Sie sind auf Seite 1von 2

Glycol Surge Drum- 1/2

BBS-V-012 / Glycol Surge Drum Data Sheet


Engineered by:
Document No. BBS-10-W8-DS-011
Project No. 90814
Project Name/Location Pengadaan & Pemasangan Dehydration Unit (DHU) Rev C Prepared P.W
Package Fasilitas Produksi LapanganBambu Besar Date 16-May-19 Checked H.I
End User PT. Pertamina EP BBS & ABS Dev Project Approved M.G
Customer PT Promatcon Tepat Guna

Equipment Tag No. BBS-V-012 Onshore/Offshore Onshore


Equipment Name Glycol Surge Drum Sour Service No NACE Region NA
Service Lean Glycol Quantity 1

DESIGN BASIS
LG4-Lean TEG LG3-Lean TEG
Operating condition Imperial Inlet Outlet
Design condition
Temperature [F] 163 163 Temperature [F] 450
Pressure [psig] 4.05 4.05 MDMT [F] 32
[lb/h] 1,081.33 1081 Pressure [psig] 51
[MMSCFD]
[ft3/min] 0.27 0.27

Density [lb/ft3] 67.23 67.48 Glycol Loss [USGal/MMSCF] 0.1


Viscosity [cp] 7.32 7.32 Gas Flowrate [MMSCFD] 7.70
Surface tension [dyne/cm] 40.96 40.96 Total Losses [USGal/day] 0.77
Molecular weight [kg/kgmol] 147.08 147.08 Total Consumption in:
p CO2 [psia] 0.24 Estimated Consumption TEG 14 days [USGal] 10.78
p H2S [psia] 0.000 [ft3] 1.44

VESSEL SIZING
Type Horizontal Head Type [Elliptical 2:1] 1-Jan-00
Vessel I.D [ft] 2-5.9" 2.46
[mm] 750
Vessel T/L - T/L [ft] 3-3.8" 3.28
[mm] 1000

SIZING BASIS
Glycol Inventory [ft3] [m3]
Glycol Contactor Not Applicable 0.00 0.00 Total Volume for Glycol Inventory : [ft3] 3.15
Lean Glycol/Dry Gas Heat Exchanger Not Applicable [m3] 0.09
Dry Gas Knock Out Drum Not Applicable 0.00 0.00
Glycol Skimmer Not Applicable 0.00 0.00
Glycol Solid Filter Not Applicable 0.00 0.00
Glycol Charcoal Filter Not Applicable 0.00 0.00
Not Applicable 0.00 0.00
Rich/Lean Glycol Heat Exchanger Applicable 0.50 0.01 Total Consumption TEG for whole pkg in 0
Glycol Reflux Condenser Applicable 1.50 0.04 days: [ft3] #REF!
Glycol Reboiler Not Applicable 0.00 0.00 [m3] #REF!
Glycol Still Column Applicable 0.00 0.000 Total Consumption TEG for whole pkg in 0
Stripping Column Applicable 0.04 0.00 days: [ft3] #REF!
Glycol Surge Drum Not Applicable 0.00 0.00
Glycol Circulation Pump Not Applicable 1.00 0.03
Est. Piping Vol : 3.5 Applicable 0.11 0.00 [m3] #REF!

GLYCOL OUTLET SECTION


Active length [ft] 3-3.8" 3.28 19.50
[mm] 1,000

Level designation Levels from BOV Glycol Volume in Outlet Section Delta Vol. Level/Vol. Ret. Time
[mm] [inch] Cylinder [ft3] Head [ft3] Total [ft3] [ft3] [%] [min]

TOV (top of Vessel) 750 29.53 15.60 3.90 19.50 2.63 100 / 100 8.94
HHLL 600 23.62 13.38 3.49 16.87 4.24 80 / 87 14.43
HLL 460 18.11 10.03 2.60 12.63 0.17 61 / 65 0.57
Stop Make-Up Level** 455 17.91 9.90 2.56 12.47 1.69 61 / 64 5.75
Start Make-Up Level** 405 15.94 8.59 2.18 10.78 0.17 54 / 55 0.58
NLL 400 15.75 8.46 2.14 10.61 3.41 53 / 54 11.60
LLL 300 11.81 5.83 1.37 7.20 3.18 40 / 37 10.81
LLLL 200 7.87 3.34 0.68 4.02 4.02 27 / 21 13.70
BOV (bottom of Vessel) 0 0 0.00 0.00 0.00

* NLL is not exist since the level is always decreasing due to losses of TEG
- Inventory for TEG Make Up between Start-Make Up Level - Stop Make Up Level: 1.69 [ft3] Ok > Required for 14 Days Losses
- Total Inventory of TEG from Stop Make-Up Level to HHLL: 4.41 [ft3] Ok > Total TEG Inventory
#REF! 2/2

BBS-V-012 / Glycol Surge Drum Data Sheet


Engineered by:
Document No. BBS-10-W8-DS-011
Project No. 90814
Project Name/Location Pengadaan & Pemasangan Dehydration Unit (DHU) Rev C Prepared P.W
Package Fasilitas Produksi LapanganBambu Besar Date 16-May-19 Checked H.I
End User PT. Pertamina EP BBS & ABS Dev Project Approved M.G
Customer PT Promatcon Tepat Guna

Equipment Tag No. BBS-V-012 Onshore/Offshore Onshore


Equipment Name Glycol Surge Drum Sour Service No NACE Region NA
Service Lean Glycol Quantity 1

DESIGN SUMMARY
Design Code ASME SEC.VIII DIV.1
U-Stamp / MIGAS No / Yes Flange
Nozzle ID Qty Description
Type Horizontal Size (in) Rating Face
Fluid name Lean Glycol N1 1 1 150# RF Glycol Inlet
Lethal service No N2 1 1 1/2 150# RF Glycol Outlet
Special service No N3 1 2 (HOLD) 150# RF PSV Outlet Nozzle
Operating temperature [F] 163 N4 1 3/4 150# RF Drain from Reboiler
Design temperature [F] 450 MDMT 32 N5 1 3/4 150# RF Equalizing Line
Operating pressure [psig] 4.05 N6 1 3/4 150# RF Glycol Make-up
Design pressure [psig] 51 FV Yes N7 1 1 150# RF Vent
Corrosion allowance [inch] 0.125 for C.S Parts N8 1 3/4 150# RF Drain
Insulation No [inch] N9 1 3/4 150# RF Spillback
Fire proofing [inch] No UC 1 3/4 150# RF Utility Conn.
Blast load [psig] -
Material of Construction K1 1 1 150# RF PG
Shell C.S K2 1 1 150# RF TT
K3 1 1 150# RF TZT
Head [Elliptical 2:1] C.S K4A/B 2 1 150# RF LG/LIT
K5A/B 2 1 150# RF LZT
Internal
M1 1 18 150# RF Manway
Vessel I.D [ft] 2-5.9"
[mm] 750
Vessel T/L - T/L [ft] 3-3.8"
[mm] 1,000
Saddle Height [ft] 5-3.0"
[mm] 1,600 (From Bottom of Saddle to Vessel Centerline)

1600

NOTE(S)
1. Inlet pipe shall be 50 mm higher above the top of
Rich/Lean Glycol Heat Exchanger.

Das könnte Ihnen auch gefallen