Beruflich Dokumente
Kultur Dokumente
Koreksi
Parameter Nilai Perhitungan Nilai Maxsurf Error
Displacement 7400.00 7466.00 0.88
V. Displacement 7219.51 7283.98 0.89
WPA 1425.76 1405.47 1.42
MSA 104.93 104.93 0.01
WSA 2258.87 2231.52 1.21
KMT 7.44 7.33 1.58
KML 116.58 117.00 0.35
BMT 4.22 4.13 2.13
BML 113.36 113.80 0.39
VCB 3.22 3.20 0.86
GMT - - -
GML - - -
CB 0.676 0.672 0.56
CM 0.982 0.983 0.05
CW 0.798 0.778 2.56
CP 0.69 0.684 0.56
LCB -1.02 -1.123 9.58
LCF -3.17 -3.314 4.67
TPC 14.61 14.406 1.42
MTC 85.26 88.772 3.96
Keterangan
OK
OK
OK
OK
OK
OK
OK
Not OK
OK
OK
-
-
OK
OK
Not OK
OK
Not OK
Not OK
OK
Not OK
Ukuran Ruangan Pada Kapal
Poop Deck
Ukuran (m) Luas
Volume
No. Ruangan Luas (m2) Jumlah Total
Panjang Lebar Tinggi (m3)
(m2)
1 Funnel 3.00 2.40 2.40 7.20 17.28 1 7.20
2 Deck Rating Room 4.30 3.55 2.40 15.27 36.64 2 30.53
3 Engine Rating Room 4.30 3.55 2.40 15.27 36.64 2 30.53
4 Chef Room 3.68 2.01 2.40 7.39 17.73 1 7.39
5 Steward Room 3.68 2.01 2.40 7.39 17.73 1 7.39
6 Smoking Room 4.30 1.47 2.40 6.30 15.12 1 6.30
7 Lavatory 4.25 4.22 2.40 17.94 43.04 2 35.87
8 Galley 3.41 2.28 2.40 7.76 18.63 1 7.76
9 Rating Mess Room 6.85 4.00 2.40 27.40 65.75 1 27.40
10 Dry Storage Room 4.20 3.21 2.40 13.48 32.36 1 13.48
11 Refrigerator Room 4.20 3.21 2.40 13.48 32.36 1 13.48
12 Locker Room 3.41 1.72 2.40 5.88 14.10 1 5.88
13 Laundry & Ironing Ro 3.16 2.40 2.40 7.58 18.20 1 7.58
14 Spare Part Room 4.29 1.17 2.40 5.01 12.01 1 5.01
15 Provision Store 4.29 1.17 2.40 5.01 12.01 1 5.01
1st Deck
Ukuran (m) Luas
Volume
No. Ruangan Luas (m2) Jumlah Total
Panjang Lebar Tinggi (m3)
(m2)
1 Funnel 3.00 2.40 2.40 7.20 17.28 1 7.20
2 1 & 2 Deck Officer Room4.30
st nd
3.20 2.40 13.76 33.02 1 13.76
3 1st & 2nd Engine Officer Room
4.30 3.20 2.40 13.76 33.02 1 13.76
4 Radio & Electrician Of 4.30 3.20 2.40 13.76 33.02 1 13.76
5 Lavatory 4.30 4.12 2.40 17.70 42.48 1 17.70
6 Prayer Room 5.10 3.13 2.40 15.95 38.27 1 15.95
7 Hospital 3.41 2.14 2.40 7.30 17.51 1 7.30
8 Rating Day Room 3.41 1.86 2.40 6.34 15.23 1 6.34
9 Pantry 3.16 2.40 2.40 7.58 18.20 1 7.58
10 Foam Room 4.47 1.93 2.40 8.61 20.67 1 8.61
11 CO2 Room 4.47 1.93 2.40 8.61 20.67 1 8.61
12 A. H. U. Room 2.85 2.90 2.40 8.25 19.79 1 8.25
13 Electrical Spare Part 2.25 3.42 2.40 7.71 18.50 1 7.71
2nd Deck
Ukuran (m) Luas
Volume
No. Ruangan Luas (m2) Jumlah Total
Panjang Lebar Tinggi (m3)
(m2)
1 Funnel 3.00 2.40 2.40 7.20 17.28 1 7.20
2 Captain Room 4.30 5.00 2.40 21.50 51.60 1 21.50
3 Chief Deck Officer Ro 4.17 4.61 2.40 19.22 46.12 1 19.22
4 Chief Engine Officer 4.17 4.61 2.40 19.22 46.12 1 19.22
5 Meeting Room 6.49 3.08 2.40 20.01 48.01 1 20.01
6 Officer Day Room 3.41 4.00 2.40 13.64 32.74 1 13.64
7 Officer Mess Room 10.57 2.62 2.40 27.65 66.36 1 27.65
8 Pantry 3.16 2.40 2.40 7.58 18.20 1 7.58
9 Battery Space 4.08 1.87 2.40 7.65 18.35 1 7.65
Navigation Deck
Ukuran (m) Luas
Volume
No. Ruangan Luas (m2) Jumlah Total
Panjang Lebar Tinggi (m3)
(m2)
1 Funnel 3.00 2.40 2.40 7.20 17.28 1 7.20
2 Wheel House 5.30 13.83 2.40 73.29 175.89 1 73.29
3 Chart Room 2.50 3.40 2.40 8.50 20.40 1 8.50
4 Radio Station 2.50 3.40 2.40 8.50 20.40 1 8.50
5 Cargo Control Room 3.41 4.00 2.40 13.64 32.74 1 13.64
6 Lavatory 3.16 2.40 2.40 7.58 18.20 1 7.58
Deck
Bangunan Panjang (m) Lebar (m) Tinggi (m) Luas (m2) Volume (m3)
Poop Deck 21.72 12.02 2.40 261.02 626.45
1st Deck 14.87 12.04 2.40 179.01 429.61
2nd Deck 14.87 12.04 2.40 179.01 429.61
Navigation Deck 14.87 9.95 2.40 148.00 355.20
Forcastle Deck 9.84 3.73 2.40 36.67 88.01
Ship Engine Selection
Generator specifications
Genset type = WARTSILA 630W6L16 / 60 Hz
Engine output = 700 kW
Diesel eff. = 95%
Diesel output = 665 kWe
Diesel output = 831.25 kVA
Fuel Oil Consumption
FOC = 199 g/kWh
Lubricating Oil Capacity
Capacity = - lt
Dimensions
Length = 4787 mm
Width = 1294 mm
Height = 1886 mm
Dry mass = 10.8 ton
0 H048 500m3/hr with head 20 m
0 H048 500m3/hr with head 20 m
0 H048 500m3/hr with head 20 m
0 H048 500m3/hr with head 20 m
0 H048 500m3/hr with head 20 m
80/200 30 m3/hr with head 20 m
80/200 30 m3/hr with head 20 m
80/200 30 m3/hr with head 20 m
80/200 30 m3/hr with head 20 m
80/200 30 m3/hr with head 20 m
5 0,3 m3/hr 60 Hz 4P 1,5 kW
5 0,3 m3/hr 60 Hz 4P 1,5 kW
75 kW 1 m3/hr
b. For CO 2 - 5
Q= 21.67 m3/min = 0.36 m3/sec = 1300 m3/hour
Ha = 10.5 m dimana Hs = 0,5 m dan Hd = 10 m
sg = 900 kg/m3
g= 9.8 m/s2
Daya Pompa = 33442.5 kgm2/s2 = 33.4425 kW
Daya Shaft = 40.78354 kW
Daya Motor = 44.32993 kW
Daya Motor Max = 52.15286 kW
Berat Pump = ton
Cargo 1 (P & S) 1
Ordinat Station luas Simpson fungsi volume Station luas Simpson fungsi volume St. Ordinat St. Area St. Ordinat St. Area
n n
(a) (b) (c) (d) = (b) x (c) (a) (b) (c) (d) = (b) x (c) 1 -52.569302 0 1 -52.5693 0
1 42.472769 18.95297 1 18.952973 1 15 28 1 28 2 -51.489278 0.946614 2 -51.48928 0.946614
2 38.152675 36.190 4 144.761016 2 16 25.500 4 102 3 -50.409255 2.549151 3 -50.40926 2.549151
3 33.832581 55.09345 2 110.186908 3 17 22.11 2 44.22 4 -48.249207 5.630859 4 -48.24921 5.630859
4 29.512486 72.70086 4 290.803432 4 18 18.67 4 74.68 5 -46.08916 12.95039 5 -46.08916 12.95039
5 27.352439 80.18178 1 80.18178 5 19 21.8 1 21.8 6 -43.929113 20.11304 6 -43.92911 20.11304
7 -41.769066 29.65146 7 -41.76907 29.65146
∑3 = 644.886109 ∑3 = 270.7 8 -39.609019 39.70768 8 -39.60902 39.70768
9 -37.448972 49.40817 9 -37.44897 49.40817
Volume Cargo 1 = 1/3 x ∑3 x (x/n) Volume WB 1 = 1/3 x ∑3 x (x/n) 10 -35.288925 58.73147 10 -35.28893 58.73147
= 632 m^3 = 265 m^3 11 -33.128878 67.71975 11 -33.12888 67.71975
-31.67 72.77007 12 -30.96883 76.12222
