SUM OF THE CENTER LINE ARAE CALCULATION

CENTER LINE = 46.98 m2

NUMBER OF THE JUNCTION = 8 LENGTH = CL - (WIDTH / 2 ) X 8


SUM OF CENTER LINE OF HORIZONTAL WALL +SUM OF CENTER LINE OF VERTICAL WALL
V1
1 5.62
2 9.53
3 9.53
24.68
H1
1 8.4
2 3.25
3 3.7
4 3.25
5 3.7
22.3
E CALCULATION

m2

= CL - (WIDTH / 2 ) X 8
LINE OF VERTICAL WALL
length (m) width (m) height
Sr . No item description no breadth depth (m) quantity
1 Earth work exavation in foundation
LENGTH = CL - (WIDTH / 2 ) X 8 1 43.38 0.9 1.1 42.9462
43.38 42.94 m3

2 B.B.C .C , FOR FOUNDATION


43.38 1 43.38 0.9 0.2 7.8084
7.80 m3

3 Brick work in cement mortar foundation


plinth:
Foundation: 1 44.98 0.5 0.3 6.747

1 st step : 6.74 m3
44.98
2 nd step:
45.38 1 45.38 0.4 0.3 5.4456
5.44 m3
3 rd step:
45.78 1 45.78 0.3 0.3 4.1202
4.12 m3
4 First class brick work in lime
mortar in super structure:
Dividiig wall between w.c & bath 1 43.6 0.2 3 26.16
wall infrint of w.c
43.6 2 2.06 0.1 3 1.236
1 1.3 0.1 3 0.39
First class brick work in lime 1 33.75 0.2 3 20.25
mortar in super structure:
Dividiig wall between w.c & bath 1 2.06 0.1 3 0.618
wall infrint of w.c 1 1.3 0.1 3 0.39
49.044
49.04 m3
Deduction:
DOOR
D1 7 1.2 0.2 2.1 3.528
D2 3 0.75 0.2 2.1 0.945
WINDOWS
W1 9 0.94 0.2 1.4 2.3688
W2 1 0.94 0.2 2 0.376
V 3 0.6 0.2 0.6 0.216
7.4338
41.6102
5 Earth filling in plinth:
Hall 2 3.7 3.3 0.6 13.1
Bed room 1 3.1 3.3 0.6 5.5
master bed room 2 3.7 3.3 0.6 13.2
Bath & wc open space 2 0.6 0.6 0.6 0.3
32.19426
32.19 m3
6 R.C.C Work in slab:(G.F0
L =8.4 1 8.4 9.5 0.125 9.975
B =5.7
R.C.C Work in slab:(F.F)
L =8.4 1 8.4 5.7 0.125 5.985
B =5.7
Deduction:
L =4.9 1 4.9 2.4 0.125 1.47
B=2.4 1 1.176
14.784
door and nos SIZE
window
D1 7 1.2 X 2.10
D2 2 0.75 X 2.10
W1 9 0.94 X 1.40
W2 1 0.94 X2.0
V 2 0.6 X0.6
length width (m) height quantity
Sr . No item description no (m) breadth depth (m)

1 Earth work exavation in foundation


LENGTH = CL - (WIDTH / 2 ) X 8 1 43.38 0.9 1.1 42.9462
43.38 42.94 m3

2 B.B.C .C , FOR FOUNDATION


43.38 1 43.38 0.9 0.2 7.8084
7.80 m3

3 Brick work in cement mortar foundation


plinth:
Foundation: 1 44.98 0.5 0.3 6.747
1 st step : 6.74 m3
44.98
2 nd step:
45.38 1 45.38 0.4 0.3 5.4456
5.44 m3
3 rd step:
45.78 1 45.78 0.3 0.3 4.1202
4.12 m3
4 First class brick work in lime
mortar in super structure:
Dividiig wall between w.c & bath 1 43.6 0.2 3 26.16
wall infrint of w.c
43.6 2 2.06 0.1 3 1.236
1 1.3 0.1 3 0.39
First class brick work in lime 1 33.75 0.2 3 20.25
mortar in super structure:
Dividiig wall between w.c & bath 1 2.06 0.1 3 0.618
wall infrint of w.c 1 1.3 0.1 3 0.39
49.044
49.04 m3
Deduction:
DOOR
D1 7 1.2 0.2 2.1 3.528
D2 3 0.75 0.2 2.1 0.945
WINDOWS
W1 9 0.94 0.2 1.4 2.3688
W2 1 0.94 0.2 2 0.376
V 3 0.6 0.2 0.6 0.216
7.4338
41.6102
5 Earth filling in plinth:
Hall 2 3.7 3.3 0.6 13.1
Bed room 1 3.1 3.3 0.6 5.5
master bed room 2 3.7 3.3 0.6 13.2
Bath & wc open space 2 0.6 0.6 0.6 0.3
32.19426
32.19 m3
6 R.C.C Work in slab:(G.F0
L =8.4 1 8.4 9.5 0.1 7.98
B =5.7
R.C.C Work in slab:(F.F)
L =8.4 1 8.4 5.7 0.1 4.788
B =5.7
Deduction:
L =4.9 1 4.9 2.4 0.1 1.176
B=2.4 1 1.176
11.592
Sr . No item description NOS UNIT PRICE

1 CEMENT OPC 43 1 RS 320


CEMENT OPC 53 1 RS 350
WHITE CEMENT 1 RS 900

2 BRICK 1 NOS 8

3 RIVER SAND N 46

4 STEEL
NON ISI 1 MT 44200
TMT 8mm 1 MT 44800
TMT 10-25 mm 1 MT 43300
RMS READY MADE STEEL 1 MT 48000
STIRRUPS 1 MT 49000

