Sie sind auf Seite 1von 58
SOIL INVESTIGATION FACTUAL REPORT PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIM SETUL, DAERAH SEREMBAN, NEGERI SEMBILAN. (MARCH 2019 ~ APRIL 2019 ) Tiaeeoaaet ‘iho IES N MONICE SDN BHD 041691-My HHo.18+6, tt Flos, velan 6/4, Pandan indah Commercial Prk, $5100, ula Lumpur Tel. 23-42061010/ 03. 42039011 Fax: 08- 4287202: Email fesn_134@yahoo.com ‘SOIL INVESTIGATION REPORT. ‘ON PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIM SETUL, DAERAH SEREMBAN, NEGERI SEMBILAN ‘March - April 2019 Client SP SETIA ECO-PROJECTS MANAGEMENT SDN BHD 5A, Setia Eco Tower, Jalan Setia Nusantara U13/17, Seksyen U13, Setia Eco Park, 40170 Shah Alam, Selangor Darul Ehsan. Tel : 03-3343 2552 Fax : 03-3343 2555 Consultant JURUTERA PERUNDING TEKADMAJU SDN BHD No. £-6-27, 101 Boulevard, ZESIONAT S- Jalan Kenari 5, Bandar Puchong Jaya, Seinanas 47170 Puchong, Selangor Darul Ehsan Tel : 03-8075 6565 Fax : 03-8071 5868 Contractor IES N MONICE SDN. BHD. No. 19-B Tingkat 1, Jalan 6/4, Taman Commercial Pandan Indah, 55100 Kuala Lumpur, Tel : 03-4296 1010 A Fax : 03-2856 8511 Proposed Soll Investigation Works For Clubhouse And Other Associated Works At Bau Lakehomes, Mukim Setul, Daerah Seremban, NegerSembil AUTHENTICATION OF THE FACTUAL REPORT PROJECT PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIM SETUL, DAERAH SEREMBAN, NEGERI SEMBILAN. I, do hereby certify that all items reported in this report are factual and all works reported herein were carried out in accordance with these specification and BS 5930 : 1999, BS 1377 : 1990, other code specified and sound engineering practice. Proposed Sol Investigation Works For Clubhouse And Other Associated Works At Bayu Lakchomes, Mukim Setul, Daetah Seremban, Negeri Sembilan. TT OS eee CONTENT Page 1. INTRODUCTION 1 2. SCOPE OF WORK 1 3. FIELDWORK 1 3.4. Setting Out 1 3.2 Rotary Wash Boring 4 3.3 Undisturbed Soil Samples 2 3.4 Standard Penetration Test 2 3.5 Mackintosh Probe 2 3.6 Standpipe 2 4. LABORATORY TEST 3 ‘APPENDIX i Chart fi, Borehole Logs fii, Summary Of Laboratory Tests Results iv. Details of Laboratory Tests ¥. Mackintosh Probe Test vi. Standpipe Records vii, Photographs vill. Location Pian Proposed Sol Investigation Works For Clubhouse And Other Associated Works At Bayu Lakehomes, Mukim Set Daerah Seremban, Negeri Sembilan 1. 2. 3. INTRODUCTION ‘This report presents the results of the Soil Investigation work carried out by M/s. IES N Monice ‘Sdn. Bhd., for Proposed Soil investigation Works For Clubhouse And Other Associated Works At Bayu Lakehomes, Mukim Setul, Daerah Seremban, Negeri Sembilan. The work was commissioned by the Client, SP Setia Eco-Projects Management Sdn Bhd. A total (1) Boreholes, (22) Mackintosh Probe test and (1) Standpipe were carried out at a various locations as indicated by the Engineers. ‘The objectives of the investigations is to determine the subsoil conditions and to obtain soit data for the design of the proposed project. The following machines and equipments were mobilized: ‘YWE D9OR Rotary Drill and accessories Mackintosh set -Standpipe set The Code OF Practice the drilling is accordance to procedures outlined in BS 5930 : 1999. The field work started on 26/3/2019 and was successfully completed on 2/4/2019, SCOPE OF WORK The scope of work for this investigation are as follow: 21° Carry out wash boring at the (1) borehole position, 2.2 Carry out Mackintosh Probing at (22) locations to depth of not more than 15m below existing ground or where the condition of blows per 0.3m penetration is encountered. 2.3. Carry out Installation of (1) Standpipe. 2.4 Carry out laboratory test on selected samples. FIELD WORK 3.1 Setting Out All borehole positions were located based on the instructions from the engineer at site. Reduced levels were based on the TBM established by the previous surveyor. 3.2. Rotary Wash Boring All the boreholes were drilled using the YWE D90R machine which has a maximum torque of 600 kg-m. The ground at the bottom of the borehole is broken up by the rotary action of the drill bits, and washed up to the surface by water that is pumped down the hollow drill rod. HW size casing is used to prevent the wall from collapsing. ‘Samplings and in-situ testing are performed at 1.5m interval or whenever there is change of strata. eee t 33 34 Proposed Soil Investigation Works For Clubhouse And Other Associated Works At Bay Lakehomes, Mukim Setul, Daerah Seremban, Negert Sembilan, Undisturbed Soils Samples In soft to medium stiff cohesive soll, undisturbed samples were collected. The sampling tube used is the seamless thin walled steel type, of 54 mm diameter and 0.5 m length