REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
A
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ -
A 12/2019 ISSUED FOR APPROVAL AB JRB
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
JRB
RCJ
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
DISCIPLINE
DATE: 12-10-19
CERTIFIED
DATE: 12-10-19
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
- DATE:
TANAJIB
TANAJIB OPD CAMP
POWER SYSTEM STUDY
DOC
PREPARED BY:
-
JO / EWO:
DECEMBER 11, 2019
-
P
SAUDI ARABIAN OIL COMPANY
DRAWING NO.
RE-1278001
7
1
OF
SHORT CIRCUIT AND LOAD FLOW STUDIES
SHT.NO.
A
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
JRB
AB
TABLE OF CONTENTS
1.0 INTRODUCTION..........................................................................................................3
2.0 SCOPE OF POWER SYSTEM STUDY.......................................................................3
ISSUED FOR APPROVAL
4.0 SOFTWARE.................................................................................................................3
5.0 REFERENCE PROJECT DRAWINGS & DOCUMENTS............................................3
6.0 OVERALL STUDY INFORMATION.............................................................................3
7.0 DATA INPUTS..............................................................................................................4
8.0 LOAD FLOW STUDIES...............................................................................................4
9.0 SHORT CIRCUIT STUDIES........................................................................................6
JO/EWO
-
10.0 ATTACHMENTS.....................................................................................................7
12/2019
NO. DATE
REV
DISCIPLINE
ENGINEER
JRB
DATE: 12-10-19
PROJECT
ENGINEER
RCJ
DATE: 12-10-19
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
1.0 INTRODUCTION
JRB
AB
This study is conducted to determine the overall electrical system capability and responses
of the Tanajib plant in regards to the Tanajib OPD Camp Project.
This report summarize the results of the ETAP Analysis for the Electrical Power System
within the project scope in terms of Load Flow Analysis and Short circuit study, The studies
ISSUED FOR APPROVAL
Below are the studies, which conducted for the IFC submittal.
Load Flow Analysis
Short Circuit Analysis
DISCIPLINE
ENGINEER
JRB
4.0 SOFTWARE
DATE: 12-10-19
PROJECT
ENGINEER
The power system software used on this study is Electrical Transient Analyzer Program
RCJ (ETAP) version 19.0.0 issued by Operation Technology Inc. (OTI), USA
DATE: 12-10-19
CERTIFIED 5.0 REFERENCE PROJECT DRAWINGS & DOCUMENTS
DATE:
Drawing No. Drawing Title
CONSTRUCTION
AGENCY Key One Line Diagram, 34.5/13.8kV Community Power
D850369001.005
Supply
DATE:
OPERATIONS
BA-000403.001 Electrical One Line diagram MDP-1, 84 Man - Camp
DD-000403.001 Electrical One Line diagram MDP-1, 136 Man - Camp
DATE:
6.0 OVERALL STUDY INFORMATION
CONTROL NUMBER
VERIFICATION
EDSD
6.1 The ETAP model provided by POD dated Oct 5, 2019. However, backup files for the
previous project was not provided and deleted as per configuration list of ETAP model.
DATE:
BY:
6.2 This study is limited to the work under Tanajib OPD Camp project. The study,
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
tabulation, & results highlighted herein are for transformers and its related distribution
OF THIS DRAWING IS COVERED, FOR ALL
equipment only.
(DCC) NO. _____________________
-
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.0 DATA INPUT
ENGG CERT
The following utility SC parameters considered for ETAP Studies as received with ETAP file
JRB
8.1 Introduction
The purpose of load flow study is the calculation of minimum, normal and maximum
steady state voltage profiles at network buses under maximum, normal and minimum
operating/ loading conditions, respectively. The steady state voltages shall comply with
JO/EWO
8.2 Assumptions
12/2019
DATE
a) Load flow study in Normal voltage configuration carried out with all bus-tie open and
Transformers / Switchgears made to operate on double-ended operation as per
NO.
REV
SAES-P-100, CL: 7.5.1.2. In this configuration, the minimum short circuit value from
DISCIPLINE
ENGINEER utility is considered with both the line is in service.
