SALES CONTRACT

No. : abcd-efg0001
Date : December 13th 2015

The Buyer : PT NANTANGIN


Address : No.12 Mlaten Street, Mlaten District, Surabaya
Tel : +6231-5941234
Represented by : Mr. Dwiki inzhagi– Chief Excecutive Officer

The Seller : THAI MACHINE INDUSTRI CO.,LTD


Address : No.1 Chanatip Road, Bangkok, Thailand
Tel : +6812-1231932
Represented by : Mr. Ferly Sulistio – Sales Manager

The Contract is made by and between the Buyer and the Seller, whereby the
Buyer agrees to buy and the Seller agrees to sell the under – mentioned
commodity according to the terms and conditions stipulated below :

ARTICLE 1: SCOPE OF THE CONTRACT:


1.1 Description of goods, quantity and price :
No Description of goods Unit Quantity Amount
price(USD)
CIF Khlong
Toei
1. ABC1 Mixing 50,000 USD 1 50,000 USD
Machine

2. XYZ23 Assembly 75,000 USD 1 75,000 USD


Machine
Total Amount 125,000 USD
SAY U.S DOLLARS ONE HUNDRED SEVENTY FIVE THOUSANDS ONLY

1.2 Specifications : Specifications and standard equipments of contracted


machines are specified in attached description of goods.
1.3 Quality : The machine must be produced in 2010. All contracted
goods must be 100% brand new.
1.4 Manufacture : THAILAND MACHINE INDUSTRI CO.,LTD
1.5 Country of origin : Thailand
1.6 Contract value : 125,000 USD (One hundred seventy five thousands only)

ARTICLE 2: PACKING/MARKING:
2.1 The packing is based on the manufacture’s export standard and the packing
has to guarantee the safety long term transport.
2.2 The Seller must be responsible for any damage or breaking of the goods until
the moment goods are delivered to the Buyer at (KHLONG TOEI PORT).
2.3 Marking : ABCD-XYZ
ARTICLE 3: DELIVERY:
3.1 Time of delivery: The shipment of all the commodities of this contract will be
ready around (75) days since the date L/C is issued.
3.2 Term of Delivery: CIF KHLONG TOEI (KHLONG TOEI PORT) – Thailand
3.3 Transshipment: Allowed.
3.4 Partial shipment: Allowed.
3.5 Five (5) days before releasing cargo ex- factory, the Seller must inform the
Buyer Plan of transport cargo to KHLONG TOEI PORT and date cargo is ready at
KHLONG TOEI PORT
3.6 Within three (3) working days after releasing cargo ex- factory, the seller
must send the following document to the Buyer by carrier :
 1 original signed and stamped Commercial Invoice, showing description of
goods, unit price, and total amount in USD.
 1 original detailed packing List giving detailed description of goods,
dimension, net weight and gross weight.

ARTICLE 4: PAYMENT
4.1 Within five (5) working days after signing the contract, the Buyer shall open
the L/C at SIGHT in USD with 100% contract value for the seller after signature
of contract.

BANK NAME : NATIONAL BANK OF THAILAND BANGKOK


BRANCH
BENEFICIARY : THAILAND MACHINE INDUSTRI CO.,LTD
ADDRESS : No.1 chanatip Road, Bangkok, Thailand
TEL : +6812-1231932
BENEFICIARY A/C NO. : 101010101000123
SWIFT CODE : QWERTY

4.2 Payment of 100% contract value shall be made upon presentation of the
following Documents to the Issuing bank by the Seller: (This is L/C international
article)
 2 original signed and stamped Commercial Invoice, showing description
of goods, unit price, and total amount in USD.
 2 original detailed packing List giving detailed description of goods,
dimension, net weight and gross weight.
 Original Bill of Lading.
 1 copy Certificate of Origin issued by Chamber of Commerce of Thailand.
This item should be prepared according the requirements on the L/C.

4.3 L/C shall be valid in 96 day from the data of L/C issuing.
4.4 All document sets for payments shall be made in English and all transferred
via the bank by which the buyer opens the L/C and these Bonds and document
mus be accepted by the Buyer and the Seller.
4.5 All bank charges outside Indonesia are for the Seller’s account.

ARTICLE 5: WARRANTY AND AFTER SALE SERVICE:


5.1 Duration of warranty of the machine (except any consumable parts and
standard accessories) is 12 months from the date Protocol of Goods Handover is
signed.
5.2 The Seller is responsible for setting and bearing all charges and expenses
related to the costs for workmanship and materials caused from faulty designed
of the machinery and or poor workmanship within the period warranty.

ARTICLE 6: ARBITRATION:
6.1 Throughout the execution course of this contract, all disputes shall be settled
by negotiation between both parties. If the both parties not to reach the amicable
agreement, disputes shall be referred to the Thailand Council for the Promotion
of International Trade Thailand Branch. All awards of arbitrators shall be final
and binding on both parties.
6.2 The fee for arbitration and the other charges shall be borne by the losing
party.

ARTICLE 7: FORCE MAJEURE:


7.1 War, fire, floods, and earthwakes which may be occurred in equipment
manufacturing country and in Indonesia shall be considered as force majored.
7.2 If force majored situation arise, the Seller should notify the Purchaser in
writing of such condition with the certification of the local authority in power
within 7 days. Beyond this period, the event shall not be considered as force
majored.
7.3 If there is not direct reply in writing of the Buyer, the Seller will continue to
execute his obligation as stipulated in this contract in possible abilities and seek
for any counter measure in orger to excite the contract. The delay time of force
majored will be counted in equipment acceptance and handover time.

ARTICLE 8: PENALTY:
Except cases stipulated in Article 7, in case of delay goods delivery, the penalty
for mentioned delays shall be counted in the amount 0,5% of the contract value
for each completed week of delay. However, total delay time should not exceed 1
month after the latest delivery time mentioned in this contract otherwise the
Buyer has right to terminate this contract and all arising cost and damage caused
by this delay will be borne by the Seller.

ARTICLE 10: GENERAL REGULATIONS:


This contract comes into effect since the date the seller receives L/C payment
order by fax. Any amendment and addition clause to these conditions shall be
valid only if made in written form and duly confirmed by both parties.
The present contract was made in English at December 2015 in duplicate of
equal force two of which are kept by each party.

Sales Manager: CEO PT NANTANGIN:

FERLY DWIKI

Mr. Ferly Sulistio Mr. Dwiki inzaghi