Sie sind auf Seite 1von 13

GLOSSARY

INDONESIAN ENGLISH
LEMTEK FTUI LEMTEK FTUI
Laporan Akhir Final Report
Revisi Revision
Feasibility Study Terminal Regasifikasi LNG untuk Feasibility Study on LNG Regasification Terminal
Pembangkit Listrik Berbahan Bakar Gas di Jawa for Gas-Fueled Power Plant in Eastern Part of
Bagian Timur Java
Kata Pengantar Preface
Daftar Isi Table of Contents
Daftar Gambar List of Figures
Daftar Table List of Tables
Bab 1 Pendahuluan Chapter 1 Introduction
Latar Belakang Background
Maksud dan Tujuan Review Studi Kelayakan Purposes and Objectives of Review of Feasibility
Study
Ruang Lingkup Kerja Scope of Works
Metodologi Methodology
Keluaran Outputs
Lokasi Site (hanya kadang-kadang saja diterjemahkan
Location)
Bab 2 Hasil Survei Lokasi Chapter 2 Result of Site Survey
Kondisi Lokasi Site Condition
PLTGU Tambak Lorok Tambak Lorok CCPP
PLTGU/PLTU Gresik dan Jawa 3 Gresik and Jawa 3 CCPP/SPP
PLTGU Grati Grati CCPP
Onshore Receiving Facilities (ORF) Porong Porong Onshore Receiving Facilities (ORF)
PLTGU Madura Madura CCPP
PLTG Pesanggaran Pesanggaran GPP
Bab 3 Skema Logistik Chapter 3 Logistics Scheme
Model Logistik LNG LNG Logistics Model
Opsi Skenario Logistik dan Seleksi Tahap I Optional Logistics Scenarios and 1st Stage
Selection
Asumsi Umum Skenario Logistik Logistics Scenario General Assumptions
Deskripsi Opsi Skenario Description of Optional Scenarios
Scenario 2, 3, 4, dst. Scenario 2, 3, 4, dst.
Seleksi Tahap II 2nd Stage Selection
Berdasarkan Levelized Cost Based on Levelized Cost
Hasil Perhitungan Logistics Result of Logistics Calculation
Levelized Cost Shipping, Regas, Storage dan Pipa Levelized Cost of Shipping, Regasification, Storage
and Piping
Seleksi Tahap III 3rd Stage Selection
Berdasarkan Cashflow Based on Cashflow
Metode dan Asumsi Perhitungan Cashflow Cashflow Calculation Methods and Assumptions
Metode dan Asumsi Perhitungan Cashflow untuk Cashflow Calculation Methods and Assumptions
Perpipaan for Piping
Hasil Perhitungan Cashflow untuk Lima Skenario Result of Cashflow Calculation for Five Selected
Terpilih Scenarios
Pemilihan Skenario Terbaik Selection of the the Best Scenario
Bab 4 Seleksi Teknologi Chapter 4 Selection of Technology
LNG Center LNG Center
Tipe Tangki LNG Carrier Types of LNG Carrier Tanks
Tangki Tipe A, Tangki Tipe B, Tangki Tipe C Type A Tank, Type B Tank, Type C Tank
Tangki Tipe Membrance Membrane Type Tank
Mesin Kapal Boat Engine
Ketersediaan Kapal Vessel Availability
Seleksi Teknologi Kapal Selection of Vessel Technology
Jetty Jetty
Fasilitas Umum Pendukung Operasi General Operation Supporting Facilities
Fasilitas Khusus Transportasi LNG LNG Transportation Special Facilities
Kapasitas Jetty Jetty Capacity
Seleksi Teknologi Jetty Selection of Jetty Technology
Transfer LNG (Loading and Unloading) LNG Transfer (Loading and Unloading)
Ship to Shore Ship to Shore
Ship to Ship Ship to Ship
Unit Regasifikasi Regasification Unit
Tipe Regasifikasi Regasification Type
Storage Storage
Tangki Atmospheric Atmospheric Tank
Tangki Bertekanan Pressurized Tank
Vaporizer Vaporizer
Open Tack Vaporizer (ORV) Open Rack Vaporizer (ORV)
Submerged Combustion Vaporizer (SCV) Submerged Combustion Vaporizer (SCV)
Air Ambient Vaporizer (AAV) Air Ambient Vaporizer (AAV)
Intermediate Fluid Vaporizer (IFV) Intermediate Fluid Vaporizer
FSRUB (Floating Storage & Regasification Unit FSRUB (Floating Storage and Regasification Unit
Barge) Barge)
Sistem Perpipaan LNG dan Natural Gas LNG and Natural Gas Piping System