and has a sharp cutting edge at the lower end. It is connected to the drill rod and pushed by static force into the bottom of the hole. When the tube is almost full, it is withdrawn from the hole, removed from the crilled rod and sealed at both ends with paraffin wax. The tube is then wrapped with sponge and stored in sample box. Standard Penetration Test Standard Penetration Test (SPT) is carried out in stiff cohesive materials or in cohesion less soil at every 1.5 m. A split spoon, which is an open-ended steel cylinder which splits longitudinally into two halves and hetd together by a cutting shoe at the lower end and a coupling at the other, is connected to the drill rod and lowered to the bottom of the borehole. It i then driven 45 cm into the ground by means of a 65 kg hammer falling a free height of 75 cm. The number of hammer blows required to drive the last 30 cm is recorded as the N- Value. After the blow counts are recorded, the spoon is withdrawn from the borehole and a representative sample is secured. These samples are kept in airtight containers with proper identification for visual examination and laboratory tests, 3.5. Mackintosh Probes 3.6 ‘The Mackintosh probes were carried out using a5 kg hammer, which was dropped freely at 30 cm height along a 13 mm diameter hardened steel rod with a 25 mm diameter cone at the tip. The number of blows required to penetrate every 30 cm was recorded until a maximum penetration is about 15 m or 400 blows per 30 cm which ever arrives first. Standpipe The standpipe tube shall consist of a UPVC (unplasticised polyvinyl chloride) tube with inner diameter not less than 12 mm to allow air bubbles to rise freely. At least, 1000 mm of the end section of tube shall be perforated with not less than 25 Nos. of 3 mm diameter holes that are uniformly staggered. The perforated section shall be surrounded by or wrapped around with geofilter fabric, Polyfelt TS50 or equivalent and sealed in the borehole at the level specified by Engineer. The pipe shall be capped at the bottom, preferably with threaded plug. Proposed Sol Investigation Works For Clubhouse And Other Associated Works At Bayu Lakehomes, Mukim Set, Daerah Seremban, Negeri Sembilan. i 4, LABORATORY TEST The water samples collected from the exploratory boreholes were sent to our laboratory for selective testing, Details of which is outlined in the Laboratory Test Summaries. Generally, the following tests were carried out: a, Moisture Content. b, Atterberg Limit . Specific Gravity d. Bulk Density e. Particle Size Distribution f. Chemical Tests . Unconsolidated Undrained Triaxial Compression Test h. Consolidated Undrained Triaxial Compression Test i. One Dimensional Consolidation Test All test were carried out in accordance to procedures outlined in BS 1377 (1990). [aa4s ssajuinys / ssoug uo] wo9gx QT "wlpG 1 preLow aqny b aqhy [PM UL, ypajs Aekoj9 uo 4405 wou ajduos paqun)sipun Burjo4 oy st yuauidinb3 siyy. ~ 61 se 1s Slt 09 7 O18 (un) ezis . ypu] 7 y46u27 2[6uy 204s qr qo ys6ua7 poy aug ys6u07 aoys Ast Shldg i FP — — Sey ts0r) poz wo »L S31 NOILVULANAd GUVONVIS . YOI UI TAWVS NOOdS LIS eBW s0x9Uvey +139 woods AES. sous: COIs Sa WIA oouEpsozoN Uy ‘oAg]s urd zy AUyssed PePTOQENT We peut sqwoUreMsTont) Sos OsIv0D Jo 31vd IOUT OM PUL sTJOS OMTZ Jo NONTOTTSSEID OI LOY Z2RYD AQDTISeL — QT oaNsLy (qu99 sed) panty pinbry Ozh OW OOL 28 OL os oO Of oz ot @ ee eae ou al 2 e " S 9 oe ® ne OHW 69 say;0w 21uDBu0 jo Uo} Jodad yuDD1}1U61s pf] OS. Buyurojuee jor Jejow Kup jo joquiks| @® 2U) &} PAPPH $10 42338) UL SION | os - TSU SERIO BUGIS] WOM TOR srerpaIe Far maT oe aGups A} 5) aa) Aon 5 a ( aury-y eaogo ~ av 2 ‘0s 3NIa ‘SD peulquios 3q Oo pup W a Y mojag=(NOS-W) LIS W guoRpes 666L0E69 SA ANTVA YLaWOULANAd JNOD DINWNAG Hf SA ALIOWd VD ONINV3d TIAVMOTIV : V LVHD (Ys smog) anjea sojowosjoueg auog oyweuka “yy T Oct «OF OO G6 O8 O£ C9 OS Ob OF OF OL O sqlovez = uoLt ‘ (3ybs/uoL) ALIOVdvo ONIN JIGVMOTIV ZZ BOREHOLE LOGS BOREHOLE LoG Proposed Salt ivesgaion Warls For Cubhousa Ad Other Asodited Waris A Baya Lakebomes, Mim Stal, Daerah Seremban, Negeri Sembtlan '5PSetia Eco Projects Management Sdh Bd Jeonsnant:Jurutera Perunding Teka Sdn Bhd fesse Type = ww Tv Depth o Benet, > Ga Dexrptien of sate I TOT TT TPT Top sil, browsish orange, sandy SILT Mecium sift, brownish yellow, sandy SLT with aces of aravet. a Brownish yellow, sandy SILT with traces of ravel Medium stif, brownish yellow, sandy SLT | Mecium sti, brownish yellow, sandy SILT Yellowish brown, sancy SILT Medium st, brownish orange, sandy SLT Medium stif, brownish eran, sandy SILT Brownish orange, sandy SUT Sif, beownish yellow, sandy SILT 8, medium