement brake wear rear
brake, check residual pressure rear brake, pressure test parking
brake system from internal leaking
29/11/19 NS : Test pressurized parking brake and service brake
rear Rhs (result : pressurized pressure for service brake drop),
remove axle shaft Rhs, remove final drive Rhs
30/11/19 DS : Replace and Install final drive pos 2 and torque bolt
mounting, install axle shaft pos 2, install hose brake and brake
cooling brake pos 2, fill up hyd oil, fill up axle oil, install tyre pos 5
and 6.
replace hose brake oil cooler to diverter valve leak
30/11/19 NS : Perform TA brake, add hydraulic + T/m oil,
install end tube muffler
01/12/19 DS : Replace oring cover final drive pos 4 leak, fill up oil
fian drive, test performance ARC and brake system, adjust tyre
pressure, final check
01/12/2019 7:50 AM
5.
08 5.
08 0.
00 0.
00 Complete RHs REAR view mirror broken 30/11/2019 N12: M
anpower : Agus, Taufik , 30/11/19 NS : Replace
d Rhs rear view mirror
01/12/2019 10:05 PM
0.
58 0.
58 0.
58 0.
58 Complete Schedule retorque tyre 01/12/2019 N12: Hamka, Jonianto, Performed retorque tyre pos 5
d and 6
28/11/2019 8:30 PM
0.
33 0.
33 0.
33 0.
33 Complete Tyre low pressure 28/11/2019 N12: Sugeng, Adjust tyre pressure position 5
d
02/12/2019 5:05 PM
7.
92 7.
92 7.
92 7.
92 Complete Transmission oil leaks 02/12/19 DS : Change out hose suction transmission
d
28/11/2019 9:00 PM
1.
25 1.
25 1.
25 1.
25 Complete Over taking lamp OFF 28/11/2019 N12: Irham,Satrio, ROOT CAUSE : M
aterial flaws.
d check over taking lamp off, inspect wiring, switch and lamp.
03/12/2019 8:35 PM
1.
17 1.
17 1.
17 1.
17 Complete Indicator engine warning flash 03/12/2019 N12: amri, Operator M
isuse.
Engine cant start due to
d ON emergency stop was ON.
Turn OFF the emergency stop
03/12/2019 11:20 PM
1.
92 1.
92 1.
92 1.
92 Complete 5140993 PM
250HRS Service (Duration 03/12/2019 N12: Nyoto, Irwan, heri, Performed PM
250HRS
d 2 hrs) and Backlog repair, Service
Planned 12 hrs
04/12/2019 4:20 AM
5.
00 5.
00 5.
00 5.
00 Complete Backlog repair inspect and adjust all grease injector.
replace grease injector rear
d bank 2 ea leaks
04/12/2019 4:20 AM
5.
00 5.
00 0.
00 0.
00 Complete Backlog repair reseal alternator drive leak
d
04/12/2019 4:20 AM
5.
00 5.
00 0.
00 0.
00 Complete Backlog repair 03/12/2019 N12: M
anpower : Abi, Sunari, Ardiles, Avy, Apri, fajar,
d replace hose parking brake to TCS valve leak.
Replace hose
brake cooling return rubbing.
Reoring hose inlet brake cooling RHs
leak
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 207 of 349
29/11/2019 11:15 AM
3.
92 3.
92 3.
92 3.
92 Complete A/C 29/11/2019 D12: Dimas and Alijen, Check AC clutch compressor
d not engage, found wire 521 from ac clutch switch to input ac high
pressure switch open line at steering HM
U (Rubbing witch pipe of
HM
U).
Repair cable 521 for AC pressure switch input
04/12/2019 1:15 AM
5.
75 5.
75 5.
75 5.
75 Complete Schedule POD follow up, 03/12/2019 N12: aji, gunawan, asahadi
d Planned 6 Hrs , Flushing and adjust all suspension position, calibrating payload
30/11/2019 8:55 AM
0.
92 0.
92 0.
92 0.
92 Complete Transmission oil leaks 30/11/2019 D12: atto, erik, reoring Transmission filter cover
d
30/11/2019 8:55 AM
0.
92 0.
92 0.
00 0.
00 Complete RHs rear view mirror loose Adjust and tightening RHs rear view mirror
d
04/12/2019 3:40 AM
1.
83 1.
83 1.
83 1.
83 Complete Schedule POD Follow up, 03/12/2019 N12: aji, gunawan, asahadi
d Planned 6 Hrs , Flushing and adjust all suspension position, calibrating payload
03/12/2019 3:35 AM
1.
92 1.
92 1.
92 1.
92 Complete 5149453 PM
250HRS Service (Duration 02/12/2019 N12: M
anpower : Djemik, Irwan, Performed PM
03/12/2019 7:40 AM
4.
08 4.
08 4.
08 4.
08 Complete M
echanical inspection 02/12/2019 N12: M
anpower : Abi, 02/11/19 NS : Check and adjust
d grease injector
03/12/2019 9:20 AM
1.
67 1.
67 1.
67 1.
67 Complete Over run : Continue electrical Replace cartridge solenoid ARC
d inspection
02/12/2019 9:20 AM
7.
33 7.
33 7.
33 7.
33 Complete 5030004 Schedule NDT RIM
02/12/2019 D12: Sugeng, Performed NDT RIM
tyre replacement
d replacement, Planned 12 hrs POS 3, 4, 5, 6
29/11/2019 7:55 AM
0.
75 0.
75 0.
75 0.
75 Complete Retarder loose 29/11/2019 D12: erik, roni, reinstall retarder lever bolt lock
d
02/12/2019 10:00 AM
2.
00 2.
00 2.
00 2.
00 Complete 5130675 PM
250HRS Service (Duration 02/12/2019 D12: M
anpower : Pairul,Abraham, Performed PM
02/12/2019 2:00 PM
6.
00 6.
00 4.
00 4.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Budiono, Garuda, Performed
d electrical inspection, maintenance battery, check charging and
lighting system, clean up A/C filter inner , check and tightened
knob ac thermostat switch, check RH wheel speed sensor
abnormal reading
02/12/2019 7:00 PM
9.
00 9.
00 5.
00 5.
00 Complete Backlog repair 02/12/19 DS : Replace LH glass door
d
02/12/2019 7:00 PM
9.
00 9.
00 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Zulkifly, Novi, Febri, 02/12/19 DS :
d Reseal input shaft transmission leaks
02/12/2019 7:00 PM
9.
00 9.
00 0.
00 0.
00 Complete Backlog repair 02/12/2019 D12: M
anpower : Zulkifly, Novi, Febri, 02/12/19 DS :
d Replace hose hoist 1 ea and test performance
03/12/2019 2:30 AM
7.
50 7.
50 7.
50 7.
50 Complete Over run : Continue backlog 02/12/2019 N12: M
anpower : Yuli,Idrus, Repair switch LH window
d repair can't down, replace wheel speed sensor, check and repair
snubbing system hoist,test performance
29/11/2019 3:30 AM
7.
00 7.
00 7.
00 7.
00 Complete 5134045 PM
1000HRS service 28/11/2019 N12: Pairul, Heri, Performed PM
1000HRS service
d (Duration 7 hrs) and Backlog
repair, planned 10 hrs
29/11/2019 3:30 AM
6.
50 6.
50 0.
00 0.
00 Complete Electrical inspection 28/11/2019 N12: M
an power : Sudirman, Wahyudi, Battery
d maintenance, wash up evaporator, check loto box and starting,
check charging system
29/11/2019 6:30 AM
3.
00 3.
00 3.
00 3.
00 Complete Backlog repair 28/11/2019 N12: M
anpower : Imron, Eko F, Zulkifli, Taufik, Febri,
d Abdul
, Repair RH step ladder loose
29/11/2019 6:30 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 28/11/2019 N12: M
anpower : Imron, Eko F, Zulkifli, Taufik, Febri,
d Abdul
, Replace grease pump due to stuck
29/11/2019 6:30 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 28/11/2019 N12: M
anpower : Imron, Eko F, Zulkifli, Taufik, Febri,
d Abdul
, Replace pressure tap for transmission leak
29/11/2019 6:30 AM
3.
00 3.
00 0.
00 0.
00 Complete 4507107 Backlog repair Replace drive shaft engine - pump drive
d
29/11/2019 10:00 AM
3.
50 3.
50 3.
50 3.
50 Complete Over run : Continue Backlog 29/11/2019 D12: rafles, 29/11/19 DS : Install stopper pin Y-link
d repair
29/11/2019 9:20 AM
2.
33 2.
33 0.
00 0.
00 Complete Over run : Grease system 29/11/2019 D12: M
anpower : Sunari, Ardiles, 29/11/19 DS :
d problem M
anual greasing all pin due to dry, top up grease tank, repair
grease pump and test performance
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 208 of 349
29/11/2019 10:05 AM
0.
75 0.
75 0.
08 0.
08 Complete Over run : core valve tyre pos 29/11/2019 D12: lamuda, Replace core valve tyre position 2
d 2 fail
28/11/2019 3:00 AM
3.
75 3.
75 3.
75 3.
75 Complete Tyre pos 4 sidewall cracking 27/11/2019 N12: Sugeng, Replace tyre pos 4 with spare tyre
d
02/12/2019 4:20 PM
8.
58 8.
58 8.
58 8.
58 Complete Grease leaks and grease 02/12/2019 D12: Lailia, Imam
d pump failure , M
anual greasing all pins due to dry, repair mounting grease
pump due to broken, reinstall grease pump and test performance
03/12/2019 1:05 PM
3.
58 3.
58 3.
58 3.
58 Complete Water coolant low level 03/12/2019 D12: Rajanson, Replace hose adapter for cooling air
d compressor and top up coolant 80 ltr
04/12/2019 2:00 AM
0.
33 0.
33 0.
33 0.
33 Complete Lights 03/12/2019 N12: budi, rendra, Replace LHs bulb lamp off
d
27/11/2019 10:25 AM
0.
75 0.
75 0.
75 0.
75 Complete Hydraulic leaks 27/11/2019 D12: Harnidy, ROOT CAUSE : M
aterials flaw.
After
d check, FOUND : Small leak at solenoid hydraulic pressure switch.
29/11/2019 4:30 PM
13.
75 13.
75 13.
75 13.
75 Complete Hydraulic oil leaks 29/11/2019 D12: M
anpower : Yuli,Apri,Idrus, Repair and Install
d tube suction pump no 5 and 6 leak, fill up hydraulic oil
03/12/2019 11:40 AM
8.
33 8.
33 8.
33 8.
33 Complete Tyre position 3 Flat 03/12/2019 D12: Sugeng, Replace tyre position 3 and 6
d
03/12/2019 3:00 PM
2.
00 2.
00 2.
00 2.
00 Complete 5140986 PM
250HRS Service (Duration 03/12/2019 D12: M
an power : Simon, M
argaretha (App),
d 4 hrs) and Backlog repair, Performed PM
250HRS service
planned 6 hrs
03/12/2019 7:00 PM
4.
00 4.
00 4.
00 4.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Eko F, Imron03/12/2019 N12:
d M
anpower : abi, fajar, avy
, Repair grease pump
03/12/2019 11:05 PM
4.
08 4.
08 4.
08 4.
08 Complete Over run : grease pump fail 03/12/2019 N12: M
an power : Avy, Fajar, Apri, Repair grease
d pump and manual grease all pins due dry
03/12/2019 11:05 PM
4.
08 4.
08 0.
00 0.
00 Complete Over run : Battery flat Replace battery
d
28/11/2019 3:30 PM
6.
92 6.
92 6.
92 6.
92 Complete 5130672 PM
2000HRS service 28/11/2019 D12: M
anpower : Herman, Hisbul, Agus, Performed
d (Duration 9 hrs) and backog PM
2000HRS service
repair, Planned 13 hrs
28/11/2019 9:35 PM
6.
08 6.
08 6.
08 6.
08 Complete Backlog repair 28/11/2019 D12: M
anpower : Agus, Husen, 28/11/19 DS : remove
d and repair muffler heater body adaptor
28/11/19 NS : Repair elbow muffler corrosion, re install elbow
muffler
28/11/2019 9:35 PM
6.
08 6.
08 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Agus, Husen, 28/11/19 DS :
d Reposition hoist artic hose
28/11/2019 11:45 PM
2.
17 2.
17 2.
17 2.
17 Complete Over run : Tube muffler failure 28/11/2019 N12: M
anpower : Lailia, Rahmadi, Novi
d , 28/11/19 NS : Repair elbow muffler corrosion, re install elbow
muffler
28/11/2019 10:25 PM
0.
83 0.
83 0.
00 0.
00 Complete Over run : grease injector 8/11/19 NS : Adjust grease injector, final check
d problem
29/11/2019 2:40 PM
1.
00 1.
00 1.
00 1.
00 Complete Transmission error 29/11/2019 D12: erik, roni, ROOT CAUSE : Incorrect Reported
d Fault.
Checked and tested, NO problem was FOUND
30/11/2019 4:35 AM
0.
83 0.
83 0.
83 0.
83 Complete Engine cover loose 29/11/2019 N12: Harnidy, ROOT CAUSE : Incorrect Reported
d Fault.
After check and performance test, NO problem was found.
30/11/2019 3:25 PM
5.
58 5.
58 5.
58 5.
58 Complete Transmission oil low 30/11/2019 D12: budi, check transmission oil level, found low,
d levelling it
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 209 of 349
02/12/2019 10:35 AM
37.
17 37.
17 25.
17 25.
17 Complete Transmission error (Unit can't 01/12/2019 D12: M
an power : Apri, Indra01/12/2019 N12:
d moving reverse) M
anpower : Ari,Zetting01/12/2019 N12: M
anpower : Nur Andy,
Roy02/12/2019 D12: M
anpower : Satrio, Sudirman, 01/12/19 DS :
Troubleshooting transmission error, Replace filter transmission for
check particle, take oil sample transmission.
TET check all error
code, following operation unit for check actual error code active
01/12/19 NS : Remove transmission bottom guard, drain
transmission oil and remove transmission oil pan and support
electric repair transmission gear shifting solenoid, install back
transmission oil pan and guard ( 01/12/19 : NS : Supported
mechanic removed buttom guard,drained oil
transmission,dissambly transmission
oil carter,checked solenoid valve transmission resistanced 30
Ohm,swap solenoid valve PWM
( by TET )
08 to PWM
05,checked wiring solenoid valve to controller ok
02/12/19 DS : Continue completed cover transmission after
electrician swap PWM
8 to PWM
5, refill oil transmission 50ltr,
Performance test
02/12/2019 1:45 PM
3.
17 3.
17 3.
17 3.
17 Complete Bottom guard engine loose 02/12/2019 D12: Andi, 02/12/19 DS : Check and repair bottom
d guard engine
27/11/2019 3:20 PM
422.
08 8.
33 422.
08 8.
33 Complete Diff lock excessive noise 10/11/2019 D12: Budi, Roy10/11/2019 N12: Rahmadi, Abdul
d 12/11/2019 D12: Apri,Novi13/11/2019 D12: M
anpower :
Apri,Novi,INTA M
ech26/11/2019 D12: M
anpower : Budi,
Roy26/11/2019 N12: M
anpower : Lia, Rahmadi, Novi27/11/2019
D12: M
anpower : Budi, Roy, 10/11/19 DS : Remove centre
differential propeller shaft and artic propeller shaft, disconnect
transfer case related part, remove transfer case GP
10/11/19 NS : Dissasembly actuator for difloc, drain oil on transfer
case, remove plug transfer case and found particle, flushing
transfer case
13/11/19 DS : Di-assembly transfer case and inspected
component
26/11/19 DS : Assemble Diff lock mechanism, install T/case pump,
install transfer case assy and complete + torque transfer case
mounting
26/11/19 NS : Fabricate transfer case drain plug, completed
transfercase air lines, NDT test drive shaft mounting bolts, install
hitch drive shaft, main drive shaft and front drive shaft, fill transfer
case oil
27/11/19 DS : Start up machine, leveling oil and test performance
Drop box.
Repair fatique alarm.
Repair grease system fault
29/11/2019 10:30 AM
2.
58 2.
58 2.
58 2.
58 Complete Parking brake sticky 29/11/2019 D12: budi, rendra, Replace Parking brake solenoid due
d to open line
29/11/2019 10:55 PM
2.
83 2.
83 2.
83 2.
83 Complete Sidewall cut cracking tyre pos 29/11/2019 N12: M
anpower : Nober, marsel, andri, Replace tyre
d 4 pos 4 with spare tyre
02/12/2019 10:50 PM
1.
17 1.
17 1.
17 1.
17 Complete Lights 02/12/2019 N12: amin, halman, Replace RHs front bulb lamp
d
01/12/2019 10:40 AM
2.
00 2.
00 2.
00 2.
00 Complete 5130682 PM
250HRS Service (Duration 01/12/2019 D12: M
anpower : Fathur, Performed PM
250HRS
d 4 Hrs) and Backlog Repair, Service
Planned 8 Hrs
01/12/2019 2:20 PM
4.
33 4.
33 3.
67 3.
67 Complete Electrical inspection 01/12/2019 D12: M
anpower : Petrus, Yusran, M
arsianto, Taufik,
d Electrical inspection, clean up and test load battery, check
charging system and lighting system, reinstalled cover RH head
lamp loose, fixed lock cover LH head lamp, check washer wiper,
clean up ac filter inner and outer, Final check
01/12/2019 2:20 PM
3.
67 3.
67 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Abi, Husain, 01/12/19 DS : check
d brake accumulator pressure
01/12/2019 11:40 AM
1.
00 1.
00 0.
00 0.
00 Complete Backlog repair 01/12/2019 D12: M
an power : Abi, Husain, 01/12/19 DS : Check
d and adjust all grease injector
29/11/2019 1:50 PM
6.
00 6.
00 6.
00 6.
00 Complete 5130668 PM
250HRS Service (Duration erformed PM
250HRS Service
d 4 hrs) and Backlog repair,
planned 6 hrs
29/11/2019 3:00 PM
1.
17 1.
17 1.
17 1.
17 Complete Over run : Continue backlog 29/11/2019 D12: M
anpower : Abi, Risqi , Check and adjust all
d repair injector grease
29/11/2019 11:00 PM
7.
00 7.
00 7.
00 7.
