Sie sind auf Seite 1von 7

EDSD REV

REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
A

DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ -
A 12/2019 ISSUED FOR APPROVAL AB JRB
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

JRB

RCJ
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

DATE: 12-10-19
CERTIFIED
DATE: 12-10-19

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
- DATE:

TANAJIB
TANAJIB OPD CAMP
POWER SYSTEM STUDY

TANAJIB COMMUNITY CAMP


SAUDI ARABIA
FOR

DOC
PREPARED BY:

-
JO / EWO:
DECEMBER 11, 2019

-
P
SAUDI ARABIAN OIL COMPANY

DWG.TYPE PLANT NO. INDEX


TANAJIB OPD CAMP

ISSUED FOR APPROVAL


POWER SYSTEM STUDY

DRAWING NO.

RE-1278001
7
1
OF
SHORT CIRCUIT AND LOAD FLOW STUDIES

SHT.NO.

A
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

JRB
AB

TABLE OF CONTENTS
1.0 INTRODUCTION..........................................................................................................3
2.0 SCOPE OF POWER SYSTEM STUDY.......................................................................3
ISSUED FOR APPROVAL

3.0 INDUSTRY CODE AND STANDARDS.......................................................................3


DESCRIPTION

4.0 SOFTWARE.................................................................................................................3
5.0 REFERENCE PROJECT DRAWINGS & DOCUMENTS............................................3
6.0 OVERALL STUDY INFORMATION.............................................................................3
7.0 DATA INPUTS..............................................................................................................4
8.0 LOAD FLOW STUDIES...............................................................................................4
9.0 SHORT CIRCUIT STUDIES........................................................................................6
JO/EWO
-

10.0 ATTACHMENTS.....................................................................................................7
12/2019
NO. DATE
REV

DISCIPLINE
ENGINEER
JRB
DATE: 12-10-19
PROJECT
ENGINEER

RCJ

DATE: 12-10-19
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

(DCC) NO. _____________________


-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 2
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

1.0 INTRODUCTION
JRB
AB

This study is conducted to determine the overall electrical system capability and responses
of the Tanajib plant in regards to the Tanajib OPD Camp Project.

This report summarize the results of the ETAP Analysis for the Electrical Power System
within the project scope in terms of Load Flow Analysis and Short circuit study, The studies
ISSUED FOR APPROVAL

performed were in accordance with Saudi Aramco Standard, SAES-P-100.


DESCRIPTION

2.0 SCOPE OF POWER SYSTEM STUDY

Below are the studies, which conducted for the IFC submittal.
 Load Flow Analysis
 Short Circuit Analysis

3.0 INDUSTRY CODES and STANDARDS

 SAES-P-100 - Basic Power System Design Criteria


JO/EWO

 SAES-P-116 - Switchgear and Control Equipment


-

 SAES-P-113 - Motors and Generators


12/2019
DATE

 SAES-P-121 - Transformers and Reactors


 IEEE 399 - IEEE Recommended Practice for Industrial and Commercial
Power Systems
NO.
REV

DISCIPLINE
ENGINEER
JRB
4.0 SOFTWARE
DATE: 12-10-19
PROJECT
ENGINEER
The power system software used on this study is Electrical Transient Analyzer Program
RCJ (ETAP) version 19.0.0 issued by Operation Technology Inc. (OTI), USA
DATE: 12-10-19
CERTIFIED 5.0 REFERENCE PROJECT DRAWINGS & DOCUMENTS

DATE:
Drawing No. Drawing Title
CONSTRUCTION
AGENCY Key One Line Diagram, 34.5/13.8kV Community Power
D850369001.005
Supply
DATE:
OPERATIONS
BA-000403.001 Electrical One Line diagram MDP-1, 84 Man - Camp
DD-000403.001 Electrical One Line diagram MDP-1, 136 Man - Camp
DATE:
6.0 OVERALL STUDY INFORMATION
CONTROL NUMBER
VERIFICATION
EDSD

6.1 The ETAP model provided by POD dated Oct 5, 2019. However, backup files for the
previous project was not provided and deleted as per configuration list of ETAP model.
DATE:
BY:

6.2 This study is limited to the work under Tanajib OPD Camp project. The study,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

tabulation, & results highlighted herein are for transformers and its related distribution
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

equipment only.
(DCC) NO. _____________________
-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 3
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.0 DATA INPUT
ENGG CERT

The following utility SC parameters considered for ETAP Studies as received with ETAP file
JRB

given by Saudi Aramco.