Konsiderasi untuk Tie-In dengan Pipa Eksisting Consideration for Tie-In with Existing Pipeline
Boil Off Gas Manajemen Boil Off Gas Management
Penangnan BOG di Kapal Handling of BOG on Vessel
Penanganan BOG di Unit Regasifikasi Handling of BOG at Regasification Unit
Bab 5 Analisis Finansial Chapter 5 Financial Analysis
Kemungkinan Skema Special Purpose Company Possibility of Special Purpose Company (SPC)
(SPC) dan Skema Bisnis BOOT-BOT Scheme and BOOT-BOT Business Scheme
Opsi Skema Bisnis Optional Business Schemes
Skenario Terpilih Dengan Menggunakan LNG Dari Selected Scenario Using LNG from Tangguh
Tangguh
Analisis Sensitivitas Biaya Cost Sensitivity Analysis
Bab 6 Desain Proses Chapter 6 Process Design
Desain Basis dan Data Perhitungan Basic Design and Calculation Data
Software Software
Komposisi LNG LNG Composition
Kebutuhan Gas Gas Demand
Skema Shipping LNG LNG Shipping Scheme
Cakupan Proses Simulasi Scope of Simulation Process
Deskripsi Proses Description of Process
Parameter Desain Design Parameter
Proses Simulasi Simulation Process
Transfer LNG dari Kapal ke Storage Tanks Transfer of LNG from Vessel to Storage Tanks
Proses Regasifikasi LNG LNG Regasification Process
Equipment Sizing Equipment Sizing
Basis Desain, Data dan Kriteria Perhitungan Basic Design, Data and Calculation Criteria
Software Software
Komposisi dan Kondisi Operasi Fluida Composition and Condition of Fluid Operation
Kriteria Perhitungan Calculation Criteria
Hasil Perhitungan Result of Calculation
Storage Tank Storage Tank
Booster Suction Drum Booster Suction Drum
BOG Suction Scrubber BOG Suction Scrubber
Propane Drum Propane Drum
LNG Vaporizer LNG Vaporizer
Natural Gas Heater Natural Gas Heater
Propane Evaporator Propane Evaporator
Line Sizing Line Sizing
Desain Basis dan Data Perhitungan Basic Design and Calcuation Data
Software Software
Komposisi Fluida Composition of Fluid
Kondisi Operasi dan Properti Fluida Condition of Fluid Operation and Properties
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU-FRU Bali Bali FSU-FRU
Metodologi Sizing Sizing Methodology
Velocity Velocity
Perhitungan Pressure Drop Calculation of Pressure Drop
Hasil Perhitungan Result of Calculation
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU-FRU Bali Bali FSU-FRU
Pipeline Hydraulic (Routing Onshore and Offshore Pipeline Hydraulic (Routing Onshore and Offshore
Pipeline) Pipeline)
Software Software
Komposisi Fluida Composition of Fluid
Field Layout Field Layout
Environmental Data Environmental Data
Production Rate Production Rate
Hasil Perhitungan Simulasi Result of Simulation Calculation
FSRU Porong Porong FSRU
FSRB Madura Madura FSRB
FSU+FRU Bali Bali FSU+FRU
Bab 7 Analisis Resiko dan Mitigasi Chapter 7 Risk Analysis and Mitigation
Identifikasi Risiko Identification of Risks
Profil Risiko Risk Profile
Risk Level Risk Level
Rencana Mitigasi Mitigation Plan
Bab 8 Kesimpulan Chapter 8 Conclusion
Daftar Pusaka Bibliography

Daftar Gambar List of Figures


Gambar ….. Figure ……
Barchart Supply dan Demand Balance untuk Supply and Demand Bar Chart for Eastern Part of
Wilayah Jawa Bagian Timur Java
Tahapan Pekerjaan Kajian Stages in Reviewing Work
Opsi Skenario Supply dan Demand Supply and Demand Optional Scenarios
Lokasi PLTGU Tambak Lorok Tambak Lorok CCPP Site
Lokasi Potensial Sandaran FSRU dengan CBM FSRU Potential Berthing Site with CBM
Lokasi Potensial Sandaran FSRU di Perairan FSRU Potential Berthing Site in Jepara Waters
Jepara Area
Lokasi Pembangkit UP PJB Gresik UP PJB Gresik Generating Plant Site
