RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Design Detail
Concrete f'c = 20.69 MPa
Rebar Fy = 275.8 MPa
250 mm
Unit Weight = 23.56 kN/m³
0.1 m

#3 @ 250 mm (S&T)
#5 @ 100 mm
4.4 m
4.8 m

#3 @ 250 mm (S&T)
#5 @ 200 mm
1.7 m

400 mm

Heel Bars: #5 @ 450 mm


Toe Bars: #5 @ 100 mm
0.1 m
2.1 m Footing S/T Bars: #5 @ 300 mm

2.45 m

Check Summary Criteria


Ratio Check Provided Required Combination
----- Stability Checks ----- Building Code IBC 2009
0.336 Bearing Pressure 250 kPa 84.02 kPa Stability Concrete Load Combs IBC 2009 (Strength)
0.923 Bearing Eccentricity 0.38 m 0.41 m Stability Masonry Load Combs ASCE 7-05 (ASD)
----- Toe Checks ----- Stability Load Comb Stability
0.307 Shear 179 kN/m 54.89 kN/m 1.2D + 1.0E Restrained Against Sliding Yes
0.459 Moment 149 kN·m/m 68.47 kN·m/m 1.2D + 1.6H Neglect Bearing At Heel Yes
0.176 Min Strain 0.0227 0.0040 1.2D + 1.6H Use Vert. Comp. for OT No
0.000 Min Steel 50.8 mm² 0 mm² 1.2D + 1.6H Use Vert. Comp. for Sliding No
0.765 Development 19.92 cm 15.24 cm 1.2D + 1.6H Use Vert. Comp. for Bearing Yes
0.656 S&T Max Spacing 300 mm 457.2 mm 1.2D + 1.6H Use Surcharge for Sliding & OT Yes
0.810 S&T Min Rho 0.0033 0.0027 1.2D + 1.6H Use Surcharge for Bearing Yes
----- Heel Checks ----- Neglect Soil Over Toe No
0.056 Shear 193.3 kN/m 10.78 kN/m 1.4D Neglect Backfill Wt. for Coulomb No
0.012 Moment 37.26 kN·m/m 0.46 kN·m/m 1.2D + 1.6H Factor Soil Weight As Dead Yes
0.033 Min Strain 0.1219 0.0040 1.2D + 1.6H Use Passive Force for OT Yes
0.000 Min Steel 11.29 mm² 0 mm² 1.2D + 1.6H Assume Pressure To Top Yes
0.133 Development 229.9 cm 30.48 cm 1.2D + 1.6H Extend Backfill Pressure To Key Bottom No
0.656 S&T Max Spacing 300 mm 457.2 mm 1.2D + 1.6H Use Toe Passive Pressure for Bearing No
0.810 S&T Min Rho 0.0033 0.0027 1.2D + 1.6H Required F.S. for OT 1.50
----- Stem Checks ----- Required F.S. for Sliding 1.50
0.881 Horz Bar Rho 0.0023 0.0020 1.2D + 1.6H Has Different Safety Factors for Seismic No
0.547 Horz Bar Spacing 250 mm 457.2 mm 1.2D + 1.6H Allowable Bearing Pressure 250 kPa
0.922 Moment 87.17 kN·m/m 80.35 kN·m/m 0.9D + 1.6H + 1.0E Req'd Bearing Location Middle third
0.974 Shear 108.4 kN/m 105.5 kN/m 0.9D + 1.6H + 1.0E Wall Friction Angle 25°
0.319 Max Steel 0.0125 0.0040 1.2D + 1.6H Friction Coefficent 0.35
0.478 Min Steel 20 cm²/m 9.56 cm²/m 1.2D + 1.6H Soil Reaction Modulus 27146 kN/m³
0.471 Base Development 32.38 cm 15.24 cm 1.2D + 1.6H

QuickRWall 3.0 (iesweb.com) Page 1 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Loads Load Combinations


Loading Options/Assumptions
Passive pressure neglects top 0 m of soil.
IBC 2009 (Strength)
1.2D + 1.6H
0.1 m

