INSPECTION & TEST RECORD-MECHANICAL

FAN SHAFT PULLEY ALIGNMENT

SLPG-Q-1000-03001-015-001-4-M-0402X

Project No.: Record No: GF/CMEI/ME/755


Equipment Tag No.: E-12010 B
Sub-System No.:

Plant/Unit: REGENERATION GAS COOLER Location: E & F AREA

Drawing No.: SLPG-S-120-0064-B01-003-001-1 Revision No.: D

Required-1005 mm

Actual-1005 mm

Plumbness of Fan Shaft: To be measured by attaching square master level to fan shaft.
Plumbness of Motor Shaft: To be measured by attaching square master level to fan shaft.
Level of Pulley Sheave: To be verified & confirmed using a staright edge.
Allowable Tolerance:

Note: This ITR to be used for Blower/Fan pulley alignment as well by recording applicable data.
Fan No. Plumb of Fan Shaft Plumb of Motor Shaft Level of Pulleys Remarks
A SOUTH +0.05 NORTH 0 Acceptable Acceptable
WEST 0 EAST +0.05

Sl. No. Other Checks to be Performed Remarks


1 Bolts tightened/torqued to requirement. Verified & Acceptable
2 Key & keyways undamaged. Verified & Acceptable
3 Pulley sheaves are clean & dry. Verified & Acceptable
4 Pulley run-out verified. Verified & Acceptable

Company Signature: Applicable Not Applicable

Record Acceptance Sub-Contractor QC Petrofac QC Company

Name INTEKHAB ALAM JOY THOMAS SIVAKUMAR AYILU

Signature

Date 03.12.2019 03.12.2019


Page 1 of 1