Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
JERES-H-001
Coating Selection & Application
Requirements for Industrial Plants & Equipment
This Standard covers the minimum mandatory coating requirements for the internal and
external protection of industrial facilities inside plants.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 1 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Revised Table-A2 to
extend System M to
200°C and for System N
N. Mosson, STC D. Grunemwald
5D 31-Mar-2012 from 200°C. Additional J. Davies
F. Silva, Eng. Mgr. Project Director
Note to paragraph 12.5.
Addition of ISO 16276 in
references
Revised to update
paragraph: 1.2, 5.1, 5.2,
N. Mosson, STC D. Grunemwald
5A 27-Mar-2012 6.3.1 A. Muhsen
F. Silva, Eng. Mgr. Project Director
Appendix A (Table
A1and Table A2)
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 2 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Revision Tracking
Revised to update paragraph: 6.2, 7.3, 7.5, 9.1, 10.3.5, 12.4, 12.6,
4 09 February 2009 Appendix A (Table A1and Table A2), Appendix C-Table C, Appendix
E and Appendix F.
Revised to update paragraph: Table of Contents, 3.1, 6.2, 6.3, 7.3, 7.5,
7.8, 10, 10.3.5, Table A (now Table A1), Appendix C and Appendix E.
Adding Table A2 and also Appendix F- Painting System for Insulated
3 17 November 2008
and Fireproofed material. Adding requirements to paint stainless steel
and insulated surfaces, Adding section 16 for warranties.
Revised to update paragraph: 1.2, 3, 3.1, 3.2.1, 3.2.2, 7.7.f, 8.2, 8.3 9.2,
2 21 July 2008
9.3.2, 10.4.7, 10.4.10, 12.1, 12.3, 12.5, 12.8, 15, Appendix A,
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 3 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Table of Contents
1 Scope 6
3 References 6
4 Definitions 10
6 General Requirements 11
10 Coating Application 17
13 Colour Schedule 30
15 Records 32
16 Warranties 33
Appendixes
Table A1: Selection of Coating Systems for Non- Insulated
A 35
material.
Table A2: Selection of Coating Systems for Insulated and
37
Fireproofed Material.
B Table-B: List of recommended manufacturers 40
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 4 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 5 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
1 Scope
1.1 This Standard covers the minimum mandatory coating requirements for the
internal and external protection of industrial facilities inside plants.
1.2 The purpose is to define the coating of steel structures, equipment, machinery,
piping, instruments, etc. subject to corrosion. It includes different coating systems,
the surface preparation required, the limits of paint, the thickness to be applied, the
application techniques and the requirements for inspection and testing.
1.3 This Standard does not apply to infrastructure facilities, powder coatings, or
decorative coatings unless specified in the scope of work or other mandatory
Company document.
1.4 This standard shall be attached to, and made part of, purchase orders when
required.
2 Conflicts, Deviations and Clarifications
2.1 Any conflicts between this standard and other applicable Company Engineering
Standards (JERES), Material Specifications (JERMS), Standard Drawings
(JERSD), Engineering Procedures (JEREP), Company Forms or Industry
standards, specifications, Codes and forms shall be brought to the attention of
Company Representative by the Contractor for resolution.
Until the resolution is officially made by the Company Representative, the most
stringent requirement shall govern.
2.2 Where a licensor specification is more stringent than those of this standard, the
Licensor’s specific requirement shall apply.
2.3 Where applicable Codes or Standards are not called by this standard or its
requirements are not clear, it shall be brought to attention of Company
Representative by Contractor for resolution.
2.4 Direct all requests for deviations or clarifications in writing to the Company or its
Representative who shall follow internal Company procedure and provide final
resolution.
3 References
The selection of material and equipment, and the design, construction,
maintenance, and repair of equipment and facilities covered by this standard shall
comply with the latest edition of the references listed below as of the CUT-OFF
DATE as specified in the Contract unless otherwise noted.
3.1 Company References
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 6 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 8 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 9 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SSPC Manual,
Volume 2 Systems and specifications
SSP-Vis 1 Guide to Vis 1 - 89 - Visual Standard for Abrasive Blast
Cleaned Steel
SSPC-Vis 2 Standard Methods of Evaluating Degree of Rusting on
Painted Steel Surfaces
SSPC-PA 2 SSPC Method of Measurement of Dry Paint Thickness with
Magnetic Gages
3.2.4 Norsok Standards
Norsok M501 Rev.5 Surface preparation and protective coating
3.2.5 National Association of Corrosion Engineers
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 10 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Coating manufacturer: The party which manufactures and/or supplies the coating
products
Subcontractor: The party selected by the Contractor which carries out all or part
of the material takeoff, design (in special cases), procurement, surface preparation,
application, and testing of the coatings/systems.
Corrosive Industrial Atmosphere: Areas exposed to gases, fumes, mists or dusts
from chemical or industrial facilities. This term does not include direct contact
with splashed or spilled chemicals.
Maintenance Coating/Painting: Application of coating to preserve the useful
state of an existing coating. Repairing is the most common method to maintain a
coating. Replacing completely an existing coating is not maintenance coating.
Mild Atmosphere: Areas not affected by either marine or industrial
environments, but receive enough moisture in the air to cause corrosion if the
carbon steel is not coated.
New Construction Coating: Application of coating on a completely new and
uncoated facility, equipment or machinery. New coating also applies to the
coating application on completely bare substrate that was previously coated.
Thick Film Coating: Coatings with an average dry film thickness greater than 20
mils (500 microns)
Thin Film Coating: Coatings with an average dry film thickness of 20 mils (500
microns) or less
Thixotropic Coating: A type of coating that thickens or gels in a relatively short
time when at rest, but readily becomes more fluid when agitated or stirred.