1.2D + 1.0E
 = 15.71 kN/m³ 0.9D + 1.6H + 1.0E
 = 30° 0.9D + 1.6H
1.4D
3m

Kh = 0.20
1.2D
4.3 m

Kv = 0.00
4.7 m

1.7 m

 = 15.71 kN/m³
 = 30°
c = 0 kPa

Backfill Pressure
4.7 m

4.7 m
0.1 m

 = 15.71 kN/m³ 86.76 kN/m

1.57 m
 = 30°
3m

-36.92 kPa
4.3 m
4.7 m

1.7 m

72.62 kN/m

1.43 m
Lateral Earth Pressure
-33.78 kPa
At - Rest Earth Pressure Theory
Ko = 1 - sin  = 1 - sin 30° = 0.50
h = Ko  H = 0.50 15.71 kN / m³ 4.7 m = 36.92 kPa
Lateral Earth Pressure (stem only)
h = Ko  H = 0.50 15.71 kN / m³ 4.3 m = 33.78 kPa

QuickRWall 3.0 (iesweb.com) Page 2 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Passive Pressure

1.7 m

0.57 m
1.7 m

68.1 kN/m
80.12 kPa
 = 15.71 kN/m³
 = 30°
c = 0 kPa

Lateral Earth Pressure


Rankine Passive Earth Pressure Theory
 30°
Kp = tan ² 45° + = tan ² 45° + = 3.0
2 2

p =  H Kp + 2 c Kp = 15.71 kN / m³ 1.7 m 3.0 + 2 0 kPa 3.0 = 80.12 kPa

QuickRWall 3.0 (iesweb.com) Page 3 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Seismic Pressure
-9.71 kPa 12.05 kN/m

28.52 kN/m
25.84 kN/m

4.7 m

4.7 m

2.82 m
 = 15.71 kN/m³
 = 30°
Kh = 0.20 -2.43 kPa
Kv = 0.00 10.09 kN/m
-8.88 kPa
23.87 kN/m
21.63 kN/m

2.58 m
-2.22 kPa

Seismic Pressure
Dynamic + static force Mononobe - Okabe equation
kh 0.20
' = arctan = arctan = 11.31°
1 - kv 1 - 0.0
sin ²  +  - '
Kae =
sin  +  sin  - ' - 
cos ' sin ²  sin  - ' -  1+ ^2
sin  -  - ' sin  + 
sin ² 90° + 30° - 11.31°
=
sin 30° + 25° sin 30° - 11.31° - 0°
cos 11.31° sin ² 90° sin 90° - 11.31° - 25° 1+ ^2
sin 90° - 25° - 11.31° sin 0° + 90°
= 0.4603
1 1
Pae = K  H ^ 2 1 - kv = 0.4603 15.71 kN / m³ 4.7 m ^ 2 1 - 0.0 = 79.86 kN / m
2 ae 2
Static - only force Coulomb equation
sin ²  + 
Ka =
sin  +  sin  - 
sin ²  sin - 1+ ^2
sin  -  sin  + 
sin ² 90° + 30°
=
sin 30° + 25° sin 30° - 0°
sin ² 90° sin 90° - 25° 1+ ^2
sin 90° - 25° sin 0° + 90°
= 0.2959
1 1
Pa = K H^2 = 0.2959 15.71 kN / m³ 4.7 m ^ 2 = 51.35 kN / m
2 a 2
Net dynamic force
Pae = Pae - Pa = 79.86 kN / m - 51.35 kN / m = 28.52 kN / m
P = 90° -  +  = 90° - 90° + 25° = 25° resultant force angle with horizontal
To arrive at the pressure distribution illustrated above used to determine stem moments ,
apply inverted triangular pressure plus a uniform portion to bring resultant to 0.6H
8 Pae 8 28.52 kN / m
e_top = = = 9.71 kPa
5 H 5 4.7 m
2 Pae 2 28.52 kN / m
e_bot = = = 2.43 kPa
5 H 5 4.7 m

QuickRWall 3.0 (iesweb.com) Page 4 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Wall/Soil Weights