00 Complete 5132771 PM
1000HRS Service 29/11/2019 N12: M
anpower : Herman, Agus, Performed PM
1000
d (Duration 7 Hrs) and Backlog hrs service
Repair, Planned 12 Hrs
29/11/2019 10:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 29/11/2019 N12: M
anpower : Nataniel, imam, Electrical inspection,
d check all lighting and A/C performance, cleaned Ac filter inner and
outer, maintenance battery
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 210 of 349
30/11/2019 2:25 AM
3.
42 3.
42 3.
42 3.
42 Complete Backlog repair 29/11/2019 N12: M
anpower : Nur Andy, Erikson, 29/11/19 NS :
d Replace brake cooling artic hose both side, adjust brake
accumulator, final check
30/11/2019 2:25 AM
3.
42 3.
42 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Nur Andy, Erikson, 29/11/19 NS :
d Repair flexible muffler
30/11/2019 2:25 AM
2.
83 2.
83 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
anpower : Nur Andy, Erikson, 29/11/19 NS :
d Inspect grease injector adjuster
30/11/2019 2:55 AM
0.
50 0.
50 0.
50 0.
50 Complete Tyre inspection 29/11/2019 N12: Hamka, Jonianto, Adjust tyre pressure pos 3
d
01/12/2019 9:25 PM
5.
08 5.
08 5.
08 5.
08 Complete Bead damage tyre pos 3 01/12/2019 N12: M
anpower : Wawan, marsel, andik, Replace tyre
d pos 3 with spare tyre
29/11/2019 10:30 AM
2.
75 2.
75 2.
75 2.
75 Complete 5136102 PM
250HRS Service Performed PM
250HRS Service
d ( Duration 2 hrs ) and Backlog
repair, planned 6 hrs
29/11/2019 1:45 PM
3.
25 3.
25 3.
25 3.
25 Complete Backlog repair 29/11/2019 D12: M
anpower : Abi, Risqi, Andrianus, Nelson, Check
d and adjust all injector grease
29/11/2019 1:45 PM
3.
25 3.
25 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Abi, Risqi, Andrianus, Nelson, Re-
d torque bolt mounting main drive shaft, final check
28/11/2019 2:50 PM
7.
17 7.
17 7.
17 7.
17 Complete 5136197 PM
1000HRS Service 28/11/2019 D12: M
anpower : Syair, Angga, Abraham, Untung,
d (Duration 7 hrs) and backlog Performed PM
1000HRS service
repair, Planned 10 hrs
28/11/2019 5:40 PM
3.
58 3.
58 2.
83 2.
83 Complete Backlog repair 28/11/2019 D12: M
anpower : Jaka , Irwan, Haris, Repair brake air
d valve
28/11/2019 5:40 PM
3.
58 3.
58 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Jaka , Irwan, Haris, 28/11/19 DS :
d Adjust grease injector
28/11/2019 5:40 PM
3.
58 3.
58 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Jaka , Irwan, Haris, 28/11/19 DS :
d payload calibration
28/11/2019 11:00 PM
5.
33 5.
33 5.
33 5.
33 Complete Over run : operator seat switch 28/11/2019 N12: M
anpower : Satrio, AKT team, 28/11/19 NS :
d fail Continue repair indicator seat belt continue ON, replace seat belt
group.
Performance test
30/11/2019 1:10 PM
4.
00 4.
00 4.
00 4.
00 Complete 5165644 Hydraulic oil SOS Follow up, Performed resampling hydraulic oil by Trakindo.
Replace hyd oil
d Planned 4Hrs due to high particle
30/11/2019 12:00 PM
2.
00 2.
00 0.
00 0.
00 Complete Inspection, FOUND : bolt Retorque bolt mounting main drive shaft, final check
d mounting main drive shaft
loosen
03/12/2019 8:30 PM
6.
83 6.
83 6.
83 6.
83 Complete 5143527 PM
1000HRS service 03/12/2019 N12: Nyoto, Irwan, Performed PM
1000HRS service
d (Duration 7 hrs) and backlog
repair, planned 13 hrs
03/12/2019 10:50 PM
7.
58 7.
58 2.
33 2.
33 Complete Backlog repair 03/12/2019 D12: M
anpower : Eko F, Imron03/12/2019 N12:
d M
anpower : Sunari, Ardiles, M
ech TU, inspect and retorque bolt
mounting main drive shaft
03/12/2019 8:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Backlog repair TBM
_repair bracket support LHs mirror,final check
d
27/11/2019 11:45 AM
3.
00 3.
00 3.
00 3.
00 Complete 5147272 Schedule DM
G Follow up 27/11/2019 D12: M
anpower : Nur Andy, TU, Performed DM
G
d planned 3 hrs follow up : Check and repair ambeint air.
Enable ambient
temperature with hfactory password, Check Ambient temperature
sensor.
Parameter still not read waiting decission From Caterpilar
28/11/2019 4:35 AM
2.
00 2.
00 2.
00 2.
00 Complete 5140969 PM
250HRS service (Duration 27/11/2019 N12: M
anpower : Heru,Fasili, Performed PM
250HRS
d 2 hrs) and Backlog repair, service
planned 8 hrs
28/11/2019 9:10 AM
4.
58 4.
58 4.
58 4.
58 Complete Electrical inspection 27/11/2019 N12: M
anpower : Dimas, aziz, 27/11/19 NS : Electrical
d inspection, battery maintenance, clean up ac filter
28/11/2019 9:10 AM
2.
17 2.
17 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Jaka, Irwan, Haris, Reseal
d transmission charging filter lines, reseal T/c charging filter
28/11/2019 9:10 AM
2.
17 2.
17 0.
00 0.
00 Complete Backlog repair 28/11/2019 D12: M
anpower : Jaka, Irwan, Haris, 28/11/19 DS :
d check payload calibration, final check
03/12/2019 9:45 AM
1.
83 1.
83 1.
83 1.
83 Complete Dump body pin loosen 03/12/2019 D12: Abdul,Febri, Remove bolt pin broken and replace
d new bolt pin dump body
28/11/2019 2:35 AM
6.
83 6.
83 6.
83 6.
83 Complete Engine can't start 27/11/2019 N12: M
anpower : Sampurno, Troubleshooting
d electrical for engine can not start, checked power output module
fatique sometimes off, replaced module fatique latching and
performance test
27/11/2019 1:30 PM
2.
42 2.
42 2.
42 2.
42 Complete Engine low power 27/11/2019 D12: M
anpower : Jumanto, Yudistira, Replace fuel
d separator
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 211 of 349
02/12/2019 12:30 AM
5.
08 5.
08 5.
08 5.
08 Complete 5140973 PM
500HRS Service (Duration 01/12/2019 N12: M
anpower : Syair,Fuad, Angga, Performed PM
02/12/2019 2:40 AM
5.
67 5.
67 2.
17 2.
17 Complete Electrical inspection 01/12/2019 N12: M
anpower : Eko, Electrical inspection, check all
d electrical system and AC performance, maintenance battery,
cleaned AC filter and outter
02/12/2019 6:25 AM
5.
92 5.
92 3.
75 3.
75 Complete Backlog repair 01/12/2019 N12: M
anpower : Taufik, Nova, 01/12/19 NS : Flushing
d and adjust rear suspension, calibration payload, repair Lhs
handrail
02/12/2019 10:15 AM
3.
83 3.
83 3.
83 3.
83 Complete Over run : M
ain drive shaft 02/12/2019 D12: Imam,Febrian, Follow up CIP change out bolt
d spider joint bolt broken main drive shaft due to broken
03/12/2019 4:40 PM
3.
67 3.
67 3.
67 3.
67 Complete Transmission SOS follow up, erformed Transmission SOS follow up
d planed 6 hrs
03/12/2019 4:40 PM
3.
67 3.
67 0.
00 0.
00 Complete Hydraulic oil SOS follow up 03/12/2019 D12: M
anpower ; TU Tech, Performed follow up SOS
d hydraulic
28/11/2019 11:00 PM
3.
67 3.
67 3.
67 3.
67 Complete Tread puncture by iron steel 28/11/2019 N12: M
anpower : Asrono boy, Remove iron steel from
d tyre pos 6 tyre pos 6 ( Tread puncture by iron steel tyre pos 6 )
02/12/2019 3:55 AM
1.
33 1.
33 1.
33 1.
33 Complete Lights 01/12/2019 N12: Rully, Alfan, Repair wiring supply relay DLR
d worklamp, replace relay DLR worklamp
28/11/2019 5:30 AM
8.
67 8.
67 8.
67 8.
67 Complete 5126647 PM
2000HRS service 27/11/2019 N12: M
anpower : Heru,Fasili, Performed PM
2000HRS
d (Duration 9 hrs) and backlog service
repair, planned 10 hrs
28/11/2019 5:30 AM
6.
50 6.
50 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Budiono, wahyudi, Electrical
d inspection, Replace bulb h3 4ea, Replace filter ac, battery
maintenance
28/11/2019 3:30 AM
2.
50 2.
50 0.
00 0.
00 Complete Backlog repair 27/11/2019 N12: M
anpower : Eko, Abdul, Abdul, Install rear unit
d number / mechanical inspection
27/11/2019 12:00 PM
3.
17 3.
17 3.
17 3.
17 Complete PM
250HRS service, planned 27/11/2019 D12: M
anpower : Hisbul, Abdi, Peformed PM
250HRS
d 4 hrs service
27/11/2019 11:00 AM
2.
17 2.
17 0.
00 0.
00 Complete Electrical inspection 27/11/2019 D12: M
anpower : eko,widayah,garuda, Electrical
d inspection,maintenance battery,cleaned AC filter,check all lighting
and AC performance
03/12/2019 8:15 AM
1.
00 1.
00 1.
00 1.
00 Complete Engine oil pressure too low 03/12/2019 D12: Rajanson, Check and FOUND : Gasket cylinder
d head small leaks and temporary top up engine oil 10 ltr
29/11/2019 2:20 PM
0.
50 0.
50 0.
50 0.
50 Complete Lights 29/11/2019 D12: erik, roni, Reinstall front lamp bolt bracket due to
d loosen
02/12/2019 6:50 PM
5.
00 5.
00 5.
00 5.
00 Complete 5136088 PM
500HRS Service (Duration 02/12/2019 D12: M
anpower : Simon,Fasili,Retha APP, Performed
d 5 Hrs) and Backlog Repair, PM
500HRS service
Planned 11 Hrs
02/12/2019 5:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Budiono, Garuda, Performed
d electrical inspection, maintenance battery, clean up ac filter inner
and outer, check lighting system and charging system, check auto
lube function, final check
02/12/2019 10:55 PM
4.
08 4.
08 4.
08 4.
08 Complete Backlog repair 02/12/2019 N12: andrianus, nelson
d , Check brake accumulator pressure, repair grease injector bank
leak, repair seat belt, final check
01/12/2019 3:35 AM
2.
58 2.
58 2.
58 2.
58 Complete 5126155 PM
250HRS service (Duration 30/11/2019 N12: M
anpower : Hisbul, Agus, Herman, Performed
d 4 hrs) and backlog repair, PM
250HRS service
Planned 7 hrs
01/12/2019 3:35 AM
1.
42 1.
42 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Nur Andy, Erikson, Adjust all grease
d injector
01/12/2019 3:35 AM
1.
42 1.
42 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Nur Andy, Erikson, Adjust brake
d accumulator
29/11/2019 3:25 AM
0.
25 0.
25 0.
25 0.
25 Complete Lights Replace light bulb low beam RH/LH
d
30/11/2019 9:30 AM
1.
50 1.
50 1.
50 1.
50 Complete 5132808 PM
250HRS Service (Duration 30/11/2019 D12: M
an power : Djemik, Fajar, Performed PM
30/11/2019 3:00 PM
5.
50 5.
50 5.
50 5.
50 Complete Backlog Repair 30/11/2019 D12: M
an power : Abi, Check and adjust all grease
d injector, mechanical inspection, final check
02/12/2019 2:20 PM
1.
17 1.
17 1.
17 1.
17 Complete Engine coolant level low 02/12/2019 D12: Loe C,Erwin, Check leaks and temporary top up
d coolant 2 ltrs
03/12/2019 10:30 AM
1.
92 1.
92 1.
92 1.
92 Complete Indicator parking brake stay eplace parking brake solenoid coil
d ON
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 212 of 349
02/12/2019 8:35 PM
6.
00 6.
00 6.
00 6.
00 Complete Schedule POD Follow up, 02/12/2019 N12: M
anpower : Aji,Gunawan,Asa, 02/12/19 DS :
d Planned 6 Hrs Check pay load error
02/12/19 NS : Check all suspension pressure, calibration payload
02/12/2019 4:30 PM
1.
92 1.
92 0.
00 0.
00 Complete Electrical inspection of POD 02/12/2019 D12: M
an power : Sudirman, Follow up pay load error,
d follow up replace bulb pay load 2ea, continue check mechanic
27/11/2019 10:55 PM
2.
00 2.
00 2.
00 2.
00 Complete 5134269 Pre service inspection, Performed Pre service inspection
d planned 2 hrs
27/11/2019 10:55 PM
1.
83 1.
83 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Budino, wahyudi, Electrical
d inspection, Replace AC filter, adjust v-belt AC, adjust v-belt
alternator, battery maintenance
28/11/2019 7:30 AM
15.
42 15.
42 14.
42 14.
42 Complete Engine oil leaks 27/11/2019 N12: M
anpower : Danu, lidin aries, 27/11/19 NS :
d Repair water coolant leak at cooler pipe
T/M
, repair oil engine leak at lub compressor, tightened clamp
exhaust pipe loose, repair bolt inter cooler loose 2 ea, add water
colant
28/11/2019 7:30 AM
12.
50 12.
50 0.
00 0.
00 Complete Shock absorber mounting 27/11/2019 N12: M
anpower : Danu, lidin aries, 27/11/19 NS :
d bolts broken Repair bolt mounting shock absorber 3, tightened bolt mounting
boogie pos 10 loose
27/11/2019 11:00 PM
4.
00 4.
00 0.
00 0.
00 Complete Weekly inspection 27/11/2019 N12: M
anpower : Danu, lidin aries, Performed weekly
d inspection
27/11/2019 10:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Triyadi and Januar, Perform
d electrical Inspection for weekly inspection, Checked lighting
system, AC and charging system, Service battery and Ac
Evaporator, Cleaned up AC filter, test electrical system and final
check
28/11/2019 2:00 PM
6.
50 6.
50 6.
50 6.
50 Complete Over run : brake chamber Installed stand, removed tyre pos 17 and 18, replaced lining brake
d position 9 fail position 10, installed tyre position 17 and18, replaced brake
chamber position 9,
28/11/2019 2:00 PM
1.
92 1.
92 0.
00 0.
00 Complete Over run : bracket mirror Repair LH bracket mirror broken
d broken
30/11/2019 3:00 AM
6.
00 6.
00 6.
00 6.
00 Complete 2698658 PM
600HRS Service, Planned 29/11/2019 N12: M
an power : Edi, Ikhsan, M
arson, Suli,
d 6 Hrs Performed PM
600HRS Service
30/11/2019 3:00 AM
6.
00 6.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
an power : Edi, Ikhsan, M
arson, Suli, 29/11/19
d NS : check and reseal foot brake valve leaks
30/11/2019 3:00 AM
6.
00 6.
00 0.
00 0.
00 Complete Backlog repair 29/11/2019 N12: M
an power : Edi, Ikhsan, M
arson, Suli, 29/11/19
d NS : clean up table fifth wheel.
Test running and check leaks
30/11/2019 3:00 AM
6.
00 6.
00 0.
00 0.
00 Complete Electrical inspection 29/11/2019 N12: M
an power : Yonathan, Sugianto, 29/11/19 NS :
d Electrical inspection.
Checked lighting system, load test battery,
check condition electrical components, clean evaporator & battery,
replaced AC filter.
30/11/2019 9:30 AM
6.
50 6.
50 6.
50 6.
50 Complete Over run : Continue backlog 29/11/2019 N12: M
an power : Edi, Ikhsan, M
arson, Suli30/11/2019
d repair D12: M
anpower : Ardiansyah, denny, abdi, 30/11/19 DS : M
anual
greasing fifth wheel, repair fitting air hose pressure leak, connect
prime mover, adjust brake VZ3699, final check
30/11/2019 9:30 AM
6.
50 6.
50 0.
00 0.
00 Complete Over run : Continue Electrical 29/11/19 NS : Electrical inspection.
Checked lighting system, load
d inspection test battery, check condition electrical components, clean
evaporator and battery, replaced AC filter.
30/11/2019 10:00 AM
3.
00 3.
00 0.
50 0.
50 Complete Over run : Continue electrical 30/11/2019 D12: M
anpower : Dimas, Edi Sutarta, Daniel,
d inspection Reconnected fuel trailer, Installed work lamp and reconnected its
wiring harness, Fixed connection for fuel trailer turn signal lamp,
Checked all lighting system
02/12/2019 2:40 AM
5.
17 5.
17 5.
17 5.
17 Complete Servo clutch failure 01/12/2019 N12: Jufry, Checked transmission problem, check
d servo clutch leaks, sent unit to tws, replaced servo clutch (take
from VT1065), bleeding servo clutch and test performance
03/12/2019 4:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Air system problem 03/12/2019 D12: Lidin, Repair air system leak
d
27/11/2019 10:10 PM
3.
17 3.
17 3.
17 3.
17 Complete Drain valve fuel problem Repai drain valve for fuel trailer
d
28/11/2019 12:00 AM
1.
83 1.
83 1.
83 1.
83 Complete Sign lamp problem 27/11/2019 N12: Satrio, Check rear turn signal lamp false
d connection, reposition cable power rear turn signal in junction box
at frame.
30/11/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Turn Signal Abnormal 30/11/2019 D12: M
anpower : Dimas, Checked and fixed
d connection for rear turn signal lamp, Checked lighting system
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 213 of 349
29/11/2019 12:00 AM
10.
00 10.
00 10.
00 10.
00 Complete Engine can't start 28/11/2019 D12: M
an power : Triyadi and Januar, 28/11/19 DS :
d Checked engine can’t start,checked engine error,test start direct to
battery and sent unit to w/s
28/11/19 NS : Troubleshooting electrical for engine cannot start,
checked power output ignition key to starting motor cut off,
repaired wiring red white for terminal s starting motor at under
cabin cut off and performance test
04/12/2019 12:00 AM
11.
