BQ Instalasi Kabel Data di Lt 3 Bogor Juanda
Rp 312,000.00 Rp 31,200,000.00
Rp 350,000.00 Rp 7,000,000.00
Rp 25,000.00 Rp 2,500,000.00
Rp 37,000.00 Rp 3,700,000.00
Rp 10,000.00 Rp 1,000,000.00
Rp 4,540,000.00
Rp 49,940,000.00
BQ Instalasi Kabel Data di Lt 3 Bogor Juanda
Rp 312,000.00 Rp 31,200,000.00
Rp 350,000.00 Rp 7,000,000.00
Rp 66,000.00 Rp 6,600,000.00
Rp 75,000.00 Rp 7,500,000.00
Rp 75,000.00 Rp 7,500,000.00
Rp 5,980,000.00
Rp 65,780,000.00
BQ Instalasi Kabel Power Listrik di Lt 3 Bogor Juanda
No Pekerjaan Instalasi Kabel Data Vol Sat Harga Satuan Total
1 Instalasi Kabel power NYY 3x2,5 100 pcs Rp 205,000.00 Rp 20,500,000.00
2 Stop kontak / terminal Listrik isi 2 100 pcs Rp 80,000.00 Rp 8,000,000.00
3 Material Lokal Lainya 1 Lot Rp 1,500,000.00 Rp 1,500,000.00
PPN 10% Rp 3,000,000.00
TOTAL Rp 33,000,000.00
No Pekerjaan Instalasi Kabel Data Vol Sat
1 A.Spek CCTV :
16 Extensions
3 Line (CO)
Caller ID
3-level Automatic Reception with voice guidance
d. Pengembangan 1 Month
PPN 10%
TOTAL
Harga Satuan Total
Rp 45,000,000.00 Rp 45,000,000.00
Rp 75,000,000.00 Rp 75,000,000.00
Rp 8,000,000.00 Rp 8,000,000.00
Rp 12,800,000.00
Rp 140,800,000.00