25.89 kN/m 6.76 kN/m

42.89 kN/m
23.09 kN/m

Bearing Pressure

e = 0.38 m

0.85 m
37.47 kN/m
3.49 kPa

86.86 kPa
110.7 kN/m
Friction
F = R = 0.350 110.7 kN / m = 38.74 kN / m

Bearing Pressure Calculation


Contributing Forces
Vert Force ...offset Horz Force ...offset OT Moment
Backfill Pressure -0 kN/m - 0 kN/m - -0 kN·m/m
Seismic Force -12.05 kN/m 2.45 m 0 kN/m - -29.53 kN·m/m
Footing Weight -23.09 kN/m 1.23 m 0 kN/m - -28.29 kN·m/m
Stem Weight -25.89 kN/m 2.23 m 0 kN/m - -57.61 kN·m/m
Backfill Weight -6.76 kN/m 2.4 m 0 kN/m - -16.21 kN·m/m
Soil over toe Weight -42.89 kN/m 1.05 m 0 kN/m - -45.03 kN·m/m
Stem Base Shear -0 kN/m - -70.31 kN/m 0.4 m 28.12 kN·m/m
Stem Base Moment 0 kN/m - 0 kN/m - 54.67 kN·m/m
-110.68 kN/m -93.88 kN·m/m
- 93.88 kN·m / m
= 0.85 m
- 110.68 kN / m

QuickRWall 3.0 (iesweb.com) Page 5 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stability Checks

Overturning Check
Check not performed; wall has lateral support.

Sliding Check
Check not performed; restrained against sliding.

Bearing Check
Bearing pressure < allowable (84.02 kPa < 250 kPa) - OK
Bearing resultant eccentricity < allowable (0.38 m < 0.41 m) - OK

Wall Top Displacement


Not calculated because this wall has a lateral restraint.

QuickRWall 3.0 (iesweb.com) Page 6 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Flexural Capacity


Moment
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-100 -73.33 -46.67 -20 6.67 33.33 60
Moment (kN·m/m)

Capacity (ACI 318-08 10.2) @ 0 m from base [Negative bending]


As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 20 cm² / m 275.8 MPa 191.3 mm - 31.37 mm / 2 = 87.17 kN·m / m

Capacity (ACI 318-08 10.2) @ 0 m from base [Positive bending]


As fy 10 cm² / m 275.8 MPa
a = = = 15.68 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 10 cm² / m 275.8 MPa 191.3 mm - 15.68 mm / 2 = 45.53 kN·m / m

Capacity (ACI 318-08 10.2) @ 4.09 m from base [Negative bending]


As fy 13.8 cm² / m 275.8 MPa
a = = = 21.65 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 13.8 cm² / m 275.8 MPa 191.3 mm - 21.65 mm / 2 = 61.82 kN·m / m

Capacity (ACI 318-08 10.2) @ 4.09 m from base [Positive bending]


As fy 10 cm² / m 275.8 MPa
a = = = 15.68 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 10 cm² / m 275.8 MPa 191.3 mm - 15.68 mm / 2 = 45.53 kN·m / m

Capacity (ACI 318-08 10.2) @ 4.4 m from base [Negative bending]


As fy 0 cm² / m 275.8 MPa
a = = = 0 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 0 cm² / m 275.8 MPa 191.3 mm - 0 mm / 2 = 0 kN·m / m

Capacity (ACI 318-08 10.2) @ 4.4 m from base [Positive bending]


As fy 0 cm² / m 275.8 MPa
a = = = 0 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2 = 0.90 0 cm² / m 275.8 MPa 191.3 mm - 0 mm / 2 = 0 kN·m / m

QuickRWall 3.0 (iesweb.com) Page 7 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Shear Capacity


Shear
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-150 -100 -50 0 50 100 150
Shear (kN/m)

Shear Capacity (ACI 318-08 11.1.1, 11.2.1) @ 0 m from base [Positive shear]

Vc = 2  f'c d = 2 1.0 20.69 MPa 191.3 mm = 144.5 kN / m


Vn =  Vc = 0.750 144.5 kN / m = 108.4 kN / m

Shear Capacity (ACI 318-08 11.1.1, 11.2.1) @ 0 m from base [Negative shear]

Vc = 2  f'c d = 2 1.0 20.69 MPa 191.3 mm = 144.5 kN / m


Vn =  Vc = 0.750 144.5 kN / m = 108.4 kN / m

Shear Capacity (ACI 318-08 11.1.1, 11.2.1) @ 4.4 m from base [Positive shear]

Vc = 2  f'c d = 2 1.0 20.69 MPa 191.3 mm = 144.5 kN / m


Vn =  Vc = 0.750 144.5 kN / m = 108.4 kN / m

Shear Capacity (ACI 318-08 11.1.1, 11.2.1) @ 4.4 m from base [Negative shear]

Vc = 2  f'c d = 2 1.0 20.69 MPa 191.3 mm = 144.5 kN / m


Vn =  Vc = 0.750 144.5 kN / m = 108.4 kN / m

QuickRWall 3.0 (iesweb.com) Page 8 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Development/Lap Length Calculations


Main vertical stem bars (bottom end) - Development Length Calculation (ACI 318-08 12.2.3, 12.5)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
8 db = 8 15.88 mm = 5.0

Main vertical stem bars (top end) - Development Length Calculation (ACI 318-08 12.2.3, 12.5)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 50 mm / 2 = 25 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 25 mm lesser of half spacing, ctr to surface
t = 1.0 bars are not horizontal
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
3. fy t e s 3. 275.8 MPa 1.0 0.80
ld = db = 15.88 mm = 44.17 cm
40 c + Ktr 40 25 mm + 0 mm
 f'c 1.0 20.69 MPa
db 15.88 mm

2nd curtain vertical bars (top end) - Development Length Calculation (ACI 318-08 12.2.3, 12.5)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 100 mm / 2 = 50 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 50 mm lesser of half spacing, ctr to surface
t = 1.0 bars are not horizontal
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
c + Ktr / db = 50 mm + 0 mm / 15.88 mm = 3.1496
3. fy t e s 3. 275.8 MPa 1.0 0.80
ld = db = 15.88 mm = 27.82 cm term 'c plus Ktr over db' limited to 2.5
40 2.5 40 2.5
 f'c 1.0 20.69 MPa
12 inch minimum controls

QuickRWall 3.0 (iesweb.com) Page 9 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Toe Checks [combination 1.2D + 1.6H]


Toe Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for toe need not exceed moment at stem base:
Mtoe = 69.66 kN·m / m  Mstem = 68.47 kN·m / m
Mu = 68.47 kN·m / m stem base moment controls
Flexure Check (ACI 318-08 10.2) 20.42 kPa (Soil)
As fy 20 cm² / m 275.8 MPa 9.43 kPa (Self-wt)
a = = = 31.37 mm

400 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2
= 0.90 20 cm² / m 275.8 MPa 315.9 mm - 31.37 mm / 2
= 149 kN·m / m 15.4 kPa
86.86 kPa
Mn = 149 kN·m / m  Mu = 68.47 kN·m / m 
Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 315.9 mm = 238.6 kN / m


Toe Factored Loads
Vn =  Vc = 0.750 238.6 kN / m = 179 kN / m 1.2D + 1.6H
Vn = 179 kN / m  Vu = 43.92 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi 39.6 kN/m
24.51 kPa (Soil)
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm 11.31 kPa (Self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 315.9 mm
t = 0.003 -1 = 0.003 -1 = 0.0227
a / 1 31.37 mm / 0.850
t = 0.0227  0.004  16.47 kPa16.47 kPa
Minimum Steel Check (ACI 318-08 10.5.1) 92.88 kPa
92.88 kPa
Mn = 149 kN·m / m  4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.4595
Mn 149 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 7.46 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 19.92 cm  ldh = 15.24 cm 

QuickRWall 3.0 (iesweb.com) Page 10 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Heel Checks [combination 1.2D + 1.6H]


Heel Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for heel need not exceed moment at stem base:
Mheel = 0.46 kN·m / m < Mstem = 68.47 kN·m / m
Mu = 0.46 kN·m / m stem moment does not control
67.55-67.55 kPa (Soil weight)
Flexure Check (ACI 318-08 10.2)
9.43 kPa (Concrete self-wt)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm

400 mm
0.85 f'c 0.85 20.69 MPa #5 @ 450 mm
Mn =  As fy d - a / 2
= 0.90 4.44 cm² / m 275.8 MPa 341.3 mm - 6.97 mm / 2
= 37.26 kN·m / m (neglect bearing pressure)

Mn = 37.26 kN·m / m  Mu = 0.46 kN·m / m 


Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 341.3 mm = 257.8 kN / m Heel Factored Loads


Vn =  Vc = 0.750 257.8 kN / m = 193.3 kN / m 1.2D + 1.6H
Vn = 193.3 kN / m  Vu = 9.24 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
81.06 kPa
81.06 kPa
1 = 0.850 f'c  4000 psi
81.06-81.06 kPa (Soil weight)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm 11.31 kPa (Concrete self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 341.3 mm #5 @ 450 mm
t = 0.003 -1 = 0.003 -1 = 0.1219
a / 1 6.97 mm / 0.850
t = 0.1219  0.004  (neglect bearing pressure)
Minimum Steel Check (ACI 318-08 10.5.1) 9.24 kN/m
Mn = 37.26 kN·m / m  4 / 3 Mu = 4 / 3 0.46 kN·m / m = 0.62 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 450 mm / 2 = 225 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 58.74 mm lesser of half spacing, ctr to surface
t = 1.30 more than 12 inches cast below - 13.12 inches
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
c + Ktr / db = 58.74 mm + 0 mm / 15.88 mm = 3.70
3. fy t e s 3. 275.8 MPa 1.30 0.80
ld = db = 15.88 mm = 36.17 cm term 'c plus Ktr over db' limited to 2.5
40 2.5 40 2.5
 f'c 1.0 20.69 MPa
Mu / Mn = 0.46 kN·m / m / 37.26 kN·m / m = 0.0124
Excess reinforcement reduction of 12.3.3 a applies: ld = 0.45 cm
12 inch minimum controls
ld_prov = 229.9 cm  ld = 30.48 cm 

QuickRWall 3.0 (iesweb.com) Page 11 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Forces [combination 1.2D + 1.6H]


Stem Internal Forces Stem Internal Forces Stem Internal Forces
Moment Shear
4.4 4.4

22.31 kN/m
3.85 3.85

3.3 3.3

2.75 2.75

2.2 2.2

1.65 1.65

1.1 1.1

0.55 0.55
-54.04 kPa
93.88 kN/m
0 0
-70 -42.5 -15 12.5 40 -40 -5 30 65 100
Moment (kN·m/m) Shear (kN/m)
-68.47 kN·m/m

Stem Joint Force Transfer


Location Force
@ stem base 93.88 kN/m

Stem Internal Forces

-54.04 kPa

QuickRWall 3.0 (iesweb.com) Page 12 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Moment Checks [combination 1.2D + 1.6H]


Moment
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-100 -73.33 -46.67 -20 6.67 33.33 60
Moment (kN·m/m)

Check (ACI 318-08 Ch 10) @ 2.4 m from base [Positive bending]


Mn = 45.53 kN·m / m  Mu = 30.15 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.09 m from base [Positive bending]
Mn = 45.53 kN·m / m  Mu = 6.91 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.13 m from base [Positive bending]
Mn = 39.79 kN·m / m  Mu = 5.93 kN·m / m 
Check (ACI 318-08 Ch 10) @ 0 m from base [Negative bending]
Mn = 87.17 kN·m / m  Mu = 68.47 kN·m / m 

QuickRWall 3.0 (iesweb.com) Page 13 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Shear Checks [combination 1.2D + 1.6H]


Shear
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-150 -100 -50 0 50 100 150
Shear (kN/m)

Shear Check (ACI 318-08 Ch 11.1.1) @ 0 m from base [Positive shear]


Vn = 108.4 kN / m  Vu = 93.88 kN / m 
Shear Check (ACI 318-08 Ch 11.1.1) @ 4.31 m from base [Negative shear]
Vn = 108.4 kN / m  Vu = 22.31 kN / m 

QuickRWall 3.0 (iesweb.com) Page 14 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Miscellaneous Checks [combination 1.2D + 1.6H]


Minimum Steel Check (ACI 318-08 10.5.1) @ 0 m from base [Stem in negative flexure]
Mn = 87.17 kN·m / m < 4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m

3 f'c 3 20.69 MPa


As_min = d = 191.3 mm = 7.86 cm² / m
fy 275.8 MPa
200 d / fy = 200 191.3 mm / 275.8 MPa = 9.56 cm² / m
As_min = 9.56 cm² / m
As = 20 cm² / m  As_min = 9.56 cm² / m 
Minimum Steel Check (ACI 318-08 10.5.1) @ 4.4 m from base [Stem in negative flexure]
Mn = 0 kN·m / m  4 / 3 Mu = 4 / 3 0 kN·m / m = 0 kN·m / m
Check is waived per ACI 10.5.3 
Maximum Steel Check (ACI 318-08 10.3.5) @ 0 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Maximum Steel Check (ACI 318-08 10.3.5) @ 4.4 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Wall Horizontal Steel (ACI 318-08 14.3.3, 14.3.5)
As_horz / shorz 141.9 mm² / 250 mm
t = = = 0.0023
t 250 mm
t = 0.0023  t_min
= 0.0020 
3 t = 3 250 mm = 750 mm
18 inch limit governs
shorz_max = 457.2 mm
shorz = 250 mm  shorz_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.7856
Mn 87.17 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 12.75 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 32.38 cm  ldh = 15.24 cm 
QuickRWall 3.0 (iesweb.com) Page 15 of 33 Monday 08/12/19 3:31 PM
Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Toe Checks [combination 1.2D + 1.0E]


Toe Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for toe need not exceed moment at stem base:
Mtoe = 69.66 kN·m / m  Mstem = 68.47 kN·m / m
Mu = 68.47 kN·m / m stem base moment controls
Flexure Check (ACI 318-08 10.2) 20.42 kPa (Soil)
As fy 20 cm² / m 275.8 MPa 9.43 kPa (Self-wt)
a = = = 31.37 mm

400 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2
= 0.90 20 cm² / m 275.8 MPa 315.9 mm - 31.37 mm / 2
= 149 kN·m / m 15.4 kPa
86.86 kPa
Mn = 149 kN·m / m  Mu = 68.47 kN·m / m 
Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 315.9 mm = 238.6 kN / m


Toe Factored Loads
Vn =  Vc = 0.750 238.6 kN / m = 179 kN / m 1.2D + 1.0E
Vn = 179 kN / m  Vu = 43.92 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi 51.29 kN/m
24.51 kPa (Soil)
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm 11.31 kPa 81.06
(Self-wt)
kPa81.06 kPa
0.85 f'c 0.85 20.69 MPa

400 mm
d 315.9 mm
t = 0.003 -1 = 0.003 -1 = 0.0227
a / 1 31.37 mm / 0.850
t = 0.0227  0.004  18.14 kPa
Minimum Steel Check (ACI 318-08 10.5.1) 102.3 kPa

Mn = 149 kN·m / m  4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m


Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.4595
Mn 149 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 7.46 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 19.92 cm  ldh = 15.24 cm 

QuickRWall 3.0 (iesweb.com) Page 16 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Heel Checks [combination 1.2D + 1.0E]


Heel Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for heel need not exceed moment at stem base:
Mheel = 0.46 kN·m / m < Mstem = 68.47 kN·m / m
Mu = 0.46 kN·m / m stem moment does not control
67.55-67.55 kPa (Soil weight)
Flexure Check (ACI 318-08 10.2)
9.43 kPa (Concrete self-wt)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm

400 mm
0.85 f'c 0.85 20.69 MPa #5 @ 450 mm
Mn =  As fy d - a / 2
= 0.90 4.44 cm² / m 275.8 MPa 341.3 mm - 6.97 mm / 2
= 37.26 kN·m / m (neglect bearing pressure)

Mn = 37.26 kN·m / m  Mu = 0.46 kN·m / m 


Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 341.3 mm = 257.8 kN / m Heel Factored Loads