00 11.
00 11.
00 11.
00 Complete 5142441 PM
250HRS Service (Duration Performed PM
250HRS Service
d 4 Hrs) and Backlog Repair,
Planned 12 Hrs
04/12/2019 12:00 AM
11.
00 11.
00 0.
00 0.
00 Complete Electrical inspection 03/12/2019 D12: M
anpower : Dimas, Januar, Oki, 03/12/19 DS :
d Performed electrical inspection, Checked lighting, AC and charging
system, Service battery and AC evaporator, Test load battery,
Replaced AC filter, Cleaned up filter case
03/12/19 NS : Adjusted wheel speed sensor front left position,
checked lighting system
04/12/2019 12:00 AM
11.
00 11.
00 0.
00 0.
00 Complete Backlog Repair 03/12/2019 D12: M
an power : Edi, Toni, Agung, Danu, Aries, Lidin,
d 03/12/19 DS : install stand remove tyre pos 1 and 2, replace drum
brake pos 2, replace lining brake pos 2, remove drum brake pad
and lining pos 1
03/12/19 NS : Replace brake lining, replace brake drum POS.
1,
install tyre POS.
1, adjusted brake, replace brake lining and drum
POS.
3, adjusted brake and check brake chamber problem,
replace brake chamber POS.
3 leaks, install tyre POS.
3 and 4
03/12/2019 8:00 PM
7.
00 7.
00 0.
00 0.
00 Complete Backlog Repair 03/12/2019 D12: M
an power : Edi, Toni, Agung, Danu, Aries, Lidin,
d manual greasing, replace buggy whip, replace safety belt
27/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Schedule weekly inspection, 27/11/2019 D12: M
anpower : Toni, Edi, M
Arson, Performed bi-
d planned 3 hrs weekly inspection
27/11/2019 4:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 27/11/2019 D12: Toni, Edi, M
arson, Repaired step ladder
d trainee,tighten bolt passenger seat no 24, tighten bolt mounting
shock no 3, final check
30/11/2019 12:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Operator seat shaky 30/11/2019 D12: M
anpower : Ardiansyah, Repair operator seat
d excessive noise, repair operator seat bracket
01/12/2019 12:00 AM
5.
00 5.
00 5.
00 5.
00 Complete Schedule Weekly inspection, 30/11/2019 N12: M
anpower : Suli, Agusand M
arson, Performed
d Planned Weekly inspection
01/12/2019 12:00 AM
5.
00 5.
00 0.
00 0.
00 Complete Engine SOS Follow up 30/11/2019 N12: M
anpower : Suli, Agusand M
arson, M
echanical
d inspection, manual greasing, reseal plug engine oil.
Engine SOS
Follow up, test performance and final check
01/12/2019 12:00 AM
5.
00 5.
00 0.
00 0.
00 Complete Transmission SOS Follow up 30/11/2019 N12: M
anpower : Suli, Agusand M
arson, Performed
d Transmission SOS Follow up
01/12/2019 12:00 AM
5.
00 5.
00 0.
00 0.
00 Complete Rear diff SOS Follow up 30/11/2019 N12: M
anpower : Suli, Agusand M
arson, Performed
d Rear diff SOS Follow up
30/11/2019 10:00 PM
2.
00 2.
00 0.
00 0.
00 Complete Electrical inspection 30/11/2019 N12: M
anpower : Sugianto, Yonathan, 30/11/19 NS :
d Electrical inspection.
Checked lighting, charging, & AC system.
27/11/2019 9:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Head Lamp OFF 27/11/2019 N12: M
anpower : Triyadi and Januar, Checked
d electrical for head lamp lamp, replaced bulb for RHs low beam and
performance test
01/12/2019 3:30 AM
2.
50 2.
50 2.
50 2.
50 Complete 5030020 Transmission shifting problem 30/11/2019 N12: M
anpower : Edi, Ikhsan, Checked t/m shifting
d problem, checked air system pressure, replaced t/m pin selector,
checked t/m handle movement, test performance and final check
02/12/2019 11:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5149032 PM
250HRS Service (Duration Performed PM
250HRS Service
d 4 Hrs) and Backlog Repair,
Planned 24 Hrs
03/12/2019 2:00 AM
7.
00 7.
00 3.
00 3.
00 Complete Backlog Repair 02/12/2019 N12: M
anpower : Aries, Ardiansyah, Tightened bolt
d mounting rear stabilizer loosen, replaced both side stopper door
cabin operator 2 ea, tightened bolt mounting passenger seat
02/12/2019 11:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 02/12/2019 N12: M
anpower : Yosef, Edi sutarta, Performed
d electrical inspection, Checked lighting, AC and charging system,
Service battery and AC evaporator, Test load battery, replaced AC
filter ,replaced bulb LH low beam lamp,checked wiring coupling
pedal and brake switch.
28/11/2019 5:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5140432 PM
250HRS service (Duration erformed PM
250HRS service
d 4 Hrs) and Backlog Repair,
Planned 10 Hrs
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 214 of 349
29/11/2019 2:00 AM
9.
00 9.
00 8.
83 8.
83 Complete Backlog Repair 28/11/2019 N12: M
an power : Danu, Lidin, Aris, Repair front
d mudguard bracket Lhs, check and repair radiator bracket shaky
28/11/2019 9:00 PM
1.
00 1.
00 0.
00 0.
00 Complete Electrical Inspection 28/11/2019 D12: M
an power : Triyadi and Januar, Repaired wiring
d speaker radio FM
and Toa from cabin to cabin passenger loose,
fixed cable antenna Radio FM
, performance test and final check
29/11/2019 2:00 AM
3.
00 3.
00 0.
00 0.
00 Complete Over run : drum brake pos 2 28/11/2019 N12: M
an power : Danu, Lidin, Aris, Install stand
d worn remove tyre pos 2, replace drum brake pos 2, adjust lining brake
pos 2, install tyre pos 2, retorque bolt stud, remove stand
01/12/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5143841 Follow up hazard report 01/12/2019 D12: Done by TWS crew, Repaired mounting seal
d manhaul door, installed new seal for manhaul door
02/12/2019 2:15 PM
43.
25 43.
25 43.
25 43.
25 Complete Crane indicator OFF 02/12/2019 D12: Sofyan,Huda, Continue check LM
I indicator off,
d inspect terminal LM
I module, FOUND: LM
I module fail.
Keep
machine operation, part on oder.
02/12/2019 11:00 PM
3.
00 3.
00 3.
00 3.
00 Complete 5133743 PM
250HRS Service, Planned 02/12/2019 N12: M
anpower : Fathur, Toha, Performed PM
03/12/2019 4:00 AM
5.
00 5.
00 5.
00 5.
00 Complete M
echanical inspection 02/12/2019 N12: Ade, Performed M
echanical inspection
d
02/12/2019 9:00 PM
2.
00 2.
00 2.
00 2.
00 Complete Indicator parking brake flash 02/12/2019 N12: andik, check parking brake pressure switch,
d ON found fail, perform test, operated until replacement part ready
01/12/2019 12:00 AM
5.
00 5.
00 5.
00 5.
00 Complete 5160069 Schedule Bi-Weekly 30/11/2019 N12: M
anpower : Edi, Ikhsan, Performed Bi-Weekly
d Inspection, planned 10 Hrs Inspection
01/12/2019 12:00 AM
5.
00 5.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Edi, Ikhsan, M
echanical inspection,
d manual greasing, checked coolant leaks, add coolant to level, test
performance and check leaks, repaired air system
01/12/2019 12:00 AM
5.
00 5.
00 0.
00 0.
00 Complete Backlog repair 30/11/2019 N12: M
anpower : Edi, Ikhsan, M
echanical inspection,
d adjusted brake
01/12/2019 3:00 AM
4.
00 4.
00 3.
00 3.
00 Complete 5160055 Electrical inspection 30/11/2019 N12: M
anpower : Sugianto, Yonathan, 30/11/19 NS :
d Electrical inspection, check lighting, charging and ac system,
check and repair wiring LH work lamp fuel trailer, replace back up
alarm, check and repair wiring fog lamp.
01/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Operator seat problem 01/12/2019 D12: M
anpower : Aris, Abdn, Danny, Checked
d operator seat valve, repaired operator seat adjuster valve, test
performance
27/11/2019 12:00 PM
2.
00 2.
00 2.
00 2.
00 Complete Air system drop 27/11/2019 D12: M
an power : Edi, M
arson, Checked air system
d drop, repaired air hose and test performance
28/11/2019 8:00 PM
2.
00 2.
00 1.
98 1.
98 Complete 5160059 Schedule bi weekly inspection, 28/11/2019 D12: M
an power : Juharman, Sulistyo, Performed bi
d Planned 2 Hrs weekly inspection
29/11/2019 3:00 AM
7.
00 7.
00 7.
00 7.
00 Complete Over run : air system leak 28/11/2019 D12: M
an power : Juharman, Sulistyo, Check and
d repair air system leak, replace hose supply to service brake front
due to leak/broken
29/11/2019 3:00 AM
7.
00 7.
00 0.
00 0.
00 Complete Over run : exhaust muffler leak repair exhaust muffler leak from connection clamp
d from connection clamp
29/11/2019 3:00 AM
7.
00 7.
00 0.
00 0.
00 Complete Over run : hydraulic oil leak 28/11/2019 D12: M
an power : Juharman, Sulistyo, Repair
d from coupler hose hydraulic oil leak from coupler hose
28/11/2019 10:00 PM
2.
00 2.
00 0.
00 0.
00 Complete 5160059 Over run : electrical Inspection 28/11/2019 D12: M
anpower : Triyadi and Januar, Perform
d electrical Inspection for weekly inspection, Checked lighting
system, AC and charging system, Service battery and AC
Evaporator, Cleaned up AC filter, repaired nozzle for washer wiper
block, test electrical system and final check
30/11/2019 2:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Air system drop 29/11/2019 N12: M
an power : Suli & Agus, checked air system
d drop, repaired air hose leaks, test performance and final check
30/11/2019 2:30 PM
3.
50 3.
50 3.
50 3.
50 Complete Schedule weekly inspection, 30/11/2019 D12: M
anpower : Denny, abdi, ardiansyah, Performed
d Planned 4 hrs weekly inspection
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 215 of 349
30/11/2019 2:30 PM
3.
50 3.
50 0.
00 0.
00 Complete Backlog repair 30/11/2019 D12: M
anpower : Denny, abdi, ardiansyah, Repair seat
d belt operator seat stuck, repair adjuster operator seat stuck, install
passen
30/11/2019 2:30 PM
1.
50 1.
50 0.
00 0.
00 Complete Backlog repair 30/11/2019 D12: M
anpower : Denny, abdi, ardiansyah, Repair air
d hose leak
30/11/2019 5:00 PM
2.
50 2.
50 2.
50 2.
50 Complete Over ruin : Continue electrical 30/11/2019 D12: M
anpower : Yosef, Edi Sutarta, Daniel,
d inspection Performed electrical inspection, Checked lighting, AC and charging
system, Service battery and AC evaporator, Checked monitor
camera door off
02/12/2019 5:00 AM
26.
00 26.
00 26.
00 26.
00 Complete Door cabin passenger camera 30/11/2019 N12: M
anpower : Sugianto, Yonathan, 30/11/19 NS :
d OFF Checked cabin passenger door camera off, repaired wiring for
connector camera.
28/11/2019 9:50 PM
2.
83 2.
83 2.
83 2.
83 Complete Tyre position 3, 4 run flat 28/11/2019 N12: Sugeng, Replace tyre pos 3,4 with spare tyre
d
30/11/2019 12:00 AM
2.
00 2.
00 2.
00 2.
00 Complete Door manhoul problem 29/11/2019 N12: M
anpower : Ikhsan, Edi, Checked lock door
d manhoul problem
03/12/2019 10:00 AM
3.
00 3.
00 0.
00 0.
00 Complete 5145707 PM
250HRS Service 03/12/2019 D12: M
anpower : Toni,agung,edi
d saputra,danu,lidinryan, Performed PM
250HRS Service
03/12/2019 10:00 AM
3.
00 3.
00 0.
00 0.
00 Complete Backlog repair 03/12/2019 D12: M
anpower : Toni,agung,edi
d saputra,danu,lidinryan, Remove passenger seat main haul 1 ea,
install passenger seat main haul 1 ea after repair by welder
30/11/2019 2:00 PM
4.
00 4.
00 4.
00 4.
00 Complete Schedule 2 weekly inspection, 30/11/2019 D12: M
anpower : Denny, abdi, ardiansyah, Performed
d Planned 4 hrs 2 weekly inspection
30/11/2019 2:00 PM
3.
42 3.
42 0.
00 0.
00 Complete Backlog repair 30/11/2019 D12: M
anpower : Denny, abdi, ardiansyah, Replaced
d RH rear stopper spring
30/11/2019 2:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 30/11/2019 D12: M
anpower : Dimas, Edi Sutarta, Daniel,
d Performed electrical inspection, Checked lighting, AC and charging
system, Service battery and AC evapoator, Fixed bracket for AC
system, Checked and fixed connector for radio switch
02/12/2019 2:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5112261 PM
250HRS Service, Planned 02/12/2019 D12: M
anpower : Agung, toni, aris, juharman, sulistyo,
d 4 hrs lidin, aries, Performed PM
250HRS Service
02/12/2019 2:00 PM
4.
00 4.
00 0.
00 0.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Dimas, Januar, Novick, Performed
d electrical inspection, checked lighting, A/C and charging system,
service battery and A/C evaporator, test load battery
28/11/2019 2:00 PM
11.
00 11.
00 11.
00 11.
00 Complete Electrical inspection 27/11/2019 N12: M
anpower : Triyadi and Januar, 27/11/19 NS :
d Perform electrical Inspection, Checked lighting system, starting
system, charging system, Service battery
28/11/2019 4:00 PM
2.
00 2.
00 2.
00 2.
00 Complete PM
1000HRS service, planned erformed PM
1000HRS service
d 6 hrs
27/11/2019 3:00 PM
582.
00 8.
00 562.
00 8.
00 Complete Inter axle excessive noise 03/11/2019 D12: M
anpower : Abdi, Ardiansyah, Yosef, Edi sutarta,
d Qaulans27/11/2019 D12: M
anpower : Suli, Ikhsan , 03/11/19 DS :
Check inter axle functionand noise, removed front propeller shaft
worn out.
Checked indicator inter axle off, repaired wiring limit
switch inter axle
27/11/19 DS : Replaced front propeller shaft and flange, add oil
t/case to level, manual greasing front shaft, final check
28/11/2019 10:00 PM
2.
00 2.
00 2.
00 2.
00 Complete Inter-axle can't neutral 28/11/2019 D12: M
an power : Aries, Danu, Lidin, Check inter-axle
d can't neutral, reposition inter-axle to neutral manual, test
29/11/2019 10:00 AM
3.
00 3.
00 3.
00 3.
00 Complete Double not function 29/11/2019 D12: M
anpower : Ardiansyah, abdi, denny, aris,
d Replaced cable labrang (Swap from VT2306), adjusted link double
and Test performance
03/12/2019 2:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Safety belt broken 03/12/2019 D12: M
anpower : Sulistyo, Check and replace safety
d belt main haul 1ea due to broken
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 216 of 349
29/11/2019 3:00 AM
2.
00 2.
00 2.
00 2.
00 Complete AC Checked electrical for AC sometimes warm, replaced switch
d temperature ac and repaired wiring for LHs fog lamp, performance
test
29/11/2019 2:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Front Shock absorber 29/11/2019 D12: M
anpower : Aries, Repaired front shock absorber
d excessive noise
29/11/2019 5:00 PM
4.
00 4.
00 3.
00 3.
00 Complete A/C 29/11/2019 D12: M
anpower : Dimas, Edi sutarta, Deniel, Checked
d AC warm, Checked switch and power for AC blower, replaced
switch blower, checked and replaced relay for Ac system, fixed
connector for motor blower resistor, Test AC system
01/12/2019 11:00 AM
14.
00 14.
00 14.
00 14.
00 Complete A/C 01/12/2019 D12: M
anpower : Yosef, Edi Sutarta30/11/2019 N12:
d M
anpower : Sugianto, Yonathan, 30/11/19 NS : Checked AC hot,
check battery for AC system low voltage due to alternator not
charge.
Test install alternator from VT2307 (same condition)
01/12/19 DS : checked alternator for AC system not
charge,checked wiring B+ key ON to alternator N/A,repaired
wiring B+ key ON to alternator,completed boot terminal alternator
and protected AC hose.
03/12/2019 3:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5168221 Schedule weekly inspection, 03/12/2019 D12: M
anpower : Toni, Agung, Danu, Lidin, Aris,
d planned 4 hrs Perforemed weekly inspection
03/12/2019 3:00 PM
4.
00 4.
00 0.
00 0.
00 Complete Backlog repair Remove rear propeller shaft, replace spider joint propeller
d shaft,rep-lace spider joint propeller shaft, install rear propeller
shaft
03/12/2019 3:00 PM
4.
00 4.
00 0.
00 0.
00 Complete Electrical inspection 03/12/2019 D12: M
anpower : Dimas, Januar, Oki, Performed
d electrical inspection, Checked lighting, AC and charging system,
Service battery and AC evaporator, Fixed bracket battery for AC
system
28/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Schedule bi-weekly inspection, Performed bi-weekly inspection
d planned 3 hrs
01/12/2019 10:00 AM
66.
00 66.
00 66.
00 66.
00 Complete Over run : parking brake worn 01/12/2019 D12: Done by TWS crew, 28/11/19 DS : Checked and
d out removed parking brake worn out, tighten bolt mounting manhoul,
adjusted all lining brake
01/12/19 DS : Installed parking brake gp, replaced drum parking
brake, installed propeller shaft, adjusted parking brake and test
peformance
02/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Differential oil leaks 02/12/2019 D12: M
anpower : Sulistyo, lidin, Check oil level rear
d diff, add oil rear diff
01/12/2019 2:00 AM
12.
00 12.
00 12.
00 12.
00 Complete 5112777 PM
2000HRS service, 30/11/2019 D12: M
anpower : Rusli, Performed PM
2000HRS
d Planned 12 hrs service
01/12/2019 2:00 AM
12.
00 12.
00 0.
00 0.
