Beruflich Dokumente
Kultur Dokumente
INDONESIAN ENGLISH
LEMTEK FTUI LEMTEK FTUI
Laporan Akhir Final Report
Revisi Revision
Feasibility Study Terminal Regasifikasi LNG untuk Feasibility Study on LNG Regasification Terminal
Pembangkit Listrik Berbahan Bakar Gas di Jawa for Gas-Fueled Power Plant in Eastern Part of
Bagian Timur Java
Kata Pengantar Preface
Daftar Isi Table of Contents
Daftar Gambar List of Figures
Daftar Table List of Tables
Bab 1 Pendahuluan Chapter 1 Introduction
Latar Belakang Background
Maksud dan Tujuan Review Studi Kelayakan Purposes and Objectives of Review of Feasibility
Study
Ruang Lingkup Kerja Scope of Works
Metodologi Methodology
Keluaran Outputs
Lokasi Site (hanya kadang-kadang saja diterjemahkan
Location)
Bab 2 Hasil Survei Lokasi Chapter 2 Result of Site Survey
Kondisi Lokasi Site Condition
PLTGU Tambak Lorok Tambak Lorok CCPP
PLTGU/PLTU Gresik dan Jawa 3 Gresik and Jawa 3 CCPP/SPP
PLTGU Grati Grati CCPP
Onshore Receiving Facilities (ORF) Porong Porong Onshore Receiving Facilities (ORF)
PLTGU Madura Madura CCPP
PLTG Pesanggaran Pesanggaran GPP
Bab 3 Skema Logistik Chapter 3 Logistics Scheme
Model Logistik LNG LNG Logistics Model
Opsi Skenario Logistik dan Seleksi Tahap I Optional Logistics Scenarios and 1st Stage
Selection
Asumsi Umum Skenario Logistik Logistics Scenario General Assumptions
Deskripsi Opsi Skenario Description of Optional Scenarios
Scenario 2, 3, 4, dst. Scenario 2, 3, 4, dst.
Seleksi Tahap II 2nd Stage Selection
Berdasarkan Levelized Cost Based on Levelized Cost
Hasil Perhitungan Logistics Result of Logistics Calculation
Levelized Cost Shipping, Regas, Storage dan Pipa Levelized Cost of Shipping, Regasification, Storage
and Piping
Seleksi Tahap III 3rd Stage Selection
Berdasarkan Cashflow Based on Cashflow
Metode dan Asumsi Perhitungan Cashflow Cashflow Calculation Methods and Assumptions
Metode dan Asumsi Perhitungan Cashflow untuk Cashflow Calculation Methods and Assumptions
Perpipaan for Piping
Hasil Perhitungan Cashflow untuk Lima Skenario Result of Cashflow Calculation for Five Selected
Terpilih Scenarios
Pemilihan Skenario Terbaik Selection of the the Best Scenario
Bab 4 Seleksi Teknologi Chapter 4 Selection of Technology
LNG Center LNG Center
Tipe Tangki LNG Carrier Types of LNG Carrier Tanks
Tangki Tipe A, Tangki Tipe B, Tangki Tipe C Type A Tank, Type B Tank, Type C Tank
Tangki Tipe Membrance Membrane Type Tank
Mesin Kapal Boat Engine
Ketersediaan Kapal Vessel Availability
Seleksi Teknologi Kapal Selection of Vessel Technology
Jetty Jetty
Fasilitas Umum Pendukung Operasi General Operation Supporting Facilities
Fasilitas Khusus Transportasi LNG LNG Transportation Special Facilities
Kapasitas Jetty Jetty Capacity
Seleksi Teknologi Jetty Selection of Jetty Technology
Transfer LNG (Loading and Unloading) LNG Transfer (Loading and Unloading)
Ship to Shore Ship to Shore
Ship to Ship Ship to Ship
Unit Regasifikasi Regasification Unit
Tipe Regasifikasi Regasification Type
Storage Storage
Tangki Atmospheric Atmospheric Tank
Tangki Bertekanan Pressurized Tank
Vaporizer Vaporizer
Open Tack Vaporizer (ORV) Open Rack Vaporizer (ORV)
Submerged Combustion Vaporizer (SCV) Submerged Combustion Vaporizer (SCV)
Air Ambient Vaporizer (AAV) Air Ambient Vaporizer (AAV)
Intermediate Fluid Vaporizer (IFV) Intermediate Fluid Vaporizer
FSRUB (Floating Storage & Regasification Unit FSRUB (Floating Storage and Regasification Unit
Barge) Barge)