eray, sandy SLT. Sti, mectu sray sandy SLT Stif, mectum ara, sandy SILT St, medium gray, sandy SILT Stif, brownish yellow, sandy SILT Sti, brownish yellow, sandy SILT ‘SU, Brownish yellow, sandy SIT hn Ge ce ate aD + Noa Gant Dexpaton 4) RODG) = EPs fm BOREHOLE LOG Fra Proposed Sil inveagon Wort or Cobh Ard Oia Raid Works Bau akahanet, Malin Sl, owen 7 BT Dear Seremban, Negert Serban feouesteel: 5087 m lit v5 Seti Eo Proects Manatement Sn Bhd [ag ypo WCDI esha pe TT Wratten 6.20% comin :surteraPeruningTetadmajuSdnBnd—lomumod > txywen — fecre'Tpe | wae baste: ara cone. ESOT ever: tow [omerwan ars Sigg Dea Fane Fa enh Desrpton orate tos [Rimple | Sept] Rex [SPT Blow ert [Far] | For ne | ty |e) [75] 7517512575175 slows 00 [=a a = Em [> 7" | sit, sromnish vation, sandy tet Pronlg]nuzo| rox| 1) 2]2 a]2| E ae fa E | [| st, bowmish sae aay, sand SILT svn] asa] one |2] 3/2] 3) 3 [ » = [2 7 [> | suit, brownish pate ra sandy LT f+ feos aean| oe] 22] 2) 2) « [23 . Suit, brownish vellow, sandy SILT with traces |"4 |przv07| my 25.80] max 1/2) 3/2] 3) 4 Las | Staiaet s 295 [a | i "su, beach vetow,sanay SLT with races |n4 {peor z.00| zex | + |2|2|4) 2) 4 trent ms LL 2 f [| 58 brownish ton, say ST risrxs|} 2n20| ore |1|2/ 3/3/41 4 » | B35 30 B | veevstit tronnish ation, sandy ict | Jonoroao| pf 2ean| emx]2/2/ «| fol 8 L Bs 38 far | Ss | Har, brownish vetiow, san iT von] 3130] om »|4{ 6] 0/0 La 33 ef | [| ware rownish votow, sendy itr 22) Jorn a.00| sax ja | «914 20| 7 | 20 E 7 33388 L e I Hard, brownish yellow, sandy SILT 44 zs/02s| 34.50) sx || 7 | 12} 18]20) | 20] Las ~ uaa Hard, brownish yellow, sandy SILT re-{P2arD24| of 36.00 | sex | 4| 8 |s2/97 24] | 60 3S i LL» | [| Hare, ows yellow, sane Sit 25/00) 1] 37-50| soe | 6 |s0|s5]20|:5) | «0 [se us | ea J | Hare, brownish tow, sary SLT 20] sis | 6|s2[20]30] || 0 E | 6am conta cong - @ ‘sere ABLES belpalon yea «tryed en es NMotce soxuan BOREHOLE LOG ‘Proposed Sal veitgation Works For libhause And Gther Aaocited Works At Bayu Lakehowed, Nokin Seta, Jo! pyerah Seremban, Negert Sembilan [cist TSP Satie Eco-Proects Management SE Bhd —igTape 1 WWEOSOR ewig Type + O77 FAT |watrtewe!” + 6.20% [cout :JruteraPerunding Tekadmafu Sdn Bhd [ortthog > etwyWnh —_|sareType = MLC Joc se + 91472019 Jno mo. 1ESNZO19/13 sipevier Lew Jee rcsh = 24/2019 ray Eanpling Dea Penetrai, F Dew Desrpion Of strata tog [Same | Depth | Rac | — SPT Blow count [For] W | For wo _{ tn | oy [7575175 [75175[75| 75 [tows <0 Hard, beowsish yellow, saney SILT 1017 2] {End OF BHT At Depth : 40.805 m Installed Standpipe At Depth 12.00 m 50 | 155 bate —| Fe [ep ca] — WI tn | Wary mo | 290 | a0 io | $60 aL Branoe 4085 | 630, { { ® & Ty st 3 8 © ee itt ory ap + Eh Guy eseatien ACOH) Zeewees eR SUMMARY OF LABORATORY TEST RESULTS | { Tepe ZTSTR PY pepe pe Te pte | zee Te 7 p=] warfare ef eae ra wpe pee pope pe a i nm = 7 ala sro |rsfawwshrevvae| et | a [aw on Posbemepeetemoloml «fo |e fo | + fo | ® fe | 2 fats. lonoranfsnonn HRW REMOTE | sya oemearan ay cme sano Sonratoney | [un | se [on] wt fetes] (soy ys9, L10yeI0qe'] JO AreurKUNg NVTIGWWAS RYEOAN ‘NVEWERUAS HVEAVE “GH ‘NGS KUOLVUOAVT scormmsmcrea: eso) “TA.TAS WIMAW ‘SAWOHSAV' NAVA LV SHIOM GALVIIOSSY WATLO NTATANIONA TACT NV ASQOHAITO AOA SHAOM NOLLVOLLSAANT TOS GASOdOUd : MALO? srocwast: ome DETAILS OF LABORATORY TEST RESULTS IDEAL ENGINEERING LABORATORY SDN. BHD. PARTICLE SIZE DISTRIBUTION free TaL2039704-1080| Dano Fp 2019 JPROVEK : PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER ASSOCIATED WORKS ATBAYU LAKEHOMES, MUKIM SETUL, DAERAH SEREMBAN, NEGERI SEMBILAN. OTERO co EL DEPT or 200 EoD Wr Tor cosy (Cay 0.0 = B 2 [Ssh 0.002 ss @ 5 = Send O63 aes © © st fom! 5 2 ee Sam siSam 28 ma am im 10mm an 335 a 3 2m ci = 1.38 em w 6am, zr 025 em a 7 03mm a a on mm er ca 15 nen a ss 0.063 net = se Faria Diamar ea oT Pais Sas Draenei Tee Pa SNIPE SAMPLE RO wor ws Der “Ors BT Doses tore] aor a a ‘038i —f 00335 [00361 ‘2 5 cm lrctele [Tomar —[— onary —| 0230 = ae 3 [ss> [tans —|— 0.0090 | B0007 = # a fos» [Cts —[~0.0066—[— a0 = H a ‘aos toes —] 0.0057 3 = Tor ‘buss [ost | oom 3 a 4 ‘uo: [art | “oor 2 2 2 8 to i oe 2 tor ooh » IDEAL ENGINEERING LABORATORY SDN. BHD. UNCONSOLIDATED UNDRAINED COMPRESSION TEST (BS 1377 : PART 7 : 1990) Projet : PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIM SETUL, DAERAH SEREMBAN, NEGERI SEMBILAN, Dato Tosted : 10-04-2019 ‘SAMPLE : BHt /UD3/8.00m Tested By JAVA [SEEOMENLAT. PRESSURE [ASPEGWIEN. KPa = 0 [B SPECIMEN, KPa= 160 [CSPECMEN, WPa= 20 Deflct. | Axial | Convct | Proving | Aual | Dovisor | Provng | Axial | Deviatr| Proving | Asial Roading | Swain | ‘Area | Ring | Load | Stocs | Ring | Load | Stross | fing | Load xooimm| (9) _| (sqm) | Reading | tN) _|_(Pa)_| Reading | aw) | hPa) | Reading | an) | _ckPay a fo fas | 0 | 0.000 | 0.000] o | a000 | 0.000 | 0 | 0.000 | 0.000 2 | oss | 1138 | 16 | 0020 | 17959 | 17 | 0022 | rosa | 18 | o1ae | 20700 50 | oss | 1142 | 23 | 0080 | 26151 | 25 | 0033 | 28915 | 25 | 0.035 | a0.202 75 | 099 | 1146 | 90 | 0039 | 24209 | 22 | ooo | arosa | 6 | oar | air too | 132 | 4150 | 98 | 0047 | aoa | 41 | 01053 | «sss | 49 | 0057 | 4gzat 42s | ise | its | 41 | 005s | 6350 | 47 | oat | sass | so | ooss | 57.256 x0 | 17 | 1187 | 25 | 0060 | 51530 | so | 0065 | 57055 | 58 oor | ca.ass 17s | 230 | 1181 | so | 006s | sears | 85 | 0072 | 62200 | ¢ | oes | 71.769 200 | 263 | 1165 | 55 | 0.072 | 2080 | 60 | 07a | 67478 | 58 | o.00 | 76005 225 | 296 | 1169 | 60 | 0079 | e72s0 | 4 | 0.089 | 71285 | 72 | 0.94 | 80700 aso | 329 | 1173 | c+ | oes | rosa | 57 | 0088 | 751085 | 76 | oo9 | axasa zs | 362 | 177 | 67 | ooss | r4a10 | 7 | 092 | 7aar7 | 79 | on0g | sat89 soo | 395 | iar | 71 | oes | 7e543 | 73 | 0096 | ex.2r1 | as | 0.109 | 1.6 325 | 428 | 1185 | 73° | 0098 | soos: | 76 | o009 | esse | 03 | oxt2 | oxzot so | 461 | ites | 74 | ooas | ata77 | 78 | oor | e594 | 3 | ots | s6.s21 o7s | 493 | 1489 | 76 | 00s | asor2 | 79 | oto | 86.955 | 90 | ote | se.ze oo | s26 | st98 | 77 | oor | e038 | 80 | ons | aza7r | a1 | on20 | 90.705 az | sso | izc2 | 78 | o.o2 | 505s | 82 | o.o7 | e620 | a1 | ona0 | somes 450 | 592 | 1206 | 70 | 0.104 | seos2 | as | o.109 | s097s | 02 | ote | 00,406 47s | 625 | 1210 | eo | 0.05 | s7ost | se | oa10 | 90959 | 94 | 12a | 401.954 00 | ese | 115 | 00 | 0105 | 66755 | se | oi | soto | ss | 0123 | 00.998 sso | 724 | 1223 | a2 | o1o7 | er4z0 | as | oti | etze7 | oa | 0.123 | 100.287 00 | 7as | rex2 | s2 | or7 | seaio | 35 | o2 | 0540} 95 | o24 | 100.859 eso | sss | roar | s2 | ono7 | seizo | as | 0112 | 80002 | 9 | 0.24 | 100.192 700 | 921 | 1250 | 81 | 0x05 | eae | 05 | ote | soses | 95 | ones | ooaie 70 | 987 | 1259 as | otis | ssod7 | sa | 0123 | grade 200 | 1053 | 1268 6 | o4i3 | 89290 50 | 11.18 | 1277 as | on | s7s0s 900 | trea | 1287 960 | 1250 | 1297 oo | 13.16 | 1307 1050 | isa | 2.16 vio0 | v.47 | i327 aso | 153 | 1357 i200 | 1870 | s947 sas | i645 | 1950 ss00 | a7it | 1369 1350 | 1776 | 1380 1400 | 1842 | 1391 vaso | i008 | 1402 soo | to74 | 1414 yss0 | zoa9 | 1425 ss00_| 2105 | 1437 ‘Specimen x © tc ‘Moieturo Contont (*) asar_| 2424 | 32.02 |Sample Hoight, mm: 7% [Buk Density, Mam 475 | 1.773 | 1.778 |Sample Diameter, mm: 38 Dry Density, Mims 1297 | 1301 | 1397. |Sran Rate, movin 1.200 Nonmal Load At Faure, (AN) on07 | 013 | 0126 [Ring Factor kNiv 2.001311 Nommal Stross, («Pa) a7as | 8095 | 10085 Lateral toes, (KPa) 80 | 160 | 320 FAILURE TYPE : INTERMEDIATE [Total Normal Stress, (Pa) 10743 | o4s95 | 420.85 (Zw/N) SSONg JEUUON Je}O), Bepo=> Zw/NY Sy = {aur pos) ssaajs jex0) jesnaroayy. Bopt=$ 2w/NA TY => {aur] 10q) ssa.ys je10) pareinyes Ajjensed wo0'8 / €qN / LHd : ON FIdAVS SATOUIO HHOW 40 SdOT3ANA AYNTIVS 3 8 (cwyn») sang says 2 B e 8 a ose IDEAL ENGINEERING LABORATORY SDN. BHD. CONSOLIDATION UNDRAINED TRIAXIAL COMPRESSION TEST Project: Proposed Soil Investigation Works for Clubhouse and Other Associated Works at Bayu Lakehomes, Mukim Setul, Daerah Seremban, Negeri Sembilan Soil Description : Sandy SILT of High Plasticity Borehole Sample / Depth : BH-1 / UD1 /2.00m Date : 4-4-2019 [Sample 7 Stage No. [Specimen Diameter amy 380 [Specimen Height (mm) 76.0 IDrainage Conditions DoE| Moisture Content % 30.24 [Bulk Density (Migim3) 1.812 IDry Density (Migimn3) 4.981 [Saturation Stage frat Pore Proocre (Pay 2875 Initial Back Pressure (kPa) 280 [Saturation Pressure (kPa) 316.5 riial Cell Pressure (kPa) 300 Final Cell Pressure (kPa) 330 Final P.W, Pressure Parameter ep 07 [Consolidation Stage [Celi Pressure (Pay 330 370 50 Final Pore Pressure (kPa) 280 290 290 [Effective Pressure (kPa) 40 80 460 lVolume Change (mn) O7 14 27 100 (min) 196.89 128.96 125.44 |Coeft. of. Consolidation, Cv (m2iyr) 1743 18.36 19.02 ICoeft. of Volume Comp, Mvi (m2/MN) 024 021 0.20 Ik (calculated) (is) 4146-03] 1196-09] _1.16€-09 [Shearing Staté Conditions Max, Stress Ratio Rate of Deformation = 0.032mmimin Pore Pressure (Pa) 73 a 7 [Deviator Stress (kPa) 93 124 170 Minor Principle Effective Stress (kPa) 27 39 83 Major Principle Effective Stress (kPa) 120 160 233 Strain (%) 14.48 13.88 12.96 Stress Ratio 451 4.08 372 Final Moisture Content (%) 33.41 3287 32.98 Final Bulk Density (Mgim3) 1.865. 