Sie sind auf Seite 1von 8

VIC/RL3

Sole-2 Well Completion Report


Australia Basic Data

APPENDIX 25
SOLE-2

Wireline Logging Report/


Operations Summary
-OMV-

Back to Contents
OMV AUSTRALIA

WIRELINE LOGGING REPORT

GENERAL WELL DATA


Well Name : SOLE-2 Suite : 1 Rig : Ocean Bounty
Permit : VIC/RL3 Date 1st Log : 17 Jul 2002 Date Last Log : 18 Jul 2002
Depth Ref. : RT Depth Ref. Elev : 25.00 m GL Elev. : m
Location Lat : 38 deg 06' 18.665"S Service Comp : Schlumberger Siesmic Ref : GSA91A-05 stn
Long : 149 deg 00' 28.997"E Engineer(s) : M. Al-Ayed/C. Scott 2210
Easting X: 676,059.10 Witnesses : R. Tolliday/I.Willis
Northing Y: 5,780,595.20

HOLE DATA
Hole Size : 12.25 " Survey Type : Total depth Max Hole Dev : 0.50 °
Driller's Depth ; 1,005.0 m Logger's Depth : 1005.1 m Max Dev Depth : 657.0 Meters
Sea Bed Temp : 8.00 ° C Max BHT : 46.00 °C

Hole Problems : Major washed out hole

CASING DATA

Casing String Shoe Depth Shoe Depth Casing OD Casing ID Weight Hole Size
(mRT) (mTVDRT) (") (") (lbs/ft) (")

30" 183.6 183.6 27.000 N/A 68.00 36.00


13 3/8" 649.8 649.8 13.380 N/A 68.00 17.50

WATER BASED MUD DATA


Date Mud Sample Date Time Circ Mud Type MW pH KCl Cl FL Barite Rmf Rm Rmc
Check Taken Circ Stopped Time (sg) (%) mg/l (%) Deg C Deg C Deg C
From (date/time) (hrs)

17 Jul 02 Flowline 16 Jul 02 23:45 1.10 KCL/PHPA/Glycol 1.12 9.0 5.0 43000 5.0 1.2 _0.1443 @ 19.5_° C _0.1590 @ 18.55° C _0.2398 @ 16.2_° C

SYNTHETIC / OIL BASED MUD DATA


Date Mud Sample Date Time Circ Mud Type MW MW Water Water Total Funnel Fluid Electrical Ester
Check Taken Circ Stopped Time (sg) Hot Phase Phase Solids Viscosity Loss Stability Water
From (Mins) (sg) CaCl2 Salinity (%) (ml) (mV) Ratio

WIRELINE RUN SUMMARY DATA


Date of Mud Check: 17/07/2002 Date / Time Circ. Stopped: 16 Jul 2002 23:45 Circ. Time (Hrs): 1.10

Run Run Date Tool String Max BHT Max BHT Date Time Logger Time Since Circ.
Number ºC Depth on Bottom Stopped (hrs)

2 17 Jul 2002 MDT-GR 42.20 920.5 17 Jul 02 18:25 18.65


5 18 Jul 2002 SWC-GR 1001.0 18 Jul 02 17:55 42.15

RUN SUMMARY DATA

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page: 1 of 2


SOLE-2 Suite 1

Run Tool String Log Log Repeat Repeat Comments


# From To Depth From To Depth
Depth Depth

1 PEX-HALS-HNGS 1003 649 870 750


2 MDT-GR 774 921
3 DSI-FMI-GR 1000 149
4 CSAT (VSP) 997 197
5 SWC-GR 1001 659 Shot 60,Misfire 1,Empty 7,Recovered 52
No thermometers run

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page: 2 of 2


OMV AUSTRALIA

WIRELINE LOGGING
Operations Diary / Time Summary

WELL NAME : SOLE-2 SUITE : 1


FIELD : SOLE SERVICE COMPANY : Schlumberger
PERMIT : VIC/RL3 ENGINEERS : M. Al-Ayed/C. Scott
LOCATION WITNESSES : R. Tolliday/I.Willis
Latitude: 38 deg 06' 18.665"S DATE FIRST LOG : 17 Jul 2002
Longitude: 149 deg 00' 28.997"E DATE LAST LOG : 18 Jul 2002
Easting (m): 676,059.10
Northing (m): 5,780,595.20

