6.0 DRAINAGE STRUCTURE
Min. = 12d 13.0 OTHERS
6.1 EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE
Max. = 15d
STRUCTURES SHALL BE CHECKED IN THE FIELD. ADJUSTMENTS MAY BE MADE TO
20mmØ Min. 13.1 WHEN SOIL AT LOWER PORTION OF THE SLOPE IS REQUIRED TO BE REMOVED,
SUIT ACTUAL FIELD CONDITIONS WITH APPROVAL OF THE ENGINEER. DIAMETER = 36mmØ Max. EXCAVATION SHOULD BE DONE AT THE HEAD PORTION FIRST PROGRESSING
6.2 EXISTING DRAINAGE STRUCTURES OR PARTS THEREOF REMOVED BY THE 12.3 BAR SHALL BE BENT COLD, NO BAR PARTIALLY EMBEDDED IN CONCRETE SHALL TOWARDS THE BOTTOM IN ORDER TO MAINTAIN THE STABILITY OF LANDSLIDE
CONTRACTOR WHICH ARE STILL SERVICEABLE SHALL BE DEPOSITED AT A PLACE BE FIELD BENT, UNLESS SHOWN ON THE DRAWING OR ESPECIALLY PERMITTED AND SLOPE FAILURE AREA.
DESIGNATED BY THE ENGINEER WITHIN THE PROJECT SITE WITHOUT ANY BY THE ENGINEER. HOOKS SHALL BE FABRICATED AS SHOWN BELOW UNLESS
13.2 THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS OF AND PROVIDE
COMPENSATION. EXTREME PRECAUTIONS SHALL BE EXERCISED BY THE CONTRACTOR OTHERWISE INDICATED ON THE DRAWING. BAR SHALL BE BENT AROUND A PIN
ACCESSIBILITY FACILITIES FOR PERSONS WITH DISABILITY IN ACCORDANCE
WITH A MINIMUM DIAMETER D.
SO AS NOT TO DAMAGE THESE MATERIALS DURING THE REMOVAL AND HANDLING.
WITH D.O. 37, SERIES OF 2009.
7.0 ROAD SIGNS 13.3 THE CONTRACTOR SHALL CONDUCT PRE-CONSTRUCTION SURVEY. IN CASE OF
CONFLICT AND DISCREPANCY BETWEEN PLANS, SCHEDULES AND SECTIONS, AND OTHER
7.1 ROAD SIGNS SHALL CONFORM WITH THE HIGHWAY SAFETY DESIGN STANDARDS PART 2: ENGINEERING WORKS, THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR
ROADSIGNS AND PAVEMENT MARKINGS MANUAL OF THE DEPARTMENT OF PUBLIC WORKS ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION.
AND HIGHWAYS, SERIES OF 2004.
SIZES OF 90 - DEGREE AND 180 - DEGREE HOOKS 13.4 THE HORIZONTAL AND VERTICAL CONTROL INCLUDING OTHER SURVEY DATA, PREVIOUSLY
8.0 MISCELLANEOUS STRUCTURES APPROVED PLANS/ REPORTS AND OTHER REFERENCES WERE PROVIDED BY THE UPMO-FCMC.
d
8.1 LOCATION AND LENGTH OF SLOPE PROTECTIONS, GUARDRAILS, STONE MASONRY D
RETAINING WALLS AND OTHER STRUCTURES MAY BE ADJUSTED BY THE CONTRACTOR
TO SUIT ACTUAL FIELD CONDITIONS WITH THE APPROVAL OF THE ENGINEER. D
12d
8.2 CONSTRUCTION OF SIDE SLOPE SHALL FOLLOW THE STEPS OF EMBANKMENT CONSTRUCTION 4d OR
90° 180°
METHOD TO AVOID SLIDING OF FILL MATERIALS. 63mm
8.3 SLOPE STAKED SHALL DEPEND ON THE STABILITY OF MATERIALS. PIN DIAMETER D = 6d FOR 10mmØ THRU 25mmØ
9.0 REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION D = 8d FOR 30mmØ THRU 36mmØ
D
10.1 ROAD CLASSIFICATION DICTATES THE RIGHT OF WAY LIMITS.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DATE:
BUREAU OF DESIGN STANDARD REINFORCED
MANILA CHECKED:
CONCRETE HEADWALL FOR RCPC