JRB
DATE: 12-10-19
PROJECT
b) Load flow study in Minimum voltage configuration is carried out with all bus-tie closed
ENGINEER and Transformers / Switchgears made to operate on single ended operation with
RCJ largest standby or spare motor is running as per SAES-P-100, CL: 7.5.1.3. In this
DATE: 12-10-19 configuration, the minimum short circuit value from utility is considered
CERTIFIED
c) Load flow study in Maximum voltage configuration is carried out with all bus-tie open
DATE:
CONSTRUCTION
and Transformers / Switchgears made to operate on double-ended operation with all
AGENCY motor loads disconnected as per SAES-P-100, CL: 7.5.1.1. In this configuration, the
maximum short circuit value from utility is considered with both the line is in service.
DATE:
OPERATIONS
d) The following Voltage Drop criteria are considered as per clause 6.2 of SAES-P-100
for Load flow analysis.
DATE:
CONTROL NUMBER
LV System :
VERIFICATION
HV System :
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The model was set to highlight voltages on bus sections that were below 95% and
ENGG CERT
Composite ID : COMMUNITY
DESCRIPTION
Utility power grid is at Maximum Short circuit, All Non motor Loads: ON, All Motor
loads: OFF, Standby Loads: OFF, in secondary selective substations, both
incoming transformers are running with bus tiebreaker open
JO/EWO
-
RCJ
Utility power grid is at Minimum short circuit, all operating Loads ON, Largest
DATE: 12-10-19
CERTIFIED standby motor is running, in secondary selective substations only one transformer
is running with the tiebreaker closed.
DATE:
CONSTRUCTION Normal System Voltage Condition
AGENCY
DATE:
Presentation ID : TANAJIB PLANT
OPERATIONS Composite ID : COMMUNITY
Revision Data : Base
Configuration Status : LFNOR
DATE:
Study Mode : Load Flow
CONTROL NUMBER
VERIFICATION
Utility power grid is at Minimum short circuit, All Loads: ON, Standby Loads: OFF,
BY:
substations it is considered that both transformers are running with bus tiebreaker
OF THIS DRAWING IS COVERED, FOR ALL
open.
(DCC) NO. _____________________
-
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4 Calculation Results
ENGG CERT
The calculated Load Flow Steady State Voltages of the buses are summarize in
JRB
Table 1. The complete details of the calculation result refer to Attachment-1A/1B and
Attachment-1C.
AB
Based on this study, the system upgrade under this project will only have minimal effect on
JO/EWO
the overall system and having the basis of the above calculation results for maximum and
-
normal voltage system, it can be concluded that the electrical system under this project do
12/2019
DATE
DATE:
9.2 Assumptions
CONSTRUCTION
AGENCY
a. Pre-fault voltage for all busses is 102% of base kV as per clause 7.5.2.1 of
DATE:
SAES-P-100.
OPERATIONS
b. Short Circuit Study is based on latest ANSI C37.010 standard for equipment
DATE:
rated above 600V and ANSI C37.13 for equipment rated 600V and below.
CONTROL NUMBER
VERIFICATION
operation, with all bus-tie closed and all Loads: ON, Spare loads :OFF, Standby
Loads: OFF for the Short Circuit Analysis in compliance with SAES-P-100,
DATE:
CL:7.5.2.3
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
Bus-A
Tanajib Community
13.8kV 34.889 53.433 58 97.88
Bus-B
NO.
REV
L07-TLOT-1_BUS
DISCIPLINE
13.8kV 13.257 13.371 21.00 35.44
ENGINEER (1000kVA Transformer)
JRB
L07-TLOT-2_BUS
DATE: 12-10-19 13.8kV 13.085 13.194 21.00 35.44
(750kVA Transformer)
PROJECT
ENGINEER
10.0 ATTACHMENT
DATE:
OPERATIONS
Attachment – 1A Load Flow Report Maximum
DATE: Attachment – 1A Load Flow Report Normal
CONTROL NUMBER
POWER SYSTEM STUDY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.