Vessels: Where referred to in this standard, the term "vessels" includes, but is not
necessarily limited to, columns, traps, drums, heat exchangers, and boilers.
Wet-on-Wet Coating Application: Technique of coating application where
additional coating passes are employed over a coating that is still wet, making the
composite film dry as a whole. A wet coat applied over another wet coat is
considered one coat of application.
5 Health, Safety and Environment
5.1 For field applications only, the safety requirements per JERES-H-102 shall apply
for coating activities. Field applications shall include EPCC shops directly
involved in the fabrication and construction activities within the vicinity of
Company.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 11 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 12 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
− Valves stems, gauge glasses and guards, Friction surfaces of assemblies using
friction
− Surfaces used for identification purposes, such as nameplates, serial number
plates, valve identification signs, gauge glasses and guards, gauge faces and
light fixtures, valve stems and flange bolts.
− Plastic and plastic coated materials provided their resistance to UV has been
demonstrated, and colour coding is not necessary.
6.3.2 The following non-Insulated stainless steel surfaces (316, 304, 321 series, Duplex,
etc) may not be coated:
− Piping, vessels, tanks, and similar operating above 150o C.
− Structural non-pressure containing components
− Cable Trays and Ladder
− Junction Box
− Local Panel and Instrumentation Enclosures-Cabinet
− Cable Gland
− Instrument Impulse Tubing Line
− Instrument Air Supply Tubing Lines
− Rotating equipment casing and seal systems
− Rotating equipment appurtenances such as flushing piping and lube
oil system including piping, exchangers, tank, etc
7 Approved Painting Systems
7.1 Only approved products are allowed for use on Company Facilities. These
requirements apply to all coatings referred to in all the JERES-H-series standards.
7.2 Applications that require coating or new coating system not covered by this
standard or other Company standard shall be approved in writing by the Company
Representative.
7.3 Approved Painting Systems:
7.3.1 Non-Insulated Surfaces
The painting systems A, B, C, D, E, F, P and Q listed in Table – A1 of Appendix
A, have been selected as approved painting system applicable for Non-Insulated
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 13 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
material in accordance with ISO 12944 Part 2, high corrosivity category code C4
for industrial and coastal areas.
7.3.2 Insulated Surfaces
Zinc-rich primer organic and inorganic shall not be used under insulation or
fireproofing.
The painting systems E, G, H, K, L, M, N, O, P and Q listed in Table – A2 of
Appendix A have been selected as approved painting system applicable for
insulated material. For those cases where the painting system data sheets are not
fully developed, EPCC contractor shall submit them to Company for review and
approval prior to application.
7.4 Painting Manufacturers
7.4.1 The painting material shall be supplied from the Company approved painting
manufacturers listed in Table-B of Appendix B. The painting system data sheets
with product trade names from the different manufacturers are provided in
Appendix E and F. These systems are certified by Norsok M501 for low
temperature services and ISO12944 for higher temperature.
7.4.2 Alternative manufacturers can be proposed, provided that their range of products
meets the technical performance of this specification. The manufacturer shall be
able to provide supporting data from exposure tests and/or cyclic weathering
testing carried out in accordance to standard Norsok M501 rev.5 or equivalent.
7.5 Coating systems (Paint schedule Table – A1 and Table- A2)
The coating systems suitable for the structures, equipment and piping are provided
in Appendix-A.
Coating systems will be chosen depending on material of construction, the
presence of insulation/fireproofing and operating temperature.
Zinc-rich primer organic and inorganic shall not be used under insulation or
fireproofing.
7.6 A painting procedure (as per attached Form 1 in Appendix D) including
description of the coating system (type and trade name of coating products, number
of layers, dry film thickness of each layer, etc.) together with product data sheets
shall be submitted for approval to Company by Vendor for shop painted items and
by Sub-Contractor for paint work at field.
7.7 Coating composition
All coating products used in shop or on site shall meet the following requirements.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 14 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
a) All coating product formulation shall respect the local legislation of the place
of application (e.g. VOC, isocyanates, etc) and to some extent they shall
comply with the legislation of the country/state where the plant is built.
b) Coatings shall be free of heavy metals such as arsenic, barium, cadmium, lead,
mercury, silver, chromium, selenium. However, zinc coatings containing
barium sulfate and less than 0.02% lead are acceptable.
c) Two-pack finish coats shall be based on acrylic polyurethane media. Where
isocyanate cured products are not allowed, alternative finish products shall be
submitted to Company for approval. Finish coat shall have gloss retention and
weather/UV resistance.
d) Two-pack epoxy finish coatings shall be based on a polyamide or amine
adduct cured two-pack epoxy media and shall be pigmented with titanium
dioxide and/or light fast colored pigments to provide the necessary opacity,
film build and weather resistance. A semi gloss finish is required.
e) Silicone coatings shall be based on a one-pack formulation. They may
comprise leafing aluminum pigment dispersed in the silicone or modified
silicone media, except for application on stainless steel surfaces. The coating
shall be able to dry completely at ambient temperature (no "tacky" surface)
and shall withstand continuous exposure to temperatures up to 648°C when
required.
f) Inorganic zinc (zinc silicate) primers shall be based on ethyl silicate media and
shall contain not less than 80 % zinc dust by weight in the dry film in
accordance with ISO 12944. They shall be two-component products. Organic
zinc (epoxy zinc) primers shall be based on 2 pack epoxy and shall contain not
less than 80% zinc dust by weight in the dry film.
Zinc dust provided shall meet the requirements of ATM D520 Level II.
g) Alternative high performance two-pack waterborne coating products shall be
submitted to Company for approval. In general, preference should be given to
more environmental friendly systems consistent with meeting the
performance/maintenance requirements
7.8 Coating Effects
7.8.1 The selected coating shall not cause any degradation to the chemical or mechanical
properties of the coated surface.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 15 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
7.8.2 Special attention shall be made for selecting the coating type used on surface
operating at high temperatures especially in the situation of insulated surface so
that the coating will not cause material embrittlement.