Diagram Alur Natural Gas Gresik Flowchart of Gresik Natural Gas
Potensi Lahan di Unit Pembangkit Gresik Potential Land at Gresik Generating Unit
Kondisi Perairan dan Bathimetri sekitar Unit Condition of Waters and Bathymetry around
Pembangkit Gresik Gresik Generating Unit
Grati CCPP Generating Plant Site at Pasuruan,
East Java (Source: Indonesia Power)
Kedalaman Laut area Pipa HSD UP Grati Sea Depth of Grati Generating Plant HSD Pipeline
area
Pipeline Gas Eksisting di Wilayah Jawa Timur Existing Gas Pipeline in East Java Region (Source:
(Sumber: Indonesia Power) Indonesia Power)
ORF Porong Porong ORF
Penanda Jalur Pipa di Daerah Pesisir, Porong Pipeline Marker in Porong Coastal Area
Kondisi Pedesaan Sekitar Pesisir, Porong Condition of Villages Around Porong Coastal Area
Kondisi Daratan Dekat Bibir Pantai, Porong On-Shore Condition Close to Porong Shoreline
(Lokasi ORU Potensial) (Potential ORU Site)
Peta Situasi untuk Desain Tanah di Desa Tanjung Situational Map for Soil Design in Tanjung Village
Budidaya Rumput Laut di Sepanjang Pantai Desa Cultivation of Seaweed along Tanjung Village
Tanjung Beach
Kondisi Jalan Raya Menuju Lokasi dan Jalan Lokal Condition of Highway to the Site and Local Roads
di Lokasi Perencanaan Pembangkit at the Planned Generating Plant Site
Jarak Lokasi Pembangkit dengan Pelabuhan Distance between the Generating Plant Site and
Eksisting Existing Port
General Plant Layout untuk PLTGU Madura dan General Plant Layout for Madura CCPP and Its
Proyeksinya dalam Google Maps Projection in Google Maps
Lokasi Pembangkit PLTG Pesanggaran Pesanggaran GTPP Site
Jalur Pipa Gas dari Tanjung Benoa menuju Gas Pipeline from Tanjung Benoa to the
Pembangkit Generating Plant
Supply Demand Balance Pembangkit di Jawa Supply Demand Balance of Generating Plants in
bagian Timur Eastern Parti of Java
Lokasi Pembangkit untuk Jawa Bagian Timur Generating Plant Sites for Eastern Part of Java
Jaringan Pipa Eksisting dan Under Construction Existing Pipeline Networks and Pipeline Networks
untuk Wilayah Jawa Timur Under Construction in East Java Region
Ilustrasi Skenario 2, 3, 4, 5… 11 Opsi Logistik Illustration of Logistics Optional Scenario 2, 3, 4, 5
… 11
Ilustrasi Skenario 13 Opsi Logistik Sebelum 2022 Illustration of Logistics Optional Scenario 13
(atas) dan Setelah 2022 (bawah) Before 2022 (above) and After 2022 (below)
Perbandingan Biaya Rata-Rata Non-Gas Setiap Comparison between Average Non-Gas Costs for
Skenario Each Scenario
Perbandingan Plant Gate (Levelized Cost) Setiap Comparison between Plant Gate (Levelized Cost)
Skenario for Each Scenario
Biaya Akumulatif Bahan Bakar Setiap Skenario Accumulative Fuel Cost for Each Scenario
Total Biaya Hingga Plant Gate Total Cost Upto Plant Gate
Total Biaya Non-Gas secara Cashflow Non-Gas Total Cost based on Cashflow
Biaya Akumulasi 10 Tahun Secara Cashflow 10 Years Accumulated Cost based on Cashflow
Klasifikasi Tangki LNG berdasarkan IMO (Rich Type A LNG Tank (IMO, 2016 and Kei Tanaka,
Delpizzo, 2014) 2014)
Tangki LNG Tipe A (IMO, 2016 dan Kei Tanaka, Type A LNG Tank (IMO, 2016 and Kei Tanaka,
2014) 2014)
Tangki Independen Tipe B: (a) Moss, (b) IHI SPB Type B Independent Tank: (a) Moss, (b) IHI SPB
Tangki Independen Tipe C: (a) Cylindrical, (b) Bi- Type C Independent Tank: (a) Cylindrical, (b) Bi-
lobe lobe
Tangki Membrance Membrane Tank
Ketersediaan LNG Carrier Berdasarkan Jenis LNG Carrier Availability Based On Type of Tank
Tangki
Gambaran Perbedaan Kedua Jenis Desain Tangki Illustration of Differences between Both Design