Time Time Elapsed Cumm. Logging


Date From To Time Time Code Event Description

Run Number : 1 PEX-HALS-HNGS


17 Jul 2002 03:00 03:05 0.07 0.07 Logging Hold JSA
03:05 04:00 0.92 0.99 Logging Rig up sheave wheels
04:00 04:30 0.50 1.49 Logging Make up tools
04:30 05:05 0.58 2.07 Logging Pre log calibration and load sources
05:05 05:15 0.17 2.24 Logging RIH and set compensators
05:15 05:25 0.17 2.41 Logging Start down log at 615mRT., casing shoe at
649.5m
05:25 05:30 0.08 2.49 Logging Log hung up at 848mRT, passed on third
attempt.
05:30 05:40 0.17 2.66 Logging Continue logging down to 918m, come up
05:40 05:50 0.17 2.83 Logging Log repeat section from 870 to 750mRT.
05:50 06:10 0.33 3.16 Logging Finish repeat, RIH to TD
06:10 06:15 0.08 3.24 Logging Logger on bottom. TD=1005.1m
06:15 06:20 0.08 3.32 Down Time Start logging up,tension not recorded,RIH back
to TD
06:20 06:40 0.33 3.65 Down Time Log up. HALS not powering up. Power down
tool and troubleshoot.. RIH back to TD
06:40 06:50 0.17 3.82 Logging Back to TD, powering up OK
06:50 07:40 0.83 4.65 Logging Log up main pass, at shoe 649m
07:40 07:55 0.25 4.90 Logging POOH from shoe
07:55 08:00 0.08 4.98 Logging Tool check,remove sources
08:00 08:45 0.75 5.73 Logging Rig down tools
Cumulative Run Time (Hrs): 5.73

Run Number : 2 MDT-GR


17 Jul 2002 08:45 09:45 0.99 0.99 Logging Pick up and make up tools
09:45 10:15 0.50 1.49 Logging Calibrations and function test on drill floor
10:15 10:30 0.25 1.74 Logging Zero at Probe
10:30 11:20 0.83 2.57 Logging Run in Hole. Wait at shoe for guages to stabise
11:20 11:40 0.33 2.90 Logging Log down and start correlation. Adjust log

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page 1 of 5


SOLE-2 Wireline Operations Diary

Time Time Elapsed Cumm. Logging


Date From To Time Time Code Event Description
down 1.5m.
11:40 12:16 0.60 3.50 Logging Run to first pretest point and stabilise
12:16 14:45 2.48 5.98 Logging Take 10 pretests from 773.7m to No. 10 at
810m
14:45 16:00 1.25 7.23 Logging Take first gas sample at 810m
16:00 16:15 0.25 7.48 Down Time Reboot computors
16:15 18:25 2.17 9.65 Logging Continue pretests to 920.5m. Logger on
bottom
18:25 19:20 0.92 10.57 Logging Correlation Pass add 0.2m, Prepare data for
transmisssion to town.
19:20 20:50 1.50 12.07 Logging Check points for gas sampling. Multiple no
seals. Move down
20:50 21:40 0.83 12.90 Logging Taking second gas sample at 778m. Pump out
approx. 30 mins, 1 dump chamber 2 smaller
chambers
21:40 22:50 1.17 14.07 Logging Move to water sampling point. at 866.5m.
Pretest Good. StartPumping. approx 30 mins.
Prep to sample. Tool plugged
22:50 23:10 0.33 14.40 Lost Time Attempt to unplug probe, probably sand grains.
Set in washed out zone. Cleared OK, move
down to same point.
23:10 23:38 0.47 14.87 Logging Back to 866.5m. Try pretest,attempt 2nd
drawdown, OK.. Start pumping. Seal Failure
23:38 23:39 0.02 14.89 Logging Move to 868.2m. Do pretest, OK. Start PO
23:39 00:05 0.43 15.32 Logging Probe plugged , abort sample, POOH
18 Jul 2002 00:05 00:45 0.67 15.99 Logging Tool on surface, break down/lay down tool
00:45 01:30 0.75 16.74 Logging Tools laid down
Cumulative Run Time (Hrs): 22.47

Run Number : 3 DSI-FMI-GR


18 Jul 2002 01:45 02:27 0.69 0.69 Logging Pick-up /make-up tool string
02:27 02:30 0.05 0.74 Logging RIH and compensate
02:30 02:51 0.35 1.09 Logging at casing shoe, log down
02:51 03:35 0.73 1.82 Logging Logger on bottom, log up
03:35 03:42 0.12 1.94 Logging at shoe, stop main log, close calipers
03:42 04:40 0.97 2.91 Logging log DSI until loss of signal, GR to seabed
04:40 04:51 0.18 3.09 Logging string at surface, rig down
04:51 05:00 0.15 3.24 Logging rig down, lay down tools.
Cumulative Run Time (Hrs): 25.71

Run Number : 4 CSAT (VSP)