8 Packaged Equipment Coating Systems
8.1 This section covers packaged equipment (including mechanical parts, pressure
vessels, piping, instruments, machinery, etc.) and equipment items, such as pumps,
compressors, turbines, blowers, electric motors, transformers, generators, hoists
and cranes, control valve, instrumentation etc.
8.2 Packaged equipment can be coated according to Manufacturers standard, provided
it complies with the following requirements:
a) The Manufacturer’s coating system shall meet the minimum required design
condition of the environment in which the facility is located (in terms of
climatic and corrosive conditions), in order to match the same quality of
corrosion protection of the other systems indicated within this specification.
Any deviation shall be clearly highlighted and forwarded to Company for
written approval.
b) A detailed Painting procedure shall be submitted to Company for written
approval, including
− description of the coating system (type and trade name of coating products,
number of coating layers, dry film thickness of each layer, etc.)
− product data sheets
− any further information to enable damaged primer or finish coat to be
touched/repaired, or over coated with a compatible coating system
− Information deemed appropriate by packaged equipment manufacturer of
the system to give evidence of compliance with the above point a.
8.3 Where hot dip galvanizing is required it shall comply with Section 9 of this
standard.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 16 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
the design of the item is not adequate for galvanizing, the galvanizing Contractor
shall notify the steel fabricator for clarification.
9.3 Repair
9.3.1 Repair of damages at the galvanizing shop shall be according to the applicable
industry standards and codes.
9.3.2 For damages occurring during transport or at construction sites, they shall be
repaired in accordance with the guidelines of the following procedure (Zinc-rich
Paint application)
− PRODUCT DESCRIPTION: Zinc-rich paints (organic based, such as epoxy, is
preferable) must contain >80% zinc dust by weight in dry film in accordance
with ISO 12944.
Zinc-rich paints are usually formulated to deliver an excellent color match for
both bright and matte grey galvanized coatings.
− SURFACE PREPARATION: Basic indication of ASTM A-780 shall be
followed. Preparation of the damaged surface will be influenced by the type of
paint selected and the anticipated service conditions. The following general
guidelines shall apply:
− For highly aggressive service conditions and where feasible, the blast-cleaning
of surfaces to SSPC-SP10/NACE No. 2, near-white metal, is recommended.
− For less critical field exposure conditions and where blasting is not feasible
(i.e. non-easily accessible surfaces), power tool cleaning to SSPC-SP 3, bare
metal shall be adopted (as a minimum).
− When abrasive-blasting or power-tool cleaning is not practical, hand-tools may
be used.
− In all cases, surfaces must be free of oil, grease, weld flux residue and weld
spatter, paint and corrosion by-products. To ensure that a smooth
reconditioned coating can be affected, surface preparation shall extend into the
surrounding undamaged galvanized coating.
− COATING APPLICATION: general guidelines indicated in this specification
shall be adhered to. Reference to the paint manufacturer's instructions shall be
also made.
− The renovated area shall have a zinc coating thickness of 130% of that
specified in JERMS-H-9115 but not more than four mils.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 17 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
10 Coating Application
This section provides additional details on how to apply coating
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 18 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
air is used, air lines shall be provided with effective, well maintained oil and water
traps. Efficient well maintained air filters shall be provided to control dust.
During cleaning, all weld areas and attachments shall be given special attention to
ensure all welding flux and spatter is removed by the use of solvents, files scrapers,
chipping hammers, power or hand brushes or grinders fitted with flexible grinding
discs.
Prior to the commencement of any of the cleaning methods detailed below, the
surface to be cleaned shall have all oil, grease or wax removed by swabbing with a
suitable emulsion cleaner. The surface shall then be washed down with clean fresh
water to remove dirt, stains and residues. Where necessary, hand brushing shall be
included to ensure a clean surface.
10.3.2 Abrasive blast cleaning
In this method, millscale, rust and other surface contaminants shall be removed
using blast or centrifugally propelled abrasives. After the specified standard has
been achieved, all dust, loose materials and abrasive residues shall be removed
from the cleaned surface and the surface shall be coated before contamination or
flash rusting occurs.
Contaminants such as oil, greases, chemicals or soil shall be removed prior to
abrasive cleaning by the use of a suitable emulsion cleaner. The surface shall be
cleaned as specified in TABLE-A1 and Table- A2.
The applicable standard for surface preparation shall be as follows: the grade of
cleanliness is according to ISO 8501-1; the surface roughness is according to ISO
8503; and the surface cleanliness is according to ISO 8502.
After blast cleaning and before application of the priming coat the surface shall be
cleaned to remove dust and abrasives and in particular from pockets and corners.
This can be done by vacuum cleaning or by blowing with dry, oil-free compressed
air.
Due care shall be exercised to prevent the abrasive grit entering inside equipment
and pipe work. On completion of blasting operations, the inside of equipment and
piping shall be inspected and cleaned out if the presence of abrasive grit is
detected.
Any surface showing signs of handling contamination after blasting shall be
solvent cleaned and re-blasted.
The use of abrasives containing silica is not permitted. The abrasive must be free
from oil, grease, moisture, etc. Re-used abrasive shall be clean and reasonably
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 19 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
sharp. They shall not be rusted or noticeably worn or dull when compared with
fresh material and must be free from contaminants.
Re-used abrasive shall be approved by Company Inspector and shall meet the
requirements as specified above.
Blast cleaning shall not commence unless a protective coating can be applied
before contamination or flash rusting occur.
Blasting shall not be done outside normal daylight work hours unless authorized by
Company Inspector.
Blasting operations shall not be carried out unless surfaces to be prepared are 3°C
above ambient air dew point.