4.872 1.877 Failure Mode 1F| IF| iF olal Stress Parameter: [Cohesion Way 6 |Angie ot Shearing Resistance (Deg) 1B [EFecive Stress Parameter |Cohesion ‘Wray 7 [Angle of Shearing Resistance (Deg) 32 Sample at Failure Sketch ode of ‘Specimen A ‘Specimen B Specimen © Failure Intermediate Failure Intermediate Failure Intermediate Failure jrainage One End With [Project : Bayu Lakehomes, Mukim Setul, Daerah Seremban ‘SATURATION STAGE ‘SAMPLE : BH-1/UD1/2.00m 40 1.8 | lA 9 0 50 100 150 200 250 300 360 CELL PRESSURE (kPa) an 0 50 100-150, 200 280 300 380400 DEGREE OF SATURATION (B) eg 8 10 2 ® 2 & ° 8 DEGREE OF SATURATION (8) ° & © 8 CELL PRESSURE (kPa) ey 10 el 08 06 04 02 DEGREE OF SATURATION (B) 0.0 50 100 150 «200 «250-300 35040045000 CELL PRESSURE (kPa) TDEAL ENGINEERING LABORATORY SON, BHD, [Project Bayu Lakehomes, ‘CONSOLIDATION STAGE ‘SAMPLE : BH-4/UD1/ 2.00m VOLUME CHANGE (ml) aes & 0 “4 7 4 8 12 16 20 24 28 32 36 40 44 48 52 56 80 G4 68 72 ROOT TIME (mins) PORE PRESSURE (kP3) 8s € 8 8 8 § i 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 ROOT TIME (mins) TDEAL ENGINEERING LABORATORY SDN. BAD. ——S—SS—*& [Project : Bayu Lakehomes, Mukim Sotul, Daerah Seremban SHEARING STAGE SAMPLE : BH-1/UD4/ 2.00m 200 150 5] |e 100 50 DEVIATOR STRESS (kPe) EXSESS PWP (kPa) 8 3 0 2 4 6 8 1 12 14 16 18 2 2 24 2% 2% 3 AXIAL STRAIN (%) 400 320 240 200 160 120 80 a] T= (S1-S39/2 (kPa) 0 4 80 «120 160 200 240 280 320 360 400 440 480 S=(St'+S3'y2 (kPa) IDEAL ENGINEERING LABORATORY SDN. BHD. (Pd4) SSINLS TVWYON ogy ovr oboe oe =z ZS 98 Q g (Pd) SSBYLS YV3HS 2 8 00% SAIOYIO YHOW 4O AdOTSANS BYeNIVS Ove (69p) soumjersoy spews 30 obuy =e (©.29) ysoim voRaWOD => BSNS BASALT SSYOUSP UT Yo (69p) eunysisey J09us 40 o1buy = oa) vorsauog yussoddy =9 BEOHE WOT ToYSUEP BUT PIES Wwo0'%/LAN/ LHe ‘@[duios NV@WAYSS HVY3VC “INL3S WIN ‘SSWOHENVT NAVE "}0e!Old Sap ce = Od OL = 9 P ssans annoayg Bap ¢| =@ Ody gz => 1 SSaNS [DIO] IDEAL ENGINEERING LABORATORY SDN. BHD. CONSOLIDATION UNDRAINED TRIAXIAL COMPRESSION TEST Project: Proposed Soil Investigation Works for Clubhouse and Other Associated Works at Bayu Lakehomes, Mukim Setul, Daerah Seremban, Negeri Sembilan Soil Description : Sandy SILT of Intermediate Plasticity Borehole / Sample / Depth » BH-1 / UD2/5.00m Date : 4-4-2019 [Sample7 Stage No_ x [Specimen Diameter Tay 380 Specimen Height (mm) 78.0 Drainage Conditions DOE Moisture Content ) 2124 Bulk Density (ims) 1.844 Dry Density (Magi) 4.524 [Saturation Stage initial Pore Pressure (KPa) Dara Initial Back Pressure (kPa) 290 [Saturation Pressure (kPa) 328.5 Initial Celt Pressure (kPa) 300 Final Cell Pressure (kPa) 340 Final P.W. Pressure Parameter (Bh) 0.98 (Consolidation Stage [Cell Pressure (kPa) 340 390 790 Final Pore Pressure (kPa) 200 290 290 Effective Pressure (kPa) 50 100 200 Volume Change (ml) 14 28 54 1100 {rnin 144.00 192.25 125.44 Coeff. of. Consolidation, Cv (mane) 16.57 18.04 19.02 Coet. of Volume Comp, Mvi (m2iNiN) 0.32 0.32 031 K (calculated (nis) 1.846-09| _1.796-08| 1.84809 [Shearing State Conditions - Max. Stress Ratio Rate of Deformation = 0.032mnumin Pore Pressure (Pa) 2 118 Deviator Stress (kPa) 121 183 22 IMinor Principle Effective Stress (kPa) 38 58 81 Major Principle Effective Stress (kPa) 158 214 302 strain % 19.82 14.10 13.53 Stress Ratio 423 3.86 3.75 Final Moisture Content (%) 23.82 23.82 22.98 Final Bulk Density (Mgimn3) 1.899 1.904 1.909 Failure Mode 1F| IF) F otal Stress Parameter: [Cohesion Pay —E JAngle of Shearing Resistance (Deg) 3 |EMecve Sess Parameter [Cohesion ‘Wray z JAngle of Shearing Resistance (Deg) 38 [Sample at Failure \ [Sketch Mods af ‘Specimen A Specimen B ‘Specimen C Failure IF = intermediate Failure | IF = Intermediate Failure | IF = intermediate Failure = hes IRRSGTORS ER MMSE ——_————-—— ne "SATURATION STAGE Project: Bayu Lakehomes, Mukim Setul, Daerah Seremban SAMPLE : BH-1/UD2/5,00m & ° & ee gS DEGREE OF SATURATION (8) ° & 2 8 0 50 100150 «200, 280 300350400 CELL PRESSURE (kPa) 10 ° w DEGREE OF SATURATION (6) es s a) 2 0 50 100-180 200250 300 350 400450 CELL PRESSURE (kPa) a! 10 ° 2 g ° DEGREE OF SATURATION (8) 2 8 50 100 150 200 250 300 350 400 450 500 580 ‘CELL PRESSURE (kPa) IDEAL ENGINEERING LABORATORY SON. BHD. [Project : Bayu Lakehomes, Mukim Setul, Daerah Seremban SAMPLE : BH-1 /UD2/6.00m ‘CONSOLIDATION STAGE 0 a 2 [B 4 = io ic 2 6 & w we z S40 12 14 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 ROOT TIME (mins) 480 460 440 gio & y 400 2 2 380 g Fd & 360 wy § S x40 320 300 280 0 4 8 12 16 2 24 28 32 96 40 44 43 52 56 60 Gt 68 72 ROOT TIME (mins) IDEAL ENGINEERING LABORATORY SDN. BHD. [Project : Bayu Lakehomes, Mukim Setul, Daerah Seremban SAMPLE : BH-4 /UD2/5.00m ‘SHEARING STAGE 250 é Em 8 B © 180 Ee & x S 100 e z 0 & a B = 0 a g 00 g ii 59 Ce | 0 2 4 6 & 1 2 14 16 18 2 2 24 26 28 30 AXIAL STRAIN (%) 300 