Moss dan Membrane Types of Moss and Membrane Tanks
Diagram LNG Fuel Supply System Diagram of LNG Fuel Supply System
Proses Kerja Mesin Dual Fuel (Yanmar, 2015) Work Process of Dual Fuel Engine (Yanmar, 2015)
Kenaikan Kapasitas Liquefaction dan Train Sizes Increase in Capacity of Liquefaction and Train
(IGU World, 2016) Sizes (IGU World, 2016)
Kenaikan Ukuran dan Kapasitas Kapal LNG Carrier Increase in Size and Capacity of LNG Carrier
(IGU World, 2016) Vessels (IGU World, 2016)
Jumlah Kapal LNG Berdasarkan Kapasitas Kargo Number of LNG Vessels Based on Cargo Capacity
(IGU World, 2016) (IGU World, 2016)
Ilustrasi Mooring Dolphins dan Breasting (Ocean Illustration of Mooring Dolphins and Breasting
and Air Technology, 2013) (Ocean and Air Technology, 2013)
LNG Bunkering Ship to Ship (Kei Tanaka, 2014) Ship to Ship LNG Bunkering (Kei Tanaka, 2014)
Timeline Proses Ship to Ship (DNV, 2010) Ship to Ship Process Timeline (DNV, 2010)
Tipikal Pengaturan Bunkering Mooring (Ship to Typical Bunkering Mooring Management (Ship to
Ship) (DNV, 2010) Ship) (DNV, 2010)
Keneksi Hose saat transfer LNG (DNV, 2010) Hose Connection at the time of LNG Transfer
(DNV, 2010)
Skema Konfigurasi FSRU, ORU, dan FSU-FRU FSRU, ORU and FSU-FRU Configuration Schemes
Single Containment Tank Single Containment Tank
Double Containment Tank Double Containment Tank
Full Containment Tank Full Containment Tank
Flat Bottom Tank Linde Linde Flat Bottom Tank
Tangki Penyimpanan Berbentuk Bullet/Cylinder Bullet/Cylinder Shaped Containment Tank
Double Containment Double Containment
Full Containment Full Containment
Kwinana LNG Tank Kwinana LNG Tank
Skema Open Rack Vaporizer Open Rack Vaporizer Scheme
Open Rack Vaporizer Tokyo Gas dan Sumitomo Tokyo Gas Open Rack Vaporizer and Sumitomo
Precision Product di Ohgishima Precision Product in Ohgishima
Skema Submerged Combustion Vaporizer Submerged Combustion Vaporizer Scheme
Skema Ambient Air Vaporizer Ambient Air Vaporizer Scheme
Direct Ambient Air Vaporizer (Sumber: Direct Ambient Air Vaporizer (Sumber:
www.cryoquip.com) www.cryoquip.com)
Forced Ambient Air Vaporizer (Source: Forced Ambient Air Vaporizer (Source:
files.chartindustries.com) files.chartindustries.com)
Skema IFV dengan glikol-air IFV Scheme with glycol-air
Skema IFV dengan hidrokarbon dan air laut IFV Scheme with Hydrocarbon and seawater
Process Regasifikasi FSRU (Floating Storage & Regasification Process of FSRU (Floating Storage
Regasification Unit) & Regasification Unit)
Proses LNG regas system onboard (FRU) Process of Onboard LNG regasification system
(FRU)
Transport and Installation at Site (FSRU is shown Transport and Installation at Site (FSRU is shown
as size reference) as size reference)
Pipa Kriogenik yang Menggunakan Powder Cryogenic Pipes Using Insulation Powder
Insulasi
Skema Process Hot-Tap Hot-Tap Process Scheme
Proses Subsea Hot-Tap Hot-Tap Subsea Process
Skema Manajemen Boil Off Gas Boil Off Gas Management Scheme
Rekondensasi Sistem pada Terminal Regasifikasi Re-condensation System at Regasification
Terminal
Top Spray Pada Pressurized Tank Top Spray at Pressurized Tank
Metode Resirkulasi Recirculation Method
Ilustrasi Skenario Terpilih dengan LNG dari Illustration of Selected Scenario with LNG from
Tangguh Tangguh
Sensitivitas Biaya per Komponen Cost Sensitivity per Component
Sensitivitas Biaya hingga Plant Gate Cost Sensitivity up to Plant Gate
Sensitivitas Biaya Akumulatif selama 10 Tahun Sensitivity of Accumulated Cost for 10 Years
Skema Shipping LNG LNG Shipping Scheme