18 Jul 2002 05:00 05:30 0.49 0.49 Logging Picked-up/made-up tool string
05:30 05:35 0.08 0.57 Logging ran-in hole to 200 mRT
05:35 06:50 1.25 1.82 Lost Time waited for guns to be put in water
06:50 08:10 1.33 3.15 Logging RIH acquiring data at 200, 600 and 800 mRT
08:10 08:17 0.12 3.27 Logging pulled back to 770 mRT and made correlation

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page 2 of 5


SOLE-2 Wireline Operations Diary

Time Time Elapsed Cumm. Logging


Date From To Time Time Code Event Description
run. 0.7m deep
08:25 08:30 0.08 3.35 Logging ran in to TD
08:30 08:35 0.08 3.43 Logging tag TD, open calipers move to 1000 mRT, first
up level
08:35 10:05 1.50 4.93 Down Time no hydrophone signal, trouble shoot and retune
guns
10:05 12:38 2.55 7.48 Logging Started acquiring data at 10m intervals, where
possible, from 1000 mRT
12:38 13:50 1.20 8.68 Logging From level 27 (770m, tool depth, 767 sensor
depth) and continue shooting
13:50 14:27 0.62 9.30 Logging At shoe, continue shooting through casing.
14:27 15:00 0.55 9.85 Logging POOH to surface after poor signal in casing
15:00 15:30 0.50 10.35 Logging Rig down hydrophones and guns out of water.
Wait on cranes.
Cumulative Run Time (Hrs): 36.06

Run Number : 5 SWC-GR


18 Jul 2002 15:30 16:00 0.49 0.49 Logging Hold JSA for rigging up of CSTs(Sidewall
cores) gun and request radio silence.
16:00 17:00 1.00 1.49 Logging Rig up CST tools. Late notice on guns and shot
numbers.
17:00 17:33 0.55 2.04 Logging RIH and set compensators
17:33 17:50 0.28 2.32 Logging Correlation Pass. Deep by 1.2m
17:50 17:55 0.08 2.40 Logging Logger on bottom
17:55 19:10 1.25 3.65 Logging First shot at 1001m. Continue shooting. Shot
60.
19:10 19:15 0.08 3.73 Logging Finished shooting at 659m. POOH to 200m
19:15 19:38 0.38 4.11 Lost Time Requested and wait on radio silence
19:38 19:54 0.27 4.38 Logging Rig down guns
19:54 20:15 0.35 4.73 Logging Rig down sheaves. Rig back to DODC
Cumulative Run Time (Hrs): 40.79

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page 3 of 5


SOLE-2 Wireline Operations Diary

Time Time Elapsed Cumm. Logging


Date From To Time Time Code Event Description

Wireline Logging Time Summary

Down Logging Lost Time Total


Time

CSAT (VSP) 1.50 7.60 1.25 10.35

DSI-FMI-GR 0.00 3.24 0.00 3.24

MDT-GR 0.25 16.16 0.33 16.74

PEX-HALS-HNGS 0.41 5.32 0.00 5.73

SWC-GR 0.00 4.35 0.38 4.73

Total 2.16 36.67 1.96 40.79

Units in decimal hours

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page 4 of 5


SOLE-2 Wireline Operations Diary

Wireline Logging Detailed Time Breakdown

1 2 3 4 5 Total

After Survey 0.08 - - - - 0.1


Tool Checks
Correlation Pass - 0.92 - 0.12 0.28 1.3

Hold JSA 0.07 0.02 - - 0.49 0.6

Log Down 0.42 0.80 0.35 1.33 - 2.9

Log Main Pass 0.91 7.23 1.82 4.37 1.25 15.6

Log Repeat 0.17 - - - - 0.2


Section
Logger On 0.17 2.17 - 0.08 0.08 2.5
Bottom
Lost Time due to - 0.33 - - - 0.3
Other
Lost time due to - - - - 0.38 0.4
rig
Make Up Tools 0.50 0.99 0.69 0.49 1.00 3.7

POOH 0.25 0.43 - 0.55 0.08 1.3

Pre Log Tool 0.58 0.75 - - - 1.3


Checks
Re-acquire data 0.08 - - - - 0.1

Reboot - 0.25 - - - 0.3


Computers
Rig Down - - - - 0.35 0.4
Sheaves
Rig Down Tools 0.75 1.42 0.33 0.50 0.27 3.3

Rig up Sheave 0.92 - - - - 0.9


Wheels
RIH 0.50 1.43 0.05 0.16 0.55 2.7

Trouble Shoot 0.33 - - 1.50 - 1.8


Tools
Wait on Cranes - - - 1.25 - 1.3

Total 5.73 16.74 3.24 10.35 4.73 40.79


Units in decimal hours

Copyright © Petroleum Data Systems International Pty Ltd 2002 Page 5 of 5