Energy Infrastructure Professional with more than 22 years of world wide experience in
Combined Cycle Gas Power Projects and Thermal Power Projects ( APGENCO, India; GE,
Semb Corp, Sumitomo & Toshiba - Singapore & Malaysia.)
Lead Combined Cycle Gas Power Projects and Thermal Power Projects in Singapore,
Malaysia and India. (750 MW CCPP, 210MW, 600, 800 MW Thermal Power Plants.).
Involved in Preparation of Energy Audit Guidelines for Sri Lanka Government’s Combined
Cycle Gas Power Projects.
Outstanding performance in managing Combined Cycle Gas Power /Thermal Power Projects
EPC contracts, Commissioning, Operation & Maintenance, Outage and asset management,
Renovation & Modernization / Turnaround & Performance Analysis, Financial & Commercial
management, Fulfillment management, Budgeting, EHS and Quality Management
Strong Techno, Commercial and financial expertise in Life Cycle Analysis of Contracts and
Plants, Projects planning and execution, Periodic Reviews, Maintaining Customer
relationships, Power Purchase Agreements, O&M Contracts, Fuel supply Agreements and
Vendor Contracts.
Work Closely with Leadership in fulfilling the Company goals and business growth.
Lead all type of Large Power Stations and produce financial and operating targets.
Notable Accomplishments:
Awards received
Special Award by M/s. General Electric International Inc, Singapore for outstanding
performance in management of 750 MW CCPP (9FA+e GT’s)
Driven a culture for EHS & Compliance and Recorded ZERO EHS issues.
1 of 5
Laid the way for CONTINUOUS IMPROVEMENTS and ensured early availability and
reliability of Combined Cycle Power Train in Singapore, Malaysia and India.
Closer coordination & resource management resulted in huge Cost savings and quality
controls in CCPP and Large capacity Thermal Power Projects.
Academic Details:
Professional Enhancements:
GE Energy, USA, Contract Performance Manager Course (Project General Manager) to Lead
Power Projects. 18 months curriculum of GE Energy, USA.
National Institute of Occupational Safety and Health (NIOSH) Training at 750MW, TNB,
TJPS, Phase-2, CC Gas Power Project, Port Dickson, Malaysia.
Gas Turbine Mark-V Maintenance at GTPS; Vijjeswaram by M/s. General Electric: USA
and M/s Sumitomo Corporation, Ltd, Japan.
26 weeks Operation & Maintenance training for Operation of Thermal Power Plants at 1260
MW, VIJAYAWADA THERMAL POWER STATION, APSEB, Training institute as per the
Indian Electricity act 1956. AP, India.
First aid & Safety training programme by St. Johns Medical Services, Secunderabad, India.
2 of 5
Employment History:
May 2012 –
Present
Divisional Engineer (E&M)
AP.Power Generation Corporation Ltd /India. 600MW Kakatiya Thermal Power
Project.
Responsible for managing all aspects of 1X600MW, Thermal Power Project EPC
contract and Commissioning. Reporting to CE, Director and CMD on key performance
strategies, targets and achievements.
Aug 2009 –
Apr 2012
Lead Contract Performance Manager (Singapore, Malaysia)
General Electric International Inc. / Singapore. 750MW, Combined Cycle Gas
Power Plants.
Responsible for Managing Operation & Maintenance of Gas Power Plants, GE Energy
Contractual Service Agreements, Power business and all aspects of Power Station
including Commercial, Financial and Technical management.
Duties:
Erection of Gas Turbine and its auxiliaries.
Preparation of Commissioning procedures for Gas Turbine Generator and its
auxiliaries (Mechanical, Electrical, C&I and O&M)
Commissioning of GTG, Mechanical, Electrical Systems and C&I Systems.
Conducting Grid Code test, PG test.
Operation and Maintenance of Combined Cycle Gas Power Plant (Mechanical,
Electrical & Controls).
RCA of Unit tripping and suggesting remedial solutions.
Train Customer fleet for operation and maintenance of Power train.
Mar 1997 –
Sep 2007
Asst. Divisional Engineer (Electrical, Controls and Instrumentation)
Andhra Pradesh Power Generation Corporation Ltd, India/AP Gas Power
Corporation 272 MW Gas Power Plant
4 of 5
Erection, Commissioning and Maintenance of Gas Filtration system.
Sep 1993 –
Mar 1997
Assistant Engineer (Controls & Instrumentation)
Andhra Pradesh State Electricity Board, 1760 MW Vijayawada Thermal Power
Station, AP, India.
Working as Asst. Engineer Operation and Maintenance for Stage-II, 210MW, Thermal
Power Unit of 1760 MW, Vijayawada Thermal Power Station, Ibrahimpatnam.
5 of 5