All blasted surfaces must be clean, free of all dust, before applying paint.
10.3.3 Protection of surfaces not to be coated
Protect all surfaces not to be coated from damage and from paint products by
adequate temporary coverings during all operations of surface preparations and
painting. Remove coating that may have fallen on these surfaces e.g., valves stems,
glass, adjacent equipment, flange bolts, etc.
In particular, stainless steel and non-ferrous surfaces shall be protected from
blasting, overspray and coatings intended for carbon steel. The contractor shall
protect all equipment that is not to be painted or liable to be affected by the
presence of abrasive or paint. Special attention shall be given to avoid splashes of
zinc-based paint on equipment of austenitic steels to prevent high temperature
cracking corrosion.
10.3.4 Stainless steel
Surface shall be thoroughly degreased using an appropriate emulsion cleaner and
abrasive cleaned (sweep blasting) to create sufficient anchor profile.
Abrasive for blast cleaning of stainless steel surfaces shall be performed with a
suitable non-metallic abrasive such as aluminum oxide.
When hand or power tool cleaning is required on stainless steel, only stainless steel
wire brushes that have not been previously used on carbon steel surface may be
used.
All coatings and solvents for use on stainless steel shall be free of substances such
as chlorides and other halides, sulfur, and shall be free of low melting point metals
(zinc, aluminum, tin and lead). All coatings and solvents used on stainless steels
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 20 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
shall be free of low melting point metals (zinc, aluminium, tin and lead) and
removable chloride levels shall be < 100 ppm according to ASTM C871-04)
All coatings and solvents for use on stainless steel shall be free of substances such
as chlorides and other halides, sulfur, and shall be free of low melting point metals
(zinc, aluminum, tin and lead).
10.3.5 Galvanized surfaces that require coating (hot dip galvanizing, electroplating,
Sendzimir process)
Surface preparation shall consist of thoroughly degreasing and treating with a
mordant/etching solution. After the reaction period the surfaces shall be washed
down with clean water. The Company Inspector shall approve water source prior to
use.
Alternatively, sweep blast cleaning is acceptable after thorough degreasing by
using lower air-blasting pressure at 3.5 – 4.0 barg (50 – 60 psig). Dust from blast
cleaning operation shall be removed as previously described.
Top-coating like mastic epoxy system as approved under APCS-26 (Hempel
Painting System) is recommended for galvanized surfaces in coastal areas exposed
to marine environment with a high humidity. In any case, EPC contractor may
propose another painting system to Company for approval prior to application.
Note: Weathered galvanized surfaces should be wire brushed first to remove all
corrosion products.
10.3.6 Weld areas and sharp edges
All weld seams, sharp edges and surface irregularities shall be contoured and
surface irregularities ground smooth as required.
10.3.7 Anchor profile
Unless otherwise specified, the surface profile for carbon steel surfaces after blast
cleaning shall have a min/max height of 50/75 microns with rough peaks to 100
microns (Rz).
10.3.8 Manual and Mechanical (Power-Tool) Cleaning
Manual cleaning shall only be carried out when the use of power tools is prohibited
and with prior approval by Company Representative.
In this process dirt, rust, millscale and/or paint remains are removed and the metal
surface prepared by hand chipping, scraping or wire brushing or preferably where
possible by powered hand tools such as powered wire brushes, Bristle Blaster or
needle guns to achieve the specified standard. This method shall be limited to
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 21 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
small sized surfaces and shall be only used with the written approval of Company
representative.
The quality of surface cleanliness achieved by manual or mechanical cleaning is
specified in accordance with ISO 8501-1 for manual or mechanical cleaning.
On completion of the surface preparation, all dust and other foreign materials shall
be removed and the primer coat applied before any contamination or rusting occur,
but in any case within four hours. Should the cleaned surface be left uncoated
overnight surface preparation shall be repeated prior to painting.
10.4 Preparation and Application of Coating Material
10.4.1 General
Coating Contractor shall adhere strictly to the instructions and recommendations as
prescribed by the coating Manufacturers for the preparation and application of all
coating materials. Successive coats shall have a contrasting colors or tints.
10.4.2 Coating preparation
Coating components shall be power-stirred to obtain a homogenous consistency.
No hand stirring is allowed for quantities greater than 5 liters. Before further use,
coating shall be allowed to stand for a time long enough to remove aeration caused
by stirring.
Two-pack or multiple pack coating systems shall be mixed in the proportions and
under the conditions recommended by the Manufacturer. The mixed coating shall
not be used on expiry of its "pot life".
For inorganic zinc primers, after mixing the silicate binder and the zinc powder, the
mixed product shall be sieved prior to application and continuously power-stirred
during application.
The mixed coating shall color match with other prepared products of the same coat.
Coatings visually showing deterioration such as settling, separation, gelling, skin
formation, etc. shall be discarded.
10.4.3 Coating Application
Painting shall be done according to the application instructions of the Coating
Manufacturer and shall be performed by skilled and experienced staff, aware of
health and hazard issues related to painting activities.
Coating may be applied by brush, roller, conventional spray or airless spray
methods as approved or specified by the coating Manufacturer. Brush or rollers
used shall be of a suitable size and shape and shall be kept clean by use of
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 22 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
approved solvents. Where rollers are used, the nap shall be of sufficient length to
work the coating well into the surface.
When using conventional spray or airless spray methods, all the equipment shall
have adequate, well-maintained pressure regulating devices, effective strainers,
traps, and separators, suitable size hoses and clean, well-maintained guns. The
traps and separators for removing oil and water maintained from the compressed
air shall be such that air atomizing guns will not deposit oil or water when directed
on to a clean surface for 15 seconds.
Nozzles shall be of the correct size and provide the most suitable spray shape for
the most effective and economical application of the coating without excessive
overspray.