250 (S1-S3)/2 (KPa) Te i) 180 100 iy ‘ me oO ye ee ORO RA Be Ea) SON 0 S = (ST4S3/2 (kPa) JEAL ENGINEERING LABORATORY SDN. SHD. (Pd) SSBMLS IWAYON oog 05S os osy gh Sse oe, see op os % 0s n Be mi oo % a z os) a e 002 osz oe SFIONIO YHOW 40 AdOTSANA JYNIIV4 (ep) eounysisey 004s Jo oBuy =6 (0.9) denier voisat09 => Sop ee =e cae => ‘SOOTS eMNSEITT s2yousp cu FeO ‘ bs (60p) sounysisey s00us Jo oj6uy =p (ea) vorsauog qussoddy =2 + esang onyoowa \90"S/ZaN/ LH :aiduiog | $9 Sb =@ Pah se =o NVQW3Y3S HYSEVO “TALIS WDINN ‘SANOHANYT NAVE A99fO4g s90n§ [0101 IDEAL ENGINEERING LABORATORY SDN. BHD. ONE DIMENSIONAL CONSOLIDATION TEST (BS1377, PART 5:1990) JProfect: PROPOSED SOL. INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER |BoreholeNo = BH ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIM SETUL, DAERAH jSampleNo =: UD1 ‘SEREMBAN, NEGERI SEMBILAN [bepan (my = 200m [Soll Description: Sandy SILT of High Plastic Date 2 aunots lseeoran siz mm: 80.00 50.00 spent Gray Sot 2610 2610 of RngeWet So: 14820 142.80 [it of Sb, ho rm): 10851 10651 0, Tot Detecton INTIAL FINAL tof Sot Semple.n¢mm: 20.000 17.380 |, wc Ratio Hsbayno JweortorRinatel: 75007500 INTIAL FINAL | do, change Void Rais Jwekrcorwer soa): 71.20 67.80 |volsRato,e 0.878 0.633 | cr, sxe OFcContton NWoightot Dry Sol (a): 54.80 £4.80 | Buk Oensay gins) 4813 1.985 | wv, Coen of ompansty Wwoloneaewteri): 18.80 13.20 [oor dDenty ans) 1390 1.590 | 4, com oF Permasiny later content): 30.4242 logge of Saturation (8) 99 109 ‘ole Pressure Toil Sample M6 Sempe Hogttot Vox m0 eon ” Fressxw ncomeat Defee. He Ha Ve rsa yy weetly 82) dpa) Bf) _H.tnm) Wn 100_Ho mm extshome dem) (mane emmy ‘m 0 - 70000 1000 99 0878 625 oe 19508 0.192 1024 © 438 258E-10 6.25 ozs 19976 999925 0878 628 occ 18941 0584 784 583 a69e-0 125 0.069 19907 o95 9.255 0869 2s 0018 19823 0878 676 6.45 1,366.00 2 0.169 19738 987 9.087 0.859 25 0029 19584 0824 841 5.08 8826-10 50 0908 10490 72 aya 0824 ry oos2 10.153 0870 861 424 7516-0) 100 084 1887] 94s 8.225 OrI2 100 0079 18.455 0445 784 © 482 G87E-t0) 200 0.640 18098 902 7385 0893, 200 0098 17518 0208 678 5.06 «526-10 400 1.040 18.005 850 6450896, 200 0.028 17022 65.1 a7! 0888 > RECOVERY 100 00st 17078 a4 0422 0.603 > RECOVERY 2B 0.120 17-194 88068430814 > RECOVERY 625 0.195 17389 eo 7380883 > RECOVERY m7 Pressure Versus Void Ratio rN ov (m2iyear) 10 400 Pressure (kPa) Mv (m2iMiN) IDEAL ENGINEERING LABORATORY SDN. BHD. ONE DIMENSIONAL CONSOLIDATION TEST (BS1377, PART 5:1990) lproject: PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER [Borehole No: BHT ‘ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIMSETUL, DAERAH [Sample No pe ‘SEREMBAN, NEGERI SEMBILAN [Pepe (my +: 500m [Sou Description: Sandy SILT of Intermediate Plasticity bate + ar019 lseecmen Sinem}: 50.00 50.00 | Space Greviyof Sa, Ge 2630 2630 JweorRngeWerson: 147.40 148.50 [ito Std to oe) 1142211422 | 0, Teta Detection INTIAL FINAL Ht ofSe2 Sempie,ngrm): 20.000 17.283 | «, vid Ratio (tstymo |reantorring a: 76.00 76.00 INTIAL FINAL | co, change nvoi Rate Jwocreorwetsou (a): 7240 70:50 |Vousaso.e 075+ 0513 x coe. of Contain joi ory Sei(a): $0.00 50.00 [au Dory aia) 1.04 2.077] WW, coet, Of compresitty Iw orwatr(@): 13.40 11.50 [oryDensty gms) 1502 1.738 | Coes, oF Permeanity later Consents): __22.7__ 19.8 Dope Souraton (3) 20100 ‘ovlec Prassue Toil Sap 94 Sale Hight Vols Rats Mean * rossi erement Dee. Hath! Hol Vole Serpe my wevt egoiiee) Drm) Her) Wm 00_ tbo) exeHnoime 62 um gn) (m2) gm) es ° = 20000 1000 8s7eO7Et 128 0.002 19988 0112 578 88 2286-10] 28 0.028 10072 099 88800749 125 007 19930 0338 «578 755 aTEO 2 008 19688 904 8.4ss Oat 2 0020 19.73 0463-729 598 Bre. 50 0.230 19658 983 8288 0.721 %0 0.041 19425 0473 900455 o.e4e-0 100 0465 19.193 60 T7Tt 0680 100 0055 tess1 ons © ast 471 4756-10 200 0623 18570 928 7.4148 0826 200 006s tate 0201 1024 559 2256-0) 400 one 17822 691 6400 0560 400 oor 17389 022 900 ars 1ase-0| 800 0567 15055 485533 O84 400 00x err Bee 5554 0.486 > RECOVERY 200 006 17020 85.1897 0.490 > RECOVERY 50 0100 17.120 886 5508 O40 > RECOVERY es 0468 17283 864 SAB st > RECOVERY [Sample : BH-1/ UD21 5.0m Pressure Versus Void Ratio L 10 100 Pressure (kPa) IDEAL ENGINEERING LABORATORY SDN. BHD, ONE DIMENSIONAL CONSOLIDATION TEST (BS1377, PART 5:1990) [Project : PROPOSED SOIL INVESTIGATION WORKS FOR CLUBHOUSE AND OTHER [Borehole No: BHI ‘ASSOCIATED WORKS AT BAYU LAKEHOMES, MUKIMSETUL, DAERAH [SampleNo—: UDS. ‘SEREMBAN, NEGERI SEMBILAN open (rm) 800m |SolDeseription: Sandy SILT of High Paetcty bate 2 alarots lsoecimen ste rm: $0.00 60.00 [specie ravy or sot, cx 2819 2610 JrtotRngsverson: 144.70 141.10 |W o Sota ho rm) 10.105 10.105] 