00 Complete Electrical inspection 30/11/2019 D12: M
anpower : Dimas, Edi Sutarta,
d Daniel30/11/2019 N12: M
anpower : Sugianto, Yonathan, 30/11/19
DS : Performed electrical inspection, Checked lighting, AC and
charging system, Service battery and AC evaporator, Test load
battery
30/11/19 NS : C/O belt AC Alternator fatigue, repair bracket battery
pos 3 & 4 due to not match with new battery, replaced battery pos
3 and 4, checked charging system, final check.
01/12/2019 2:00 AM
11.
58 11.
58 0.
00 0.
00 Complete Backlog repair 30/11/2019 D12: M
anpower : Rusli30/11/2019 N12: M
anpower :
d Suli, Agusand M
arson, 30/11/19 DS : Repair window glasses due
to shaky
30/11/19 NS : manual greasing, test performance and final check
01/12/2019 9:00 AM
1.
00 1.
00 1.
00 1.
00 Complete 5112777 Engine shutdown 01/12/2019 D12: Done by TWS team, Checked engine shutdown,
d bleeding fuel system, test performance
29/11/2019 1:00 PM
4.
00 4.
00 4.
00 4.
00 Complete Schedule 2 weekly inspection, 29/11/2019 D12: M
anpower : Abdi, denny, aries, toni, agung,
d Planned 4 hrs Performed 2 weekly inspection
29/11/2019 1:00 PM
4.
00 4.
00 0.
00 0.
00 Complete Electrical inspection 29/11/2019 D12: M
anpower : Dimas, Edi sutarta, Deniel, Perfrom
d electrical Inspection, checked lighting system, Ac and charging
system, Service battery and Ac evaporator, Cleaned up AC filter
and case
29/11/2019 1:00 PM
2.
75 2.
75 0.
00 0.
00 Complete Backlog repair 29/11/2019 D12: M
anpower : Abdi, denny, aries, toni, agung,
d Replaced nipple grease spider joint and Propeller shaft
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 217 of 349
29/11/2019 8:00 PM
1.
00 1.
00 0.
73 0.
73 Complete Cabin Passenger lamp OFF 29/11/2019 D12: M
anpower : Yonathan, Sugianto, Checked rear
d cabin passenger lamp off, replaced it's bulb lamp 2ea
02/12/2019 3:00 PM
5.
00 5.
00 5.
00 5.
00 Complete 5026440 PM
500HRS Service, Planned 02/12/2019 D12: M
anpower : Agung, Toni, Aris, Juharman,
d 6 hrs Sulistyo, Lidin, Aries, Performed PM
500HRS Service
02/12/2019 1:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 02/12/2019 D12: M
anpower : Dimas, Januar, Novick, Performed
d electrical inspection, checked lighting, A/C and charging system,
service battery and A/C evaporator, test load battery, adjust belt
alternator for A/C system, repaired reverse alarm, fixed bracket
battery for A/C system
27/11/2019 4:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Schedule weekly inspection, 27/11/2019 D12: M
anpower : Toni, Agus, Performed weekly
d planned 4 hrs inspection
02/12/2019 8:00 AM
1.
00 1.
00 1.
00 1.
00 Complete Passenger seat main haul 02/12/2019 D12: M
anpower : Danu, sulistyo, Check shock
d Shaky adjuster passenger seat main haul, install stopper adjuster
passenger seat main haul
02/12/2019 2:00 PM
4.
00 4.
00 4.
00 4.
00 Complete 5168220 Schedule weekly inspection, 02/12/2019 D12: M
anpower : Toni, agung, danu, sulistyo,
d planned 4 hrs Performed weekly inspection
02/12/2019 5:00 PM
3.
00 3.
00 3.
00 3.
00 Complete Over run : Electrical inspection 02/12/2019 D12: M
anpower : Dimas, Januar, Novick, Performed
d electrical inspection, checked lighting, A/C and charging system,
service battery and A/C evaporator, replaced belt alternator for A/C
system
29/11/2019 9:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Lights 29/11/2019 D12: M
anpower : Yonathan, Sugianto, Checked LH
d low beam lamp off, replaced it's bulb lamp
02/12/2019 3:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Parking brake not function 02/12/2019 D12: M
anpower : Danu, Aris, Check parking brake
d cable, repair connector cable due to stuck, test parking brake
performance
29/11/2019 2:00 PM
4.
00 4.
00 4.
00 4.
00 Complete Schedule 2 weekly inspection, 29/11/2019 D12: M
anpower : Ardiansyah, abdi, toni, agung,
d Planned 4 hrs Performed 2 weekly inspection
29/11/2019 2:00 PM
3.
00 3.
00 0.
00 0.
00 Complete Electrical inspection 29/11/2019 D12: M
anpower : Dimas, Edi sutarta, Deniel, Perform
d electrical Inspection, checked lighting system, Ac and charging
system, Service battery and Ac evaporator, Cleaned up AC filter
and case
29/11/2019 3:00 PM
1.
00 1.
00 1.
00 1.
00 Complete Over run : Passanger seat bolt 29/11/2019 D12: M
anpower : Ardiansyah, abdi, toni, agung,
d broken Replaced bolt passenger seat 4 ea and tightened, replaced bolt
mounting
02/12/2019 12:00 AM
3.
00 3.
00 3.
00 3.
00 Complete Lining brake worn out 01/12/2019 N12: M
anpower : Ikhsan, Agus, M
arson, Disassembly
d lining brake,clean up lining shoe face,assembly lining brake
01/12/2019 9:00 PM
2.
00 2.
00 0.
00 0.
00 Complete Lining brake worn out 01/12/2019 N12: M
anpower : ikhsan, M
arson, Agus, 01/12/19 NS :
d Disassembly lining brake, clean up lining shoe face, assembly
lining brake
03/12/2019 2:00 AM
3.
00 3.
00 3.
00 3.
00 Complete PM
250HRS Service, Planned 02/12/2019 N12: M
anpower : Fathur, Toha, Performed PM
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 218 of 349
Activity Reason Reason Comp System Part sys - Part Failure Mode Downtime No Work Is Failure addition grup
Origin Required
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure
0 Crane
09-Unplanned 012 - Torque Torque Torque Torque Torque Torque FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter/Tran Converter/Trans Converter/Trans Converter/Transmissio Failure
n n smission mission mission - Torque n
Converter/Trans
mission
0 Crane
09-Unplanned 029 - Undercarriage Undercarriage Roller Track Roller Roller - Track Worn UREP- No No
M
aintenance (UM
D) Roller Unplanned
Repair
0 Cat D10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 219 of 349
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R),29-Opportune
M
aintenance Non-
Rostered Unplanned
(UOM
N)
0 Drill
09-Unplanned 029 - Undercarriage Undercarriage Track Chain Track Shoe/Plate Track Chain - Bolt FAIL- No Yes
M
aintenance (UM
D) Track Shoe/Plate Loose/M
issing/Failed Failure
0 Drill
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
0 Hitachi ZX350/Z
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 220 of 349
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
0 Komatsu PC40
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
0 Komatsu PC30
09-Unplanned 011 - Engine Engine - UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
0 Komatsu PC30
09-Unplanned 018 - Chassis/Frame/Cabin/ Boom Structure Boom - Structure Cracked FAIL- No Yes
M
aintenance (UM
D),19- Chassis/Frame/Cabin/ Steer Axles Failure
Opportune M
aintenance Steer Axles
Rostered Unplanned
(UOM
R)
08-Planned M
aintenance 022 - GET GET - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
08-Planned M
aintenance 015 - Final Final - SERV- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Service
0 CAT 18M
#N/A #N/A
013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter FAIL- No Yes
Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Failure
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
#N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure #N/A #N/A
028 - Buckets/Bowls/Body Buckets/Bowls Buckets/Bowls/B Buckets/Bowls/B Buckets/Bowls/Body FAIL- No Yes
Buckets/Bowls/Body /Body ody ody - Failure
Buckets/Bowls/B
ody
#N/A #N/A
019 - LV Electrical LV Electrical - UREP- No No
Unplanned
Repair #N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 221 of 349
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure #N/A #N/A
09-Unplanned 010 - Other/M
isc Other/M
isc - UREP- No No
M
aintenance (UM
D) Unplanned
Repair KSB Rent Pumps
020 - Plant Damage Plant Damage Plant Damage Plant Damage Plant Damage - Plant Damage UREP- No No
Plant Damage Unplanned
Repair
#N/A #N/A
08-Planned M
aintenance 011 - Engine Engine - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
Pump M
iniPumps
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure KSB Rent KSB Rent Pum
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine - UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical - UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 016 - Brakes Brakes - UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque - UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Unplanned
n n Repair 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics - UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 222 of 349
08-Planned M
aintenance 015 - Final Final - COM
P- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 017 - Hydraulics Hydraulics - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service 0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 223 of 349
08-Planned M
aintenance 012 - Torque Torque - No No
(PM
D) Convertor/Transmissio Convertor/Transmissio
n n
0 Cat 785C
08-Planned M
aintenance 011 - Engine Engine - No No
(PM
D)
0 Cat 785C
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service
0 Cat 785C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles
Steer Axles
0 Cat 785C
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil Overfilled FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 785C
09-Unplanned 012 - Torque Torque - FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Failure
n n 0 Cat 785C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 789C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ - FAIL- No Yes
M
aintenance (UM
D),19- Chassis/Frame/Cabin/ Steer Axles Failure
Opportune M
aintenance Steer Axles
Rostered Unplanned
(UOM
R)
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ - UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Unplanned
Steer Axles Repair 0 Cat 789C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics - FAIL- No Yes
M
aintenance (UM
D),19- Failure
Opportune M
aintenance
Rostered Unplanned
(UOM
R)
0 Water Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 224 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777D Coal
08-Planned M
aintenance 015 - Final Final - COM
P- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Componen
t
Replaceme
nt
0 Cat 777D OB T
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - COM
P- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Componen
t
Replaceme
nt
0 Cat 777D OB T
08-Planned M
aintenance 017 - Hydraulics Hydraulics - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 777D OB T
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - COM
P- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Componen
t
Replaceme
nt
0 Cat 777D OB T
08-Planned M
aintenance 012 - Torque Torque - COM
P- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Componen
t
Replaceme
nt
0 Cat 777D OB T
08-Planned M
aintenance 019 - LV Electrical LV Electrical - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 777D OB T
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 011 - Engine Engine - FAIL- No Yes
M
aintenance (UM
D),19- Failure
Opportune M
aintenance
Rostered Unplanned
(UOM
R)
0 CAT 745
09-Unplanned 020 - Plant Damage Plant Damage Plant Damage Plant Damage Plant Damage - Plant Damage UREP- No No
M
aintenance (UM
D),19- Plant Damage Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
Water TrailM
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 225 of 349
09-Unplanned 016 - Brakes Brakes - FAIL- No Yes
M
aintenance (UM
D) Failure #N/A #N/A
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure
M
anhaul M
edium Truck
09-Unplanned 014 - Differentials/Bevel Differentials/B Differentials/Bev Differentials/Bev Differentials/Bevel FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering evel Gears el Gears el Gears - Gears Failure
Gears/Steering Clutches Differentials/Bev
Clutches el Gears
M
anhaul M
edium Truck
09-Unplanned 013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Unplanned
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive Repair
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
M
anhaul M
edium Truck
09-Unplanned 028 - Buckets/Bowls/Body Buckets/Bowls Buckets/Bowls/B Buckets/Bowls/B Buckets/Bowls/Body FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body /Body ody ody - Failure
Buckets/Bowls/B
ody
Service Tr M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical - UREP- No No
M
aintenance (UM
D) Unplanned
Repair
Service Tr M
edium Truck
020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
Unplanned
Repair #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure
#N/A #N/A
011 - Engine Engine - FAIL- No Yes
Failure #N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure
#N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair 0 Crane
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 226 of 349
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair
#N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D8R
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat D8R
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service
0 Cat D8R
09-Unplanned 011 - Engine Engine Cooling Radiator Cooling - Bracket/M
ount Failed UREP- No No
M
aintenance (UM
D) Radiator Unplanned
Repair
0 Cat D8R
09-Unplanned 012 - Torque Torque Torque Hose/Steel Tube Torque Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter - Unplanned
n n Hose/Steel Tube Repair
0 Cat D8R
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Delivery Delivery - Unplanned
Hose/Steel Tube Repair
0 Cat D8R
09-Unplanned 022 - GET GET Ripper Tip/Tooth Ripper - Worn UREP- No No
M
aintenance (UM
D) Tip/Tooth Unplanned
Repair 0 Cat D8R
09-Unplanned 029 - Undercarriage Undercarriage Track Chain Track Link Track Chain - Adjusted UREP- No No
M
aintenance (UM
D) Track Link Unplanned
Repair 0 Cat D8R
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Cat D10T
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Damaged FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat D10T
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat D8R
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - SOS Sample Follow UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Up Unplanned
n n Repair 0 Cat D8R
09-Unplanned 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Bolt FAIL- No Yes
M
aintenance (UM
D) Loose/M
issing/Failed Failure
0 Cat D8R
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat D8R
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
09-Unplanned 018 - Chassis/Frame/Cabin/ Electrical Electric M
otor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Electric M
otor Failure
Steer Axles 0 Cat D8R
09-Unplanned 011 - Engine Engine Fuel No Fault Found Fuel - No Fault Inspected UREP- No No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat D8R
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 227 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat D10T
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat D10T
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service 0 Cat D10T
09-Unplanned 029 - Undercarriage Undercarriage Track Frame Bogie Track Frame - Damaged UREP- No No
M
aintenance (UM
D) Bogie Unplanned
Repair
0 Cat D10T
09-Unplanned 011 - Engine Engine Cooling Radiator Cooling - Blocked UREP- No No
M
aintenance (UM
D) Radiator Unplanned
Repair
0 Cat D10T
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
09-Unplanned 029 - Undercarriage Undercarriage Track Frame Equalizer Bar Track Frame - Damaged UREP- No No
M
aintenance (UM
D) Equalizer Bar Unplanned
Repair
0 Cat D10T
09-Unplanned 018 - Chassis/Frame/Cabin/ Ripper Frame Ripper Linkage - Bushing Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Linkage Frame Unplanned
Steer Axles Repair
0 Cat D10T
09-Unplanned 019 - LV Electrical LV Electrical Power Wiring Power - Wiring Rubbed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat D10T
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Housing Intake/Exhaust - Seal Failed UREP- No No
M
aintenance (UM
D) Air Filter Housing Unplanned
Repair
0 Cat D10T
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 228 of 349
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair 0 Cat D10T
09-Unplanned 001 - Inspection Inspection Inspection Inspection Inspection - Inspection UREP- No No
M
aintenance (UM
D) Inspection Unplanned
Repair 0 Cat D10T
09-Unplanned 023 - Aircon Aircon M
echanical Compressor M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Compressor Failure
0 Cat 834
09-Unplanned 028 - Buckets/Bowls/Body Blade Linkage Push Arm Blade Linkage - Cracked FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Push Arm Failure
0 Cat 834
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Bolt FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Loose/M
issing/Failed Failure
Hose/Steel Tube
TJ Rent DoTJ RENT Koma
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - Contaminated FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Failure
n n TJ Rent DoTJ RENT Koma
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
TJ Rent DoTJ RENT Koma
09-Unplanned 011 - Engine Engine Fuel Filter Fuel - Filter Blocked FAIL- No Yes
M
aintenance (UM
D) Failure TJ Rent DoTJ RENT Koma
09-Unplanned 029 - Undercarriage Undercarriage Roller Track Roller Roller - Track Worn FAIL- No Yes
M
aintenance (UM
D) Roller Failure
0 Cat D8R
09-Unplanned 022 - GET GET Blade End Bit Blade - End Bit Bolt/Pin/Lock Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat D8R
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Cat D8R
09-Unplanned 012 - Torque Torque Transmission Internal Transmission - Failed FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Component Internal Failure
n n Component TJ Rent DoTJ RENT Koma
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
TJ Rent DoTJ RENT Koma
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D10R
09-Unplanned 023 - Aircon Aircon M
echanical Belt M
echanical - Belt Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat D10R
09-Unplanned 023 - Aircon Aircon M
echanical Compressor M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Compressor Failure
0 Cat D10R
09-Unplanned 017 - Hydraulics Hydraulics Electrical Joystick Electrical - Adjusted FAIL- No Yes
M
aintenance (UM
D) Joystick Failure 0 Cat D10R
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D10R
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 229 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat D10R
09-Unplanned 029 - Undercarriage Undercarriage Idler Idler Idler - Idler Worn FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat D10T
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Handle/Lock Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Cat D10T
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Cat D10T
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat D10T
09-Unplanned 023 - Aircon Aircon Electrical Switch/Relay/Sol Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat D10T
09-Unplanned 017 - Hydraulics Hydraulics Implement Screen Implement Seal Failed FAIL- No Yes
M
aintenance (UM
D) Storage Storage - Screen Failure
TJ Rent DoTJ RENT Koma
09-Unplanned 012 - Torque Torque Transmission Filter Transmission - Seal Failed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Filter Unplanned
n n Repair TJ Rent DoTJ RENT Koma
09-Unplanned 023 - Aircon Aircon Electrical Switch/Relay/Sol Electrical - Failed UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair TJ Rent DoTJ RENT Koma
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
TJ Rent DoTJ RENT Koma
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service TJ Rent DoTJ RENT Koma
09-Unplanned 017 - Hydraulics Hydraulics Implement Oil Implement Low Level FAIL- No Yes
M
aintenance (UM
D) Storage Storage - Oil Failure TJ Rent DoTJ RENT Koma
09-Unplanned 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Failed FAIL- No Yes
M
aintenance (UM
D) Failure TJ Rent DoTJ RENT Koma
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service TJ Rent DoTJ RENT Koma
09-Unplanned 011 - Engine Engine Fuel Fuel Fuel - Fuel Low Level UREP- Yes No
M
aintenance (UM
D) Unplanned
Repair TJ Rent DoTJ RENT Koma
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat D8R
08-Planned M
aintenance 011 - Engine Engine Pre- Valve Pre-Lubrication - Failed PREP- No No
(PM
D) Lubrication Valve Planned
Repair 0 Cat D8R
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
08-Planned M
aintenance 022 - GET GET - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 230 of 349
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Cat D8R
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat D8R
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked FAIL- No Yes
M
aintenance (UM
D) Air Filter Failure 0 Cat D8R
08-Planned M
aintenance 022 - GET GET - SERV- No No
(PM
D) Planned
Service 0 KOM
D85ESS
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 KOM
D85ESS
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 KOM
D85ESS
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 KOM
D85ESS
09-Unplanned 017 - Hydraulics Hydraulics Implement Valve Implement Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Valve Failure
0 KOM
D85ESS
09-Unplanned 023 - Aircon Aircon M
echanical Compressor M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Compressor Failure 0 Komatsu D65P
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Komatsu D65P
08-Planned M
aintenance 023 - Aircon Aircon - SERV- No No
(PM
D) Planned
Service
0 Komatsu D65P
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Komatsu D65P
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 834
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
0 Cat 834
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 834
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked FAIL- No Yes
M
aintenance (UM
D) Air Filter Failure
0 Cat 834
18-Opportune 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Fault PREP- No No
M
aintenance Rostered Planned
Planned (POM
R) Repair
0 Drill
18-Opportune 022 - GET GET Drill Pipe/Rod/Sub Drill - Bolt/Pin/Lock Failed PREP- No No
M
aintenance Rostered Saver Pipe/Rod/Sub Planned
Planned (POM
R) Saver Repair
0 Drill
18-Opportune 010 - Other/M
isc Other/M
isc - SERV- No No
M
aintenance Rostered Planned
Planned (POM
R) Service
0 Drill
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 231 of 349
18-Opportune 013 - Drive Drive Lines/Splitter - SERV- No No
M
aintenance Rostered Lines/Splitter Box/Swing/Drives Planned
Planned (POM
R) Box/Swing/Drives Service
0 Drill
18-Opportune 018 - Chassis/Frame/Cabin/ - COM
P- No No
M
aintenance Rostered Chassis/Frame/Cabin/ Steer Axles Planned
Planned (POM
R) Steer Axles Componen
t
Replaceme
nt