The specified coating thickness shall be achieved at all protrusions, corners and
crevices. Edges, cracks, bolt heads, etc. may require the coating to be evened by
laying off with a brush after roller application.
All coating materials shall be applied evenly in a normal full coat free from mud
cracking, wrinkling, sagging, curtaining, cissing (cracking in the top coat of a
coating), fish eyes, orange peeling, pinholes, brush and roller marks and other
defects.
The dry film thickness shall be measured from the peaks of the grit blast profile
and suitable pieces of grit blasted steel shall be prepared to enable the thickness
meters to be calibrated in accordance with the indications from the equipment
Manufacturer.
Due care shall be exercised whilst spraying to prevent overspray and contamination
of other surfaces by the use of shields, etc.
Under no circumstances shall zinc or aluminum in the form of coating pigments or
metal spray shall be allowed to come into contact with stainless steels, nickel based
alloys or copper based alloys.
10.4.4 Priming
The priming coat shall be applied as soon as possible after the surface preparation
has been carried out and before any contamination of the cleaned surface. The
specified surface preparation is understood to be the one at the moment of the
application.
Angles, corners, sharp edges, bolt or rivet heads, weld seams and other surface
irregularities shall be stripe-coated by brush. This coat shall be the same product as
the primer, but should be of a different color for identification purpose.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 23 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
be primed only. Where piping is fully painted before hydrostatic test, each
successive coat of paint will be stopped 50 mm to 75 mm before the preceding coat
at each joint to allow for proper tie-in of subsequent coats after the completion of
the test. In any case, coating of welds prior to hydrotest may be accepted limited to
multi-pass welds: single run welds such as seal or socket welds are to be left
uncoated.
10.4.11 Shipping, handling and storage of coated items
− Coated items shall not be handled or moved until all coatings have been
properly dried or cured as required in the Coating Manufacturer's instructions.
− Coated items shall be handled with equipment such as wide belt slings, web
belts, and wide padded skids selected to prevent damage to the coating.
Handling equipment likely to cause damage to the coating shall not be used.
Items such as chains, cables, hooks, tongs, metal bars, and narrow skids shall
not be permitted to come in contact with the coating. Dragging or skidding
coated items shall not be permitted.
− Coated items shall be loaded, padded, and secured for transport in such a
manner that the coating will not be damaged in transit.
− Coated items shall be separated so that the items do not bear against each other.
− Coated items shall be stacked off the ground using suitable means (e.g. parallel
height ridges of rock-free sand, wooden timbers placed under the uncoated pipe
ends) to avoid damages of the coating.
11 Equipment Used for Coating Preparation and Application
11.1 Blasting equipment
All blasting equipment supplied will have a current inspection certificate from a
third party independent source if required.
The pressure and volume of the compressed air supply for blast cleaning shall meet
the work requirement and shall be sufficiently free of oil and water contamination
to ensure that the cleaning process is not impaired. Traps, separators and filters
shall be emptied and cleaned regularly.
11.2 Hand tools
Chipping, scraping and steel wire brushing using manual or power driven tools
shall be of a type acceptable to Company.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 26 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Dry film thickness shall be measured with a magnetic or ultrasonic probe, such as
"ELCOMETER" or "MICROTEST" etc ... The equipment shall be calibrated at
least twice daily in accordance with the Coating Manufacturers' recommendations.
It is suggested that, in order to achieve the specified dry-film thickness, wet-film
thickness be checked during the coating application with wet film thickness gauges
such as the Elcometer wheel or comb type.
Reference is to ISO 2178 and ISO 2808. The acceptance criteria shall be according
to SSPC-PA 2.
If the dry film thickness does not meet the specified value, additional coats shall be
applied, except for inorganic zinc (zinc silicate) primers that shall be re-blasted and
re-applied at the required dry film thickness.
Inorganic zinc (zinc silicate) primers applied at dry film thickness greater than
100µm or showing mud-cracking shall also be re-blasted and re-applied at the
required dry film thickness.
12.3 Drying/curing
For each coat, the curing shall be checked by assessing the solvent resistance.
Test shall be performed according to ASTM D4752 for inorganic zinc (zinc
silicate) primers.
12.4 Adhesion check
The coating shall be examined and tested for measuring adhesion between coats
and for adhesion of the first coat to the substrate by applying once per shift the
Tape Test Method A of ASTM-D-3359 and the rating shall be between 4A and 5A.
For coating thickness greater than 5 mils, X-cut adhesion test with knife can be
used.
An adhesion pull-off test shall be carried out at any location where there is
evidence of any sort of failure in any coating including, but not limited to, lifting of
coats or loss of adhesion between layers in coating system.
The adhesion pull-off tests as well as their results shall be conducted and reported
respectively in accordance with ISO 4624 or ASTM D4541.
Coating whose adhesion pull-off test result is less than 30 kg/cm2 (3 MPa) shall be
considered to have failed, except on silicon based coatings.
12.5 Porosity check
Film continuity shall be checked as follows
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 28 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
All External surfaces will be subject to visual inspection for holidays, pinholing
and excessive overspray. Inspection using electrical comb tester reveals defects
such as porosity, and absence or discontinuity in the paint film. This inspection
shall be carried out with an electrical comb tester set to a voltage calculated on a
basis of 3volts per micron of the normal dry film thickness.
Areas found to have been improperly coated shall be reapplied.
Note: Zinc rich coatings and aluminium rich coatings may be conductive and not
provide meaningful results for the electrical comb test or ‘wet sponge’ test
12.6 Soluble salt contamination
Soluble salts contamination is a mandatory test, which is carried out to measure
chloride and soluble salt concentrations and pH level from a steel surface. This test
shall be conducted as follows:
− One (1) time per week for new surface preparation activities
− It shall be done after surface preparation has been completed and prior to
coating application.
− One (1) test on every batch of new garnet
− One (1) test whenever recycled garnet is used.
