This IEE Checklist Report shall be used for proposed SUBDIVISION AND HOUSING PROJECTS
(i.e resettlement projects, economic and socialized housing project, open market housing) and
other similar (horizontal) land development projects to be located within Environmentally
Critical Areas (ECA).
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if
any, following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and
affected areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization
Scheme (PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO
2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces
provided or otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes
with check marks() are automatically required. Use additional sheets if necessary
and indicate this in the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC
issuance.
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Attach vicinity map/s and photographs of the project site and site development/layout plan and survey plan
approved by Geodetic Engineer.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
1. Residential lots
2. Commercial Area (e.g. banks,
restaurants, outlets, stores,
etc.)
3. Institutional Area (e.g. offices,
schools, etc. – please specify)
4. Amenities (e.g. swimming
pools, gym, Chapel, club
house, etc.)
5. Open/Common Spaces (e.g.
reception area, garden, parks,
etc.)
6. Road system
Primary/Main road
Secondary road
Alley
7. Common Parking area
8. Water supply system
9. Drainage system
10. Support facilities (e.g.
emergency generators, guard
houses/posts, etc.)
11. Waste Water Management
Facility
12. Solid waste management
facilities
13. Others, specify
____________________
(Use additional sheets if needed)
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Water m³/day
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation and frequency
LAND
Consistency with land Current land use w/in 1km radius See attached proof of compatibility with
use (as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
________________
Disturbance to wildlife Existing vegetation in the area: Compliance with conditions of DENR/LGU Annual inspection of area Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing Marshland
Permit
Grassland
Limit land clearing as much as possible
Mangrove
Provide temporary fencing to vegetation
that will be retained
Wetland Promote restoration of damaged or
Others, specify destroyed vegetation where possible (e.g.,
____________________ tree planting);
Soil/Land contamination Existing soil type in the area: Implementation of the Ecological Solid Daily inspection of Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal
clay Set-up temporary fence around the segregation
sandy-loam
construction area Daily inspection for presence
Others, specify
Implement re-use and recycling of waste of mixed garbage in the
materials facility
____________________
Implement proper segregation, collection Weekly inspection of waste
and disposal of domestic wastes in accumulated
designated areas Others, specify
Provide receptacles / bins for solid wastes ____________________
Coordinate with the municipal / city waste
collectors
Impairment of visual Presence of visually significant Implement landscaping and other Regular inspection of Cost integrated in the
aesthetics landforms/landscape/structures? beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
zones
Others, specify
Regularly monitor
________________
presence/absence of
complaints from adjacent
property owners
WATER
Increased siltation due Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality Strictly require the contractor and its Water treatment facility (i.e.,
degradation Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
Others, specify body: and proper sanitation
___________________ 0 to less than 0.5 km
Strictly observe proper waste handling and Quarterly monitoring of the
disposal following:
0.5 to 1 km
Provision of wastewater treatment facility pH
More than 1 km (e.g. oil and water separator, etc.) TSS concentration
If nearest/receiving water body is Set up silt trap/stilling ponds to minimize BOD
fresh water, specify classification:
downstream siltation
Total Coliform
AA
Provision of three-chambered septic tank
Color
for domestic sewage
A
Others, specify
Oil and Grease
B ___________
C
D
Competition in water Size of population using receiving Implement rainwater harvesting and similar Cost integrated in the
use surface water: measures as an alternative source of water Regularly monitor construction/ operation cost
Depletion of water ≤ 1,000 persons Observe water conservation measures presence/absence of
resources >1,000 and ≤ 5,000persons Careful selection of project site to avoid
complaints
Increased occurrence Is the project site located in an area Use appropriate design for project facilities Regularly monitor Cost integrated in the
identified by MGB/PAG-ASA as
of flooding
flood prone? Implement appropriate drainage system
presence/absence of
complaints
construction/ operation cost
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, generator, etc) presence/absence of construction/ operation cost
0.5 to 1 km Install when applicable, the appropriate air
complaints
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise Regularly monitor Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, generator, etc) presence/absence of construction/ operation cost
0.5 to 1 km Install when applicable, the appropriate
complaints
More than 1 km noise control device/s (e.g., mufflers, Regular monitoring of buffer
silencer, sound barriers, etc.) zones
Implement appropriate operating hours
Provide adequate buffer and/or planting of
trees
Others, specify
_____________________________
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance Regularly monitor Cost integrated in the
residents in the project ≤ 1,000 persons compensation packages presence/absence of construction/ operation cost
site and within its
>1,000 and ≤ 5,000persons Prioritize local residents for employment complaints
vicinity
Regular coordination with
Displacement of
>5,000person Promptly pay local taxes and other
LGU
financial obligations
Indigenous People
Classification of host barangay: Regular coordination with LGU Others, specify
Enhanced employment
Urban Prior consultation & coordination to
_________________
and/or livelihood
opportunities Rural minimize disruption on daily domestic
activities & respect for IP rights and
Reduced employment
Available services within/near the cultural practices
and/or livelihood
opportunities
host barangay: Ensure participation of IPs in consultations
Impacts on community Regular coordination with LGU Regularly monitor Cost integrated in the
health and safety Provide appropriate warning signs, lighting presence/absence of construction/ operation cost
Others, specify and barricades, whenever practicable complaints
____________________ Observe proper housekeeping Regular coordination with
LGU
Provide on-site medical services for any
Regularly monitor submission
emergency.
of reports to concerned
Participate in public awareness programs agency
on health and safety
Others, specify
Implement appropriate safety programs for _________________
both community and workers
Strictly comply with fire, safety and similar
regulatory requirements
Others, specify
________________________
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to the
best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising from
any misrepresentation or failure to state material information in this IEE Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.