Sie sind auf Seite 1von 1

FORMWORK FOR CONSTRUCTION OF INNER WALL

330
240

870
300
650

2ND CASTING

1747
Post-installed rebar D16@750, L=240mm
Method rebar

200
240
2Steel box 100x50 @max750

750
5550
650
Steel box 50x50 @max200
Post-installed rebar D20@750

750
3500
650

750
1ST CASTING

750
300
Detail B

Tie rod D16 @750 1130

DETAIL B
(Using rebar D16) DETAIL B
SC 1:5 SC 1:5
(Before casting concrete) (After casting concrete)

Formwork 18mm
Tie rod D16

Rebar D16 Tie rod D16 40


Cone

70 Cutting
(If any)
Weld h=5mm
L=50 mm, 02 faces

Filled by approved material

EMPLOYER / CHỦ ĐẦU TƯ EMPLOYER'S REPRESENTATIVE GENERAL CONTRACTOR / NHÀ THẦU CHÍNH PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
DATE REV. DESCRIPTION SIGNATURE
ĐẠI DIỆN CHỦ ĐÀU TƯ NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1)
NGÀY BẢN THUYẾT MINH CHỮ KÝ As Shown
DESIGNER
PHAN ĐỨC CHÍNH
A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ TP HỒ CHÍ MINH
TUYẾN BẾN THÀNH-SUỐI TIÊN (TUYẾN SỐ 1)
NGƯỜI THIẾT KẾ
20/03/2018 A FIRST SUBMISSION
CHECKER DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BA SON STATION
TRẦN NGỌC HOÀN TÊN BẢN VẼ
23/04/2018 B SECOND SUBMISSION NGƯỜI KIỂM TRA NHÀ GA BA SON
21/04/2018
TEAM LEADER
HCMC PEOPLE'S COMMITTE NJPT Association SHIMIZU-MAEDA JOINT OPERATION CHỦ TRÌ THIẾT KẾ
S.SASAKI
STAGE / GIAI ĐOẠN
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SHIMIZU-MAEDA DESIGN MANAGER
KENICHI.ITO
CHỦ NHIỆM THIẾT KẾ
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC METHOD STATEMENT DRAWING DRAWING NO REV. BẢN
PROJECT MANAGER BẢN VẼ BIỆN PHÁP THI CÔNG BẢN VẼ SỐ 1
GIÁM ĐỐC DỰ ÁN
NOBUYUKI.KAIWAI A