Sistem Perpipaan LNG dan Natural Gas LNG and Natural Gas Piping System
Konsiderasi untuk Tie-In dengan Pipa Eksisting Consideration for Tie-In with Existing Pipeline
Boil Off Gas Manajemen Boil Off Gas Management
Penangnan BOG di Kapal Handling of BOG on Vessel
Penanganan BOG di Unit Regasifikasi Handling of BOG at Regasification Unit
Bab 5 Analisis Finansial Chapter 5 Financial Analysis
Kemungkinan Skema Special Purpose Company Possibility of Special Purpose Company (SPC)
(SPC) dan Skema Bisnis BOOT-BOT Scheme and BOOT-BOT Business Scheme
Opsi Skema Bisnis Optional Business Schemes
Skenario Terpilih Dengan Menggunakan LNG Dari Selected Scenario Using LNG from Tangguh
Tangguh
Analisis Sensitivitas Biaya Cost Sensitivity Analysis
Bab 6 Desain Proses Chapter 6 Process Design
Desain Basis dan Data Perhitungan Basic Design and Calculation Data
Software Software
Komposisi LNG LNG Composition
Kebutuhan Gas Gas Demand
Skema Shipping LNG LNG Shipping Scheme
Cakupan Proses Simulasi Scope of Simulation Process
Deskripsi Proses Description of Process
Parameter Desain Design Parameter
Proses Simulasi Simulation Process
Transfer LNG dari Kapal ke Storage Tanks Transfer of LNG from Vessel to Storage Tanks
Proses Regasifikasi LNG LNG Regasification Process
Equipment Sizing Equipment Sizing
Basis Desain, Data dan Kriteria Perhitungan Basic Design, Data and Calculation Criteria
Software Software
Komposisi dan Kondisi Operasi Fluida Composition and Condition of Fluid Operation
Kriteria Perhitungan Calculation Criteria
Hasil Perhitungan Result of Calculation
Storage Tank Storage Tank
Booster Suction Drum Booster Suction Drum
BOG Suction Scrubber BOG Suction Scrubber
Propane Drum Propane Drum
LNG Vaporizer LNG Vaporizer
Natural Gas Heater Natural Gas Heater
Propane Evaporator Propane Evaporator
Line Sizing Line Sizing
Desain Basis dan Data Perhitungan Basic Design and Calcuation Data
Software Software
Komposisi Fluida Composition of Fluid
Kondisi Operasi dan Properti Fluida Condition of Fluid Operation and Properties
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU-FRU Bali Bali FSU-FRU
Metodologi Sizing Sizing Methodology
Velocity Velocity
Perhitungan Pressure Drop Calculation of Pressure Drop
Hasil Perhitungan Result of Calculation
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU-FRU Bali Bali FSU-FRU
Pipeline Hydraulic (Routing Onshore and Offshore Pipeline Hydraulic (Routing Onshore and Offshore
Pipeline) Pipeline)
Software Software
Komposisi Fluida Composition of Fluid
Field Layout Field Layout
Environmental Data Environmental Data
Production Rate Production Rate
Hasil Perhitungan Simulasi Result of Simulation Calculation
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU+FRU Bali Bali FSU+FRU
Bab 7 Analisis Resiko dan Mitigasi Chapter 7 Risk Analysis and Mitigation
Identifikasi Risiko Identification of Risks
Profil Risiko Risk Profile
Risk Level Risk Level
Rencana Mitigasi Mitigation Plan
Bab 8 Kesimpulan Chapter 8 Conclusion
Daftar Pusaka Bibliography
BBTUD BBTUD
MMSCFD MMSCFD
Gas turbin = Gas Turbine = GT Gas turbine = Gas Turbine = GT
Turbin gas Gas turbine
Metode Tie-In Tie-In Method
MFO MFO
Jetty Jetty
RUPTL = Rencana Umum Penyediaan Tenaga General Plan for Electricity Provision (RUPTL)
Listrik
UP PJB Gresik PJB Gresik Generating Unit
HUB atau hub HUB atau hub
CNG Plant CNG Plant
Turbin Uap = Steam Turbine = ST Steam Turbine = ST
HSD HSD
Dermaga HSD HSD Wharf