0 Drill
09-Unplanned 010 - Other/M
isc Other/M
isc Air Delivery Hose/Steel Tube Air Delivery - Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Drill
09-Unplanned 023 - Aircon Aircon M
echanical Compressor M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Compressor Failure
0 Drill
09-Unplanned 019 - LV Electrical LV Electrical Controlling E-Stop Controlling - E- Fault FAIL- No Yes
M
aintenance (UM
D) Stop Failure 0 Drill
09-Unplanned 011 - Engine Engine Fuel No Fault Found Fuel - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Travel Delivery Pump Travel Delivery - Bolt FAIL- No Yes
M
aintenance (UM
D) Pump Loose/M
issing/Failed Failure
0 Drill
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair 0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Travel Delivery Pump Travel Delivery - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure
0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Drill
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Implement Valve Implement Seal Failed UREP- No No
M
aintenance (UM
D) Delivery Delivery - Valve Unplanned
Repair 0 Drill
09-Unplanned 019 - LV Electrical LV Electrical Electrical Alternator Electrical - Belt Failed UREP- No No
M
aintenance (UM
D) Alternator Unplanned
Repair 0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Drill
09-Unplanned 010 - Other/M
isc Other/M
isc Work Tools No Fault Found Work Tools - No Inspected UREP- No No
M
aintenance (UM
D) Fault Found Unplanned
Repair 0 Drill
09-Unplanned 022 - GET GET Drill No Fault Found Drill - No Fault Inspected UREP- No No
M
aintenance (UM
D) Found Unplanned
Repair
0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Implement Pump Implement Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Pump Failure
0 Drill
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil SOS Sample Follow UREP- No No
M
aintenance (UM
D) Up Unplanned
Repair 0 Drill
09-Unplanned 015 - Final Final Final Drive Internal Final Drive - Failed UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Component Internal Unplanned
Axles/Tandems Axles/Tandems Component Repair
0 Drill
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 232 of 349
09-Unplanned 019 - LV Electrical LV Electrical Electrical Alternator Electrical - Belt Failed FAIL- No Yes
M
aintenance (UM
D) Alternator Failure
0 Drill
09-Unplanned 015 - Final Final Final Drive Oil Final Drive - Oil SOS Sample Follow UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Up Unplanned
Axles/Tandems Axles/Tandems Repair
0 Drill
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX2500
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Hitachi EX2500
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Service Arm Chassis - Hydraulic M
odule FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Service Arm Failed Failure
Steer Axles 0 Hitachi EX2500
09-Unplanned 017 - Hydraulics Hydraulics Implement No Fault Found Implement Inspected UREP- Yes No
M
aintenance (UM
D) Storage Storage - No Unplanned
Fault Found Repair 0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX2500
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Hitachi EX2500
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
09-Unplanned 017 - Hydraulics Hydraulics Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure 0 Hitachi EX2500
09-Unplanned 029 - Undercarriage Undercarriage Track Chain Track Link Track Chain - Adjusted FAIL- No Yes
M
aintenance (UM
D) Track Link Failure
0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Lubrication Fitting Lubrication - Loose FAIL- No Yes
M
aintenance (UM
D) Fitting Failure 0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Valve Implement Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Valve Failure
0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Fuel Injector Fuel - Injector Fault FAIL- No Yes
M
aintenance (UM
D) Failure
0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Electrical Control M
odule Electrical - Adjusted/Calibrated FAIL- No Yes
M
aintenance (UM
D) Control M
odule Failure
0 Hitachi EX3600
09-Unplanned 029 - Undercarriage Undercarriage Track Chain Track Link Track Chain - Adjusted FAIL- No Yes
M
aintenance (UM
D) Track Link Failure
0 Liebherr R984
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Liebherr R984
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Liebherr R984
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 233 of 349
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 023 - Aircon Aircon - SERV- No No
(PM
D) Planned
Service 0 Liebherr R984
09-Unplanned 029 - Undercarriage Undercarriage Track Frame Track Chain Track Frame - Damaged UREP- No No
M
aintenance (UM
D) Guide Track Chain Unplanned
Guide Repair
0 Liebherr R984
09-Unplanned 017 - Hydraulics Hydraulics Travel Delivery Hose/Steel Tube Travel Delivery - Clamp UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Loose/M
issing/Failed Unplanned
Repair 0 Liebherr R984
09-Unplanned 011 - Engine Engine Fuel Valve Fuel - Valve Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Liebherr R984
09-Unplanned 026 - Grease System Grease System Electrical Switch/Relay/Sol Electrical - Adjusted UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair 0 Liebherr R984
09-Unplanned 013 - Drive Drive Lines/Splitter Swing Drive Housing Swing Drive - Bolt UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Housing Loose/M
issing/Failed Unplanned
Box/Swing/Drives Repair 0 Liebherr R984
09-Unplanned 026 - Grease System Grease System M
echanical Hose/Steel Tube M
echanical - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Unplanned
Repair 0 Liebherr R984
09-Unplanned 026 - Grease System Grease System Electrical Fuse/Circuit Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Breaker Fuse/Circuit Failure
Breaker
0 Liebherr R984
09-Unplanned 011 - Engine Engine Fuel Filter Fuel - Filter Blocked FAIL- No Yes
M
aintenance (UM
D) Failure
0 Liebherr R984
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Liebherr R984
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
0 Liebherr R984
09-Unplanned 026 - Grease System Grease System M
echanical Hose/Steel Tube M
echanical - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Unplanned
Repair
0 Liebherr R984
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 234 of 349
09-Unplanned 011 - Engine Engine Lubrication Fitting Lubrication - Failed UREP- No No
M
aintenance (UM
D) Fitting Unplanned
Repair 0 Liebherr R984
09-Unplanned 017 - Hydraulics Hydraulics Implement M
otor Implement Bolt FAIL- No Yes
M
aintenance (UM
D) Actuation Actuation - M
otor Loose/M
issing/Failed Failure
0 Hitachi ZX350/Z
09-Unplanned 028 - Buckets/Bowls/Body Bucket Structure Bucket - Pin Retaining Plate FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Structure Bolt Failure
Loose/M
issing/Failed
0 Komatsu PC30
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Komatsu PC30
08-Planned M
aintenance 015 - Final Final - SERV- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Service 0 Komatsu PC30
19-Opportune 028 - Buckets/Bowls/Body Bucket No Fault Found Bucket - No Inspected UREP- No No
M
aintenance Rostered Buckets/Bowls/Body Fault Found Unplanned
Unplanned (UOM
R) Repair
0 Hitachi ZX350/Z
09-Unplanned 019 - LV Electrical LV Electrical Controlling Fuse/Circuit Controlling - Failed FAIL- No Yes
M
aintenance (UM
D) Breaker Fuse/Circuit Failure
Breaker 0 Caterpillar 330D
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Caterpillar 330D
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Caterpillar 330D
09-Unplanned 015 - Final Final Final Drive Oil Final Drive - Oil SOS Sample Follow UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Up Unplanned
Axles/Tandems Axles/Tandems Repair 0 Caterpillar 330D
09-Unplanned 023 - Aircon Aircon M
echanical Compressor M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Compressor Failure 0 Caterpillar 330D
09-Unplanned 029 - Undercarriage Undercarriage Track Frame Track Adjuster Track Frame - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Track Adjuster Failure TJ Rent ExTJ Rental PC30
09-Unplanned 015 - Final Final Final Drive Housing Final Drive - Bolt UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Housing Loose/M
issing/Failed Unplanned
Axles/Tandems Axles/Tandems Repair
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 235 of 349
09-Unplanned 017 - Hydraulics Hydraulics Implement Pump Implement Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Pump Failure
0 Hitachi EX5500
09-Unplanned 019 - LV Electrical LV Electrical Electrical No Fault Found Electrical - No Inspected UREP- No No
M
aintenance (UM
D) Fault Found Unplanned
Repair
0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Hitachi EX5500
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure 0 Hitachi EX5500
09-Unplanned 026 - Grease System Grease System Electrical No Fault Found Electrical - No Inspected UREP- Yes No
M
aintenance (UM
D) Fault Found Unplanned
Repair 0 Hitachi EX5500
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Service Arm Chassis - Hydraulic M
odule FAIL- No Yes
M
aintenance (UM
D),19- Chassis/Frame/Cabin/ Steer Axles Service Arm Failed Failure
Opportune M
aintenance Steer Axles
Rostered Unplanned
(UOM
R)
0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Implement Cylinder Implement Damaged FAIL- No Yes
M
aintenance (UM
D) Actuation Actuation - Failure
Cylinder
0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Implement Cylinder Implement Damaged FAIL- No Yes
M
aintenance (UM
D) Actuation Actuation - Failure
Cylinder 0 Hitachi EX5500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Travel M
otor Travel Actuation Bolt UREP- No No
M
aintenance (UM
D) Actuation - M
otor Loose/M
issing/Failed Unplanned
Repair
0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Failure
Hose/Steel Tube
0 Hitachi EX3600
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil Overheated UREP- Yes No
M
aintenance (UM
D) Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Bolt FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Loose/M
issing/Failed Failure
Hose/Steel Tube
0 Hitachi EX2500
09-Unplanned 051 - Technology Technology 2 Way Radio Hand Piece 2 Way Radio - Failed FAIL- No Yes
M
aintenance (UM
D) Hand Piece Failure 0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX2500
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 236 of 349
08-Planned M
aintenance 015 - Final Final - SERV- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Service 0 Hitachi EX2500
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX2500
09-Unplanned 017 - Hydraulics Hydraulics Electrical Switch/Relay/Sol Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid
0 Hitachi EX2500
09-Unplanned 022 - GET GET Engaging Tip/Tooth Engaging - Bolt/Pin/Lock Failed FAIL- No Yes
M
aintenance (UM
D) Tip/Tooth Failure 0 Hitachi EX2500
09-Unplanned 028 - Buckets/Bowls/Body Bucket No Fault Found Bucket - No Inspected UREP- Yes No
M
aintenance (UM
D) Buckets/Bowls/Body Fault Found Unplanned
Repair 0 Hitachi EX2500
09-Unplanned 022 - GET GET Engaging Tip/Tooth Engaging - Worn UREP- No No
M
aintenance (UM
D) Tip/Tooth Unplanned
Repair 0 Hitachi EX2500
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Intake Duct Intake/Exhaust - Clamp Failed FAIL- No Yes
M
aintenance (UM
D) Air Intake Duct Failure
0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Hitachi EX2500
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - SERV- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service 0 Hitachi EX2500
08-Planned M
aintenance 023 - Aircon Aircon - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX2500
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 237 of 349
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
0 Hitachi EX3600
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service 0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Hose/Steel Tube Implement Rubbed UREP- No No
M
aintenance (UM
D) Delivery Delivery - Unplanned
Hose/Steel Tube Repair
0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Valve Implement Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Valve Failure
0 Hitachi EX3600
09-Unplanned 015 - Final Final Final Drive Oil Final Drive - Oil SOS Sample Follow UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Up Unplanned
Axles/Tandems Axles/Tandems Repair 0 Hitachi EX3600
09-Unplanned 025 - Fire Suppression Fire Suppression Electrical Control Panel Electrical - Reset FAIL- No Yes
M
aintenance (UM
D) Control Panel Failure
0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Intake/Exhaust Exhaust Intake/Exhaust - Cracked UREP- No No
M
aintenance (UM
D) M
anifold/Pipe Exhaust Unplanned
M
anifold/Pipe Repair
0 Hitachi EX3600
09-Unplanned 025 - Fire Suppression Fire Suppression Electrical No Fault Found Electrical - No Inspected FAIL- No Yes
M
aintenance (UM
D) Fault Found Failure 0 Hitachi EX3600
09-Unplanned 026 - Grease System Grease System M
echanical Injector M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Injector Failure
0 Hitachi EX3600
09-Unplanned 019 - LV Electrical LV Electrical Indicating Horn/Hornless Indicating - Failed FAIL- No Yes
M
aintenance (UM
D) System Horn/Hornless Failure
System 0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil SOS Sample Follow UREP- No No
M
aintenance (UM
D) Up Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 013 - Drive Drive Lines/Splitter Pump Drive Oil Pump Drive - Oil Contaminated FAIL- No Yes
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Failure
Box/Swing/Drives 0 Hitachi EX2500
09-Unplanned 017 - Hydraulics Hydraulics Electrical Switch/Relay/Sol Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Hitachi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 238 of 349
09-Unplanned 011 - Engine Engine Cooling Coolant Cooling - Overheated UREP- Yes No
M
aintenance (UM
D) Coolant Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 026 - Grease System Grease System M
echanical Injector M
echanical - Bolt FAIL- No Yes
M
aintenance (UM
D) Injector Loose/M
issing/Failed Failure
0 Hitachi EX3600
09-Unplanned 026 - Grease System Grease System M
echanical Injector M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Injector Failure
0 Hitachi EX3600
09-Unplanned 022 - GET GET Engaging Tip/Tooth Engaging - Worn UREP- No No
M
aintenance (UM
D) Tip/Tooth Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Electrical Electric M
otor Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) Electric M
otor Failure
0 Hitachi EX3600
09-Unplanned 025 - Fire Suppression Fire Suppression Activation Gauge Activation - Failed FAIL- No Yes
M
aintenance (UM
D) Gauge Failure
0 Hitachi EX3600
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Access Chassis - Access Bracket/M
ount Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Ladder/Stairs Ladder/Stairs Failure
Steer Axles
0 Hitachi EX3600
09-Unplanned 019 - LV Electrical LV Electrical Power No Fault Found Power - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Hitachi EX3600
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 029 - Undercarriage Undercarriage - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
0 Hitachi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 239 of 349
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX3600
09-Unplanned 001 - Inspection Inspection Inspection Inspection Inspection - Inspection UREP- No No
M
aintenance (UM
D) Inspection Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Travel M
otor Travel Actuation Seal Failed UREP- No No
M
aintenance (UM
D) Actuation - M
otor Unplanned
Repair
0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Cooling Radiator Cooling - Blocked UREP- No No
M
aintenance (UM
D) Radiator Unplanned
Repair
0 Hitachi EX3600
09-Unplanned 026 - Grease System Grease System M
echanical Grease M
echanical - Bled UREP- No No
M
aintenance (UM
D) Grease Unplanned
Repair 0 Hitachi EX3600
09-Unplanned 015 - Final Final Final Drive No Fault Found Final Drive - No Inspected UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Fault Found Unplanned
Axles/Tandems Axles/Tandems Repair
0 Hitachi EX3600
09-Unplanned 018 - Chassis/Frame/Cabin/ Boom No Fault Found Boom - No Fault Inspected UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Found Unplanned
Steer Axles Repair
0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Travel M
otor Travel Actuation Failed UREP- No No
M
aintenance (UM
D) Actuation - M
otor Unplanned
Repair
0 Hitachi EX3600
09-Unplanned 017 - Hydraulics Hydraulics Implement Filter Implement Seal Failed FAIL- No Yes
M
aintenance (UM
D) Delivery Delivery - Filter Failure
0 Hitachi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 240 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX3600
09-Unplanned 011 - Engine Engine Accessory Belt Accessory Drive Failed FAIL- No Yes
M
aintenance (UM
D) Drive - Belt Failure 0 Hitachi EX5500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX5500
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Hitachi EX5500
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX5500
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service
0 Hitachi EX5500
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Hitachi EX5500
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Hitachi EX5500
09-Unplanned 011 - Engine Engine Air Hose/Steel Tube Air - Hose/Steel Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Tube Unplanned
Repair
0 Hitachi EX5500
09-Unplanned 011 - Engine Engine Intake/Exhaust No Fault Found Intake/Exhaust - Inspected UREP- No No
M
aintenance (UM
D) No Fault Found Unplanned
Repair
0 Hitachi EX5500
09-Unplanned 017 - Hydraulics Hydraulics Electrical Plug/Connection Electrical - Broken UREP- No No
M
aintenance (UM
D) Plug/Connection Unplanned
Repair 0 Hitachi EX5500
09-Unplanned 019 - LV Electrical LV Electrical Power Plug/Connection Power - Broken UREP- No No
M
aintenance (UM
D) Plug/Connection Unplanned
Repair 0 Hitachi EX5500
09-Unplanned 028 - Buckets/Bowls/Body Bucket Structure Bucket - Pin Retaining Plate FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Structure Bolt Failure
Loose/M
issing/Failed
0 Hitachi EX2500
09-Unplanned 028 - Buckets/Bowls/Body Bucket Structure Bucket - Pin Retaining Plate FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Structure Bolt Failure
Loose/M
issing/Failed
0 Hitachi EX2500
18-Opportune 000 - PM
Service PM
Service - SERV- No No
M
aintenance Rostered Planned
Planned (POM
R) Service
0 Hitachi EX2500
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Komatsu PC30
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Komatsu PC30
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair #N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service #N/A #N/A
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair #N/A #N/A
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 241 of 349
09-Unplanned 001 - Inspection Inspection Inspection Inspection Inspection - Inspection UREP- No No
M
aintenance (UM
D) Inspection Unplanned
Repair 0 Cat 16M
09-Unplanned 011 - Engine Engine Lubrication Hose/Steel Tube Lubrication - Rubbed FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 16M
09-Unplanned 011 - Engine Engine Lubrication Hose/Steel Tube Lubrication - O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 16M
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 16M
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - SOS Sample Follow UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Up Unplanned
n n Repair 0 Cat 16M
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 16M
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - SERV- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
0 Cat 16M
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service
0 Cat 16M
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 Cat 16M
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 16M
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 16M
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked FAIL- No Yes
M
aintenance (UM
D) Air Filter Failure 0 Cat 16M
09-Unplanned 028 - Buckets/Bowls/Body Blade Wear Strip/Blade Blade - Wear Worn FAIL- No Yes
M
aintenance (UM
D),19- Buckets/Bowls/Body Slide Strip/Blade Slide Failure
Opportune M
aintenance
Rostered Unplanned
(UOM
R)
0 Cat 16M
09-Unplanned 019 - LV Electrical LV Electrical Power No Fault Found Power - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 16M
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - SOS Sample Follow UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Up Unplanned
n n Repair 0 Cat 16M
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat 16M
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles
0 Cat 16M
09-Unplanned 021 - Tyres Tyres Rim Assembly O-Ring Rim Assembly - Failed FAIL- No Yes
M
aintenance (UM
D) O-Ring Failure 0 CAT 18M
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 242 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 18M
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Handle/Lock Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 CAT 18M
08-Planned M
aintenance 011 - Engine Engine - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 CAT 18M
08-Planned M
aintenance 019 - LV Electrical LV Electrical - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 CAT 18M
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - COM
P- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Componen
t
Replaceme
nt
0 CAT 18M
08-Planned M
aintenance 022 - GET GET - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 CAT 18M
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service
0 CAT 18M
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil Low Level FAIL- No Yes
M
aintenance (UM
D) Failure 0 CAT 18M
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 18M
08-Planned M
aintenance 028 - Buckets/Bowls/Body Blade Wear Strip/Blade Blade - Wear Worn PREP- No No
(PM
D) Buckets/Bowls/Body Slide Strip/Blade Slide Planned
Repair 0 CAT 18M
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
08-Planned M
aintenance 021 - Tyres Tyres - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
09-Unplanned 011 - Engine Engine Fuel Valve Fuel - Valve Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 CAT 18M
08-Planned M
aintenance 022 - GET GET - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 18M
