GHD Global Pty Ltd.


- Contractor to ensure that all components such as valves, equipment etc. indicated on the DOCUMENT / DRAWINGS
REVIEW STAMP

approved shop drawings have been installed and is in accordance with the contract requirements A Accepted
and manufacturer's recommendations and shall be consistent with the flow direction of fluids.
B Accepted as noted
- All completed installation work will be protected to avoid damage until final inspection sign off by
Not Approved - Revise/
C
the client. Resubmit
CHECKED BY: Joseph Batitay DATE:
- Insulation of pipes passing through fire barriers are fire resistant and all gaps around will be 28-04-19
Documents receiving an A or B status are considered to
sealed with fire resistant material conform with the design intent but does not mean acceptance
of dimensions, sizes or weights, nor does it relieve the
Subcontractor/Consultant from any responsibility for
errors, ommisions and/or compliance with obligations an/or
responsibility of the Contract and/or Consultancy agreement.

Joseph Batitay Mechanical Inspector