AB

230kV Three Phase Single Phase


SC Type
Utility
MVASc X/R kASc MVASc X/R kASc
ISSUED FOR APPROVAL

Ultimate 3904.042 10.7 9.8 2191.044 5 5.5


DESCRIPTION

At 230kV Maximum 2469.904 9.8 6.2 1673.161 6.1 4.2


Minimum 1155.278 6.8 2.3 916.255 6.8 2.3

8.0 LOAD FLOW STUDIES

8.1 Introduction
The purpose of load flow study is the calculation of minimum, normal and maximum
steady state voltage profiles at network buses under maximum, normal and minimum
operating/ loading conditions, respectively. The steady state voltages shall comply with
JO/EWO

the requirements of SAES-P-100, par. 6.2.


-

8.2 Assumptions
12/2019
DATE

a) Load flow study in Normal voltage configuration carried out with all bus-tie open and
Transformers / Switchgears made to operate on double-ended operation as per
NO.
REV

SAES-P-100, CL: 7.5.1.2. In this configuration, the minimum short circuit value from
DISCIPLINE
ENGINEER utility is considered with both the line is in service.
JRB
DATE: 12-10-19
PROJECT
b) Load flow study in Minimum voltage configuration is carried out with all bus-tie closed
ENGINEER and Transformers / Switchgears made to operate on single ended operation with
RCJ largest standby or spare motor is running as per SAES-P-100, CL: 7.5.1.3. In this
DATE: 12-10-19 configuration, the minimum short circuit value from utility is considered
CERTIFIED

c) Load flow study in Maximum voltage configuration is carried out with all bus-tie open
DATE:
CONSTRUCTION
and Transformers / Switchgears made to operate on double-ended operation with all
AGENCY motor loads disconnected as per SAES-P-100, CL: 7.5.1.1. In this configuration, the
maximum short circuit value from utility is considered with both the line is in service.
DATE:
OPERATIONS
d) The following Voltage Drop criteria are considered as per clause 6.2 of SAES-P-100
for Load flow analysis.
DATE:
CONTROL NUMBER

LV System :
VERIFICATION

At Switchgear/Control gear = +5%, -5%.


EDSD

At Light Fixtures = +4.2%,-8.3%


DATE:

At utilization equipment other than lights = +4.2%,-10%


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

HV System :
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

At the Control gear / MCC buses in same plant = +5%,-2.5%


(DCC) NO. _____________________

At utilization device = +5%,-10%


-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 4
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The model was set to highlight voltages on bus sections that were below 95% and
ENGG CERT

105% of the nominal voltages at all buses.


JRB

8.3 Study Cases


AB

The following Case Studies is used to evaluate the Power System,

Maximum System Voltage Condition

Presentation ID : TANAJIB PLANT


ISSUED FOR APPROVAL

Composite ID : COMMUNITY
DESCRIPTION

Revision Data : Base


Configuration Status : LFNOR
Study Mode : Load Flow
Study Type : Load Flow
Study Case : LFMAX-Tamimi

Utility power grid is at Maximum Short circuit, All Non motor Loads: ON, All Motor
loads: OFF, Standby Loads: OFF, in secondary selective substations, both
incoming transformers are running with bus tiebreaker open
JO/EWO
-

Minimum System Voltage Condition


12/2019
DATE

Presentation ID : TANAJIB PLANT


Composite ID : COMMUNITY
Revision Data : Base
NO.
REV

DISCIPLINE Configuration Status : LFMIN


ENGINEER
Study Mode : Load Flow
JRB
Study Type : Load Flow
DATE: 12-10-19
PROJECT Study Case : LFMIN-Tamimi
ENGINEER

RCJ
Utility power grid is at Minimum short circuit, all operating Loads ON, Largest
DATE: 12-10-19
CERTIFIED standby motor is running, in secondary selective substations only one transformer
is running with the tiebreaker closed.
DATE:
CONSTRUCTION Normal System Voltage Condition
AGENCY

DATE:
Presentation ID : TANAJIB PLANT
OPERATIONS Composite ID : COMMUNITY
Revision Data : Base
Configuration Status : LFNOR
DATE:
Study Mode : Load Flow
CONTROL NUMBER
VERIFICATION

Study Type : Load Flow


EDSD

Study Case : LFNOR-Tamimi


DATE:

Utility power grid is at Minimum short circuit, All Loads: ON, Standby Loads: OFF,
BY:

loads considered in its normal working configuration, in secondary selective


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

substations it is considered that both transformers are running with bus tiebreaker
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

open.
(DCC) NO. _____________________
-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 5
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4 Calculation Results
ENGG CERT

The calculated Load Flow Steady State Voltages of the buses are summarize in
JRB

Table 1. The complete details of the calculation result refer to Attachment-1A/1B and
Attachment-1C.
AB