Cargo 2 (P & S) 2 12 -30.968831 76.12222 13 -28.80878 83.24849
Ordinat Station luas Simpson fungsi volume Station luas Simpson fungsi volume 13 -28.808784 83.24849 14 -26.64874 88.87745
n n
(a) (b) (c) (d) = (b) x (c) (a) (b) (c) (d) = (b) x (c) 14 -26.648737 88.87745 15 -24.48869 93.3448
1 27.352439 80.18178 1 80.18178 1 12 31.50 1 31.5 15 -24.48869 93.3448 16 -22.32864 96.74586
2 23.032345 91.71379 4 366.855164 2 13 31.00 4 124 16 -22.328643 96.74586 17 -20.1686 99.24845
3 18.712251 98.46805 2 196.936108 3 14 29.78 2 59.56 17 -20.168596 99.24845 18 -18.00855 101.2244
4 14.392157 102.3437 4 409.374992 4 15 28.00 4 112 18 -18.008549 101.2244 19 -15.8485 102.7573
5 12.23211 103.5215 1 103.52148 5 16 25.50 1 25.5 -16.95 102.5 20 -13.68846 103.8467
19 -15.848502 102.7573 21 -11.52841 104.4832
∑3 = 1156.869524 ∑3 = 352.56 22 -9.368361 104.8302
20 -13.688455 103.8467 23 -7.208313 104.934
Volume Cargo 2 = 1/3 x ∑3 x (x/n) Volume WB 2 = 1/3 x ∑3 x (x/n) 21 -11.528408 104.4832 24 -5.048266 104.934
= 1134 m^3 = 346 m^3 22 -9.368361 104.8302 25 -2.888219 104.934
23 -7.208313 104.934 26 -0.728172 104.934
Cargo 3 (P & S) 3 24 -5.048266 104.934 27 1.431875 104.9299
n Ordinat Station luas Simpson fungsi volume n Station luas Simpson fungsi volume 25 -2.888219 104.934 28 3.591922 104.9042
(a) (b) (c) (d) = (b) x (c) (a) (b) (c) (d) = (b) x (c) 26 -0.728172 104.934 29 5.751969 104.8427
1 12.23211 103.5215 1 103.52148 1 9 31.57 1 31.57 27 1.431875 104.9299 30 7.912016 104.7029
2 7.912016 104.7029 4 418.811416 2 10 31.64 4 126.56 28 3.591922 104.9042 31 10.07206 104.2841
3 3.591922 104.9042 2 209.808472 3 11 31.55 2 63.1 29 5.751969 104.8427 32 12.23211 103.5215
4 -0.728172 104.934 4 419.736196 4 12 31.50 4 126 30 7.912016 104.7029 33 14.39216 102.3437
5 -2.888219 104.934 1 104.934046 5 13 31.00 1 31 31 10.072063 104.2841 34 16.5522 100.68
32 12.23211 103.5215 35 18.71225 98.46805
∑3 = 1256.81161 ∑3 = 378.23 33 14.392157 102.3437 36 20.8723 95.48491
34 16.552204 100.68 37 23.03235 91.71379
Volume Cargo 3 = 1/3 x ∑3 x (x/n) Volume WB 3 = 1/3 x ∑3 x (x/n) 35 18.712251 98.46805 38 25.19239 86.61229
= 1232 m^3 = 371 m^3 36 20.872298 95.48491 39 27.35244 80.18178
37 23.032345 91.71379 40 29.51249 72.70086
Cargo 4(P & S) 4 38 25.192392 86.61229 41 31.67253 64.24912
n Ordinat Station luas Simpson fungsi volume n Station luas Simpson fungsi volume 39 27.352439 80.18178 42 33.83258 55.09345
(a) (b) (c) (d) = (b) x (c) (a) (b) (c) (d) = (b) x (c) 40 29.512486 72.70086 43 35.99263 45.68469
1 -2.888219 104.934 1 104.934046 1 6 28.88 1 28.88 41 31.672533 64.24912 44 38.15268 36.19025
2 -7.208313 104.934 4 419.73606 2 7 30.21 4 120.84 42 33.832581 55.09345 45 40.31272 27.23649
3 -11.528408 104.4832 2 208.966402 3 8 31.08 2 62.16 43 35.992628 45.68469 46 42.47277 18.95297
4 -15.848502 102.7573 4 411.029076 4 9 31.57 4 126.28 44 38.152675 36.19025 47 44.63282 10.31077
5 -16.95 102.5 1 102.5 5 10 31.64 1 31.64 45 40.312722 27.23649 48 46.79286 3.184408
46 42.472769 18.95297 49 47.87289 0.951434
∑3 = 1247.165584 ∑3 = 369.8 47 44.632816 10.31077 50 48.95291 0
48 46.792863 3.184408
Volume Cargo 4 = 1/3 x ∑3 x (x/n) Volume WB 4 = 1/3 x ∑3 x (x/n) 49 47.872886 0.951434
= 1222 m^3 = 362 m^3 50 48.95291 0
Cargo 5 (P & S) 5
n Ordinat Station luas Simpson fungsi volume n Station luas Simpson fungsi volume
(a) (b) (c) (d) = (b) x (c) (a) (b) (c) (d) = (b) x (c)
1 -16.95 102.5 1 102.5 1 3 21.90 1 21.9
2 -20.168596 99.24845 4 396.993792 2 4 23.92 4 95.68
3 -24.48869 93.3448 2 186.689594 3 5 26.67 2 53.34
4 -28.808784 83.24849 4 332.993948 4 6 28.88 4 115.52
5 -31.67 72.77007 1 72.7700661658 5 7 31.64 1 31.64
∑3 = 1091.947400166 ∑3 = 318.08
f1 = faktor penurunan berat jika digunakan material high tensile steel (HTS); jika
menggunakan mild steel maka faktor ini diambil sama dengan nol
f2 = faktor empiris untuk tanker, seperti diberikan dalam tabel
f3 = faktor penambahan berat dari bangunan atas = WSST
1.2 1 Deck st
4 Outfitting Weight
�_𝑂𝑇=(𝑓_6−𝐿_𝑃𝑃/1620)×𝐿_𝑃𝑃∙𝐵+𝑓_7 (ton)
f6 = 0.285 (tabel pada PPT)
f7 = 10 ton (2 buah crane)
WOT = 402.79 ton
Total LWT 1087.05 ton DWT DWT/∆ (%) WST/WL (%) WOT /WL (%) WM/WL (%)
Volume Tanki FO
𝐹𝑂 𝑇𝑎𝑛𝑘 𝑉𝑜�=�_𝐹𝑂/𝜌_𝐹𝑂 ×1.15 (m^3)
Volume Tanki LO
𝐿𝑂 𝑇𝑎𝑛𝑘 𝑉𝑜�=�_𝐿𝑂/𝜌_𝐿𝑂 ×1.15 (m^3)
VOLLO = 11.03 m
3
12.68 m
3
= (cad 15%)
Cargo 1 (P & S)
VolCO = 631.99 m
3
WCO = 568789.54814 kg
= 568.79 ton
Cargo 2 (P & S)
VolCO = 1133.73 m
3
WCO = 1020358.9202 kg
= 1020.36 ton
Cargo 3 (P & S)
VolCO = 1231.68 m
3
WCO = 1108507.84 kg
= 1108.51 ton
Cargo 4 (P & S)
VolCO = 1222.22 m
3
WCO = 1100000.0451 kg
= 1100.00 ton
Cargo 5 (P & S)
VolCO = 1070.11 m
3
WCO = 963097.60695 kg
= 963.10 ton
WCO tot = 3660.75 ton
ρFW = 1 ton/m3
WFW = 10 ton
ρFW = 1 ton/m3
WFW = 10 ton
5 Logistic Weight
Koreksi = 0.1948885698 %
WEIGHT COMPONENTS, TOTAL WEIGHT (DISPLACEMENT) AND CENTER OF GRAVITY
NO WEIGHT COMPONENT VOL QTY. WEIGHT AP-G (X) TCG (Y) KG (Z) WX WY WZ
(m3) (%) (tonnes) (m) (m) (m) (ton.m) (ton.m) (ton.m)
① ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨ ⑩ ⑪
I LIGHT WEIGHT (LWT)
I.1 HULL STRUCTURE - 100% 317 49.048 0.000 4.150 15533.926 0.000 1314.50232
I.2 SUPER STRUCTURE: Note :
I.2.1 Poop Deck : X = Dari G Ke AP (+)
I.2.1.1 Engine Rating Room A (3 people) 51.7104 100% 3.9 19.82 -5.6 9.7 76.868 -21.718 37.619 Y = Kiri ke Cl (-) dari Depan Kapal
I.2.1.2 Engine Rating Rooms B (3 people) 51.7104 100% 3.9 19.82 -1.4 9.7 76.868 -5.430 37.619 Kanan ke Cl (+) dari Depan Kapal
I.2.1.3 Deck Rating Rooms A (3 people) 51.7104 100% 3.9 19.82 5.6 9.7 76.868 21.718 37.619 Z = Dari Keel ke G (+)
I.2.1.4 Deck Rating Rooms B (3 people) 51.7104 100% 3.9 19.82 1.4 9.7 76.868 5.430 37.619
I.2.1.5 Lavatory A 54 100% 4.1 13.25 -6.08 9.7 53.663 -24.624 39.285
I.2.1.6 Lavatory B 54 100% 4.1 13.25 6.08 9.7 53.663 24.624 39.285
I.2.1.7 Locker Room 20.22096 100% 1.5 14 -1.36 9.7 21.232 -2.063 14.711
I.2.1.8 Galley 26.66664 100% 2.0 14 -1.03 9.7 28.000 -2.060 19.400
I.2.1.9 Refrigerator Room 38.4 100% 2.9 7.99 -5.45 9.7 23.011 -15.696 27.936
I.2.1.10 Dry Storage Room 38.4 100% 2.9 7.99 5.45 9.7 23.011 15.696 27.936
I.2.1.11 Chef Room 17.0112 100% 1.3 2.97 -4.63 9.7 3.789 -5.907 12.376
I.2.1.12 Steward Room 17.0112 100% 1.3 2.97 4.63 9.7 3.789 5.907 12.376
I.2.1.13 Laundry Ironing Room 25.36704 100% 1.9 10 0.02 9.7 19.025 0.038 18.455
I.2.1.14 Provision Store 7.254 100% 0.5 -0.5 -3.38 9.7 -0.272 -1.839 5.277
I.2.1.15 Spare Part Room 7.254 100% 0.5 -0.5 3.38 9.7 -0.272 1.839 5.277
I.2.1.16 Rating Mess Room 94.464 100% 7.1 0.43 0 9.7 3.046 0.000 68.723
I.2.1.17 Smoking Room 19.32984 100% 1.9 19.5 -8.6 9.7 37.693 -16.624 18.750
I.2.1.18
I.2.2 1st Deck :
I.2.2.1 Lavatory 63.648 100% 4.13712 19.7 -5.85 12.05 81.501 -24.202 49.852
I.2.2.2 Radio & Electrician Officer Room 46.512 100% 3.02328 19.82 -1.5 12.05 59.921 -4.535 36.431
I.2.2.3 1st & 2nd Deck Officer Room 46.512 100% 3.02328 19.82 2.34 12.05 59.921 7.074 36.431
I.2.2.4 1st & 2nd Engine Officer Room 46.512 100% 3.023 19.82 6.27 12.05 59.921 18.956 36.431
I.2.2.5 Electrical Spare Part Room 27.864 100% 1.811 14.62 -5.63 12.05 26.479 -10.197 21.824
I.2.2.6 AHU Room 31.008 100% 2.016 11.44 -5.3 12.05 23.058 -10.682 24.287
I.2.2.7 Praying Room 63.5712 100% 4.132 12.45 5.4 12.05 51.445 22.313 49.792
I.2.2.8 Hospital 25.092 100% 1.631 14 -1.11 12.05 22.834 -1.810 19.653
I.2.2.9 Rating Day Room 22.42392 100% 1.458 13.99 1.3 12.05 20.391 1.89482124 17.564
I.2.2.10 CO2 Room 38.16 100% 2.480 8.2 -4.64 12.05 20.339 -11.509056 29.889
I.2.2.11 Foam Room 38.16 100% 2.480 8.2 4.64 12.05 20.339 11.509056 29.889
I.2.2.12 Pantry 25.5744 100% 1.662 10 0 12.05 16.623 0 20.031
I.4 OUTFITTING:
I.4.1 Engine Room - 100% 40.279 14.564 0 8.925 586.630 0.000 359.502 34.667 110
I.4.4 Life Boat + Davit 1 - 100% 8.700 -4.100 -1.3 12.800 -35.670 -11.310 111.360 2310.531
I.4.5 Life Boat + Davit 2 - 100% 8.700 -4.100 1.3 12.800 -35.670 11.310 111.360 393.984
I.4.6 Chain Locker - Forepick (SB) - 100% 0.06 94.100 -0.4 7.480 5.646 -0.024 0.449
I.4.1 Chain Locker - Forepick (PS) 100% 0.06 94.100 0.4 7.480 5.646 0.024 0.449
I.4.4 Anchor - Forepick (SB) 100% 6 97.000 -2.07 8.900 582.000 -12.420 53.400
I.4.5 Anchor - Forepick (PS) 100% 6 97.000 2.07 8.900 582.000 12.420 53.400
I.4.6 Cargo Pipe - 100% 5 0 0 12.4 0.000 0.000 62.000
I.4.1 MAIN Crane 100% 3 61.7 0 12.4 185.100 0.000 37.200
I.5 ELECTRICAL EQUIPMENT:
I.5.1 Genset 1 - 100% 20.7 22.02 -2.807 5.530 455.814 -58.105 114.471
I.5.2 Genset 2 - 100% 20.7 22.02 2.807 5.530 455.814 58.105 114.471
I.5.3 Emergency Genset - 100% 10.8 5.000 0 5.530 54.000 0.000 59.724
II DEADWEIGHT (DWT)
II.1 Cargo Oil:
II.1.1 Cargo Oil Tank #1 (SB) & (PS) 631.988 98% 582.188 83.777 0.000 5.760 48773.939 0.000 3353.401
II.1.2 Cargo Oil Tank #2 (SB) & (PS) 1133.732 98% 1044.394 69.01 0.000 5.760 72073.633 0.000 6015.710
II.1.3 Cargo Oil Tank #3 (SB) & (PS) 1231.675 98% 1134.619 54.33 0.000 5.760 61643.870 0.000 6535.408
II.1.4 Cargo Oil Tank #4 (SB) & (PS) 1222.222 98% 1125.911 39.61 0.000 5.760 44597.341 0.000 6485.248
II.1.5 Cargo Oil Tank #5 (SB) & (PS) 1070.108 98% 985.784 24.9 0.000 5.760 24546.019 0.000 5678.115
DwT 6084.562
Displ = 7159.32
1.1307475875
Koreksi = 1.52 %
6596.325
Err:509 Err:509 -0.66640
KOREKSI DISPLASEMEN
Berat DWT
Payload 4872.896 ton
Fuel Oil 575.424 ton
Lube Oil 23.337 ton
Freshwater 400.100 ton
Crew 21.000 ton
Provision 151.200 ton
Spare Part 40.604
Total 6084.562 ton Desain DWT = 6183
Berat LWT
Berat Hull Structure 316.711 ton
Berat (Super Structure) Deckhou 114.253 ton
Berat E&O 77.799 ton
Berat Permesinan 565.999 ton
Total 1074.762 ton Desain LWT = 1087.05
21777
Distribusi Berat Deck
Deck W(ton) X(m) dari AP W.X
Poop 47.450 8.792 417.174
1st Deck 22.797 16.459 375.206
2nd Deck 20.110 5.546 111.529
Navigation 6.522 15.805 103.085
Forecastle 8.801 139.288 1225.869
Total 105.680 Total 2232.863
Distribusi Tangki
Tank W(ton) X(m) dari AP
Ballast Tank
1. After Peak Ballast Tank
2. Fore Peak Ballast Tank
3. Ballast Tank 1
4. Ballast Tank 2
5. Ballast Tank 3
6. Ballast Tank 4
Fuel Oil 393.984 22.501
Lube Oil 23.337 23.500
Fresh Water 400.100 1.801
Total 817.421 47.802
GAYA ANGKAT DAN BERAT BADAN KAPAL
Data Kapal
Lwl 100.000 m
Lpp 98.4 m
B 17.8 m
T 6.00 m
Cb 0.672
massa jenis 1.025 ton/m3
hs 2.500000 m
Perhitungan ma dan mf
Berat kapal total (BKT) 7581.632 ton gaya angkat
DWT (DWT) 8870 ton Penyesuaian Payload
LWT : 884 ton Dari TDK I
A. Bangunan atas (BA) 430.964 ton
B. Permesinan (MP) 565.999 ton dari TDK I
C. Perlengkapan P 77.799 ton dari TDK I
D. Hull weight 316.711 ton dari TDK I
1. Lengkung CSA (WHL) 211.140 ton 2/3 Hull weight
2. Trapesium (WHT) 105.570 ton 1/3 Hull weight
t.b.BKT =
(DWT x t.b.DWT) + (BA x t.b.BA) + (MP x t.b.MP) + (WHL x t.b.WHL) + (WHT x t.b. WHT) + (P x t.b.P)
BKT
t.b.WHT =
(BKT x t.b.BKT) - [(DWT x t.b.DWT) + (BA x t.b.BA) + (MP x t.b.MP) + (WHL x t.b.WHL) + (P x t.b.P)]
WHT
t.b.WHT = 45.809 m
4836.061155
ma = Mo/L - 6 Mo.x/L2 (Owen Hughes)
ma = -1.846 ton/m
mf = 3.957 ton/m
Perhitungan Gaya Angkat
q rata2 Momen Jarak Station
No St Area [m2] q [ton/m] Lengan [m]
[ton/m] luasan [m^3] [m]
0 5.631 5.772 5.772 -48.750 -281.367 Err:522
1 12.950 13.274 9.523 -46.250 -440.434 Err:522
2 20.113 20.616 16.945 -43.750 -741.344 Err:522
3 29.651 30.393 25.504 -41.250 -1052.053 Err:522
4 39.708 40.700 35.547 -38.750 -1377.429 Err:522 100.000
5 49.408 50.643 45.672 -36.250 -1655.605 Err:522
6 58.731 60.200 55.422 -33.750 -1870.478 Err:522
7 67.720 69.413 64.806 -31.250 -2025.195 Err:522
8 76.122 78.025 73.719 -28.750 -2119.421 Err:522
9 83.248 85.330 81.677 -26.250 -2144.034 Err:522
10 88.877 91.099 88.215 -23.750 -2095.095 Err:522
11 93.345 95.678 93.389 -21.250 -1984.514 Err:522
12 96.746 99.165 97.421 -18.750 -1826.652 Err:522
13 99.248 101.730 100.447 -16.250 -1632.265 Err:522
14 101.224 103.755 102.742 -13.750 -1412.707 Err:522
15 102.757 105.326 104.541 -11.250 -1176.082 Err:522
16 103.847 106.443 105.885 -8.750 -926.489 Err:522
17 104.483 107.095 106.769 -6.250 -667.307 Err:522
18 104.830 107.451 107.273 -3.750 -402.274 Err:522
19 104.934 107.557 107.504 -1.250 -134.380 Err:522
20 104.904 107.527 107.542 1.250 134.428 Err:522
21 104.843 107.464 107.495 3.750 403.107 Err:522
22 104.703 107.320 107.392 6.250 671.201 Err:522
23 104.284 106.891 107.106 8.750 937.176 Err:522
24 103.521 106.110 106.500 11.250 1198.129 Err:522
25 102.344 104.902 105.506 13.750 1450.707 Err:522
26 100.680 103.197 104.050 16.250 1690.807 Err:522
27 98.468 100.930 102.063 18.750 1913.688 Err:522
28 95.485 97.872 99.401 21.250 2112.269 Err:522
29 91.714 94.007 95.939 23.750 2278.559 Err:522
30 86.612 88.778 91.392 26.250 2399.043 Err:522
31 80.182 82.186 85.482 28.750 2457.606 Err:522
32 72.701 74.518 78.352 31.250 2448.511 Err:522
33 64.249 65.855 70.187 33.750 2368.807 Err:522
34 55.093 56.471 61.163 36.250 2217.161 Err:522
35 45.685 46.827 51.649 38.750 2001.391 Err:522
36 36.190 37.095 41.961 41.250 1730.888 Err:522
37 27.236 27.917 32.506 43.750 1422.147 Err:522
38 18.953 19.427 23.672 46.250 1094.835 Err:522
39 10.311 10.569 14.998 48.750 731.136 Err:522
40 3.184 3.264 6.916 51.250 354.459 Err:522
40.703 0.951 0.975 2.120 51.953 110.121 Err:522
41.406 0.000 0.000 0.488 52.656 25.676 Err:522
Jumlah
3032.653 Jumlah [ton] 6186.723
[ton/m]
LCB dr
displ. [ton] 7581.632 2.040
midship (m)
Perhitungan Berat Badan Kapal
Distribusi hull weight [ ton/m]
Station lengkung lengan momen
trapesium total rata2
CSA
0 0.161 -1.846 -1.685 -1.685 -48.750 82.154
1 0.370 -1.701 -1.331 -1.508 -46.250 69.754
2 0.574 -1.556 -0.982 -1.156 -43.750 50.593
3 0.846 -1.411 -0.564 -0.773 -41.250 31.885
4 1.133 -1.266 -0.132 -0.348 -38.750 13.493
5 1.410 -1.121 0.290 0.079 -36.250 -2.858
6 1.676 -0.975 0.701 0.495 -33.750 -16.721
7 1.933 -0.830 1.103 0.902 -31.250 -28.184
8 2.173 -0.685 1.488 1.295 -28.750 -37.236
9 2.376 -0.540 1.836 1.662 -26.250 -43.625
10 2.537 -0.395 2.142 1.989 -23.750 -47.239
11 2.665 -0.250 2.415 2.278 -21.250 -48.412
12 2.762 -0.105 2.657 2.536 -18.750 -47.542
13 2.833 0.040 2.873 2.765 -16.250 -44.930
14 2.889 0.185 3.075 2.974 -13.750 -40.892
15 2.933 0.330 3.264 3.169 -11.250 -35.652
16 2.964 0.475 3.440 3.352 -8.750 -29.327
17 2.982 0.620 3.603 3.521 -6.250 -22.008
18 2.992 0.766 3.758 3.680 -3.750 -13.802
19 2.995 0.911 3.906 3.832 -1.250 -4.790
20 2.995 1.056 4.050 3.978 1.250 4.973
21 2.993 1.201 4.194 4.122 3.750 15.457
22 2.989 1.346 4.335 4.264 6.250 26.651
23 2.977 1.491 4.468 4.401 8.750 38.510
24 2.955 1.636 4.591 4.529 11.250 50.956
25 2.921 1.781 4.703 4.647 13.750 63.893
26 2.874 1.926 4.800 4.751 16.250 77.209
27 2.811 2.071 4.882 4.841 18.750 90.770
28 2.726 2.216 4.942 4.912 21.250 104.381
29 2.618 2.361 4.979 4.961 23.750 117.817
30 2.472 2.507 4.979 4.979 26.250 130.703
31 2.289 2.652 4.940 4.960 28.750 142.590
32 2.075 2.797 4.872 4.906 31.250 153.318
33 1.834 2.942 4.776 4.824 33.750 162.805
34 1.573 3.087 4.659 4.718 36.250 171.014
35 1.304 3.232 4.536 4.598 38.750 178.163
36 1.033 3.377 4.410 4.473 41.250 184.513
37 0.777 3.522 4.300 4.355 43.750 190.523
38 0.541 3.667 4.208 4.254 46.250 196.742
39 0.294 3.812 4.107 4.157 48.750 202.673
40 0.091 3.957 4.048 4.077 51.250 208.967
40.703 0.027 4.059 4.086 4.067 51.953 211.312
41.406 0.000 4.161 4.161 4.124 52.656 217.149
Jumlah
132.957 Jumlah [m3] 2725.748
[ton/m]
titik berat
berat [ton] 332.392 20.501
[m]
Perhitungan Ruang Muat
Luas Potongan
D.B 33.661 m2 Total [2] 280.352 m2
W.Tank 29.883 m 2
[2] - [1] 216.807 m2
[1] 63.544 m 2
tb Muatan = 8.063
Berat = 12003.751
Grafik Cross Sectional Area Gaya Angkat
120.000
100.000
80.000
Area [m2]
60.000
40.000
20.000
0.000
0 5 10 15 20 25 30 35 40 45
Station
0.000
0 5 10 15 20 25 30 35 40 45
Station
Grafik Berat Lambung Kapal
6.00
5.00
4.00
3.00
berat/panjang [ton/m]
2.00
1.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
-1.00
-2.00
-3.00
Station
-3.00
Station
PENYEBARAN BERAT KAPAL KOSONG
Dari perhitungan sebelumnya telah diperoleh berat kapal kosong tiap station (40 station)
sehingga penyebaran berat kapal kosong dapat dihitung sebagai berikut
q(x) = W(x)/hs ton/m
dimana:
W(x) = Berat kapal kosong tiap station [ton]
hs = jarak station [m]
= Lwl/40 ; Lwl = 100.000 m
= 2.50000 m
berat
luas dek q konstruksi r konstruksi
panjang (m) tinggi (m) volume (m3) konstruksi jarak
[m2] [ton/m] [ton/m3]
[ton]
Poop 21.72 2.4 261.019 626.220 47.450 2.185 0.076 8.8
Forecastle 9.84 2.4 36.671 88.010 8.801 0.894 0.100 139.3
1st Deck 14.87 2.4 179.005 Err:508 22.797 1.533 Err:508 16.5
2nd Deck 14.87 2.4 179.005 Err:508 20.110 1.352 Err:508 5.5
Navigation 14.87 2.4 148.001 155.890 6.522 0.439 0.042 15.8
total Err:508 105.680
Permesinan
Termasuk berat mesin dan berat konstruksi pendukungnya, funnel, dsb.
dimana
Lwl = 100.000 m
le = 21.00 m (panjang kamar mesin)
Wm = Berat Instalasi Permesinan
= 520.140 ton; (dari Tugas Merancang I )
Penyebaran beban 0 4 10
W = q * le le
q= W / le
= 520.140 / 21.000
= 24.77 ton / m
Beban di belakang st. 4
W' = q * x'
dimana
x' = 3.132 m (panjang kamar mesin dibelakang st. 4)
maka
W' = 77.57 ton
Beban didistribusikan ke dalam st.3 s/d st. 5.
W' = W1' + W2'
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b
- 2 W' a = - W1' * b + W2' * b
W' * b = W1' * b + W2' * b
W' ( -2a - b ) = - 2 W1' * b
W1' = W' ( 2a + b ) / ( 2b )
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.56585 m
b = Lpp/40
= 2.50 m
sehingga
W2' = -9.800 ton q (st. 4 s/d 5) = -3.920 ton / m
W1' = 87.368 ton q (st. 3 s/d 4) = 34.947 ton / m
Beban di depan st. 8
W' = q * x'
dimana
x' = 2.737 m (panjang kamar mesin didepan st. 7)
maka
W' = 67.78 ton
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.3683 m
b = Lpp/40
= 2.50 m
sehingga
W2' = -3.2074 ton q (st. 6 s/d 7) = -1.283 ton / m
W1' = 70.9891 ton q (st. 7 s/d 8) = 28.396 ton / m
W2' = W' ( 2a -b ) / ( 2b )
W1' = W' -W2'
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.000 m
b = Lwl/40
= 2.5000 m
sehingga
W2' = 0.00 ton q (st. 1 s/d 2) = 0.00 ton / m
W1' = 0.00 ton q (st. 0 s/d 1) = 0.00 ton / m
Beban di depan st. 8
W' = q * x'
dimana
x' = 2.737 m (panjang kons. didepan st. 8)
maka
W' = 5.979 ton
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.368 m
b = Lwl/40
= 2.50 m
sehingga
W2' = -0.28 ton q (st. 9 s/d 10) = -0.11 ton / m
W1' = 6.26 ton q (st. 10 s/d 11) = 2.50 ton / m
Poop
Station q (ton/m) q(dist) (q) total Station (q) total
0 0-1 2.18
2.18 2.18 1-2 2.18
1 2-3 2.18
2.18 2.18 3-4 2.18
2 4-5 2.18
2.18 2.18 5-6 2.18
3 6-7 2.18
2.18 2.18 7-8 2.07
4 8-9 2.50
2.18 2.18
5
2.18 2.18
6
2.18 2.18
7
2.18 -0.11 2.07
8
2.50 2.50
9
S= 19.87
W1' = W' ( 2a + b ) / ( 2b )
W2'' = W'' -W1'' x''
dimana
a = letak titik berat segi empat = 1/2 x W2''
= 1.457 m W1'' W''
b = Lwl/40
= 2.50 m a b
sehingga 3 4 5
W2' = -0.37 ton q (st. 4 s/d 5) = -0.15 ton / m
W1' = 4.84 ton q (st. 3 s/d 4) = 1.94 ton / m
Beban di depan st. 8
W' = q * x'
dimana
x' = 2.737 m (panjang kons. didepan st. 7)
maka
W' = 4.20 ton
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.368 m
b = Lwl/40
= 2.50 m
sehingga
W2' = -0.20 ton q (st. 9 s/d 10) = -0.08 ton / m
W1' = 4.39 ton q (st. 10 s/d 11) = 1.76 ton / m
Boat 14.870
Station q (ton/m) q(dist) (q) total Station (q) total
4 4-5 1.94
1.94 1.94 5-6 1.38
5 6-7 1.53
1.53 -0.15 1.38 7-8 1.45
6 8-9 1.76
1.53 1.53
7
1.53 -0.08 1.45
8
1.76 1.76
9
S= 8.06
W1' = W' ( 2a + b ) / ( 2b )
W2' = W' -W1' x''
5 6 7
W1'' W2''
dimana
letak titik berat segi empat = 1/2 x'
a= 1.849 m W''
b= Lwl/40
2.50 m
sehingga
W2' = -1.20 ton q (st. 6 s/d 7) = -0.48 ton / m
W1' = 6.20 ton q (st. 5 s/d 6) = 2.48 ton / m
Beban di depan st. 8
W' = q * x'
dimana
x' = 2.737 m (panjang kons. didepan st. 7)
maka
W' = 3.70 ton
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.368 m
b = Lpp/40
= 2.50 m
sehingga
W2' = -0.18 ton q (st. 9 s/d 10) = -0.07 ton / m
W1' = 3.88 ton q (st. 10 s/d 11) = 1.55 ton / m
Bridge
Station q (ton/m) q(dist) (q) total Station (q) total
5 5-6 2.48
2.48 2.48 6-7 0.87
6 7-8 1.28
1.35 -0.48 0.87 8-9 1.55
7
1.35 -0.07 1.28
8
1.55 1.55
9
S= 6.19
W1' = W' ( 2a + b ) / ( 2b )
W2'' = W'' -W1''
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.740 m
b = Lwl/40
= 2.50 m
sehingga
W2' = 0.1324 ton q (st. 6 s/d 7) = 0.05 ton / m
W1' = 0.52 ton q (st. 5 s/d 6) = 0.21 ton / m
sehingga
W2' = -0.06 ton q (st. 9 s/d 10) = -0.02 ton / m
W1' = 1.26 ton q (st. 10 s/d 11) = 0.50 ton / m
Navigation
Station q (ton/m) q(dist) (q) total Station (q) total
6 6-7 0.05
0.05 0.05 7-8 0.62
7 8-9 0.50
0.44 0.18 0.62
8
0.50 0.50
9
S= 1.18
Penyebaran beban
W=q*l
q= W/l
= 0,009 / 10
= 0.894 ton / m
Beban di belakang st. 38 a
W' = q * x' x'' b
dimana 36 37 38
x' = 2.751 m (panjang kons. dibelakang st. 38) W1'' W'' W2''
maka
W' = 2.461 ton
Beban didistribusikan ke dalam st. 36 s/d st. 38.
W = W1 + W2
W * a = -W1 ( 1/2 ) b - W2 ( 3/2 ) b
2 W * a = -W1 * b - 3 W2 * b
W * b = W1 * b + W2 * b +
W ( 2a +b ) = - 2 W2 * b
W2 = - W ( b + 2a ) / 2b
W1 = W -W2
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.376 m
b= Lwl/40
= 2.50 m
sehingga
W2' = -0.12 ton q (st. 37 s/d 38) = -0.05 ton / m
W1' = 2.58 ton q (st. 36 s/d 37) = 1.03 ton / m
maka W'
W' = 1.51 ton 38 39
Forecastle
Station q (ton/m) q(dist) (q) total Station (q) total
37 37-38 1.03
1.034 1.034 38-39 1.01
38 39-40 1.33
0.894 0.117 1.011
39
0.894 0.436 1.331
40
S= 3.375
0
5
10
15
20
25
30
35
40
1
1.455
2
1.806
3
2.190
4
37.562
5
25.826
6
32.091
7
31.093
8
30.989
37.151
2.767
3.056
3.314
3.543
3.752
3.947
4.130
4.299
4.458
4.610
4.756
Station
4.900
5.042
5.179
5.307
5.425
Grafik Penyebaran LWT
5.529
5.619
5.690
5.739
5.757
5.738
5.684
5.602
5.496
5.376
5.251
5.133
6.066
5.946
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
6.186
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
PENYEBARAN BERAT DWT
Data-data perhitungan
Payload 4872.896 ton LPP = 98.40 m
Fuel Oil 575.424 ton LPP/40 = 2.460 m
Lube Oil 23.337 ton
Freshwater 400.100 ton
Crew 21.000 ton
Provision 151.200 ton
Total 6084.56 ton
W1' = W' ( 2a + b ) / ( 2b )
8
W1'' = W'' ( 2a + b ) / ( 2b ) W2'' 9 10
' W'' W1''
2 W'' a = W1'' * b - W2'' * b a
W'' * b = W1'' * b + W2'' * b - b x''
W'' ( 2a - b ) = -2 W2'' * b
W2'' = W'' ( 2a - b ) / ( -2b )
dimana
a = letak titik berat segi empat = 1/2 x''
= 1.368 m
b= Lwl/40
= 2.46 m
sehingga
W2' = -12.65 ton q (ST 7 s/d ST 8) = -5.14 ton / m
W1' = 237.60 ton q (ST 6 s/d ST 7) = 96.59 ton / m
Fuel Oil
Station q dist(ton/m) q(dist) (q) total Station (q) total
6 6-7 9.60
9.60 9.60 7-8 83.52
7 8-9 96.59
82.20 1.32 83.52
8
96.59 96.59
9
S= 189.7052
W1' = W' ( 2a + b ) / ( 2b )
Beban di depan ST 2
W'' = q * x''
dimana
x'' = 0.43 m (panjang tangki di depan ST 3)
maka
W'' = 57.90 ton
Beban didistribusikan ke dalam st. 2 s/d st. 3
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
2 W'' a = W1'' * b - W2'' * b
W'' * b = W1'' * b + W2'' * b +
W'' ( 2a + b ) = 2 W1'' * b
3
W1'' = W'' ( 2a + b ) / ( 2b ) W2'' 4 5
' W'' W1''
2 W'' a = W1'' * b - W2'' * b a
W'' * b = W1'' * b + W2'' * b - b x''
W'' ( 2a - b ) = -2 W2'' * b
W2'' = W'' ( 2a - b ) / ( -2b )
dimana
a = letak titik berat segi empat = 1/2 x''
= 0.217 m
b= Lwl/40
= 2.46 m
sehingga
W2' = 23.84 ton q (ST 1 s/d ST 2 ) = 9.69 ton / m
W1' = 34.06 ton q (ST 2 s/d ST 3) = 13.85 ton / m
Freshwater
Station q (ton/m) q(dist) (q) total Station (q) total
2 2-3 90.921
133.37 42.446 90.921
3
S= 90.921
W1' = W' ( 2a + b ) / ( 2b )
Beban di depan ST 8
W'' = q * x''
dimana
x'' = 2.30245 m (panjang tangki di depan ST 5)
maka
W'' = 53.73 ton
Beban didistribusikan ke dalam st. 4 s/d st. 6
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
2 W'' a = W1'' * b - W2'' * b
W'' * b = W1'' * b + W2'' * b +
W'' ( 2a + b ) = 2 W1'' * b
7
W1'' = W'' ( 2a + b ) / ( 2b ) W2'' 8 9
' W'' W1''
2 W'' a = W1'' * b - W2'' * b a
W'' * b = W1'' * b + W2'' * b - b x''
W'' ( 2a - b ) = -2 W2'' * b
W2'' = W'' ( 2a - b ) / ( -2b )
dimana
a = letak titik berat segi empat = 1/3 x''
= 0.76748 m
b= Lwl/40
= 2.46 m
sehingga
W2' = 10.10 ton q (ST 5 s/d ST 6 ) = 4.11 ton / m
W1' = 43.63 ton q (ST 6 s/d ST 7) = 17.74 ton / m
Station q dist (ton/m) q(dist) (q) total Station (q) total
6 6-7 26.40
26.40 26.40
7
S= Err:522
W1' = W' ( 2a + b ) / ( 2b )
Beban di depan ST 15
W'' = q * x''
dimana
x'' = 0.2561 m (panjang tangki di depan ST 15)
maka
W'' = 48.22 ton
Beban didistribusikan ke dalam st. 14 s/d st. 16
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
7
W1'' = W'' ( 2a + b ) / ( 2b ) W2'' 8 9
' W'' W1''
2 W'' a = W1'' * b - W2'' * b a
W'' * b = W1'' * b + W2'' * b - b x''
W'' ( 2a - b ) = -2 W2'' * b
W2'' = W'' ( 2a - b ) / ( -2b )
dimana
a = letak titik berat segi empat = 1/2 x''
= 0.128 m
b = Lwl/40
= 2.46 m
sehingga
W2' = 21.60 ton q (ST 15 s/d ST 16) = 8.78 ton / m
W1' = 26.62 ton q (ST 14 s/d ST 15) = 10.82 ton / m
Station q dist (ton/m) q(dist) (q) total Station (q) total
9 9-10 104.65
104.65 104.65 10-11 184.86
10 11-12 176.79
169.47 15.39 184.86 12-13 182.28
11 13-14 186.44
176.79 176.79 14-15 198.49
12 15-16 10.82
182.28 182.28
13
186.44 186.44
14
189.71 8.78 198.49
15
10.82 10.82
16
S= 1044.3278
S x h = 2569.046 Ton
W2' = W' ( 2a -b ) / ( 2b )
W1' = W' -W2'
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.000 m
b = Lwl/40
= 2.46 m
sehingga
W2' = 0.00 ton q (st. 1 s/d 2) = 0.00 ton / m
W1' = 0.00 ton q (st. 0 s/d 1) = 0.00 ton / m
Beban di depan ST 8
W'' = q * x''
dimana
x'' = 2.737 m (panjang di depan ST 8)
maka
W'' = 21.70 ton
Beban didistribusikan ke dalam st. 7 s/d st. 9
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
W1'' = W'' ( 2a + b ) / ( 2b )
dimana 9 10 11
a = letak titik berat segi empat = 1/2 x''
= 1.36830 m
b = Lwl/40 W2'' a W1''
= 2.46 m b x''
sehingga
W2' = -1.22 ton q (ST 9 s/d ST 10) = -0.50 ton / m
W1' = 22.92 ton q (ST 10 s/d ST 11) = 9.32 ton / m
0
100
150
200
250
50
1
7.929
2
7.929
3
98.850
4
7.929
5
7.929
6
7.929
7
43.925
8
90.955
105.903
104.645
184.859
176.789
182.279
186.444
198.489
174.862
202.760
194.666
195.086
199.583
Station
184.350
199.353
194.363
193.264
191.459
Grafik Penyebaran DWT
207.659
149.719
198.078
174.099
165.847
143.999
207.739
119.154
110.991
93.726
76.146
64.763
14.118
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Koreksi Displacement, LCB dan LCG
h = 2.460000 m , (jarak antar station)
Berat total = S4
= 19094.718 ton
LCG = S5/S4
= 61023.140 / 19094.718
= 3.196 m , di depan midship
0
50
100
150
200
250
300
1
67.885
2
68.236
3
159.541
4
103.992
5
92.256
6
98.521
7
133.519
8
180.445
201.556
165.914
246.417
238.604
244.324
248.698
260.937
237.493
265.561
257.626
258.197
262.840
Station
247.751
262.896
Grafik Penyebaran LWT + DWT
258.043
257.073
255.386
271.690
213.840
262.269
238.339
230.106
208.238
271.925
183.257
174.988
157.603
139.898
128.397
78.685
64.448
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
64.688
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
PENYEBARAN GAYA LINTANG DAN MOMEN PADA AIR TENANG
m
ton/m
ton
ton
ton
oreksi non linear
ton/m
ton/m
ton.m
ton.m
09 x (0,003^2)/2|
ton.m
)max, koreksi non linear
Grafik Gaya Lintang dan Momen Air Tenang
600
500
400
300
200
100
0
0 5 10 15 20 25 30 35 40
-100
-200
-300
-400
Station
Gelombang Hogging
MT = MSW + MWV [ kNm ]
MWV = L2 . B . c0 . c1 . cL . cM [ kNm ]
Keterangan :
MT = total bending moment in the seaway
MSW = still water bending moment of the actual loading or ballast condition considered
( positif sign for hogging, negativ sign for sagging )
MWV = vertical wave bending moment ( positif sign for hogging, negativ sign for sagging )
Data Kapal :
L= 98.40 m T = 6.00 m
B= 17.80 m H = 8.50 m
Cb = 0.672 Vo = 13.00 knot
1 kg = 9.81 KN
Rumus untuk perhitungan :
c0 = 10.75 - [ (300-L) / 100 ] 1.5 ; for 90 < L > 300 m
c1 = hogging / sagging factor as follows :
c1H = 0.19. Cb ; for hogging condition
c1S = -0.11 ( Cb + 0.7) ; for sagging condition
cv = 3√(Vo/1.4√L) ≥ 1.0
cL= 1 ; for L > 90 m
CM = Distribution factor
Hogging condition
CMH = 2.5 . x/L untuk x/L <0.4
CMH = 1 untuk 0.4 ≤ x/L ≤ 0.65
CMH = [1-x/L]/0.35 untuk x/L > 0.65
Sagging condition
CMS = c v . 2.5 . x/L untuk x/L <0.4
CMS = cv untuk 0.4 ≤ x/L ≤ 0.65
CMS = c v . [(x/L-0.65 c v )/ 1-0.65 c v] untuk x/L > 0.65
Hasil Perhitungan :
c0 = 7.89
c1H = 0.128
cv = 1
Hasil Perhitungan :
c0 = 7.89
c1S = -0.151
cv = 1
Rekapitulasi
M WV (kNm) M SW (kNm) M T (kNm)
St.
Hogging Sagging Hogging Sagging Hogging Sagging
0 0.000 0.000 0.000 0.000 0.000 0.000
1 10848.158 -12822.713 2222.681 2222.681 13070.838 -10600.032
2 21696.315 -25645.425 544.740 544.740 22241.055 -25100.685
3 32544.473 -38468.138 2713.915 2713.915 35258.387 -35754.223
4 43392.630 -51290.850 7027.414 7027.414 50420.044 -44263.437
5 54240.788 -64113.563 15076.729 15076.729 69317.516 -49036.834
6 65088.945 -76936.275 27638.864 27638.864 92727.810 -49297.411
7 75937.103 -89758.988 44035.433 44035.433 119972.536 -45723.555
8 86785.260 -102581.700 62315.869 62315.869 149101.130 -40265.831
9 97633.418 -115404.413 80911.629 80911.629 178545.047 -34492.784
10 108481.576 -128227.126 100712.568 100712.568 209194.144 -27514.557
11 119329.733 -141049.838 120702.436 120702.436 240032.169 -20347.402
12 130177.891 -153872.551 138935.087 138935.087 269112.978 -14937.464
13 141026.048 -166695.263 155691.077 155691.077 296717.125 -11004.186
14 151874.206 -179517.976 170824.079 170824.079 322698.284 -8693.897
15 162722.363 -192340.688 183950.270 183950.270 346672.634 -8390.418
16 173570.521 -205163.401 195509.471 195509.471 369079.992 -9653.930
17 173570.521 -205163.401 205428.253 205428.253 378998.774 264.852
18 173570.521 -205163.401 213131.984 213131.984 386702.505 7968.583
19 173570.521 -205163.401 218868.949 218868.949 392439.470 13705.548
20 173570.521 -205163.401 222487.554 222487.554 396058.075 17324.153
21 173570.521 -205163.401 224307.754 224307.754 397878.275 19144.353
22 173570.521 -205163.401 224323.226 224323.226 397893.747 19159.825
23 173570.521 -205163.401 222206.513 222206.513 395777.034 17043.112
24 173570.521 -205163.401 218108.806 218108.806 391679.327 12945.405
25 173570.521 -205163.401 212062.534 212062.534 385633.055 6899.133
26 173570.521 -205163.401 203544.455 203544.455 377114.976 -1618.946
27 161172.627 -190508.872 193722.671 193722.671 354895.297 3213.798
28 148774.732 -175854.344 182743.480 182743.480 331518.212 6889.136
29 136376.838 -161199.815 169668.083 169668.083 306044.921 8468.268
30 123978.944 -146545.286 155236.964 155236.964 279215.907 8691.677
31 111581.049 -131890.758 140052.340 140052.340 251633.389 8161.582
32 99183.155 -117236.229 122432.458 122432.458 221615.613 5196.229
33 86785.260 -102581.700 102674.240 102674.240 189459.501 92.540
34 74387.366 -87927.172 83222.426 83222.426 157609.792 -4704.746
35 61989.472 -73272.643 64295.160 64295.160 126284.631 -8977.484
36 49591.577 -58618.115 46379.513 46379.513 95971.090 -12238.602
37 37193.683 -43963.586 29783.987 29783.987 66977.670 -14179.599
38 24795.789 -29309.057 15824.464 15824.464 40620.253 -13484.593
39 12397.894 -14654.529 5924.651 5924.651 18322.545 -8729.878
40 0.000 0.000 0.000 0.000 0.000 0.000
Penggambaran Grafik
M WV (kNm) M SW (kNm) M T (kNm)
St. Skala 100 Skala 100 Skala 100
Hogging Sagging Hogging Sagging Hogging Sagging
0 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
1 108.48158 -128.22713 22.22681 22.22681 130.70838 -106.00032
2 216.96315 -256.45425 5.44740 5.44740 222.41055 -251.00685
3 325.44473 -384.68138 27.13915 27.13915 352.58387 -357.54223
4 433.92630 -512.90850 70.27414 70.27414 504.20044 -442.63437
5 542.40788 -641.13563 150.76729 150.76729 693.17516 -490.36834
6 650.88945 -769.36275 276.38864 276.38864 927.27810 -492.97411
7 759.37103 -897.58988 440.35433 440.35433 1199.72536 -457.23555
8 867.85260 -1025.81700 623.15869 623.15869 1491.01130 -402.65831
9 976.33418 -1154.04413 809.11629 809.11629 1785.45047 -344.92784
10 1084.81576 -1282.27126 1007.12568 1007.12568 2091.94144 -275.14557
11 1193.29733 -1410.49838 1207.02436 1207.02436 2400.32169 -203.47402
12 1301.77891 -1538.72551 1389.35087 1389.35087 2691.12978 -149.37464
13 1410.26048 -1666.95263 1556.91077 1556.91077 2967.17125 -110.04186
14 1518.74206 -1795.17976 1708.24079 1708.24079 3226.98284 -86.93897
15 1627.22363 -1923.40688 1839.50270 1839.50270 3466.72634 -83.90418
16 1735.70521 -2051.63401 1955.09471 1955.09471 3690.79992 -96.53930
17 1735.70521 -2051.63401 2054.28253 2054.28253 3789.98774 2.64852
18 1735.70521 -2051.63401 2131.31984 2131.31984 3867.02505 79.68583
19 1735.70521 -2051.63401 2188.68949 2188.68949 3924.39470 137.05548
20 1735.70521 -2051.63401 2224.87554 2224.87554 3960.58075 173.24153
21 1735.70521 -2051.63401 2243.07754 2243.07754 3978.78275 191.44353
22 1735.70521 -2051.63401 2243.23226 2243.23226 3978.93747 191.59825
23 1735.70521 -2051.63401 2222.06513 2222.06513 3957.77034 170.43112
24 1735.70521 -2051.63401 2181.08806 2181.08806 3916.79327 129.45405
25 1735.70521 -2051.63401 2120.62534 2120.62534 3856.33055 68.99133
26 1735.70521 -2051.63401 2035.44455 2035.44455 3771.14976 -16.18946
27 1611.72627 -1905.08872 1937.22671 1937.22671 3548.95297 32.13798
28 1487.74732 -1758.54344 1827.43480 1827.43480 3315.18212 68.89136
29 1363.76838 -1611.99815 1696.68083 1696.68083 3060.44921 84.68268
30 1239.78944 -1465.45286 1552.36964 1552.36964 2792.15907 86.91677
31 1115.81049 -1318.90758 1400.52340 1400.52340 2516.33389 81.61582
32 991.83155 -1172.36229 1224.32458 1224.32458 2216.15613 51.96229
33 867.85260 -1025.81700 1026.74240 1026.74240 1894.59501 0.92540
34 743.87366 -879.27172 832.22426 832.22426 1576.09792 -47.04746
35 619.89472 -732.72643 642.95160 642.95160 1262.84631 -89.77484
36 495.91577 -586.18115 463.79513 463.79513 959.71090 -122.38602
37 371.93683 -439.63586 297.83987 297.83987 669.77670 -141.79599
38 247.95789 -293.09057 158.24464 158.24464 406.20253 -134.84593
39 123.97894 -146.54529 59.24651 59.24651 183.22545 -87.29878
40 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
Grafik Hogging
4500
4000
3500
3000
2500
2000
1500
1000
500
0
0 5 10 15 20 25 30 35 40 45
1000
0
0 5 10 15 20 25 30 35 40 45
-1000
-2000
-3000
-4000
-5000
1
Gelombang Hogging dan Sagging
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
-0.5
-1
-1.5
Gelombang Hogging Gelombang Sagging
V.2. Penyebaran Gaya tekan ke atas pada Kondisi Hogging
150
100
50
0
0 5 10 15 20 25 30 35 40
-50
-100
-150
-200
-250
-300
1
Gelombang Hogging dan Sagging
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
-0.5
-1
-1.5
Gelombang Hogging Gelombang Sagging
V.2. Penyebaran Gaya tekan ke atas pada Kondisi Sagging
200
100
0
0 5 10 15 20 25 30 35 40 45
-100
-200
-300
VFO = 729.994 m3
VFO = 253.63 m3
VLO = 19.55 m3
VLO = 6.79 m3
Fresh water
Weight
WFW = 0.2 ton/(person x day)
WFW = 138.00 ton
Volume
ρFW = 1000 kg/m3
ρFW = 1 ton/m3
VFW = 138.00 m3
Total weight
Wtot = 1106.02 ton
Engine and Generators Center of fuel oil weight
Tank location
At Machinery room
Tank dimensions
HFOT = Assumption =HDB
HFOT = 1.50 m
BFOT = 0.75 B
BFOT = 0.00 m Passageway = 1m
LFOT = VFO / (HFOT x BFOT) frame spacing = 0.6 m
LFOT = #DIV/0! m = 18 m ~ 30 frame spacing
Vertical
VCGFOT = T + 0.5 HFOT
VCGFOT = 0.75 m
Longitudinal
from AP
Lst = 61.1063 m
LCGFOT = Lst + 0.5 LFOT
LCGFOT = 70.1063 m #DIV/0!
227.2835
Ship Design and Construction, ch. 11 pg. 25
133.875
frame spacing
frame spacing
Freeboard Calculation
International Convention on Load Lines, 1966 and Protocol of 1988
Input Data :
L= 145.85 m lpoop = 33.00 m 96%l pada 0.85D= 126.72
B= 23.00 m lFC = 12.00 m
D= 12.40 m 10.54 S= lPoop + lFC
d1= 85% Moulded Depth = 45.00 m 151.928
= 10.54 m T= 8.50 m
CB = 0.72
Ship type = Type A
Calculation :
• Correction
1. Length
L>=100 m
FB1 = 1900.46 mm
2. CB correction
3. Depth correction (Regulation 31 Correction for depth) Regulation 31 Correction for depth
For ship with D < L/15 no correction needed ; If D > L/15 correction is needed as :
D= 12.40 m
L= 145.85 m
L/15 = 9.7234 D > L/15
4. Deduction of Superstructure
Forecastle Poop
lFC = 12.00 m lpoop = 33.00 m
hsFC = 2.51 m hspoop = 2.51 m
hFC = 2.40 m hpoop = 2.40 m
lsFC = 11.48 m lspoop = 31.57 m
Fb4 = 2188 mm
Total Freeboard
FB' = FB4
FB' = 2187.51 mm
FB' = 2.19 m 10.21
C1 1.92
C2 0.8
C3 0.65
C4 0.4
C5 -0.95
W0
Dari Fig 1.a maka didapatkan:
Wo 0.375
Nt
Dari Gambar GA maka nilai Nt yaitu:
Nt 10
Breadth (B) 23
Lpp (L) 144
Depth (D) 12.4
Draught (d) 8.5
hdb (h) 1.533
sehingga persebaran berat lambung kapal mengikuti rumus axm bergantung pada fig 3 dan fig 4
station a m a.m
0 0.34 42.384787 14.410828
1 0.49 42.384787 20.768546
2 0.63 42.384787 26.702416
3 0.73 42.384787 30.940895
4 0.82 42.384787 34.755526
5 0.88 42.384787 37.298613
6 0.94 42.384787 39.8417
7 0.98 42.384787 41.537091
8 0.99 42.384787 41.960939
9 1 42.384787 42.384787
10 1 42.384787 42.384787
11 1 42.384787 42.384787
12 1 42.384787 42.384787
13 0.99 42.384787 41.960939
14 0.98 42.384787 41.537091
15 0.93 42.384787 39.417852
16 0.86 42.384787 36.450917
17 0.76 42.384787 32.212438
18 0.62 42.384787 26.278568
19 0.4 42.384787 16.953915
20 0.14 42.384787 5.9338702
total 55137.389
Cb = 0.72
45
40
35
30
25
20 Column D
15
10
0
25
20 Column D
15
10
0
0 5 10 15 20 25
PERHITUNGAN BERAT KAPAL KOSONG
Berat bagian kapal yang direncanakan pada saat peluncuran meliputi (berdasarkan LR ' 64) :
A. Berat baja kapal dari lunas sampai geladak menerus teratas
B. Berat - berat setempat (lokal), yang meliputi :
a). Berat poop
b). Berat Forecastle
c). Berat Forepeak tank
d). Berat Afterpeak tank
e). Berat peralatan di ujung-ujung kapal
f). Berat baling-baling dan poros di luar kamar mesin
g). Berat kamar mesin
A. Berat Baja Kapal Kosong dari Geladak Utama hingga Dasar Kapal dari AP ~ FP
Rumus :
m = 43,4 x H x ( Lpp / 104 ) (ton/m)
dimana :
H = (c1 x B) + (c2 x D) + (c3 x d) + (c4 x Wo x Nt) + c5 + (2,5 x h)
dari LR ' 64 (fig 1a,1b, dan 2 hal 72 & 73) diperoleh :
c1 = 1.92 c4 =
c2 = 0.80 c5 =
c3 = 0.65 Wo =
maka :
H = (1.92 x 23) + (0.80 x 12) + (0.65 x 9) + (0.40 x 0.375 x 10) + (-0.95) + (2.5 x 1.533)
H= 63.99
sehingga :
m = 43.40 x 63.99 x (144.00 / 10000)
m= 39.99 (ton/m)
Dari harga m dibuat tabel q = m x a dimana harga m diatas dikalikan dengan harga a ( LR ' 64 fig 3 dan 4
disimpsonkan, maka diperoleh berat baja kapal kosong dari AP ~ FP dan titik berat terhadap midship kap
Station a q=mxa Fs q x Fs Fm
-0.97 0.000 0.000 0.49 0.000 -10.97
-0.49 0.170 1.875 1.94 3.646 -10.49
0 0.340 13.60 1.49 20.206 -10
1 0.490 19.59 4 78.380 -9
2 0.630 25.19 2 50.387 -8
3 0.730 29.19 4 116.770 -7
4 0.820 32.79 2 65.583 -6
5 0.880 35.19 4 140.763 -5
6 0.940 37.59 2 75.181 -4
7 0.980 39.19 4 156.759 -3
8 0.990 39.59 2 79.179 -2
9 1.000 39.99 4 159.959 -1
10 1.000 39.99 2 79.979 0
11 1.000 39.99 4 159.959 1
12 1.000 39.99 2 79.979 2
13 0.999 39.95 4 159.799 3
14 0.990 39.59 2 79.179 4
15 0.960 38.39 4 153.560 5
16 0.900 35.99 2 71.981 6
17 0.800 31.99 4 127.967 7
18 0.650 25.99 2 51.987 8
19 0.425 17.00 4 67.982 9
20 0.140 5.60 1.139 6.376 10
20.14 0.070 0.445 0.556 0.247 10.14
20.28 0.000 0.000 0.14 0.000 10.28
S1 = 1985.8079 S2 =
Kurva q = m x a
45.0
Kurva q = m x a
45.0
40.0
q=mxa
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
-2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0
No Station
RAT KAPAL KOSONG
0.40 133.209
-0.95
0.38
m
m
q . Fs . Fm hstat = 144.0
0.000 20
-38.231 hstat = 7.2 SPL
-202.059 0 0,13.59647352
-705.417 7.2 7.2,19.59491772
-403.095 14.4 14.4,25.19346564
-817.388 21.6 21.6,29.19242844
-393.498 28.8 28.8,32.79149496
-703.817 36 36,35.19087264
-300.722 43.2 43.2,37.59025032
-470.278 50.4 50.4,39.18983544
-158.359 57.6 57.6,39.58973172
-159.959 64.8 64.8,39.989628
0.000 72 72,39.989628
159.959 79.2 79.2,39.989628
159.959 86.4 86.4,39.989628
479.396 93.6 93.6,39.949638372
316.718 100.8 100.8,39.58973172
767.801 108 108,38.39004288
431.888 115.2 115.2,35.9906652
895.768 122.4 122.4,31.9917024
415.892 129.6 129.6,25.9932582
611.841 136.8 136.8,16.9955919
63.761 144 144,5.59854792
2.507
0.000
-11.61
KG 4.133 m
urva q = m x a
urva q = m x a
8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0
No Station