Ilustrasi Regasifikasi pada Golar Spirit Illustration of Regasification at Golar Spirit
Skema Proses FSRU Porong Porong FSRU Process Scheme
Skema Proses FSRB Madura Madura FSRB Process Scheme
Skeme Proses FSU-FRU Bali Bali FSU-FRU Process Scheme
Skema Pipeline FSRU Porong Porong FSRU Pipeline Scheme
Skema Pipeline FSRB Madura Madura FSRB Pipeline Scheme
Skema Pipeline FSU-FRU Bali Bali FSU-FRU Pipeline Scheme

Daftar Tabel List of Tables


Supply dan Demand untuk Wilayah Jawa Bagian Supply and Demand for Eastern Part of Java
Timur
Kapasitas Pembangkit Berbahan Bakar Gas di Capacity of Gas-Fueled Power Plants in Eastern
Jawa Bagian Timur Part of Java
Perencanaan Profil PLTGU Madura Planned Profile of Madura CCPP
Daftar Lokasi Pembangkit untuk Studi Jawa List of Generating Plant Sites for Study on Eastern
Bagian Timur Part of Java
Supply Demand Balance Pembangkit di Jawa Supply Demand Balance of Generating Plants in
Bagian Timur Eastern Part of Java
Jarak Tempuh Logistik Logistics Distance
Opsi Skenario Logistik Tahap I 1st Stage Logistics Optional Scenarios
Hasil Seleksi Skenario Logistik Tahap I Result of Selection of 1st Stage Logistics Scenarios
Waktu Penyimpanan dan Ukuran Kapal Time for Storage and Size of Vessel
Total Throughput selama 10 Tahun per Scenario Total Throughput for 10 Years per Scenario
Karakteristik Tipe Mesin (IGU, 2017) Characteristics of Engine Types
Perbedaan Karakteristik Tipe Mesin Difference of Characteristics between Engine
Types
Peralatan Utama Kapal Penyalur dan Kapal Main Equipment of Transmitting Vessel and
Penerima LNG Receiving Vessel
Tipikal Ukuran Pipa untuk Proses Typical Pipe Size for Loading/Unloading Process
Loading/Unloading Berdasarkan Skala Operasi Based on Operational Scale
Perbandingan Capex-Opex dan Fleksibilitas dari Comparison of Capex-Opex and Flexibilities
Empat Opsi between Four Options
Perbedaan Jenis Tangki Differences of Tank Types
Perbedaan Jenis Tangki Horizontal dan Vertikal Differences between Horizontal Type and Vertical
(Wartsila, 2016) Type Tanks (Wartsila, 2016)
Keuntungan dan Kerugian untuk Setiap Jenis Advantages and Disadvantages of Each Type of
Tangki LNG (Sumber: IGU, 2015) LNG Tank (Source: IGU, 2015)
Pemilihan Tangki Selection of Tanks
Investasi pada Skema SPC I dan II Investment in SPC I and II Schemes
Investasi pada Skema SPC III Investment in SPC III Scheme
Biaya Pada Skema SPC I dan II Costs in SPC I and II Schemes
Biaya Para Skema SPC III Costs in SPC III Scheme
Hasil Penilaian Skema SPC Result of SPC Scheme Evaluation
Asumsi Pada Perhitungan Skema Bisnis Assumptions in Business Scheme Calclation
Perbandingan Hasil Perhitungan Skema Bisnis Comparison between Results of Business Scheme
Calculation
Biaya Investasi pada Skema Gas dari Tangguh Investment Cost for the Scheme of Gas from
Tangguh
Perbandingan Skema dengan Suplai Gas dari Comparison between Schemes with Gas Supply
Bontang dan Tangguh from Bontang and Tangguh
Perbandingan Perhitungan Cashflow dengan Comparison of Cashflow Calculation with Gas
Suplai Gas dari Tangguh Supply from Tangguh
Sensitivitas Biaya Investasi yang Diterapkan Sensitivity of Investment Costs Applied
Komposisi LNG Composition of LNG
Kebutuhan Gas untuk Pembangkit Jawa Bagian Gas Demand of Generating Plants in Eastern Part
Timur (dalam BBTUD) of Java (in BBTUD)
Kebutuhan Gas untuk Pembangkit Jawa Bagian Gas Demand of Generating Plants in Eastern Part
Timur (dalam MMscfd) of Java (in MMscfd)
Data Kapasitas LNG Carrier, LNG Feeder and FSRU Data of Capacity of LNG Carrier, LNG Feeder and