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 243 of 349
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 CAT 18M
09-Unplanned 022 - GET GET Blade Cutting Edge Blade - Cutting Worn UREP- No No
M
aintenance (UM
D) Edge Unplanned
Repair 0 CAT 18M
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres PREP- No No
Planned
Repair
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- No No
Unplanned
Repair
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
028 - Buckets/Bowls/Body Buckets/Bowls Buckets/Bowls/B Buckets/Bowls/B Buckets/Bowls/Body FAIL- No Yes
Buckets/Bowls/Body /Body ody ody - Failure
Buckets/Bowls/B
ody
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair #N/A #N/A
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure
#N/A #N/A
023 - Aircon Aircon Aircon Aircon Aircon - Aircon Aircon FAIL- No Yes
Failure
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair #N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 244 of 349
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- No No
Unplanned
Repair #N/A #N/A
023 - Aircon Aircon Aircon Aircon Aircon - Aircon Aircon FAIL- No Yes
Failure
#N/A #N/A
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres FAIL- No Yes
Failure
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- No No
Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 245 of 349
018 - Chassis/Frame/Cabin/ - SERV- No No
Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres PREP- No No
Planned
Repair
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 246 of 349
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
023 - Aircon Aircon - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair #N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair #N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service #N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
018 - Chassis/Frame/Cabin/ - SERV- No No
Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service
#N/A #N/A
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter UREP- No No
Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Unplanned
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive Repair
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 247 of 349
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
018 - Chassis/Frame/Cabin/ - SERV- No No
Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
#N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres PREP- No No
Planned
Repair
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure
#N/A #N/A
013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter FAIL- No Yes
Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Failure
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
028 - Buckets/Bowls/Body Buckets/Bowls Buckets/Bowls/B Buckets/Bowls/B Buckets/Bowls/Body FAIL- No Yes
Buckets/Bowls/Body /Body ody ody - Failure
Buckets/Bowls/B
ody
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 248 of 349
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
021 - Tyres Tyres - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- No No
Unplanned
Repair #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
016 - Brakes Brakes - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service
#N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter FAIL- No Yes
Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Failure
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
#N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ UREP- No No
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Unplanned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
013 - Drive Drive Lines/Splitter - SERV- No No
Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service #N/A #N/A
021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
Unplanned
Repair #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service
#N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 249 of 349
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure
#N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 GENSET
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- Yes No
Unplanned
Repair #N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical UREP- Yes No
HV Electrical Unplanned
Repair #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 GENSET
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 250 of 349
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed FAIL- No Yes
enoid Switch/Relay/Sol Failure
enoid #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- Yes No
Unplanned
Repair #N/A #N/A
024 - HV Electrical HV Electrical HV Electrical HV Electrical HV Electrical - HV Electrical FAIL- No Yes
HV Electrical Failure #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
Failure #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
011 - Engine Engine Fuel Fuel Fuel - Fuel Low Level UREP- Yes No
Unplanned
Repair #N/A #N/A
011 - Engine Engine Fuel Filter Fuel - Filter Blocked FAIL- No Yes
Failure #N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Loader
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Loader
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair 0 Loader
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 251 of 349
09-Unplanned 026 - Grease System Grease System M
echanical Grease M
echanical - Low Level FAIL- No Yes
M
aintenance (UM
D) Grease Failure 0 Loader
09-Unplanned 019 - LV Electrical LV Electrical Electrical No Fault Found Electrical - No Inspected UREP- No No
M
aintenance (UM
D) Fault Found Unplanned
Repair 0 Loader
09-Unplanned 017 - Hydraulics Hydraulics Electrical Plug/Connection Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Plug/Connection Failure
0 Loader
016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
Failure #N/A #N/A
018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ UREP- No No
Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Unplanned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
#N/A #N/A
08-Planned M
aintenance 011 - Engine Engine - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
Pump M
iniPumps
08-Planned M
aintenance 010 - Other/M
isc Other/M
isc Other/M
isc Other/M
isc Other/M
isc - Other/M
isc PREP- No No
(PM
D) Other/M
isc Planned
Repair KSB Rent Pumps
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure Pump M
iniPumps
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure
Pump M
iniPumps
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service Pump M
iniPumps
08-Planned M
aintenance 010 - Other/M
isc Other/M
isc Other/M
isc Other/M
isc Other/M
isc - Other/M
isc PREP- No No
(PM
D) Other/M
isc Planned
Repair
Pump M
iniPumps
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure Pump M
iniPumps
011 - Engine Engine Engine Engine Engine - Engine Engine UREP- Yes No
Unplanned
Repair #N/A #N/A
09-Unplanned 022 - GET GET GET GET GET - GET GET UREP- Yes No
M
aintenance (UM
D) Unplanned
Repair Pump M
iniPumps
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure Pump M
iniPumps
09-Unplanned 010 - Other/M
isc Other/M
isc Other/M
isc Other/M
isc Other/M
isc - Other/M
isc UREP- Yes No
M
aintenance (UM
D) Other/M
isc Unplanned
Repair Pump M
iniPumps
09-Unplanned 022 - GET GET GET GET GET - GET GET UREP- No No
M
aintenance (UM
D) Unplanned
Repair Pump M
iniPumps
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
Pump M
iniPumps
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
Pump M
iniPumps
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
Electrical Failure #N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service KSB Rent KSB Rent Pum
09-Unplanned 010 - Other/M
isc Other/M
isc Other/M
isc Other/M
isc Other/M
isc - Other/M
isc FAIL- No Yes
M
aintenance (UM
D) Other/M
isc Failure KSB Rent KSB Rent Pum
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service KSB Rent KSB Rent Pum
09-Unplanned 022 - GET GET GET GET GET - GET GET UREP- No No
M
aintenance (UM
D) Unplanned
Repair KSB Rent KSB Rent Pum
001 - Inspection Inspection - SERV- No No
Planned
Service #N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 252 of 349
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure Service Tr Service Truck C
09-Unplanned 011 - Engine Engine Cooling Pump Cooling - Pump Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair Service Tr Service Truck C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair Service Tr Service Truck C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
Service Tr Service Truck C
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service Service Tr Service Truck C
09-Unplanned 013 - Drive Drive Lines/Splitter Pump Drive Hose/Steel Tube Pump Drive - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Hose/Steel Tube Unplanned
Box/Swing/Drives Repair
Service Tr Service Truck C
19-Opportune 028 - Buckets/Bowls/Body Body Structure Body - Structure Worn UREP- No No
M
aintenance Rostered Buckets/Bowls/Body Unplanned
Unplanned (UOM
R) Repair
Service Tr Service Truck C
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure Service Tr Service Truck C
09-Unplanned 012 - Torque Torque Transmission Plug/Connection Transmission Loose FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Electrical Electrical - Failure
n n Plug/Connection
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Power No Fault Found Power - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair
0 Cat 785C
09-Unplanned 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Cracked FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Sensor Failure
Steer Axles
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Cat 785C
09-Unplanned 023 - Aircon Aircon Electrical Wiring Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Wiring Failure
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - Low Level UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Unplanned
n n Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 785C
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - SERV- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service 0 Cat 785C
09-Unplanned 013 - Drive Drive Lines/Splitter Drive Line Drive Shaft Drive Line - Damaged UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Drive Shaft Unplanned
Box/Swing/Drives Repair 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 253 of 349
09-Unplanned 019 - LV Electrical LV Electrical Power Wiring Power - Wiring Broken UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission No Fault Found Transmission - Inspected UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio No Fault Found Unplanned
n n Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 011 - Engine Engine - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 254 of 349
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 255 of 349
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - COM
P- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 012 - Torque Torque - COM
P- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - COM
P- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 014 - Differentials/Bevel - COM
P- No No
(PM
D) Differentials/Bevel Gears/Steering Planned
Gears/Steering Clutches Componen
Clutches t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 015 - Final Final - COM
P- No No
(PM
D) Drives/Planetary/Drive Drives/Planetary/Drive Planned
Axles/Tandems Axles/Tandems Componen
t
Replaceme
nt
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 256 of 349
08-Planned M
aintenance 023 - Aircon Aircon - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 028 - Buckets/Bowls/Body - SERV- No No
(PM
D) Buckets/Bowls/Body Planned
Service
0 Cat 785C
08-Planned M
aintenance 017 - Hydraulics Hydraulics - COM
P- No No
(PM
D) Planned
Componen
t
Replaceme
nt
0 Cat 785C
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Steering Hose/Steel Tube Steering Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hydraulic Hydraulic Unplanned
Delivery & Delivery & Repair
Cooling Cooling -
Hose/Steel Tube
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Delivery & Delivery & Unplanned
Cooling Cooling - Repair
Hose/Steel Tube
0 Cat 785C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Indicating Flashing Light Indicating - Wiring/Plug Failed UREP- No No
M
aintenance (UM
D) Flashing Light Unplanned
Repair
0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Air Hose/Steel Tube Air - Hose/Steel Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Tube Unplanned
Repair
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 257 of 349
09-Unplanned 019 - LV Electrical LV Electrical Electrical No Fault Found Electrical - No Inspected UREP- No No
M
aintenance (UM
D) Fault Found Unplanned
Repair
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Bearing Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Unplanned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission No Fault Found Transmission - Inspected UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio No Fault Found Unplanned
n n Repair
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Delivery & Delivery & Unplanned
Cooling Cooling - Repair
Hose/Steel Tube
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 258 of 349
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis No Fault Found Chassis - No Inspected UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Fault Found Unplanned
Steer Axles Repair
0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Low Pressure UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 051 - Technology Technology Display M
odule Display - M
odule Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery & Delivery & Failure
Cooling Cooling -
Hose/Steel Tube
0 Cat 785C
09-Unplanned 051 - Technology Technology Fleet Switch/Relay/Sol Fleet Failed UREP- No No
M
aintenance (UM
D) M
anagement enoid M
anagement Unplanned
System System - Repair
Switch/Relay/Sol
enoid
0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Plug/Connection Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Plug/Connection Failure
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Valve Hydraulic Failed FAIL- No Yes
M
aintenance (UM
D) Delivery & Delivery & Failure
Cooling Cooling - Valve
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 012 - Torque Torque Torque Filter Torque Seal Failed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter - Filter Unplanned
n n Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Access Chassis - Access Cracked UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Ladder/Stairs Ladder/Stairs Unplanned
Steer Axles Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque Torque Sensor Torque Failed FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter Failure
n n Electrical Electrical -
Sensor
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 259 of 349
09-Unplanned 012 - Torque Torque Torque Sensor Torque Failed FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter Failure
n n Electrical Electrical -
Sensor
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - Overfilled FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Failure
n n 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Sensor Transmission Failed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Electrical Electrical - Unplanned
n n Sensor Repair
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Power Plug/Connection Power - Loose FAIL- No Yes
M
aintenance (UM
D) Plug/Connection Failure
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
Service Tr Service Truck C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service Service Tr Service Truck C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Bumper Chassis - Bracket/M
ount Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Bumper Unplanned
Steer Axles Repair Service Tr Service Truck C
09-Unplanned 013 - Drive Drive Lines/Splitter Pump Drive Hose/Steel Tube Pump Drive - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Hose/Steel Tube Unplanned
Box/Swing/Drives Repair Service Tr Service Truck C
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Damaged UREP- No No
M
aintenance (UM
D) Pump Unplanned
Repair Service Tr Service Truck C
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 260 of 349
09-Unplanned 019 - LV Electrical LV Electrical Controlling Isolation Box Controlling - Failed UREP- No No
M
aintenance (UM
D) Isolation Box Unplanned
Repair
0 Cat 740
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 740
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 740
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 740
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 740
09-Unplanned 026 - Grease System Grease System M
echanical Grease M
echanical - Bled UREP- No No
M
aintenance (UM
D) Grease Unplanned
Repair 0 Cat 740
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 740
09-Unplanned 011 - Engine Engine Intake/Exhaust Turbocharger Intake/Exhaust - Failed UREP- No No
M
aintenance (UM
D) Turbocharger Unplanned
Repair
0 Cat 740
09-Unplanned 019 - LV Electrical LV Electrical Electrical Starter M
otor Electrical - Failed UREP- No No
M
aintenance (UM
D) Starter M
otor Unplanned
Repair
0 Cat 740
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 261 of 349
09-Unplanned 017 - Hydraulics Hydraulics Steering Hose/Steel Tube Steering Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hydraulic Hydraulic Unplanned
Delivery & Delivery & Repair
Cooling Cooling -
Hose/Steel Tube
0 Cat 740
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Unplanned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 740
09-Unplanned 016 - Brakes Brakes Park Brake Brake Pad Park Brake Worn UREP- No No
M
aintenance (UM
D) Assembly Assembly - Unplanned
Brake Pad Repair
0 Cat 740
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis No Fault Found Chassis - No Inspected FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Fault Found Failure
Steer Axles 0 Cat 740
09-Unplanned 023 - Aircon Aircon M
echanical Filter M
echanical - Blocked FAIL- No Yes
M
aintenance (UM
D) Filter Failure 0 Cat 740
09-Unplanned 011 - Engine Engine Electrical Plug/Connection Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Plug/Connection Failure
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
08-Planned M
aintenance 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Cracked PREP- No No
(PM
D) Hose/Steel Tube Planned
Repair 0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service
0 Cat 789C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 262 of 349
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
09-Unplanned 016 - Brakes Brakes Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure
0 Cat 789C
09-Unplanned 016 - Brakes Brakes Pneumatic Rotor Chamber Pneumatic - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Rotor Chamber Failure
0 Cat 789C
09-Unplanned 012 - Torque Torque Torque Wiring Torque Loose FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter Failure
n n Electrical Electrical -
Wiring
0 Cat 789C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Damaged FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
09-Unplanned 011 - Engine Engine Air Valve Air - Valve Damaged FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Hose/Steel Tube Transmission - Rubbed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Hose/Steel Tube Unplanned
n n Repair 0 Cat 785C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Filter Transmission - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Filter Failure
n n 0 Cat 785C
09-Unplanned 026 - Grease System Grease System M
echanical Hose/Steel Tube M
echanical - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Unplanned
Repair 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Steering Valve Steering Seal Failed UREP- No No
M
aintenance (UM
D) Hydraulic Hydraulic Unplanned
Delivery & Delivery & Repair
Cooling Cooling - Valve
0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure 0 Cat 785C
09-Unplanned 016 - Brakes Brakes Electrical Switch/Relay/Sol Electrical - Dirty FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid
0 Cat 785C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Delivery & Delivery & Unplanned
Cooling Cooling - Repair
Hose/Steel Tube
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Filter Transmission - Seal Failed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Filter Unplanned
n n Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Rim Assembly O-Ring Rim Assembly - Failed FAIL- No Yes
M
aintenance (UM
D) O-Ring Failure 0 Cat 785C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 785C
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Hose/Steel Tube Water Spray - Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Water Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Water Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 263 of 349
09-Unplanned 016 - Brakes Brakes Hydraulic Accumulator Hydraulic Failed FAIL- No Yes
M
aintenance (UM
D) Actuation & Actuation & Failure
Storage Storage -
Accumulator
0 Cat 777D OB T
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis M
ud Flap/M
ud Chassis - M
ud Bracket/M
ount Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Guard Flap/M
ud Guard Unplanned
Steer Axles Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Bolt FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Loose/M
issing/Failed Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 011 - Engine Engine Lubrication Hose/Steel Tube Lubrication - O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 011 - Engine Engine Lubrication Filter Lubrication - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Filter Failure 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Pin Retaining Plate FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Bolt Failure
Steer Axles Strut Cylinder/Ride Loose/M
issing/Failed
Strut
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Bolt UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Loose/M
issing/Failed Unplanned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 011 - Engine Engine Air Valve Air - Valve Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Brake Slack Hydraulic Failed FAIL- No Yes
M
aintenance (UM
D) Actuation & Adjuster Actuation & Failure
Storage Storage - Brake
Slack Adjuster
0 Cat 785C
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked FAIL- No Yes
M
aintenance (UM
