Project: CDU/VDU, VRMP- HPCL, EIL Ref Spec No :6-14-0016 REV 4 & 6-14-0015 REV 3,
Package Title :CDUVDU Doc No: LTHE/HPCL/CDU-VDU/ITP/M/013
VISAKAPATTANAM 6-14-0003-Rev.05
SL No. Activity /Nature of Check / Test SULZER LTHE EIL REMARK / FORM OF RECORD
1 GENERAL REQURIMENTS
a Availability of latest Copy of approved Drawing with concern Engineer Rw Rw - Drg Register
b Check & Ensure the correctness of the welding consumables Received for the job. WC S Rw IMIR, TC
3 IN PROCESS INSPECTION
e Modification of drawings, scope, procedure as per site condition WC HP HP FO-SQA-5.029/ Client Formats
c Equipment box up - Check completion of all activities as per G.A drawing WC HP HP FO-SQA-5.45. B/ 3-0542-4002-Rev1
d Mechanical Completion - Check completion of all activities as per Drg WC HP Rw FO-SQA-5.054/ Client Formats
HP- Hold Point, W- Witness, S- Surveillance, Rw- Review, WC - 100% examination by SULZER
NOTES
FO-SQA -5.011 - General inspection format
Approved By EIL
Description Date Rev Prepared By SULZER Checked By L&T
Equipment Tag:
Description
Drawing No:
Items:
Material
Dimensional Survey Hardness Survey
Traceability
Identification
Heat Treatment Pressure Testing
Mark
Fit-up
Welding Coatings
Inspection
Visual
NDT Testing Certification Records
Inspection
Remarks:
Equipment
Tag:
REMARKS:-
REMARKS:-
SULZER LTHE
Signature : Signature :
Name : Name :
Designation : Designation :
Date : Date :
EIL
Date:
FO-SQA-5.117 Page :
NO OF PASSES
EIL
Signature :
Name :
Designation :
Date :
SULZER LTHE
Client HPCL
Vendor Sulzer
Equipment Tag:
Tray No.
Drg. Dimension
C
As Built Dimesion at
Point D
Dimesion to be taken from top to top of TSR with points marked on the same orientation for all trays minimum at four p
points above 2000Ø
2. LOCATION OF BOLTING BAR
Tray No.
Drg. Dimension
G1
Actual
Drg. Dimension
G2
Actual
Drg. Dimension
G3
Actual
Drg. Dimension
G4
Actual
Drg. Dimension
G5
Actual
Drg. Dimension
G6
Actual
Drg. Dimension
G7
Actual
Drg. Dimension
G8
Actual
REMARK;-
SULZER LTHE
Signature : Signature :
Name : Name :
Designation : Designation :
Date : Date :
EIL
FO-SQA-5.45.G1 Page :
CONSECUTIVE TRAYS )
on the same orientation for all trays minimum at four points upto 2000Ø & minimum six
EIL
Signature :
Name :
Designation :
Date :
SULZER LTHE EIL
Client HPCL PMC ENGINEERS INDIA LIMITED
Equipment Tag:
3. LEVEL READING
TSR Ref
Level at
(Tray / Internal )
Ref. Point
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
Level at A, B, C, D, ….. Taken with water tube with ''A'' as references point minimum at four points upto 2000Ø & maximum six points above
2000Ø . Minimum 3 points per TSR segments shall be selected.
REMARKS;-
For information /
action
*(Delete as
Reply Required by:
required)
Response:
Response by: Date:
EIL
Page :
SULZER LTHE EIL
HPCL ENGINEERS INDIA LIMITED
Client PMC
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM Date:
Vendor Sulzer FO-SQA-5.45.E1 Page no
Equipment Tag:
COLUMN INTERNAL AFTER INSTALLATION
Tray No.
Drg. Dimension
A1, A3, A4, A5, A7, A8,
A
A2, A6
A1
A2
A3
A6
A7
A8
Drg. Dimension
B1, B3, B4, B5, B7, B8
B
B2, B6
B1
B2
B3
Under downflow clearance in mm. (distance B4
between downcomer bottom & tray deck / recessed
seal pan plate) B5
B6
B7
B8
Drg. Dimension
C1, C3, C4, C5, C7, C8
C
C2, C6
C1
C2
C3
C6
C7
C8
REMARKS:-
REMARKS:-
Report No.
Page : of
TION
EIL
signation :
SULZER LTHE
Client HPCL
Contractor L&T Hydrocarbon Engineering Limited
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM
Vendor Sulzer
Equipment Tag:
Tray No.
