Beruflich Dokumente
Kultur Dokumente
Issue Submission
Rev
Purpose date
A FI 09-Aug-2018
PO NO. G-V020-P-2181-020-A
JOB NO. G-V020-40-0000
ORIG. PURCHASE ORDER NO. SERIAL REV.
CONTRACTOR
V- 2181-020-A- 811 A
DOC NO.
IN D R-20A
G
18
- A U
28 PRINT
ED
WHEN
LLED
NCONTRO
G0-L0IL-7A20112-902-A
5.1 MW AC Station
Installation manual
(Preliminary)
NOTICE
Make sure that this manual is delivered to the end user of this product.
Read carefully this manual before installing or operating this product. Keep it in a safe place for
future reference.
Confidential
A
IN8-ADUGR-2018
1
2 PRINT
ED
WHEN
LLED
NCO NTRO
G0-L0IL-7A20112-902-A
1. Equipment
4. Auxiliary transformer
A
IN8-ADUGR-2018
3
2 PRINT
ED
WHEN
LLED
NCO NTRO
G0-L0IL-7A20112-902-A
Confidential
A
IN8-ADUGR-2018
24
2 PRINT
ED
WHEN
LLED
NCO NTRO
G0-L0IL-7A20112-902-A
Front
Basement
Confidential
A
IN8-ADUGR-2018
25
2 PRINT
ED
WHEN
LLED
NCO NTRO