MECHANICAL DEPARTMENT. PROJECT :
PREPARED BY :
STRAINER 125 1 20 20
PIPE ,M 125 2 3.3 6.6
ELBOW 125 2 16 32
PIPE ,M 125 2 3.3 6.6
TEE 125 1 27 27
GATE VALVE 125 1 3 3
PIPE ,M 125 1 3.3 3.3
PUMP 100 3 0 0
PIPE ,M 100 1 3.3 3.3
GATE VALVE 100 1 2 2
CHECK VALVE 100 1 18.5 18.5
TEE 100 1 21 21
PIPE ,M 100 2 3.3 6.6
ELBOW 100 1 12.5 12.5
PIPE ,M 100 2 3.3 6.6
ELBOW 100 1 12.5 12.5
PIPE ,M 100 3 3.3 9.9
GATE VALVE 100 1 2 2
PIPE ,M 100 6.2 3.3 20.46
TEE 100 1 21 21
PIPE ,M 100 17.2 3.3 56.76
TEE 100 1 21 21
REDUCER 100/63 2 2 4
PIPE ,M 63 57 3.3 188.1
ELBOW 63 1 7 7
PIPE ,M 63 1.6 3.3 5.28
ELBOW 63 1 7 7
PIPE ,M 63 4 3.3 13.2
ELBOW 63 1 7 7
PIPE ,M 63 20 3.3 66
ELBOW 63 1 7 7
PIPE ,M 63 1 3.3 3.3
TEE 63 1 12 12
REDUCER 63/50 2 2 4
PIPE ,M 50 4 3.3 13.2
GATE VALVE 50 1 1 1
BALANCE VALVE 50 1 4.5 4.5
CHECK VALVE 50 1 9 9
PIPE ,M 50 1 3.3 3.3
TEE 50 1 0.5 0.5
PIPE ,M 50 3.2 3.3 10.56
TEE 50 1 0.5 0.5
REDUCER 50/32 2 2 4
ELBOW 32 2 3 6
GATE VALVE 32 1 0.5 0.5
PIPE ,M 32 3 3.3 9.9
ELBOW 32 2 3 6
TOTAL LENGTH 705.46
FRICTION LOSS ,10FT /100 FT 70.546
OUTLET HEAD ,PSI 25 2.3 57.5
VERTICAL HEAD ,M 18 3.3 59.4
TOTAL HEAD 187