DPTO 101 2 850 850 DPTO 201 2 850 850 DPTO 301 2 850 850 DPTO 401 2 850 850 DPTO 501 4 1350 1350 TOTAL 4750 OTROS m² DOTACION PARCIAL(LT/D) DOTACION TOTAL(LT/D) AREAS VERDES 13.82 2 27.64 TOTAL 4777.64
DOTACION TOTAL 4777.64 L/D
CISTERNA 3583.23 L/D tanque elevado 1194.41 l/d
CALCULO DE LA CAPACIDAD DE ALMACENAMIENTO
DISEÑO DE CISTERNA VOLUMEN EFECTIVO(L/D) 3583 VOLUMEM EFECTIVO(m³) 3.58 AREA BASE (m²) 2.53 ALTURA EFECTIVA(m) 1.59 CALCULO DE REBOSE(") 2 ALTURA ENTRE TECHO Y ENTRADA(m) 0.2 ALTURA ENTRE ENTRADA Y REBOSE(m) 0.1 ALTURA ENTRE REBOSE Y AGUA(m) 0.05 ALTURA LIBRE (m) 0.35 ALTURA TOTAL(m) 1.94 3,58m³ 1,35m³