Sr.
Comments / Observations by Railways Compliance/ Reply
No.
Major Observations (On Pile, Pile Cap, Pier, Pier Cap)
The soft copy of the design calculation sheets Noted. Soft copies of design excel files for both
5
and STAAD file used for Load analysis. Superstructure & substructures will be shared.
Geotechnical report is to be submitted with
duly signed by engineer in-charge of railway
6 Noted.
indicating the soil strata, N-value, type of soil
as per Is classification, pile capacity , SBC etc.
Observations of Drawings
Project thickness for lines depicting structural Noted. Proper *.ctb file will be checked & furnish
7
members and dimensions lines shall be used. further.
The signatures, designation, name of Road
8 authorities, Railway divisional authorities, Noted.
design consultant and proof checker are to be
Page 1 of 4
ANNEXURE-I
Page 2 of 4
ANNEXURE-I
Unsymmetrical section of Pier cap along the Unsymmetrical section of pier cap is shown in
i) Vertical axis is used, same may clarify or Section A-A
make correction in drawing.
The purpose for the different arrangement for
Noted. “09a” and “09b” can be combined into a
the bars marked “9”and (“9a” and “9b”) shall
ii) single bar.
be explained. The requirement for bar marked
“09b” shall be justified.
The bar marked “07a” is shear reinforcement in
pile cap and legs are only required for direct
The bar marked “07a” may be detailed as
iii) tension and moreover same is easier for
rings with leg arrangement.
construction.
Page 3 of 4
5
ANNEXURE-I
k
m
Thanking you,
For, Patel Vadodara - Kim Expressway Pvt. Ltd.,
Authorized Signatory
Vinay Shah
Vice President (Technical)