D) Air Filter Failure 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Seal Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Steering Hose/Steel Tube Steering Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Hydraulic Hydraulic Failure
Delivery & Delivery &
Cooling Cooling -
Hose/Steel Tube
0 Cat 785C
09-Unplanned 021 - Tyres Tyres Rim Assembly O-Ring Rim Assembly - Failed FAIL- No Yes
M
aintenance (UM
D) O-Ring Failure 0 Cat 785C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair
0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Separated UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 264 of 349
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
09-Unplanned 011 - Engine Engine Lubrication Filter Lubrication - Seal Failed UREP- No No
M
aintenance (UM
D) Filter Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Bolt UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Loose/M
issing/Failed Unplanned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Wiring Electrical - Rubbed FAIL- No Yes
M
aintenance (UM
D) Wiring Failure
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Implement Oil Implement Low Level UREP- No No
M
aintenance (UM
D) Storage Storage - Oil Unplanned
Repair 0 Cat 785C
09-Unplanned 014 - Differentials/Bevel M
echanical Rear Axle M
echanical - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering Housing Rear Axle Failure
Gears/Steering Clutches Structure Housing
Clutches Structure
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Electrical Wiring Electrical - Broken UREP- No No
M
aintenance (UM
D) Wiring Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Rim Assembly Rim Component Rim Assembly - Damaged PREP- No No
(PM
D) Rim Component Planned
Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Rim Assembly Rim Component Rim Assembly - Cracked UREP- No No
M
aintenance (UM
D) Rim Component Unplanned
Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Separated FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body No Fault Found Body - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Buckets/Bowls/Body Found Unplanned
Repair 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Hoist Delivery Pump Hoist Delivery - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure
0 Cat 785C
09-Unplanned 025 - Fire Suppression Fire Suppression Electrical Wiring Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Wiring Failure 0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair
0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 789C
09-Unplanned 014 - Differentials/Bevel M
echanical Rear Axle M
echanical - Cracked FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering Housing Rear Axle Failure
Gears/Steering Clutches Structure Housing
Clutches Structure
0 Cat 789C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis M
irror Chassis - M
irror Bolt FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Loose/M
issing/Failed Failure
Steer Axles 0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 265 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis M
irror Chassis - M
irror Bolt FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Loose/M
issing/Failed Failure
Steer Axles 0 Cat 789C
08-Planned M
aintenance 011 - Engine Engine Intake/Exhaust Intake M
anifold Intake/Exhaust - Damaged PREP- No No
(PM
D) Intake M
anifold Planned
Repair 0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair
0 Cat 789C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure
0 Cat 789C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure
0 Cat 789C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure
0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 789C
09-Unplanned 011 - Engine Engine Cooling Pump Cooling - Pump Seal Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 789C
09-Unplanned 012 - Torque Torque Transmission Hose/Steel Tube Transmission - Clamp UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Hose/Steel Tube Loose/M
issing/Failed Unplanned
n n Repair
0 Cat 789C
09-Unplanned 017 - Hydraulics Hydraulics Steering Accumulator Steering Seal Failed UREP- No No
M
aintenance (UM
D) Hydraulic Hydraulic Unplanned
Actuation & Actuation & Repair
Storage Storage -
Accumulator
0 Cat 789C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 789C
09-Unplanned 012 - Torque Torque Transmission Hose/Steel Tube Transmission - Bolt FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Hose/Steel Tube Loose/M
issing/Failed Failure
n n 0 Cat 789C
09-Unplanned 017 - Hydraulics Hydraulics Hoist Delivery Hose/Steel Tube Hoist Delivery - O-Ring Seal Failed UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Unplanned
Repair 0 Cat 789C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 266 of 349
09-Unplanned 017 - Hydraulics Hydraulics Hoist Delivery Hose/Steel Tube Hoist Delivery - O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
09-Unplanned 014 - Differentials/Bevel M
echanical Rear Axle M
echanical - Cracked FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering Housing Rear Axle Failure
Gears/Steering Clutches Structure Housing
Clutches Structure
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
09-Unplanned 014 - Differentials/Bevel M
echanical Rear Axle M
echanical - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering Housing Rear Axle Failure
Gears/Steering Clutches Structure Housing
Clutches Structure
0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
09-Unplanned 016 - Brakes Brakes Pneumatic Valve Pneumatic - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Valve Failure 0 Cat 789C
09-Unplanned 016 - Brakes Brakes Pneumatic Rotor Chamber Pneumatic - Bypass FAIL- No Yes
M
aintenance (UM
D) Rotor Chamber Failure
0 Cat 785C
09-Unplanned 011 - Engine Engine Air Valve Air - Valve Damaged FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Valve Hydraulic Failed FAIL- No Yes
M
aintenance (UM
D) Delivery & Delivery & Failure
Cooling Cooling - Valve
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Pneumatic Rotor Chamber Pneumatic - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Rotor Chamber Failure
0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Hoist Delivery Hose/Steel Tube Hoist Delivery - Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service PM
Service PM
Service PM
Service - PM
PM
Service PREP- No No
(PM
D) Service Planned
Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Hose/Steel Tube Transmission - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Hose/Steel Tube Unplanned
n n Repair 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Bolt FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Loose/M
issing/Failed Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - Contaminated FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Failure
n n
0 Cat 785C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 785C
09-Unplanned 012 - Torque Torque Torque Sensor Torque Failed FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter Converter Failure
n n Electrical Electrical -
Sensor
0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 267 of 349
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Seal Failed FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Wiring Electrical - Corroded/Green FAIL- No Yes
M
aintenance (UM
D) Wiring Death Failure 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes Electrical Sensor Electrical - Failed PREP- No No
(PM
D) Sensor Planned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed UREP- No No
M
aintenance (UM
D) Sensor Unplanned
Repair
0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair
0 Cat 785C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Housing Transmission - Seal Failed UREP- No No
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Housing Unplanned
n n Repair 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 268 of 349
08-Planned M
aintenance 014 - Differentials/Bevel - SERV- No No
(PM
D) Differentials/Bevel Gears/Steering Planned
Gears/Steering Clutches Service
Clutches
0 Cat 785C
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service 0 Cat 785C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 785C
08-Planned M
aintenance 020 - Plant Damage Plant Damage - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Structure Body - Structure Cracked FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 789C
09-Unplanned 017 - Hydraulics Hydraulics Steering Valve Steering Seal Failed FAIL- No Yes
M
aintenance (UM
D) Hydraulic Hydraulic Failure
Delivery & Delivery &
Cooling Cooling - Valve
0 Cat 789C
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 Cat 789C
09-Unplanned 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Clamp UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Loose/M
issing/Failed Unplanned
Repair
0 Cat 789C
09-Unplanned 017 - Hydraulics Hydraulics Hoist Delivery Hose/Steel Tube Hoist Delivery - Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Hose/Steel Tube Unplanned
Repair 0 Cat 789C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Fault UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair 0 Cat 789C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Separated UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 789C
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
09-Unplanned 011 - Engine Engine Electrical Switch/Relay/Sol Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat 789C
09-Unplanned 021 - Tyres Tyres Rim Assembly Valve Rim Assembly - Failed FAIL- No Yes
M
aintenance (UM
D) Valve Failure 0 Cat 789C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 269 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 789C
09-Unplanned 025 - Fire Suppression Fire Suppression Electrical Plug/Connection Electrical - Bolt FAIL- No Yes
M
aintenance (UM
D) Plug/Connection Loose/M
issing/Failed Failure
0 Cat 789C
09-Unplanned 011 - Engine Engine Air No Fault Found Air - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Found Unplanned
Repair 0 Cat 789C
09-Unplanned 011 - Engine Engine Air Air Starter Air - Air Starter Low Pressure FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 789C
09-Unplanned 011 - Engine Engine Electrical Switch/Relay/Sol Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat 789C
09-Unplanned 011 - Engine Engine Fuel Hose/Steel Tube Fuel - Cracked FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Cat 789C
09-Unplanned 011 - Engine Engine Air Air Starter Air - Air Starter Seal Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 789C
09-Unplanned 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Wiring/Plug Failed FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 785C
09-Unplanned 051 - Technology Technology Display M
odule Display - M
odule Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 020 - Plant Damage Plant Damage - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service
0 Cat 785C
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 014 - Differentials/Bevel - SERV- No No
(PM
D) Differentials/Bevel Gears/Steering Planned
Gears/Steering Clutches Service
Clutches
0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body No Fault Found Body - No Fault Inspected UREP- Yes No
M
aintenance (UM
D) Buckets/Bowls/Body Found Unplanned
Repair 0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure 0 Cat 785C
09-Unplanned 051 - Technology Technology Display Wiring Display - Wiring Broken UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 270 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Steering Steering Steering Bolt UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles M
echanical Column/Wheel M
echanical - Loose/M
issing/Failed Unplanned
Steer Axles Steering Repair
Column/Wheel
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Sensor Failure
Steer Axles 0 Cat 785C
09-Unplanned 015 - Final Final Final Drive Housing Final Drive - Bolt UREP- No No
M
aintenance (UM
D) Drives/Planetary/Drive Drives/Planetary/Drive Housing Loose/M
issing/Failed Unplanned
Axles/Tandems Axles/Tandems Repair 0 Cat 785C
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 017 - Hydraulics Hydraulics Steering Hose/Steel Tube Steering O-Ring Seal Failed FAIL- No Yes
M
aintenance (UM
D) Hydraulic Hydraulic Failure
Delivery & Delivery &
Cooling Cooling -
Hose/Steel Tube
0 Water Truck
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Control M
odule Water Spray Failed FAIL- No Yes
M
aintenance (UM
D) Electrical Electrical - Failure
Control M
odule
0 Water Truck
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Valve Water Spray - Failed FAIL- No Yes
M
aintenance (UM
D) Valve Failure
0 Water Truck
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Fitting Water Spray - Failed FAIL- No Yes
M
aintenance (UM
D) Fitting Failure 0 Water Truck
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping UREP- No No
M
aintenance (UM
D) Delivery & Delivery & Unplanned
Cooling Cooling - Repair
Hose/Steel Tube
0 Water Truck
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Hose/Steel Tube Water Spray - Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Failure
0 Water Truck
09-Unplanned 010 - Other/M
isc Other/M
isc Water Spray Bulk Water Water Spray - Damaged FAIL- No Yes
M
aintenance (UM
D) Pump Bulk Water Failure
Pump
0 Water Truck
09-Unplanned 011 - Engine Engine Lubrication Oil Lubrication - Oil Low Level UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Water Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Handle/Lock Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Water Truck
09-Unplanned 051 - Technology Technology 2 Way Radio M
odule 2 Way Radio - Failed FAIL- No Yes
M
aintenance (UM
D) M
odule Failure 0 Cat 777D Coal
09-Unplanned 019 - LV Electrical LV Electrical Indicating Flashing Light Indicating - Failed FAIL- No Yes
M
aintenance (UM
D) Flashing Light Failure
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 271 of 349
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - COM
P- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Componen
t
Replaceme
nt
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 272 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777D OB T
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 777D OB T
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 777D OB T
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 777D OB T
09-Unplanned 012 - Torque Torque Transmission Wiring Transmission Broken FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Electrical Electrical - Failure
n n Wiring
0 Cat 777D OB T
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 777D OB T
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat 777D OB T
09-Unplanned 019 - LV Electrical LV Electrical Power Battery Power - Battery Fault FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 777D Coal
09-Unplanned 011 - Engine Engine Intake/Exhaust M
uffler Intake/Exhaust - Bracket/M
ount Failed FAIL- No Yes
M
aintenance (UM
D) M
uffler Failure
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 273 of 349
09-Unplanned 019 - LV Electrical LV Electrical M
onitoring Cab Dashboard M
onitoring - Cab Failed FAIL- No Yes
M
aintenance (UM
D) Light Dashboard Light Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Handle/Lock Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Failure
Steer Axles 0 Cat 785C
09-Unplanned 014 - Differentials/Bevel M
echanical Breather M
echanical - Loose FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering Breather Failure
Gears/Steering Clutches
Clutches
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Door Cabin - Door Hinge Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Unplanned
Steer Axles Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Fuel Filter Fuel - Filter Blocked FAIL- No Yes
M
aintenance (UM
D) Failure #N/A #N/A
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
#N/A #N/A
09-Unplanned 011 - Engine Engine Fuel Filter Fuel - Filter Blocked UREP- No No
M
aintenance (UM
D) Unplanned
Repair #N/A #N/A
09-Unplanned 051 - Technology Technology 2 Way Radio Antenna 2 Way Radio - Bolt FAIL- No Yes
M
aintenance (UM
D) Antenna Loose/M
issing/Failed Failure
#N/A #N/A
09-Unplanned 026 - Grease System Grease System M
echanical Grease M
echanical - Overfilled UREP- No No
M
aintenance (UM
D) Grease Unplanned
Repair #N/A #N/A
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis M
irror Chassis - M
irror Adjusted UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Unplanned
Steer Axles Repair #N/A #N/A
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Separated UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Air Valve Air - Valve Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 785C
09-Unplanned 012 - Torque Torque Transmission Oil Transmission - Low Level FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Oil Failure
n n 0 Cat 785C
09-Unplanned 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Bolt FAIL- No Yes
M
aintenance (UM
D) Hose/Steel Tube Loose/M
issing/Failed Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Damaged FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat 785C
09-Unplanned 016 - Brakes Brakes Pneumatic Valve Pneumatic - Failed FAIL- No Yes
M
aintenance (UM
D) Valve Failure 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 Cat 785C
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 025 - Fire Suppression Fire Suppression - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Indicating Horn/Hornless Indicating - Failed FAIL- No Yes
M
aintenance (UM
D) System Horn/Hornless Failure
System 0 Cat 785C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 274 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 028 - Buckets/Bowls/Body Body Pad Body - Pad Adjusted FAIL- No Yes
M
aintenance (UM
D) Buckets/Bowls/Body Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis Belly Guard Chassis - Belly Bolt FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Guard Loose/M
issing/Failed Failure
Steer Axles 0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Switch/Relay/Sol Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure
0 Cat 785C
09-Unplanned 016 - Brakes Brakes Hydraulic Hose/Steel Tube Hydraulic Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D) Delivery & Delivery & Failure
Cooling Cooling -
Hose/Steel Tube
0 Cat 785C
09-Unplanned 011 - Engine Engine Fuel Tank Fuel - Tank Cracked FAIL- No Yes
M
aintenance (UM
D) Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Windscreen Cabin - Valve Failed FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Wiper Windscreen Failure
Steer Axles Wiper
0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Power Plug/Connection Power - Dirty UREP- No No
M
aintenance (UM
D) Plug/Connection Unplanned
Repair
0 Cat 785C
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure
0 Cat 785C
09-Unplanned 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Failure
Steer Axles Strut Cylinder/Ride
Strut
0 Cat 785C
09-Unplanned 011 - Engine Engine Lubrication Filter Lubrication - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Filter Failure
0 Cat 785C
09-Unplanned 011 - Engine Engine Electrical Sensor Electrical - Failed FAIL- No Yes
M
aintenance (UM
D) Sensor Failure 0 Cat 785C
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked UREP- No No
M
aintenance (UM
D) Air Filter Unplanned
Repair 0 Cat 785C
09-Unplanned 011 - Engine Engine Fuel Breather Fuel - Breather Blocked FAIL- No Yes
M
aintenance (UM
D) Failure 0 Cat 785C
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed UREP- No No
M
aintenance (UM
D) enoid Switch/Relay/Sol Unplanned
enoid Repair
0 Cat 785C
08-Planned M
aintenance 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Retorque PREP- No No
(PM
D) Planned
Repair 0 Cat 777D Coal
09-Unplanned 011 - Engine Engine Intake/Exhaust Air Filter Intake/Exhaust - Blocked FAIL- No Yes
M
aintenance (UM
D) Air Filter Failure 0 Cat 777D Coal
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777D Coal
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 275 of 349
08-Planned M
aintenance 017 - Hydraulics Hydraulics - SERV- No No
(PM
D) Planned
Service 0 Cat 777D Coal
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service 0 Cat 777D Coal
08-Planned M
aintenance 012 - Torque Torque - SERV- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Planned
n n Service 0 Cat 777D Coal
09-Unplanned 020 - Plant Damage Plant Damage Other Other Other - Other Other UREP- No No
M
aintenance (UM
D) Unplanned
Repair
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 276 of 349
09-Unplanned 023 - Aircon Aircon Electrical Wiring Electrical - Broken FAIL- No Yes
M
aintenance (UM
D) Wiring Failure
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 277 of 349
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Seal Failed UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 777D OB T
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Volvo A40 Thie
09-Unplanned 026 - Grease System Grease System M
echanical Pump M
echanical - Failed FAIL- No Yes
M
aintenance (UM
D) Pump Failure
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 278 of 349
09-Unplanned 012 - Torque Torque Transmission Sensor Transmission Fault FAIL- No Yes
M
aintenance (UM
D),19- Convertor/Transmissio Convertor/Transmissio Electrical Electrical - Failure
Opportune M
aintenance n n Sensor
Rostered Unplanned
(UOM
R)
0 CAT 745
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
09-Unplanned 026 - Grease System Grease System M
echanical Grease M
echanical - Low Level UREP- No No
M
aintenance (UM
D) Grease Unplanned
Repair 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 CAT 745
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 279 of 349
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 021 - Tyres Tyres - SERV- No No
(PM
D) Planned
Service 0 CAT 745
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777E Coal
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 777E Coal
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - SERV- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service 0 Cat 777E Coal
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777E Coal
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 Cat 777E Coal
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 Cat 777E Coal
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 777E Coal