− One (1) test to be carried out whenever there is a change in the blasting crew
− One (1) test when the relative humidity approaches 85% or when there is
extreme change in weather conditions such as a sandstorm, rain, foggy or misty
conditions.
− The test area shall be 4 inches by 4 inches and using as material KTA Swab
SCAT kit.
Testing for chloride and soluble salt concentrations and the pH level shall be done
using a Bresle Method according to ISO 8502-6. The chloride and soluble salt
concentrations shall be less than 10 ppm and the pH shall be neutral (between 6
and 8). When these levels are exceeded, the surfaces shall be either steam cleaned
or high pressure water washed before abrasive blasting. The cleaned surface shall
be retested to verify that the contaminant levels are within the acceptable range.
12.7 Supplementary testing
The following tests may be carried out at the discretion of the Company.
Millscale test – A copper sulfate test shall be performed to determine the presence
of millscale.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 29 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
13.2 The final color coding shall be finalized by the Company prior to commencing the
work.
DIAMETER OF PIPE A B C D E
mm mm mm mm mm mm
Up to 100 350 50 25 30 20
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 31 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
15 Records
15.1 At the end of the project, the technical file, handed over by the Contractor and co-signed
by the Manufacturer, at the end of the works, shall include, at least, the following:
− the painting system;
− the location of each painting system on the applicable painted structure;
− the product data sheet and references of the batches used;
− certificates specifying the durations, criteria and performance levels of the warranties;
− reports of the inspections;
− provisional acceptance reports;
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 32 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
16 Warranties
16.1 The Contractors shall provide Company Representative with painting and coating life
warranties to be reviewed and approved by Company.
16.2 The warranty shall be minimum five years.
16.3 After five years of application of the painting, the painting shall perform in according of
the following:
− Maximum degree of rust shall be Ri2 according to ISO 4628
− Maximum degree of cracking, blistering or flaking shall be 3S3 according to ISO
4628
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 33 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
System Coated
Index Surface Coating
System Specification Notes
Non Base Material / Activity
Insulated Tmin / Tmax
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
75μm of 2-pack Epoxy zinc rich (organic zinc)
ambient temp Primer 1
A or 75µm of 2-pack ethyl zinc silicate (inorganic zinc)
2
120°C Intermediate 150μm of 2-pack polyamide epoxy MIO
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 30-75μm)
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 30-75μm)
50-65μm 2-pack ethyl zinc silicate (inorganic zinc)
201°C Primer
C or 75µm DFT of 2-pack ethyl zinc silicate (inorganic zinc) 1
400°C Intermediate 25μm of silicone aluminium
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 30-50μm)
Ambient Primer 25μm of silicone aluminium coating
D 2
401°C to 540°C Intermediate 25μm of silicone aluminium coating
C.S. Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm) 3
P
Ambient Primer 100µm of Titanium Modified Inorganic Co-Polymer 4
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 34 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
System Coated
Index Surface Coating
System Specification Notes
Non Base Material / Activity
Insulated Tmin / Tmax
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
Stainless Steel. Surface prep. Light abrasive blast cleaning (Rz = 30-40μm)
Galvanized
Surface prep. Light abrasive blast cleaning (Rz = 30-50μm)
Steel
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 36 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Coated
System Surface
Index Base Material/ Coating
System Specification Notes
Activity
Insulated Tmin/Tmax
Insulated Surface
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
cryogenic
Primer 100μm of 2-pack epoxy amine phenolic
services.
K 1
150°C Intermediate 100μm of 2-pack epoxy amine phenolic
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 30-50μm)
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
100µm of Titanium Modified Inorganic Co-Polymer 3
P Ambient Primer
4
400 °C Intermediate 100µm of Titanium Modified Inorganic Co-Polymer
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 37 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Coated
System Surface
Index Base Material/ Coating
System Specification Notes
Activity
Insulated Tmin/Tmax
Insulated Surface
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
Carbon Steel Surface prep. Abrasive blast cleaning to ISO Sa 2.5 (Rz = 50-75μm)
Ambient Primer 25μm of silicone aluminium coating
D 401°C to
Intermediate 25μm of silicone aluminium coating
540°C
Stainless Steel Surface prep. Light abrasive blast cleaning (Rz = 30-40μm)
galvanized
structural steel Surface prep. light abrasive blast cleaning (Rz = 10-15μm)
fireproofed
75μm of 2-pack polyamide epoxy (also for touch up of HDG surfaces 5
G ambient Primer
refer to paragraph 9.3.2)
80°C Intermediate Not Required
Finish Not Required
carbon steel
Abrasive blast cleaning to ISO Sa 2.5 (Rz = 30-50μm)
H fireproofed Surface prep. 5
structural
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 38 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Coated
System Surface
Index Base Material/ Coating
System Specification Notes
Activity
Insulated Tmin/Tmax
Insulated Surface
Note 2: Product examples for System L are: Hi-Temp 1027 or Jotatemp 650.
Note 3: Non cyclic operating conditions. Normal shutdown for turnarounds or catalyst change is
not considered cyclic from coating prospective.
Note 4: Cyclic condition such as regeneration lines.
Note 5: For concrete fire proofed structures
Note 6: System `C' may be used in lieu of System `N' for insulated equipment based on the
suitability of inorganic zinc-rich primer being coated with a silicon acrylic intermediate
and topcoat as outlined in NACE SP-198-2010 Table 2 system CS-8.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 39 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
AMERON
CARBOLINE
HEMPEL
SIGMA
HI-TEMP COATINGS
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 40 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Structural steel (Pipe Rack, etc.) Traffic Grey 7042 As per Para. 5.1.1 of JERES-B-067.