Check the following
Check for damaged missing valves and valve movement for all
valves for vale trays
REMARKS:-
(1) This format shall be filled for all Trays by Installation Contractor and counter checked by Engineer in Charge
(2) Tolerance on various drawing dimensions shall be as per applicable drawing / standard
(3) Ref standard 7 - 14 - 0202 for abbreviations & typical detail of trays
SULZER LTHE
Signature : Signature :
Name : Name :
Designation : Designation :
Date : Date :
EIL
PMC ENGINEERS INDIA LIMITED
STALLATION
Tray No.
ge
EIL
Signature :
Name :
Designation :
Date :
SULZER LTHE
Client HPCL
Contractor L&T Hydrocarbon Engineering Limited
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM
Vendor Sulzer
Equipment Tag:
Check the multibeam support plate sits properly on the TSR with
no undesired gaps. All spacings and gaps are evenly distributed
across the level diameter
Check for proper levelling of top of bed and gap between top of
bed and bed limiter (No gaps preferred; maximum gap at few
locations not to exceed one packing size)
Check that bed limiter is properly bolted and the gap on the
periphery is uniform and not more than that specified in the
drawing. Also check that packing is not free to come out from
any opening. Also check that bed limiter mesh is intact
REMARKS:-
SULZER LTHE
Signature : Signature :
Name : Name :
Designation : Designation :
Date : Date :
EIL
PMC ENGINEERS INDIA LIMITED
LLATION
y No.
EIL
Signature :
Name :
Designation :
Date :
SULZER LTHE EIL
Client HPCL PMC ENGINEERS INDIA LIM
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM Date:
Vendor Sulzer FO-SQA-5.46.G
Equipment Tag:
CHIMNEY TRAY INSTALLATION REPORT
DESCRIPTION YES NO N/A
REMARKS:-
AY INSTALLATION REPORT
REMARKS
EIL
SULZER LTHE EIL
Client HPCL PMC ENGINEERS INDIA LIMITED
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM Date:
Vendor Sulzer FO-SQA-5.46C Page : of
Equipment Tag:
REMARKS:-
Equipment Tag:
N/A Yes No
FO-SQA-5.046B Page : of
spection Checklist
REMARKS
EIL
Designation :
SULZER LTHE EIL
Client HPCL PMC
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
of
A-5.46.E
N/A REMARKS
EIL
SULZER LTHE
Client HPCL PMC
Contractor L&T Hydrocarbon Engineering Limited
Inspection Rep
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM
Date:
Vendor Sulzer Page : of
Equipment Tag: FO-SQA-5.46D
DESCRIPTION
TEST NO.1 TEST NO.2(IF APPLICABLE)
DATE OF TEST
ACCEPTABLE(YES/NO)
e: of
QA-5.46D
REMARKS
EIL
SULZER LTHE
Client HPCL PMC
Contractor L&T Hydrocarbon Engineering Limited
Inspection R
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM
Date:
Vendor Sulzer Page : of
Equipment Tag: FO-SQA-5.45
TRAY MANWAY CLOSURE CHECKLIST
TRAY MANWAY NO :
DESCRIPTION
YES NO
REMARKS:-
SULZER LTHE
Signature : Signature : Signature :
Date:
Page : of
FO-SQA-5.45B1
NWAY CLOSURE CHECKLIST
NOT APPLICABLE
EIL
Signature :
Designation :
SULZER LTHE EIL
Client HPCL PMC ENGINEERS INDIA LIMIT
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM Date:
Vendor Sulzer Page : of
Equipment Tag: FO-SQA-5.45.B2
MANHOLE NO
DESCRIPTION YES NO NOT APPLICABLE
REMARKS:-
Page : of
FO-SQA-5.45.B2
NOT APPLICABLE
EIL
SULZER LTHE EIL
ENGINEERS INDIA
Client HPCL PMC
Contractor L&T Hydrocarbon Engineering Limited Inspection Report No.
Project CDU/VDU, VRMP- HPCL, VISAKAPATTANAM Date:
Vendor Sulzer
Page : of
Equipment Tag: FO-SQA-5.54
DESCRIPTION
C
O
M
M
E
N
T
S
Page : of
FO-SQA-5.54
AL COMPLETION REPORT
DESCRIPTION
REMARKS
SULZER EIL
Name : Name:
SIGN : SIGN :
Date : Date:
DESIGNATION : DESIGNATION :
EIL-COMMISSINING HPCL
Name : Name:
SIGN : SIGN :
Date : Date:
DESIGNATION : DESIGNATION :