yang digunakan FSRU used
Kondisi Operasi Aliran Masuk dan Aliran Keluar Condition of Inflow and Outflow Operation of
FSRU/FSRB/FSU-FRU FSU/FSRB/FSU-FRU
Laju Alir Transfer LNG LNG Transfer Flowrate
Hasil Simulasi In-Tank Pumps Result of In-Tank Pump Simulation
Hasil Simulasi Booster Pump Suction Drum Result of Simulations of Booster Pump Suction
Drum
Hasil Simulasi Booster Pump Result of Booster Pump Simulation
Hasil Simulasi LNG Vaporizer Result of LNG Vaporizer Simulation
Hasil Simulasi Natural Gas Heater Result of Natural Gas Heater Simulation
Hasil Simulasi Propane Drum Result of Propane Drum Simulation
Hasil Simulasi Propane Pump Result of Propane Pump Simulation
Hasil Simulasi Propane Evaporator Result of Propane Evaporator Simulation
Hasil Simulasi Pipeline Result of Pipeline Simulation
Simulasi BOG Compressor Suction Scrubber Simulation of BOG Compressor Suction Scrubber
Hasil Simulasi BOG Compressor Result of BOG Compressor Simulation
Hasil Simulasi Fuel Gas Heater Result of Fuel Gas Heater Simulation
Hasil Simulasi 2nd BOG Compressor FSRU Porong Result of 2nd BOG Compressor Simulation of
Porong FSRU
Hasil Perhitungan Storage Tank Result of Storage Tank Calculation
Hasil Perhitungan Booster Suction Drum Result of Booster Suction Drum Calculation
Hasil Perhitungan Propane Drum Result of Propane Drum Calculation
Hasil Perhitungan Natural Gas Result of Natural Gas Calculation
Hasil Perhitungan Propane Evaporator Result of Propane Evaporator Calcultion
Data Panjang Pipe Pipe Length Data
Kondisi Operasi dan Properti Fluida FSRU Porong Condition of Fluid Operation and Properties of
Porong FSRU
Kondisi Operasi dan Properti Fluida FSRB Madura Condition of Fluid Operation and Properties of
Madura FSRB
Kondisi Operasi dan Properti Fluida FSU-FRU Bali Condition of Fluid Operation and Properties of
Bali FSU-FRU
Krigteria Velocity dalam Perhitungan Line Sizing Velocity Criteria in Line Sizing Calculation
Konstanta Empiris (Harga – C) Empirical Constant (C - Value)
Hasil Perhitungan Line Sizing FSRU Porong Result of Line Sizing Calculation for Porong FSRU
Hasil Perhitungan Line Sizing FSRB Madura Result of Line Sizing Calculation for Madura FSRB
Hasil Perhitungan Line Sizing FSU-FRU Bali Result of Lince Sizing Calcualtion for Bali FSU-FRU
Ukuran Line Terpilih Selected Line Sizing
Rekapitulasi Data Pipa Pipeline Data Recapitulation
Production Rate Pada Masing-Masing Fasilitas Production Rate at Each Regasification Facility
Regasifikasi
Hasil Perhitungan Hidraulik FSRU Porong Result of Hydraulic Calculation for Porong FSRU
Hasil Perhitungan Hidraulik FSRB Madura Result of Hydraulic Calculation for Madura FSRB
Hasil Perhitugnan Hidraulik FSU-FRU Bali Result of Hydraulic Calculation for Bali FSU-FRU
Identifikasi Risiko dan Deskripsi Risk Identification and Description
Matriks Risiko Risk Matrix
Profil Risiko Risk Porfile
Risk Level Risk Level
Mitigasi Risiko untuk Fase Pengembangan, Mtigiation of Risks for Development,
Konstruksi dan Operasi & Pemeliharaan Construction and Operation & Maintenance
Phases

BBTUD BBTUD
MMSCFD MMSCFD
Gas turbin = Gas Turbine = GT Gas turbine = Gas Turbine = GT
Turbin gas Gas turbine
Metode Tie-In Tie-In Method
MFO MFO
Jetty Jetty
RUPTL = Rencana Umum Penyediaan Tenaga General Plan for Electricity Provision (RUPTL)
Listrik
UP PJB Gresik PJB Gresik Generating Unit
HUB atau hub HUB atau hub
CNG Plant CNG Plant
Turbin Uap = Steam Turbine = ST Steam Turbine = ST
HSD HSD
Dermaga HSD HSD Wharf

Das könnte Ihnen auch gefallen