5 AGGREGATE
20 mm 1 CFT 30
40 mm 1 CFT 26

6 BITUMEN
GRADE 60/70 1 MT 45100
GRADE 80/100 1 MT 44124

7 BLACK GRANITE 1 SQF 180


GREEN MARBLE 1 SQF 90
WHITE MARBLE 1 SQF 90
KADAPPA 1 SQF 40
TANDOOR 1 SQF 38
KOTA 1 SQF 48
ITALIAN MARBILE 1 SQF 400
SHAHBAD 1 SQF 18
CEMENT TILE =12'' X 12'' 1 SQF 22

8 PALLING BLOCK 1 NOS 35


60 mm THICK M20 GRADE

9 WOOD WORK (DOOR & WINDOW) 1 M³ ???

10 LABOUR RATE
CARPENTER 1 NOS 850
PAINTER / PLUMBER 1 NOS 800
BITUMEN MASSON 1 NOS 800
LABOUR MAN 1 NOS 600
WOMEN 1 NOS 400
Sr . No item description MATERIALS REQURIED NO UNIT QTY

1 Earth work exavation in foundation EXAVATION 1


LENGTH = CL - (WIDTH / 2 ) X 8
43.38

2 B.B.C .C , FOR FOUNDATION CEMENT 1 1


43.38 SAND 1 1
AGGREGATE 1 1

3 Brick work in cement mortar foundation BRICK 1 1


plinth: SAND 1
Foundation: CEMENT 1
1 st step :
44.98
2 nd step: BRICK 1 1
45.38 SAND 1
CEMENT 1
3 rd step: BRICK 1 1
45.78 SAND 1
CEMENT 1
4 First class brick work in lime BRICK
mortar in super structure: SAND
Dividiig wall between w.c & bath CEMENT
wall infrint of w.c
43.6

First class brick work in lime


mortar in super structure:
Dividiig wall between w.c & bath
wall infrint of w.c

Deduction:
DOOR
D1
D2
WINDOWS
W1 CEMENT 1
W2 BRICK 1
V SAND 1
CEMENT 1
1
5 Earth filling in plinth:
Hall
Bed room
master bed room
Bath & wc open space
1
6 R.C.C Work in slab:(G.F0 CEMENT 1
L =8.4 SAND 1
B =5.7 AGGREGATE 1
R.C.C Work in slab:(F.F) STEEL 1
L =8.4
B =5.7
Deduction:
L =4.9
B=2.4
1
UNIT QTY UNIT TOTAL MATERIAL TOTAL
UNIT M L
REQURIED RATE unit QTY TOTAL QTY AMMOUNT
M³ 221 42.9462 9491.1102 2 750
9491.1102

PKG 5.025 350 7.8084 39.23721 13733.0235 9 750


CU.FT 15.89 46 124.075476 5707.471896
CU.FT 31.78 30 248.150952 7444.52856

NO 367 8 6.747 2476.149 19809.192 16 750


CU.FT 9.88 46 66.66036 3066.37656 16 900
CU.FT 2 350 13.494 4722.9 16 750
16 900

NO 367 8 5.4456 1998.5352 15988.2816


CU.FT 9.88 46 53.802528 2474.916288
CU.FT 2 350 10.8912 3811.92
NO 367 8 4.1202 1512.1134 12096.9072
CU.FT 9.88 46 40.707576 1872.548496
CU.FT 2 350 8.2404 2884.14

26.16

1.236
0.39
20.25

0.618
0.39
49.044
49.04 m3

3.528
0.945

NO 2 8 2.3688 83.2204 665.7632


CU.FT 367 46 0.376 15270.9434 702463.3964
CU.FT 9.88 350 0.216 411.108776 143888.0716
7.4338
M³ 41.6102 80 900
80 750
13.14214 8 750
5.516857
13.19676
0.338505
32.19426
M³ 221 32.19 m3 7114.9304217
PKG 6.12 350 90.4536 31658.76 20 900
CU.FT 15.13 46 7.98 223.6214 10286.5844 20 900
CU.FT 30.26 30 447.2428 13417.284 10.00 900
MT 80 44 1182.4 52025.6
4.788

1.176
1.176
M³ 14.78

293 9900
1500 Data
0 MATERIALS REQSum - UNIT QTY REQURIED Sum - UNIT RATE
0 AGGREGATE 62.04 60
0 BRICK 1468 70
6750 CEMENT 19.145 1758
0 EXAVATION 221
0 SAND 54.65 534
0 SAND 15.89 46
12000 STEEL 80 44
14400 (empty) 221
12000 Total Result 1699.725 2954
14400
0
0 Row Labels UNIT QTY REQURIED UNIT RATE
0 AGGREGATE 62 60
0 BRICK 1468 70
0 CEMENT 19 1758
0 EXAVATION 221
0 SAND 55 534
0 SAND 16 46
0 STEEL 80 44
0 (blank) 221
0 Grand Total 1700 2954
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
72000
60000
6000
0
0
0
0
0
18000
18000
9000
0
0
0
0
0
0
0

244050
Sum - MATERIAL TOTAL QTY Sum - TOTAL AMMOUNT
695.393752 20861.81256
21257.741 750357.7772
245.53681 57476.5067
9491.1102
795.90064 161588.497344
124.075476 5707.471896
1182.4 52025.6
16606.040621672
24301.047678 1074114.81652167
293

MATERIAL TOTAL QTY TOTAL AMMOUNT


695 20862
21258 750358
246 57477
9491
796 161588
124 5707
1182 52026
16606
24301 1074115
PLUMBING 66000
WOOD 45000
PAINT 49200
TILES 81600
ELECTRICAL 66000
PLUMBING-CP+ SANITARY 49200
MATERIALS COST 1431115
MAN POWER COST 244050
1675165
SQF 1288.5883204013

900 162