0, rea Deteckon INMAL FINAL |i of or Sample, nm 20.000 17406 | «,vidRato thane WWoighterRhg ie): 75.09 75.00 INTIAL FINAL | ds chargein void Rate [Woeheorwerset a): 68:70 68.10 [vols Rate, « 0973 0.722 Cr,coWt OfConttsaion weit roy Satie): $1.80 51.80 laut Dont ana) 1778 1.934 | te coe oF Compressiity Jeon orwate ed: 17.90 14.90 [ony Demy doi) 1318 1818| coat of ermesbity |wsterconne (i): 34.8 27.6 |oagroe of Sturn 0 92100 ‘pptos Presuce ToS Sams Hage Vode Rao ean © Pranze hesement Detbe, Hight Het Vat rsersle YB wehy (Ning) dpahnz) oer) _H*100 tommy es toiho get tn) ora) 2 ° 20.000 1000 9.805 0.979 220 0.002 19958 9.096 1368 328 gare 2s 0024 19976 999 gars onTT 25 0.007 19.042 0269 1089 405 3206-10) Ea 0.087 18909 99.5 98ne 0970 8 001 19528 0324 © 961 454 Aare] 0 0161 19748 987 9682 0954 50 0033 19583 0533 1158 368 3.1e-0 100 ome 19619 974 oats 0922 100 0057 19.4132 0285 9.00 451 4.4E-] 200 os2 18003 962 ares 0.68 200 0080 ta40 0216 © 9813.93 2626-0] 400 0813 18033 902 7928 ores 400 400 17528 0140 Bat 400 1.700 800 1008 17025 85.4 6.920 068s 400 0025 17.050 a53 mAs 687 > RECOVERY 200 0050 17.100 855 5.905 0692 > RECOVERY 50 O47 i727 6817412 0708 > RECOVERY 28 0.189 17408 070701722 > RECOVERY [Sample | BH-1/ UD3/ 8.00m Pressure Versus Void Ratio ov (maha £88 10 100 1900 Pressure (kPa) MACKINTOSH PROBE TEST RECORDS $0 te |__| cccccaimiasecaiecaceats Eo [Proposed Soil Investigation Works For Chibhouse And Other Associated Works At Bayu Lakshomes, “Job No. IMuicm Set, Daerah Seremban, Negeri Sembilan ESN2019713 [Client SP Setia Eco Projects M: ‘Sdn. Bhd tant [Juruere Peruiding Tekadraju Sdn. Bhd Position No. rs Ri Level (m) Saar Date FE Mar 2005 Dent Toa fy Toor m - 2 Blows 50-05 15 03-06 1s 06-08 92 09-12 4 46 12-15 38 15-18 18-21 23-24 24-27 27-30 30-33 33-36 36-39 Sap 42-45 45-48. 45-51 31-54 $4.57 57-60 60-63 63-66 56-59. 65-72 72-15 75-78 78-81 31-84 84-87 37-90 90-93. 93-96 96-99. 39-102 102-105 105-108, 108-111 T1114 4-117 17-120 120-123, 123-126 126-129 129-132. 132-135 BS- 38. 138-141, 141-144 14d 147 147-180, Final Depth os @ i slalalas|slale sl hee] oe fe ae oom FProjecr_[ProP0s0d Soil vestigation Works For Chubhouse And Other Asocinial Works At Baya Lakehomes, ob Ne. {Mukim Setul Daerah Seremban, Negeri Sembilan fESN2019713) [Glieat —_—|SP Seia Feo-Projects ent Sda- Bh [Consultant —[Jurwers Pecunding Tekadmaju Sdn, Bhd, Position No- MPs re Level (| S421 3420 Date Mae 2009 Tear 205 Devt 0-03 03-06 06-09 09-12 42-135 is-ie 1e-21 23-24 24-27 27-30 30-33 33.36 36-39 39-42 40 45-48 48-51 Binsa 34-57 57-60 50-63 63-66 66:69 58-72 72-75 15-78 Tek ar84 84-87 87-90 90-93 93-96 36.99 99-102, 102-105 105-108 108-111 Tt-t14 T4117 117-120 120-133 123-126 136-129 129-132 32-135 155-13 138-14. iat. 144 144-147 147-150 Final Depth ) Supervisor: Naim [Consultan Position No. R/Level Date Deptt 90-03 03-06 05-09) 09-12 12-15 15-18 18-21 21.24 24-27 27-30 30-33 33-36 36-39 39-42 2-45 3.48 45-31 31-54 54-57 57-60 60-63 63-66 56-59 65-72 72.15 75-78, 78-81 I-84 887 87-90 9.0.93 93-96 96-99 39-102 102-105 105-108 108-111 Tt n4 14-117, 117-120 120-123, 123-125 126-129 129-132 132-135. 135-138 138-141 V4i-144 [Proposed Soil Investigation Works For Clubhouse And Other Associated Works At Bayo Lakchomes, Tab Now IMukim Setul, Daerah Seremban, Negeri Sembilan TESNa019713) ISP Setia Eco Projects Management Sdn Bhd Lurutere Perunding Tekednaju Sdn. Bhd. rs sae Bhar 2079 Neo Paes 0 NIL Supervisor: Naim | és | IES N MONICE SDN BHD thom ject [Proposed Sol Investigation Works For Clubhouse And Other Associated Works At Bayu Lakehomes, Tob No. Mukim Setl, Daerah Seremban, Ne ESN201973 [etieat [SP Seta Eco-Projents Mi [Consultant [Juruera Perunding Teka Position No- MPIC Mri Te Ri Level 356 3230 5225 Date Bar 3019 Mar 2019 5inar30 Det | Not Pea oa] | eo Pe @ | abv aa a ae 09-03 135 03-06 8 05-09 a 09-12 6 12-15 x 38 15-18 5 86 18-21 33 21-24 24-27 27-30 3.0233 33-36 36-39 39-82 114-117 117-120 120-123, 123.126 126-129 129-132 B25 BS- BS 8141 14.1144 144-147 147-150 Final Depth : () 5 : Lee 12.26 rer We oo NIL Supervisor: Naim 100 — [50 kPa | 6 | IES N MONICE SDN BHD MACKINTOSH PROBE project | Pr0P0860 Soil Invesigaton Works For Chbhouse And Other Assoeed Warks ArBayu Latchomes, Tab No- |Mukim Set, Daerah Seremban, Nageri Sembilan TESNz0197F [Giient [SP Sctia Eeo-Projects Management Sdn Bhd [Consultant [unera Perunding Tekadmaju Sdn. Bhd. Position No. MPs PIs Tans Level ‘iT ‘ort S031 Tver 2009 TeMar209, eM 2015 : Orr esas ae &) Supervisor: Nain eet (Giient [Consultant Position No, i Level (m) Date Devt 7-05 03-06 06-09 09-12 [ERIE 1s. Le Ta-21 21-24 24-27 27-30 30-33 33-36 36-39 39-42 42-45 45-48 48-51 31.3.4 34-57 57-60 60-63 63-66 65-69 69-72 72-15 75-78 78-81 Bisa a-87 87-90 30-93 93.96 3.6.9.9 99-10.2 102-105 105-108 108-111 Thd-114 T4187 117-120 129-132 132-135 133-138 138-141 ig.t-148 144-147 147-150 Final Depth Te ) IES N MONICE SDN BHD [Proposed Soil Investigation Works For Clubhouse And Other Associated Works At Bayu Lakshomes, Job No. IMukim Setul, Daerah Seremban, Neyer Sembilan TESNDI9TH [SP Seta Eco-Projects Management Sdn Bhd [ugutera Peunding Tekadmaju San. Bhd, MII rT 3038 30.98) evar 2019) Fiver 30 Noor Pep Si Blow: x : fe 20. 