Negative and Zero sequence diagram. Shown in figure 1 and take base values as a generator
having largest rating
MCQS:
1) What percentage of fault occurring in the power system is line to line fault?
A) 5 %
B) 15 %
C) 25 %
D) 75 %
2) What percentage of fault occurring in the power system is line to Ground fault?
A) 5%
B) 15 %
C) 25 %
D) 75 %