Structural column along the road and bridge up to Black and Yellow
9005/1021 Over either steel or galvanized steel
1.5 m from base plate (ground level) Stripe (*)
2.0 Equipment
Equipment Skirt & Leg Traffic Grey 7042 As per Para. 5.1.1 of JERES-B-067.
As fireproofing
Equipment Skirt (fireproofing required) ----------
colour
3.0 Machinery
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 41 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
4.0 Piping
Hose Connector for Raw Water in Utility Stations Blue 5015 As per Para 19.4 of JERES-L-310
Hose Connector for Air in Utility Stations Green/Grey 6016/7042 As per Para 19.4 of JERES-L-310
Hose Connector for Steam in Utility Stations White 9010 As per Para 19.4 of JERES-L-310
Hose Connector for Nitrogen in Utility Station Green/Orange 6016/2000 As per Para 19.4 of JERES-L-310
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 42 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
7042 or ANSI
Switchgear, control gear Traffic Grey
61
7042 or ANSI
Motor Control Center (MCC) Traffic Grey
61
7042 or ANSI
Electrical Distribution Panel Traffic Grey
61
7042 or ANSI
Battery Charger Traffic Grey
61
7042 or ANSI
Uninterruptible Power Supply (UPS) Traffic Grey
61
7042 or ANSI
Transformer Traffic Grey
61
6.0 Instrument
Outdoor Cabinets: Exterior Mfr's Standards Mfr's Standards As per Para 6.4.1 of JERMS-J-4820
Control valve and On-off Valve actuators Mfr's Standards Mfr's Standards
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 43 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Junction Box Outdoor Mfr's Standards Mfr's Standards N/A if selected as stainless steel
Portable and Fixed Fire Protection System Red 3000 As per Para 5.2.1 b) of JERES-B-067.
Mounting Background for Fire Extinguisher Red 3000 As per Para 5.2.1 b) of JERES-B-067.
Shelters for Portable Fire-fighting Equipment Red 3000 As per Para 5.2.1 b) of JERES-B-067.
Fire water pumps control panels Red 3000 As per Para 5.2.1 b) of JERES-B-067.
Emergency Stop Pushbutton Devices and Switches Red 3000 As per Para 5.2.1 b) of JERES-B-067.
9.0 Others
Background of Emergency Eye-wash and Shower Green 6016 As per Para 5.2.2 a) of JERES-B-067
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 44 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
Background of Emergency Safety Equipment Green 6016 As per Para 5.2.2 a) of JERES-B-067
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 45 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
PAINT SYSTEM:
Surface preparation:
Primer
Intermediate
Finish
Note:
The manufacturer of the paint products shall be able to provide supporting data from tests carried out in accordance to
standard Norsok M501 or equivalent.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 46 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer AMERON
1. REFERENCE SYSTEM
1.1. Surface preparation: SA 2 ½
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: SA 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 47 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: SA 2 ½ cording to ISO 8501-1
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: St3 according to ISO 8501-1
Application of intermediate and finish coat at DFT provided for original system
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 48 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: SA 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 49 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.2 Coating:
1.2 Application
2. REPAIR SYSTEM
2.1. Surface preparation: ISO 8501-1:1998 Power tool cleaning to minimum St2
1.2 Coating: 2 coats of Interseal 670HS / Interthane 990 System build-up 150µm/150µm/50µm
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 50 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
Hand and/or power tool cleaning to Sa 3 or spot blasting to Sa 2 ½, feathering adjacent sound coating on10-15cm.
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 51 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM A
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 52 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
2) PAINT SYSTEM B
SYSTEM B
Manufacturer AMERON
1. REFERENCE SYSTEM
1.1. Surface preparation: SA 2 ½
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: SA 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 53 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM B
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: SA 2 ½ cording to ISO 8501-1
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: SA 2 ½ according to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 54 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM B
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2.1. Surface preparation: SA 2 ½
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 55 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM B
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: N/A
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 56 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM B
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2.5(Rz = 30-75 µm)
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- small areas repairs/ touch-ups: Hand and/or power tool cleaning to St 3 or spot blasting to Sa 2 ½, feathering adjacent
sound coating on10-15cm
2.2. Coating: Apply above system / coats sequence, except for small areas repairs/touch-ups where 2 x 35 µm Solvalitt
Zinc, one pack silicone zinc rich primer should be used in substitution of the Ethyl zinc silicate primer
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 57 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM B
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 58 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
3) PAINT SYSTEM C
SYSTEM C
Manufacturer AMERON
1. REFERENCE SYSTEM
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 59 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM C
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 60 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM C
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 61 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM C
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: N/A
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 62 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM C
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz = 30-75 µm)
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
small areas repairs/ touch-ups: Hand and/or power tool cleaning to St 3 or spot blasting to Sa 2 ½, feathering adjacent
sound coating on10-15cm
2.2. Coating: Apply above system / coats sequence, except for small areas repairs/touch-ups where 2 x 35 µm Solvalitt
Zinc, one pack silicone zinc rich primer should be used in substitution of the Ethyl zinc silicate primer
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 63 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM C
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 64 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
4) PAINT SYSTEM D
SYSTEM D
Manufacturer AMERON
1. REFERENCE SYSTEM
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 65 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM D
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 66 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM D
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 67 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM D
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: N/A
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 68 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM D
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz = 30-75 µm)
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- small areas repairs/ touch-ups: Hand and/or power tool cleaning to St 3 or spot blasting to Sa 2 ½, feathering - ----
adjacent sound coating on 10-15cm
3. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 69 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM D
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2.1. Surface preparation:
2. REMARKS
3.1. Inspections:
• Minimum adhesion NA
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 70 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
5) PAINT SYSTEM E
SYSTEM E
Manufacturer AMERON
1. REFERENCE SYSTEM
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 71 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: Sweep blasting with non-metallic and chloride free grit to obtain anchor profile of 25-45 µm
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 72 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 73 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: N/A
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 74 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Light Abrasive
blast cleaning to ISO Sa 2 ½ (Rz = 10-15 µm) using non metallic abrasive
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- small areas repairs/ touch-ups: Non ferrous hand/or power tool cleaning to St 3 or spot blasting to Sa 2 ½, feathering
feathering adjacent sound coating on10-15cm
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 75 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 76 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
6) PAINT SYSTEM F
SYSTEM F
Manufacturer AMERON
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 77 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM F
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: Sweep blasting with non-metallic and chloride free grit to obtain anchor profile of 25-45 µm
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 78 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM F
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 (light abrasive grit-sweeping)
1.2 Coating:
1.3 Application
REPAIR SYSTEM
2. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 79 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM F
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Light Abrasive Blast of Galvanized preferred
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: ISO 8501-1:1998 Power tool cleaning to minimum St 2
2.2. Coating: 2 coats of Interseal 670HS / Interthane 990 System build-up 150µm/150µm/50µm
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 80 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM F
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Light Abrasive
blast cleaning to ISO Sa2 ½ (Rz = 10-15 µm) using non metallic abrasive
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- small areas repairs/ touch-ups: Non ferrous hand/or power tool cleaning to St 3 or spot blasting to Sa2 ½ , feathering
feathering adjacent sound coating on10-15cm
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 81 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM F
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Light abrasive Blast Cleaning (sweep blasting)
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 82 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
7) PAINT SYSTEM P
SYSTEM P
Manufacturer INTERNATIONAL
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz=50-75 µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- Small areas repairs/touch-ups: Power tools cleaning to SSPC-SP11 (Rz = 40 µm), feathering adjacent sound coating on
10 – 15 cm.