8 ar Ta 165 1a 16, 135; 148 168 138 135; 100) 86 _ 168. 23s, 25 301 Supervisor és IES N MONICE SDN BHD PProjeer | OPOREU Soll vestigation Works For Chibhouse And Other Associated Works At Bayu Latehomes, “Job No- Iukim Setal, Daerah Seremban, Negeri Sembilan fESNI019/1} ieat___|SP Setia Eco-Projesis Managewent Sda Bhd [Consultant |Jurwera Perunding Tekadmaju Sdn. Bhd. Position No, MP9. Par RY Level 3085 S13 Bear 2019 Bear 2019 Dents ey 7 Noor = tS é Blows ae 45 J 36 ng 135, 127 Tad 156, 102-105 105-108 108-11 Wa-17 117-20 129-132 132-135 135.138 B8-14L 14d 144 144-147 147-150 Final Depeh er @ Supervisor: Naim = ject [PoP2eed Soi lavestizaion Works For Cubhouse And Other Associated Works At Bayu Laksbomes, ‘Job No. Iniukim Sein, Daerah Seremban, Negeri Sembilan ESN201975 [Client [SP Setia Eco-Projocts Management Sdn Bhd [Consultant —Hurutera Perueding Tekadangju Sdn. Bhd. Position No. Mz 30.52 2 Mar 2075 03-06 05-08 09-12 12-15 1soLe 1S-21 21.24 24-27 27-30 30-33 33-36 3.639 39-42 42-45 45-48 45-51 31.84 34-57 37-50 60-63 63-66 65-69 69-72. 12-15 75-78 7E-E1 Bi-8d 34-87 87.9.0 90-93 93.96 96-99 39-102 io2-105 105-108 10e- UL Td-114 4-117 117-120 12.0-123 123-126 126-129 129-133, 132-135 135-138 138-141 141-148 144-147 147-15.0 Final Depth mer oo Supervisor: Naim STANDPIPE RECORDS Proposed SI Works For Chbhouse & Others Associate Work At Bayu Lakehomes, Mukim Setul, Daerah Seremban, Neged Sembilan, BHT Reduced Level m) Initial Reading (n) Intaled Stanopipe :12.00.m Installation Date STANDPIPE READINGS Water Level bad tm) Time Steel cap with Lock Protective Steel Cover = 75mm dia. 8.35 Air Vents Ground Level Reading during field work Removable Cap Concrete 1<— 100mm dia. borehole Sand filter surround __| End of tubo securely capped ole: b.gl = below ground level 2 3 8 5 E Propesed Slllavestiaion Woths For Cibhouse And Other Astcitod Works A Say Lakchomes, Hakim Sel, Daerah Seremban, Newer Semban, SITE PHOTOGRAPHS DRILLING IN PROGRESS AT BH1 STANDPIPE INSTALLED AT BH1 ropes Sf Ivorigaion Work For Cbhoute And Other Asocated Works A ayu Lakehomes, Mukim Stu, Daerah Seremban, Negert Sembilan. SITE PHOTOGRAPHS HACRTORH PROBE TEST -APA [7 acrarTosn Roa TEsT-r2 [Comcawrosi prose Tesrnps]«— ([/MACRRTOSN PROBE TEST mPa Prapoted Sol Inversion Werks For Clubhouse And Other Associated Works At Bayu Lakehomes, Mukim Set Daerah Seremban, Neger Sembilan. SITE PHOTOGRAPHS ‘MACKINTOSH PROBE TEST - MP5 ‘MACKINTOSH PROBE TEST - MP6 MACKINTOSH PROBE TEST - MP7 ‘MACKINTOSH PROBE TEST - MP Proposed Soll investigation Works For Cibhoute And Other Asoc d Werks At Bay Lakehomes, kim Stu Deerah Seremban, Negert Sela ‘SITE PHOTOG MACKINTOSH PROBE TEST - MP11 MACKINTOSH PROBE TEST - MP12 Propored Sl investigation Works Fr Clubhouse And Other Associated Works. SITE PHOTOGRAPHS (MACKINTOSH PROBE TEST - MP14 (MACKINTOSH PROBE TEST - MP13, MACKINTOSH PROBE TEST - MP15 MACKINTOSH PROBE TEST - MP16 Bay Lakzhomes, Mukim Set, Daerah Seremban, Nged Semban, Proposed Sl investinton Works Fr Clubhouse And Other Asecated Work At Bayu Lakehomes, MukimSeulDarah Seremban, Negr Sembilan. SITE PHOTOGRAPHS Proposed Sl investigation Works For lobhause And Other Asacated Works At BayuLakehomes, Nuk Setu,Dasrah Seremban, Never Sembilan SITE PHOTOGRAPHS MACKINTOSH PROBE TEST - MP21 MACKINTOSH PROBE TEST - MP22 1 ¥ Monice S08 aap os0@ Minha 4, Jalan 6/4, ‘aman Commercial Pandan Indah, 8100 Kuala Lempur el: OG-d200100 / Pax O9-2N60011 y = we = @ x THOS on snc) \\ Yow at TO Laas, so SEE, Basra NoTaRE | Rey \\ MRA SEREMBAN, BCE STAN [saan bea \ wares] — Tao | NORENG | RUA) | \. esas aa sa \ er |" samen” [tana [50 4 | \ ws ~oemsrat | veasaeae | eat rol NJ ee aosa5s teams] sart Li om ‘SOL IVESTIGATION WORKS (eres ee iff 4s ns ck ro Porm & |= yer: “9194508 | 30177878 a0. | if ‘MACKINTOSH PROBE TEST es See fi {state | meee [ ae = / |i wed | aor aserauna | sna fi i (ooo isto es itl ‘ 2 eee iL % oa See eee ii : eens eo 1 iy % Si —{ seer | test ii te | sha [tite AX 5 ryt | tas \ ea | Sy | roma 505 \ oa sree [tone oe \\ oe \\ ter oat | asa \ wa | 73 ‘aveen | sae \ —— ane 1 I i

Das könnte Ihnen auch gefallen