Plant Peak Capacity : 5 m3/hr 1. From the jar test of similar effluent sample, it is found that the optimum process for FM Flow Meter
Plant Total Capacity : 110 m3/day this effluent is "appropriate & effective physico-chemical process followed by
Plant Operation Period : 22 hours. efficient biological process". So, the process has been selected accordingly. Gravity Flow
G
Dosing Pump
M
Centrifugal Pump
Effluent
B B
Chemical Solution
ML
Air
Fresh Water
Service Water
Line from WTP HRT Hydraulic Retention Time
G G G G G
Lime PAC PAM H2SO4/NaOH Nutrient 1
ML Mixed Liquor
Air G Air G G Air G Air G
G Gravity
P Pump
C C
Chemical Chemical Chemical Chemical Chemical
Mixing Mixing Mixing Mixing Mixing
Tank Tank Tank Tank Tank
G
Air Chemical Air Chemical Chemical Air Chemical Air Chemical
DP DP DP DP
Service Service Service Service Service
Tank Tank Tank Tank Tank
pH
Spent Caustic Storage Tank Bottom Drain Adjustment
Flow: 0.6 m3/day Flow: 1 m3/day
D Intermittent (once/5 days) Intermittent (once/day) Contact Stabilization Tank D
Agitator Agitator Cap. 5 m3
(120 ~ 140 rpm) (10 ~ 30 rpm) (RCC)
Ready for
Discharge
G G G G G G G
Plastic Tank DP DP Plastic Tank
Cap. 5000 L Cap.1500 L
FM
Stripped Sour Water
Flow Rate: 62.4 m3/day
Continuous Coagulation Tank Flocculation Tank
Cap. 300 L Cap. 3 m3
(RCC) (RCC) Secondary Post Aeration Tank
P Primary Clarifier Neutralization Tank Clarifier Cap. 5 m3
E G Cap. 5 m3 Capacity: 5 m3
G
Cap. 5 m3
(RCC)
E
(Metalic) (RCC) ML (Metalic)
ML
Coarse
Screen
Dry Sludge
Solids Mass
G G (Re-use)
FM
Screen Chamber
(RCC)
F Oil-Water Separator
Cap. 500 L F
(RCC)
Sludge Dry Sludge
G
Drying Bed Storage
(Natural Dry) Cap. 4 m3 Bio Reactor
Cap. 1 m3 (RCC) Cap. 70 m3
Filtrate
(RCC) (RCC)
Effluent
Air Air
Equalization Tank
Cap. 50 m3
G (RCC) G
Blower Blower
1 2 3 4 5 6 7 8