Beruflich Dokumente
Kultur Dokumente
Power Plant
Gross Nett Pembangkit
KWH KWH t
KRH – Unit 1 (PGE) 317746 281373.6299 2669.065
Buangan ke Rock GPP Shutdown Import SGSS Shutdown
Muffler (Hour) Energy (Hour)
USton hr KWH hr
0 0 0 0
Keterangan
Jam Awal Gangguan Jam Akhir Gangguan
(HH:mm) => gunakan (HH:mm) => gunakan
PLTP Status Gangguan
tanda petik satu (') tanda petik satu (')
sebelum mengetik jam sebelum mengetik jam
KRH – Unit 1 (PGE) FD1 (Forced Derating Immediate)
10:00 10:00
Derating
Lokasi Gangguan Penyebab Gangguan
(MW)
Temperature calculated
Temperature calculated
Cold Brine Operation Cold Brine & Condensate Reinjection (Flow Meter perlu kalibrasi)
Hot Brine Operation Tidak ada Press,Temp dan Flow indicator
perlu kalibrasi)
SUMUR TKS Status Sumur Keterangan
barg
KRH 4-2 0 Shut In NO PRESSURE GAUGE
KRH 4-3 38 Shut In
KRH 5-3 25 Shut In
Trottle Valve Opening
SEPARATOR Tekanan Suhu Level Brine (%)
Brine (%)
barg deg C % %
KRH 4 6 163.6 60 100
KRH 5 5.8 163.4 10 100
KRH 6 6.4 165.9 10 100
Trottle Valve Opening
Steam Flow Rata2 Brine Flow Rata2
Steam (%)
% t/hr t/hr
100
100
100 61.64
Suhu
Tekanan Interface
INTERFACE POINT Interface SCRUBBER Tekanan Scrubber
Point
Point
barg deg C barg
Interface KRH Unit 1 5.791 162.5 Scrubber KRH Unit 1 5.723
Suhu Scrubber
deg C
162.1
AREA Rencana Realisasi Kemarin Temuan Kemarin
Karaha