Air leake in to packing= a water Under ISM,during= All activities When are the high sea= when
seal line to the concerning the safety(SMS) the ship is shallow water
Basic procedure= A responsible Under ISM,the company= By When planning bunkering= To
person chart and/or job description minimize the risk of incompatibility Bungkering prosedur for= Under ISM,what kind= Continues Adequate resources and shore Whe you start a purifier=A magnetic coupling Bungkering prosedur on=the Under OPA-90= An English bunkering flag speaking person avable on Which of the parts is the pump shaft= No 2 During marpol by PSC= An oil What are item “S”= Strainer to film stop dirt from entering the Which way does the fluid= C from to B During marpol by port What are item “V”= Non-return state=The oily water screw dwon valves Why do main engine makers= To improve sealing surface Here are some capacities What is show top right= An eye of=140 mᶾ/hourse X 30 metres bolt Why is omportant= To ged the oil in to the cylinder when the Here are same capasities=5 What is the usual= 85 degre C m3/hourse X 25 metres Why are conventional=Because What is this component called= the cargo holds are cleaner How are bigle well “W”= By A lion return valve perforated plating Why is it necessary=To avoid What rigging= A wire sling the intrudaction How is the opening= By spring What type of screw is number You are in charge of a night= How is air leak= A water seal 4= A round head screw Stop bankering,and establish line to the packing What type of valve are fitted= You have checked= Clean the If the heated medium of= Non-return screw dwon valves system and change the oil Carbon formation What type of pump do you= A If you find it difficult to= All of piston pump thiese. What are items “W”= Cargo If you have a fuel= Zero (0) hold bilge wells
In the event of amajor oil= he What type of filters
would lose his job are=Perforated plate filters
Prior to bunkering= Do a What is item “5”= A mesh type
complete sounding of all strainer
Telephones are being= Stop What are items “S”= Strainer to
the bunkering until stop dirt from entering
To avoid over bunkering= When bunkering through=
Continuously monitor remote blank flanges should be gauge reading