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Seat Belt Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Unplanned
Steer Axles Repair 0 Cat 777E Coal
08-Planned M
aintenance 017 - Hydraulics Hydraulics Implement Oil Implement SOS Sample Follow PREP- No No
(PM
D) Storage Storage - Oil Up Planned
Repair 0 Cat 777E Coal
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter Drive Line Universal Joint Drive Line - Bolt PREP- No No
(PM
D) Lines/Splitter Box/Swing/Drives Universal Joint Loose/M
issing/Failed Planned
Box/Swing/Drives Repair 0 Cat 777E Coal
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777E Coal
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter - SERV- No No
(PM
D) Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Service 0 Cat 777E Coal
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 777E Coal
08-Planned M
aintenance 019 - LV Electrical LV Electrical Controlling Control M
odule Controlling - Failed PREP- No No
(PM
D) Control M
odule Planned
Repair
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 280 of 349
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 Cat 777E Coal
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 777E Coal
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 Cat 777E Coal
09-Unplanned 013 - Drive Drive Lines/Splitter Drive Line Drive Shaft Drive Line - Failed UREP- No No
M
aintenance (UM
D) Lines/Splitter Box/Swing/Drives Drive Shaft Unplanned
Box/Swing/Drives Repair 0 Cat 777E Coal
08-Planned M
aintenance 012 - Torque Torque Transmission Oil Transmission - SOS Sample Follow PREP- No No
(PM
D) Convertor/Transmissio Convertor/Transmissio Oil Up Planned
n n Repair 0 Cat 777E Coal
08-Planned M
aintenance 017 - Hydraulics Hydraulics Implement Oil Implement SOS Sample Follow PREP- No No
(PM
D) Storage Storage - Oil Up Planned
Repair 0 Cat 777E Coal
09-Unplanned 021 - Tyres Tyres Tyres Tyre Tyres - Tyre Cut UREP- No No
M
aintenance (UM
D) Unplanned
Repair 0 Cat 777E Coal
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Failed FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Chassis ID/Call Sign Chassis - ID/Call Broken PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Sign Planned
Steer Axles Repair 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 CAT 745
09-Unplanned 011 - Engine Engine Top End Cylinder Head Top End - Seal Failed FAIL- No Yes
M
aintenance (UM
D) Structure Cylinder Head Failure
Structure 0 CAT 745
09-Unplanned 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Bolt FAIL- No Yes
M
aintenance (UM
D) Loose/M
issing/Failed Failure
0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 CAT 745
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 CAT 745
09-Unplanned 019 - LV Electrical LV Electrical Indicating Light Indicating - Light Failed FAIL- No Yes
M
aintenance (UM
D) Failure 0 CAT 745
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
0 CAT 745
08-Planned M
aintenance 026 - Grease System Grease System - SERV- No No
(PM
D) Planned
Service 0 CAT 745
09-Unplanned 011 - Engine Engine Cooling Coolant Cooling - Low Level FAIL- No Yes
M
aintenance (UM
D) Coolant Failure 0 Volvo A40 Intra
09-Unplanned 016 - Brakes Brakes Electrical Switch/Relay/Sol Electrical - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid 0 Volvo A40 Intra
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 281 of 349
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Suspension Suspension Suspension - Adjusted PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Cylinder/Ride Suspension Planned
Steer Axles Strut Cylinder/Ride Repair
Strut
0 Cat 777D OB T
08-Planned M
aintenance 019 - LV Electrical LV Electrical Electrical No Fault Found Electrical - No Inspected PREP- No No
(PM
D) Fault Found Planned
Repair 0 Cat 777D OB T
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service 0 Cat 785C
09-Unplanned 011 - Engine Engine Cooling Hose/Steel Tube Cooling - Slight Leak/Weeping FAIL- No Yes
M
aintenance (UM
D),19- Hose/Steel Tube Failure
Opportune M
aintenance
Rostered Unplanned
(UOM
R)
Lowboy M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Bracket/M
ount Failed UREP- No No
M
aintenance (UM
D),19- Chassis/Frame/Cabin/ Steer Axles Seat Unplanned
Opportune M
aintenance Steer Axles Repair
Rostered Unplanned
(UOM
R)
Lowboy M
edium Truck
09-Unplanned 001 - Inspection Inspection Inspection Inspection Inspection - Inspection UREP- No No
M
aintenance (UM
D) Inspection Unplanned
Repair Lowboy M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical No Fault Found Electrical - No Inspected UREP- No No
M
aintenance (UM
D) Fault Found Unplanned
Repair
Lowboy M
edium Truck
09-Unplanned 016 - Brakes Brakes Service Brake Wet Brake Service Brake Bolt UREP- No No
M
aintenance (UM
D) Assembly Housing Assembly - Wet Loose/M
issing/Failed Unplanned
Brake Housing Repair
Lowboy M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis M
irror Chassis - M
irror Bracket/M
ount Failed UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Unplanned
Steer Axles Repair Lowboy M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service 0 M
edium Truck
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service 0 M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service 0 M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
0 M
edium Truck
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes UREP- No No
M
aintenance (UM
D) Unplanned
Repair
0 M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair 0 M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair
0 M
edium Truck
09-Unplanned 012 - Torque Torque Torque Torque Torque Torque FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter/Tran Converter/Trans Converter/Trans Converter/Transmissio Failure
n n smission mission mission - Torque n
Converter/Trans
mission
0 M
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure 0 M
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure Fuel TraileM
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair Fuel TraileM
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure Fuel TraileM
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 282 of 349
09-Unplanned 019 - LV Electrical LV Electrical Controlling Switch/Relay/Sol Controlling - Fault FAIL- No Yes
M
aintenance (UM
D) enoid Switch/Relay/Sol Failure
enoid
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Cabin Operator Seat Cabin - Operator Adjusted FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles Seat Failure
Steer Axles M
anhaul M
edium Truck
001 - Inspection Inspection - SERV- No No
Planned
Service #N/A #N/A
011 - Engine Engine Lubrication Oil Lubrication - Oil SOS Sample Follow PREP- No No
Up Planned
Repair #N/A #N/A
012 - Torque Torque Transmission Oil Transmission - SOS Sample Follow PREP- No No
Convertor/Transmissio Convertor/Transmissio Oil Up Planned
n n Repair #N/A #N/A
014 - Differentials/Bevel M
echanical Oil M
echanical - Oil SOS Sample Follow PREP- No No
Differentials/Bevel Gears/Steering Up Planned
Gears/Steering Clutches Repair
Clutches
#N/A #N/A
019 - LV Electrical LV Electrical - SERV- No No
Planned
Service #N/A #N/A
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure
M
anhaul M
edium Truck
09-Unplanned 012 - Torque Torque Torque Torque Torque Torque FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter/Tran Converter/Trans Converter/Trans Converter/Transmissio Failure
n n smission mission mission - Torque n
Converter/Trans
mission
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 283 of 349
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D),18-Opportune Chassis/Frame/Cabin/ Steer Axles Planned
M
aintenance Rostered Steer Axles Service
Planned (POM
R)
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes UREP- No No
M
aintenance (UM
D),19- Unplanned
Opportune M
aintenance Repair
Rostered Unplanned
(UOM
R)
M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Unplanned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure
#N/A #N/A
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service #N/A #N/A
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service #N/A #N/A
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
M
aintenance (UM
D) Failure
#N/A #N/A
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service Fuel TraileM
edium Truck
08-Planned M
aintenance 011 - Engine Engine - SERV- No No
(PM
D) Planned
Service
Fuel TraileM
edium Truck
08-Planned M
aintenance 016 - Brakes Brakes - SERV- No No
(PM
D) Planned
Service Fuel TraileM
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
Fuel TraileM
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
Fuel TraileM
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure Lowboy M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D),18-Opportune Planned
M
aintenance Rostered Service
Planned (POM
R)
Lowboy M
edium Truck
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes UREP- No No
M
aintenance (UM
D) Unplanned
Repair Lowboy M
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine UREP- No No
M
aintenance (UM
D) Unplanned
Repair Lowboy M
edium Truck
09-Unplanned 017 - Hydraulics Hydraulics Hydraulics Hydraulics Hydraulics - Hydraulics UREP- No No
M
aintenance (UM
D) Hydraulics Unplanned
Repair Lowboy M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair
Lowboy M
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure
Lowboy M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair
M
anhaul M
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 284 of 349
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Planned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
08-Planned M
aintenance 011 - Engine Engine Engine Engine Engine - Engine Engine PREP- No No
(PM
D) Planned
Repair
M
anhaul M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
M
aintenance (UM
D) Electrical Unplanned
Repair
M
anhaul M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure
M
anhaul M
edium Truck
09-Unplanned 021 - Tyres Tyres Tyres Tyres Tyres - Tyres Tyres UREP- No No
M
aintenance (UM
D) Unplanned
Repair M
anhaul M
edium Truck
19-Opportune 028 - Buckets/Bowls/Body Buckets/Bowls Buckets/Bowls/B Buckets/Bowls/B Buckets/Bowls/Body UREP- No No
M
aintenance Rostered Buckets/Bowls/Body /Body ody ody - Unplanned
Unplanned (UOM
R) Buckets/Bowls/B Repair
ody
M
anhaul M
edium Truck
09-Unplanned 000 - PM
Service PM
Service PM
Service PM
Service PM
Service - PM
PM
Service UREP- No No
M
aintenance (UM
D) Service Unplanned
Repair M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Unplanned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair M
anhaul M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ PREP- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Planned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical PREP- No No
(PM
D) Electrical Planned
Repair
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical UREP- No No
Electrical Unplanned
Repair #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
09-Unplanned 013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter FAIL- No Yes
M
aintenance (UM
D),19- Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Failure
Opportune M
aintenance Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive
Rostered Unplanned ves s s - Drive
(UOM
R) Lines/Splitter
Box/Swing/Drive
s
M
anhaul M
edium Truck
09-Unplanned 014 - Differentials/Bevel Differentials/B Differentials/Bev Differentials/Bev Differentials/Bevel FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering evel Gears el Gears el Gears - Gears Failure
Gears/Steering Clutches Differentials/Bev
Clutches el Gears
M
anhaul M
edium Truck
09-Unplanned 012 - Torque Torque Torque Torque Torque Torque FAIL- No Yes
M
aintenance (UM
D) Convertor/Transmissio Convertor/Transmissio Converter/Tran Converter/Trans Converter/Trans Converter/Transmissio Failure
n n smission mission mission - Torque n
Converter/Trans
mission
M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 285 of 349
09-Unplanned 023 - Aircon Aircon Aircon Aircon Aircon - Aircon Aircon FAIL- No Yes
M
aintenance (UM
D) Failure
M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
09-Unplanned 023 - Aircon Aircon Aircon Aircon Aircon - Aircon Aircon UREP- No No
M
aintenance (UM
D) Unplanned
Repair
M
anhaul M
edium Truck
09-Unplanned 023 - Aircon Aircon Aircon Aircon Aircon - Aircon Aircon FAIL- No Yes
M
aintenance (UM
D) Failure
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair M
anhaul M
edium Truck
08-Planned M
aintenance 013 - Drive Drive Lines/Splitter Drive Drive Drive Drive Lines/Splitter PREP- No No
(PM
D) Lines/Splitter Box/Swing/Drives Lines/Splitter Lines/Splitter Lines/Splitter Box/Swing/Drives Planned
Box/Swing/Drives Box/Swing/Dri Box/Swing/Drive Box/Swing/Drive Repair
ves s s - Drive
Lines/Splitter
Box/Swing/Drive
s
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical PREP- No No
(PM
D) Electrical Planned
Repair
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes UREP- No No
M
aintenance (UM
D) Unplanned
Repair
M
anhaul M
edium Truck
09-Unplanned 014 - Differentials/Bevel Differentials/B Differentials/Bev Differentials/Bev Differentials/Bevel FAIL- No Yes
M
aintenance (UM
D) Differentials/Bevel Gears/Steering evel Gears el Gears el Gears - Gears Failure
Gears/Steering Clutches Differentials/Bev
Clutches el Gears
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 018 - Chassis/Frame/Cabin/ - SERV- No No
(PM
D) Chassis/Frame/Cabin/ Steer Axles Planned
Steer Axles Service
M
anhaul M
edium Truck
09-Unplanned 011 - Engine Engine Engine Engine Engine - Engine Engine FAIL- No Yes
M
aintenance (UM
D) Failure M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 026 - Grease System Grease System Grease Grease System Grease System - Grease System PREP- No No
(PM
D) System Grease System Planned
Repair M
anhaul M
edium Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 286 of 349
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D),19- Electrical Failure
Opportune M
aintenance
Rostered Unplanned
(UOM
R)
M
anhaul M
edium Truck
08-Planned M
aintenance 000 - PM
Service PM
Service - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ FAIL- No Yes
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Failure
Steer Axles Axles Axles Axles -
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection - SERV- No No
(PM
D) Planned
Service M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical PREP- No No
(PM
D) Electrical Planned
Repair
M
anhaul M
edium Truck
09-Unplanned 019 - LV Electrical LV Electrical Electrical Electrical Electrical - Electrical FAIL- No Yes
M
aintenance (UM
D) Electrical Failure M
anhaul M
edium Truck
09-Unplanned 016 - Brakes Brakes Brakes Brakes Brakes - Brakes Brakes FAIL- No Yes
M
aintenance (UM
D) Failure
M
anhaul M
edium Truck
08-Planned M
aintenance 001 - Inspection Inspection Inspection Inspection Inspection - Inspection PREP- No No
(PM
D) Inspection Planned
Repair
M
anhaul M
edium Truck
08-Planned M
aintenance 019 - LV Electrical LV Electrical - SERV- No No
(PM
D) Planned
Service
M
anhaul M
edium Truck
09-Unplanned 018 - Chassis/Frame/Cabin/ Chassis/Fram Chassis/Frame/ Chassis/Frame/ Chassis/Frame/Cabin/ UREP- No No
M
aintenance (UM
D) Chassis/Frame/Cabin/ Steer Axles e/Cabin/Steer Cabin/Steer Cabin/Steer Steer Axles Unplanned
Steer Axles Axles Axles Axles - Repair
Chassis/Frame/
Cabin/Steer
Axles
M
anhaul M
edium Truck
016 - Brakes Brakes Service Brake Brake Pad Service Brake Worn FAIL- No Yes
Assembly Assembly - Failure
Brake Pad #N/A #N/A
016 - Brakes Brakes Service Brake Brake Pad Service Brake Worn UREP- No No
Assembly Assembly - Unplanned
Brake Pad Repair #N/A #N/A
000 - PM
Service PM
Service - SERV- No No
Planned
Service #N/A #N/A
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 287 of 349
10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 288 of 349
hi ZX350/ZX330
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 289 of 349
tsu PC400
tsu PC300
tsu PC300
ntal PC200
ntal PC200
hi EX3600
8M
8M
8M
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 290 of 349
Rent Pump
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 291 of 349
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 292 of 349
85C
85C
85C
85C
85C
85C
89C
85C
85C
89C
85C
Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 293 of 349
77D Coal Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
85C
45
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 294 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 295 of 349
8R
8R
8R
8R
8R
8R
8R
8R
8R
8R
10T
10T
8R
8R
8R
8R
8R
8R
8R
8R
10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 296 of 349
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
10T
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 297 of 349
10T
10T
34
34
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
8R
8R
8R
NT Komatsu D65P-12
NT Komatsu D65P-12
10R
10R
10R
10R
10R
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 298 of 349
10R
10T
10T
10T
10T
10T
10T
10T
10T
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
NT Komatsu D85ESS
8R
8R
8R
8R
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 299 of 349
8R
8R
8R
D85ESS
D85ESS
D85ESS
D85ESS
D85ESS
tsu D65P-12
tsu D65P-12
tsu D65P-12
tsu D65P-12
34
34
34
34
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 300 of 349
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
err R984
err R984
err R984
err R984
err R984
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 301 of 349
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
err R984
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 302 of 349
err R984
hi ZX350/ZX330
tsu PC300
tsu PC300
tsu PC300
hi ZX350/ZX330
pillar 330D
pillar 330D
pillar 330D
pillar 330D
pillar 330D
ntal PC300
ntal PC200
ntal PC200
ntal PC200
ntal PC200
ntal PC200
ntal PC200
ntal PC200
ntal PC200
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 303 of 349
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 304 of 349
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
hi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 305 of 349
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX2500 OB
hi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 306 of 349
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 307 of 349
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
hi EX3600
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 308 of 349
hi EX3600
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX5500
hi EX2500 OB
hi EX2500 OB
hi EX2500 OB
tsu PC300
tsu PC300
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 309 of 349
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
6M
8M
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 310 of 349
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
8M
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 311 of 349
8M
8M
6H
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 312 of 349
SET
SET
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 313 of 349
Rent Pump
Rent Pump
Rent Pump
Rent Pump
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 314 of 349
e Truck Cat 740
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 315 of 349
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 316 of 349
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 317 of 349
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 318 of 349
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 319 of 349
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 320 of 349
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 321 of 349
85C
85C
85C
85C
Truck
Truck
Truck
40
40
40
40
40
40
40
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 322 of 349
40
40
40
40
40
40
40
40
40
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 323 of 349
40
40
40
40
40
89C
89C
89C
89C
89C
89C
89C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 324 of 349
89C
89C
89C
89C
89C
89C
89C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
Truck
Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 325 of 349
77D OB Truck
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 326 of 349
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
89C
89C
89C
89C
89C
89C
89C
89C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 327 of 349
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 328 of 349
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 329 of 349
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 330 of 349
85C
85C
85C
85C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
89C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 331 of 349
89C
89C
89C
89C
89C
89C
89C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 332 of 349
85C
85C
85C
85C
85C
Truck
Truck
Truck
Truck
Truck
Truck
Truck
Truck
Truck
77D Coal Truck
77D OB Truck
77D OB Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 333 of 349
77D Coal Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 334 of 349
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D Coal Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 335 of 349
77D Coal Truck
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 336 of 349
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
85C
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 337 of 349
77D Coal Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 338 of 349
77D Coal Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
77D OB Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 339 of 349
77D OB Truck
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 340 of 349
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
A40 Thiess
45
45
45
45
45
45
45
45
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 341 of 349
45
45
45
45
45
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 342 of 349
77E Coal Truck
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
A40 Intraco
A40 Intraco
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 343 of 349
77D OB Truck
77D OB Truck
85C
85C
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 344 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 345 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 346 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 347 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 348 of 349
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
m Truck
V 1.
0.
4 \\ Data at 24/10/2019 4:40:49 PM
- Printed by THIESS\\ARamadani Page 349 of 349