Based on SK-2 Project (Vatrak dam to be filled up by NMC irrigation pipeline) and Local source
STATEMENT NO. 10 DETAILS OF PIPE REQUIRED FOR RISING MAN, GRAVITY MAIN & DISTRIBUTION SYSTEM
St. Name of sub work Length in Meter
No. DI K-9 DI K-7 PVC 6kg/cm2 300mm 200mm 450mm 400mm 300mm 250mm 200mm 150mm 200mm 160mm 140mm 110mm 90mm Rising Main/ Gravity Main 2 Gravity Main from Sundarpura ESR of SK2 project to Gabat 1600 1200 940 1641 road main head works ESR at Jagana talav ESR and different sump filling. (Direct supply at sub HW) 2A Gravity Main from Gabat road Main ESR connecting different 1140 7751 3536 hamlets 3 Rising Main from Ramnath Talav Well to ESR at Gabat road 1446 5 Rising Main from Gabat road main HW sump to Main ESR 30 5B Rising Main from Barotvas sump to ESR 10 5C Rising Main from Barotvas sump to Raval vas ESR 313 5D Rising Main from Gabat road main HW sump to Jagana talav 794 ESR Total 30 2563 1600 1200 940 1641 1140 0 0 7751 3536 Distribution System 9 From Gabat road ESR 10 574 1284 944 631 722 4207 9A From Bhukhel road ESR 60 963 82 251 343 2115 1663 9B From Jaga na talav ESR 29 96 182 112 625 1212 459 9C From Bagicha ESR 73 551 137 93 241 113 10 From Barot vas ESR 10 24 300 292 323 247 10A From Raval vas ESR 270 50 265 222 268 Total 99 657 1380 1907 1109 850 2249 4835 6957 Distribution System for hamlets Sundarpura 100 800 Arjan vav 100 600 Dhadusia Math 400 Kansa na falia 200 Adana Chhapra 200 Total 0 0 0 0 0 0 0 200 2200 Based on SK-2 Project (Vatrak dam to be filled up by NMC irrigation pipeline) and Local source STATEMENT NO. 10 DETAILS OF PIPE REQUIRED FOR RISING MAN, GRAVITY MAIN & DISTRIBUTION SYSTEM
Consulting Engineer Services(I) Pvt. Ltd.
Based on SK-2 Project (Vatrak dam to be filled up by NMC irrigation pipeline) and Local source
STATEMENT NO. 10A
DETAILS OF PUMPING MACHINERY
Sr. Location Details of Machinery
No. Type Discharge Head (m) H.P. No. of Stand by Total (LPM) sets EXISTING MACHINERY 1 TW No.1, 2, 3 & 5 Sub pump 25000 12.5 1 0 1 2 Well No.1 Sub pump 40000 15 1 0 1 3 Well No.2 Sub pump 40000 15 1 0 1 PROPOSED MACHINERY 4 Ramnath talav well for ESR Gabat road HSCF 2000 55 35 1 1 2 5 U/G sump at Gabat road main HW - for ESR Gabat Mono sub 2000 30 20 1 1 2 road 6 U/G sump at Gabat road main HW - for ESR Jagana Mono sub 2000 30 20 1 1 2 Talav 7 U/G sump at Bhukhel road for ESR Mono sub 2000 30 20 1 1 2 8 U/G sump at Bagicha sump for ESR Mono sub 2000 30 20 1 1 2 9 U/G sump at Barotvas for Barotvas ESR Mono sub 1500 27 15 1 1 2 10 U/G sump at Barotvas for Ravalvas ESR Mono sub 1500 27 15 1 1 2