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 83 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
8) PAINT SYSTEM Q
SYSTEM Q
Manufacturer INTERNATIONAL
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz=50-75 µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
For operating temperatures below 400 °C use Intertherm 751 CSA (System I) to carry out repair. See repair procedure for System I.
2.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Grit blasting to
Sa 2 ½ (Rz=50-75 µm), feathering adjacent to sound coating on 10-15 cm.
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 84 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer AMERON
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 85 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer CARBOLINE
1. REFERENCE SYSTEM
1.1. Surface preparation: Sweep blasting with non-metallic and chloride free grit to obtain anchor profile of 25-45 µm
1.2 Coating:
1.4 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½ cording to ISO 8501-1
2.2. Coating: Application of the entire coatings system to the specified dry film thickness
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 86 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer HEMPEL
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 87 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer INTERNATIONAL PAINT
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2 Coating:
1.3. Application
3. REPAIR SYSTEM
4.
2.1. Surface preparation: N/A
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 88 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer JOTUN
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Light Abrasive
blast cleaning to ISO Sa 2 ½ (Rz = 10-15 µm) using non metallic abrasive
1.2 Coating:
1.3 Application
2. REPAIR SYSTEM
2.1. Surface preparation: thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- small areas repairs/ touch-ups: Non ferrous hand/or power tool cleaning to St 3 or spot blasting to Sa 2 ½, feathering
feathering adjacent sound coating on10-15cm
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 89 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM E
Manufacturer SIGMA
1. REFERENCE SYSTEM
1.1. Surface preparation: Abrasive Blast Cleaning to ISO Sa 2 ½
1.2 Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 90 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
2) PAINT SYSTEM G
SYSTEM G
Manufacturer Hempel
1. REFERENCE SYSTEM
1.1. Surface preparation: Light abrasive blast cleaning (Rz =10-15 µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 (light abrasive grit sweeping)
2.2. Coating:
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 91 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
3) PAINT SYSTEM H
SYSTEM H
Manufacturer Hempel
1. REFERENCE SYSTEM
1.1. Surface preparation: light abrasive blast cleaning (Rz = 50-75µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 92 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
4) PAINT SYSTEM K
SYSTEM K
Manufacturer Hempel
1. REFERENCE SYSTEM
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 93 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
5) PAINT SYSTEM L
SYSTEM L
Manufacturer Jotun
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2. Coating:
1.3. Application
Relative humidity
Temperature min/max +10°C/+260°C +10°C/+260°C
Recoating interval at 20°C and RH 24 hrs 12 hrs
60% MIN/MAX
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 94 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
6) PAINT SYSTEM M
SYSTEM M
Manufacturer Hempel
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
Note: System for finalization as epoxy intermediate and polyurethane topcoat are not suitable for use under insulation.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 95 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
7) PAINT SYSTEM N
SYSTEM N
Manufacturer Hempel
1. REFERENCE SYSTEM
1.1. Surface preparation: Sa 2 ½
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1. Surface preparation: Sa 2 ½
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 96 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
9) PAINT SYSTEM P
SYSTEM P
Manufacturer INTERNATIONAL
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz=50-75 µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
2.1 Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc.
- Small areas repairs/touch-ups: Power tools cleaning to SSPC-SP11 (Rz = 40 µm), feathering adjacent sound coating on 10
– 15 cm.
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 97 of 98
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Coating Selection & Application Requirements for Rev: 5E
Industrial Plants & Equipment JERES-H-001
SYSTEM Q
Manufacturer INTERNATIONAL
1. REFERENCE SYSTEM
1.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Abrasive blast
cleaning to ISO Sa 2 ½ (Rz=50-75 µm)
1.2. Coating:
1.3. Application
2. REPAIR SYSTEM
For operating temperatures below 400 °C use Intertherm 751 CSA (System I) to carry out repair. See repair procedure for System I.
2.1. Surface preparation: Thorough cleaning to remove all contaminants such as soluble salts, dirt, oil, etc. Grit blasting to
Sa 2 ½ (Rz=50-75 µm), feathering adjacent to sound coating on 10-15 cm.
3. REMARKS
3.1. Inspections:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.