Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8

A A
Plant Peak Capacity : 5 m3/hr 1. From the jar test of similar effluent sample, it is found that the optimum process for FM Flow Meter
Plant Total Capacity : 110 m3/day this effluent is "appropriate & effective physico-chemical process followed by
Plant Operation Period : 22 hours. efficient biological process". So, the process has been selected accordingly. Gravity Flow
G

Dosing Pump

M
Centrifugal Pump

Effluent
B B
Chemical Solution

ML

Air

Fresh Water
Service Water
Line from WTP HRT Hydraulic Retention Time
G G G G G
Lime PAC PAM H2SO4/NaOH Nutrient 1
ML Mixed Liquor
Air G Air G G Air G Air G
G Gravity
P Pump
C C
Chemical Chemical Chemical Chemical Chemical
Mixing Mixing Mixing Mixing Mixing
Tank Tank Tank Tank Tank
G
Air Chemical Air Chemical Chemical Air Chemical Air Chemical
DP DP DP DP
Service Service Service Service Service
Tank Tank Tank Tank Tank

Activated Sludge Return

pH
Spent Caustic Storage Tank Bottom Drain Adjustment
Flow: 0.6 m3/day Flow: 1 m3/day
D Intermittent (once/5 days) Intermittent (once/day) Contact Stabilization Tank D
Agitator Agitator Cap. 5 m3
(120 ~ 140 rpm) (10 ~ 30 rpm) (RCC)

Ready for
Discharge

G G G G G G G
Plastic Tank DP DP Plastic Tank
Cap. 5000 L Cap.1500 L

FM
Stripped Sour Water
Flow Rate: 62.4 m3/day
Continuous Coagulation Tank Flocculation Tank
Cap. 300 L Cap. 3 m3
(RCC) (RCC) Secondary Post Aeration Tank
P Primary Clarifier Neutralization Tank Clarifier Cap. 5 m3
E G Cap. 5 m3 Capacity: 5 m3
G
Cap. 5 m3
(RCC)
E
(Metalic) (RCC) ML (Metalic)
ML

2.6 m3/hr 0.04 m3//hr 0.025 m3/hr

Coarse
Screen
Dry Sludge
Solids Mass
G G (Re-use)
FM
Screen Chamber
(RCC)
F Oil-Water Separator
Cap. 500 L F
(RCC)
Sludge Dry Sludge
G
Drying Bed Storage
(Natural Dry) Cap. 4 m3 Bio Reactor
Cap. 1 m3 (RCC) Cap. 70 m3
Filtrate
(RCC) (RCC)
Effluent

Air Air

Equalization Tank
Cap. 50 m3
G (RCC) G
Blower Blower

PROJECT: DWG. TITLE:


Design, Supply and Commissioning of ETP of
Capacity 5 m3/hr Process Flow Diagram C:\Users\HP\Google Drive\Utility System Design and Engineering\USDE-Customized\Knitex Dresses Ltd\USDE-KDL-Design & Drawing\bedc logo.png

H DWG. NO.: SCALE: SHEET:


H
Engr. Jahid Abedin Engr. Shohely Sarker Dr. Tarekh Rasul 04/12/2018
CLIENT: ETP 5-ARL-01-PFD/R1 NTS A3 1st Floor, R#12, H#11, Niketan,Gulshan, Dhaka-1212, Bangladesh
Engr. Jahid Abedin Engr. Shohely Sarker Dr. Tarekh Rasul 30/10/2018
Aqua Refinery Limited Mobile: 01882 433 779, 01714116342, Email: bedc.bd@gmail.com
Elite House, South Avenue Tower (2nd Floor), House # 50, Road # 3 ,7 Gulshan Avenue, Gulshan-1,
Dhaka-1212, Bangladesh. Ph: +88 02 9859998, 9857884, 9857890, 9857910, Fax: +88 02 9883681
PROJECT NO.: ETP - 05 DATE: 18/09/2018 REV. DESCRIPTION DRAWN CHECKED APPROVED DATE SIGNATURE WITH SEAL THIS DRAWING AND ALL INFORMATION CONTAINED HERE ON IS THE PROPERTY OF BEDC. MUST NOT BE
COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT.