Sie sind auf Seite 1von 5

Machine: MITSUBISHI 5 COLOR PRINTING PRESS

Product: Reynolds Jetter


Expected Production per hour: 12000
Machine's Catalog Capacity per hour: 16000

Target: 100.00% AVAILABLE TIME = 24 HOURS


THEORETICAL EXPECTED PRODUCTION = 24 * 12000 = 288000

Stage 1: 91.67% PLANNED TIME = 22 HOURS


ESTIMATED PRODUCTION = 22 * 12000 = 264000

Stage 2: 83.33% AVAILABLE TIME = 20 HOURS


ACHIEVABLE PRODUCTION = 20 * 12000 = 240000

Stage 3: 79.17% MINOR STOPPGES, SPEED LOSSES CONTRIBUTING 1 HOUR = 19 HOURS


FIRST STAGE POSSIBLE PRODUCTION = 19 * 12000 = 228000

Stage 4: 75.00% YIELD LOSS DUE TO SPEED UP / DOWN CONTRIBUTING 1 HOUR = 18 HOURS
SECOND STAGE POSSIBLE PRODUCTION = 18 * 12000 = 216000

Stage 5: 70.83% QUALITY LOSS / REWORK LOSSES CONTRIBUTING 1 HOUR = 17 HOURS


THIRD STAGE POSSIBLE PRODUCTION = 17 * 12000 = 204000

Machine Availibility: 90.91% (Number of Actual Hours machine has run / Number of Act

Speed Rate: 77.27% (Actual Final Speed / Desired Speed for the product)

Quality Rate: 94.12% (Quantity finally accepted / Quantity finally produced)

OEE: 66.11% Multiply all above to obtain Overall equipm


Per day time
available for production

2 hours for meeting, cleaning


preventive maintenance etc.

Machine stopped during production due to


set up, adjustments, breakdown etc. > 10 mins.

1 HOUR = 19 HOURS Machine slowing down, speeding up


jams, sensor faults etc. < 10 mins.

NG 1 HOUR = 18 HOURS Whenver the machine stops and starts it


needs time to rise to set speed / to slow down

HOUR = 17 HOURS
204000

ine has run / Number of Actual Hours machine can run)

Speed for the product)

antity finally produced)

btain Overall equipment efficiency


for production

ction due to
n etc. > 10 mins.
Machine: Battenfeld TC40 Controlled Molding m/c
Product: 907 Fuse Housing, Single Cavity
Material: PA6,6 20% GF
Calculated Cycle Time: 45 seconds (20 seconds cooling time)
Calculated Output per hour: 80 Morning Meetings, Machine
Ideal Working Hours per day: 24 Morning Meetings, Machine
Cleaning, Material Pre-heating,
Cleaning, Material Pre-heating,
Mold Servicing, Production
Mold Servicing, Production
Number of Hours Planned Preparation and other planned
A 22 Preparation and other planned
Per day: stoppages
stoppages

B Downtimes 3
When m/c running, it stops due to
When m/c running,
breakdowns, it stopsrunner
power failures, due to
breakdowns,
catching, lump power failures,
formation, waterrunner
Nett machine running catching,
leakages lump
and formation,
more. water
The machine
C (available time) = A - B 19 leakages
totally and more. The machine
STOPS.
totally STOPS.

Theoretical expected
D production @ 80 1520
components per hour Due to various limitations on the
Due to various limitations on the
machines, mold, material, skill the
machines, mold, material, skill the
theoretical cycle time is never
theoretical cycle time is never
Actual Quantity Produced achieved. In this example we have
E 1140 achieved. In this example we have
for run hours reduced output to 60 per hour
reduced output to 60 per hour

Quantity rejected due to


F various reasons 200
Due to in-process as well as after
Due to in-process as well as after
production problems, 100
production problems, 100
Nett output achieved at the numbers are rejected. Please
G 940 = E-F numbers are rejected. Please
end of the day include customer end or upstream
include customer end or upstream
process rejection also.
process rejection also.

H Machine Availibility C/A


86.4%

I Yield Loss E/D


75.0%

J Quality Loss G/E


82.5%

Overall Equipment H*I*J


Effectiveness ( O E E ) 53.4%

6 MAJOR LOSSES AS ADVOCATED BY T P M

BREAKDOWN
LOSSES
IDLING &
MINOR
STOPPAGES
SET UP &
ADJUSTMENT
LOSSES

SPEED
LOSSES

YIELD QUALITY
LOSSES REWORK &
DEFECTS