Broms Free Head Piles in Cohesive Soil (OVERTURNING)

Moment (working) M = 102.0 kN.m


Leverarm e = 7.5 metres
(F.O.S.) = 1
Bored Pier Diameter B = 0.75 metres
Soil Shear c= 50 kPa
P = 13.6 kN P=(F.O.S.)M/e (factored)
f = 0.04 metres f = P/9cB
M(max) = 117.57 kN.m M(max) = P( e + 1.5B + 0.5f )
g = 1.18 metres The picture can't be display ed.

M max
g 
2 . 25 cB
L req = 2.35 metres
L req  1 .5 B  f  g
The picture can't be display ed.

UPLIFT CHECK

Uplift force (working) 35.00 kN x= 0.98 metres


Depth 1.70 metres Base of large cone = 2.71 metres
Diameter 0.75 metres Volume of large cone = 4.53 m3
Unit weight of soil 18.00 kN/m3 Mass of soil 66.25 kN
Volume of concrete cylinder 0.75 m3 Mass of concrete cylinder 18.02 kN
Depth of small cone y = 0.650 metres Total resistance to uplift = 84.28 kN
Volume of small cone = 0.10 m3 FOS 2.41

BEARING CAPACITY OF BORED PIER

Vertical Down Force 35.00 kN Allowable bearing Capacity 150.00 kPa


Depth 1.70 metres Allowable Skin Friction 10.00 kPa/m2
Diameter 0.75 metres Base Bearing Capacity 66.27 kN
Unit weight of soil 18.00 kN/m3 Skin Friction Capacity 40.06 kN
Bearing Area 0.442 m2 Total Bearing Capacity 106.32 kN
Skin Surface area 4.006 m2 FOS 3.04