TABLE- 1: Switchgear/MCC Steady State Voltage


Composite ID based on Rated Steady State Voltage (%)
ETAP file) Voltage Maximum Minimum Normal
ISSUED FOR APPROVAL

Tanajib Community Bus-A 13.8kV 100.420 100.537 99.866


DESCRIPTION

Tanajib Community Bus-B 13.8kV 100.501 100.537 100.106


L07-TLOT-1_BUS
13.8kV 100.480 100.534 100.039
(1000kVA Transformer)
L07-TLOT-2_BUS
13.8kV 100.480 100.534 100.051
(750kVA Transformer)

8.5 Evaluation and Conclusion

Based on this study, the system upgrade under this project will only have minimal effect on
JO/EWO

the overall system and having the basis of the above calculation results for maximum and
-

normal voltage system, it can be concluded that the electrical system under this project do
12/2019
DATE

meet Saudi Aramco Standards.


NO.
REV

DISCIPLINE 9.0 SHORT CIRCUIT STUDIES


ENGINEER
JRB
9.1 Introduction
DATE: 12-10-19
PROJECT The purpose of short circuit study is the calculation of maximum expected 3- phase
ENGINEER
short circuit fault currents on the network buses under study in order to check the
RCJ
rating of electrical equipment in terms of short circuit capability, as per SAES-P-100,
DATE: 12-10-19
CERTIFIED
par. 7.5.2.2 requirements.

DATE:
9.2 Assumptions
CONSTRUCTION
AGENCY
a. Pre-fault voltage for all busses is 102% of base kV as per clause 7.5.2.1 of
DATE:
SAES-P-100.
OPERATIONS
b. Short Circuit Study is based on latest ANSI C37.010 standard for equipment
DATE:
rated above 600V and ANSI C37.13 for equipment rated 600V and below.
CONTROL NUMBER
VERIFICATION

c. All the transformers / switchgears were made to operate on single ended


EDSD

operation, with all bus-tie closed and all Loads: ON, Spare loads :OFF, Standby
Loads: OFF for the Short Circuit Analysis in compliance with SAES-P-100,
DATE:

CL:7.5.2.3
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

(DCC) NO. _____________________

9.3 Study Case


-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 6
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

Short Circuit Maximum Condition


JRB
AB

Presentation ID : TANAJIB PLANT


Composite ID : COMMUNITY
Revision Data : Base
Configuration Status : SCMAX1
Study Mode : Short Circuit
Study Type : Short Circuit
ISSUED FOR APPROVAL

Study Case : SCMAX-Tamimi


DESCRIPTION

9.4 Calculation Results


The calculated Short Circuit Results of the faulted buses are summarize in Table 2.
The complete details of the calculation result refer to Attachment-2.

TABLE- 2: Duty Summary


Momentary Duty Device Capability
SWGR/MCC Tag ½ Cycle (kA) (kA)
Rated
(or Composite ID based Sym Sym Asym
Voltage Asym rms
JO/EWO

on ETAP file) Rms Rms rms


(kA)
-

(kA) (kA) (kA)


Tanajib Community
12/2019

13.8kV 34.837 53.433 58 97.88


DATE

Bus-A
Tanajib Community
13.8kV 34.889 53.433 58 97.88
Bus-B
NO.
REV

L07-TLOT-1_BUS
DISCIPLINE
13.8kV 13.257 13.371 21.00 35.44
ENGINEER (1000kVA Transformer)
JRB
L07-TLOT-2_BUS
DATE: 12-10-19 13.8kV 13.085 13.194 21.00 35.44
(750kVA Transformer)
PROJECT
ENGINEER

RCJ 9.5 Evaluation and Conclusion


DATE: 12-10-19
CERTIFIED
Based on the above calculation results and as per project scope it can be concluded
the network buses under this project operate within voltage limits as per SAES-P-100
DATE:
CONSTRUCTION
requirements.
AGENCY

10.0 ATTACHMENT
DATE:
OPERATIONS
Attachment – 1A Load Flow Report Maximum
DATE: Attachment – 1A Load Flow Report Normal
CONTROL NUMBER

Attachment – 1A Load Flow Report Minimum


VERIFICATION
EDSD

Attachment – 2 Short Circuit Report Maximum


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

(DCC) NO. _____________________


-

POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

TANAJIB OPD CAMP DOC


- P RE-1278001 7
TANAJIB COMMUNITY CAMP OF A
TANAJIB SAUDI ARABIA JO / EWO: - 7

Das könnte Ihnen auch gefallen