Vn =  Vc = 0.750 257.8 kN / m = 193.3 kN / m 1.2D + 1.0E
Vn = 193.3 kN / m  Vu = 9.24 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi
81.06-81.06 kPa (Soil weight)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm 11.31 kPa (Concrete self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 341.3 mm #5 @ 450 mm
t = 0.003 -1 = 0.003 -1 = 0.1219
a / 1 6.97 mm / 0.850
t = 0.1219  0.004  (neglect bearing pressure)
Minimum Steel Check (ACI 318-08 10.5.1) 9.24 kN/m
Mn = 37.26 kN·m / m  4 / 3 Mu = 4 / 3 0.46 kN·m / m = 0.62 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 450 mm / 2 = 225 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 58.74 mm lesser of half spacing, ctr to surface
t = 1.30 more than 12 inches cast below - 13.12 inches
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
c + Ktr / db = 58.74 mm + 0 mm / 15.88 mm = 3.70
3. fy t e s 3. 275.8 MPa 1.30 0.80
ld = db = 15.88 mm = 36.17 cm term 'c plus Ktr over db' limited to 2.5
40 2.5 40 2.5
 f'c 1.0 20.69 MPa
Mu / Mn = 0.46 kN·m / m / 37.26 kN·m / m = 0.0124
Excess reinforcement reduction of 12.3.3 a applies: ld = 0.45 cm
12 inch minimum controls
ld_prov = 229.9 cm  ld = 30.48 cm 

QuickRWall 3.0 (iesweb.com) Page 17 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Forces [combination 1.2D + 1.0E]


Stem Internal Forces Stem Internal Forces Stem Internal Forces
Moment Shear
4.4 4.4

22.31 kN/m
3.85 3.85

3.3 3.3

2.75 2.75

2.2 2.2

1.65 1.65

1.1 1.1

0.55 0.55
-54.04 kPa
93.88 kN/m
0 0
-12 -7 -2 3 8 -10 -2.5 5 12.5 20
Moment (kN·m/m) Shear (kN/m)
-68.47 kN·m/m

Stem Joint Force Transfer


Location Force
@ stem base 11.63 kN/m

Stem Internal Forces

-8.05 kPa

-2.01 kPa

QuickRWall 3.0 (iesweb.com) Page 18 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Moment Checks [combination 1.2D + 1.0E]


Moment
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-100 -73.33 -46.67 -20 6.67 33.33 60
Moment (kN·m/m)

Check (ACI 318-08 Ch 10) @ 2.89 m from base [Positive bending]


Mn = 45.53 kN·m / m  Mu = 7.7 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.09 m from base [Positive bending]
Mn = 45.53 kN·m / m  Mu = 2.92 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.13 m from base [Positive bending]
Mn = 39.79 kN·m / m  Mu = 2.55 kN·m / m 
Check (ACI 318-08 Ch 10) @ 0 m from base [Negative bending]
Mn = 87.17 kN·m / m  Mu = 11.87 kN·m / m 

QuickRWall 3.0 (iesweb.com) Page 19 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Shear Checks [combination 1.2D + 1.0E]


Shear
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-150 -100 -50 0 50 100 150
Shear (kN/m)

Shear Check (ACI 318-08 Ch 11.1.1) @ 0 m from base [Positive shear]


Vn = 108.4 kN / m  Vu = 11.63 kN / m 
Shear Check (ACI 318-08 Ch 11.1.1) @ 4.31 m from base [Negative shear]
Vn = 108.4 kN / m  Vu = 10 kN / m 

QuickRWall 3.0 (iesweb.com) Page 20 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Miscellaneous Checks [combination 1.2D + 1.0E]


Minimum Steel Check (ACI 318-08 10.5.1) @ 0 m from base [Stem in negative flexure]
Mn = 87.17 kN·m / m < 4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m

3 f'c 3 20.69 MPa


As_min = d = 191.3 mm = 7.86 cm² / m
fy 275.8 MPa
200 d / fy = 200 191.3 mm / 275.8 MPa = 9.56 cm² / m
As_min = 9.56 cm² / m
As = 20 cm² / m  As_min = 9.56 cm² / m 
Minimum Steel Check (ACI 318-08 10.5.1) @ 4.4 m from base [Stem in negative flexure]
Mn = 0 kN·m / m  4 / 3 Mu = 4 / 3 0 kN·m / m = 0 kN·m / m
Check is waived per ACI 10.5.3 
Maximum Steel Check (ACI 318-08 10.3.5) @ 0 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Maximum Steel Check (ACI 318-08 10.3.5) @ 4.4 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Wall Horizontal Steel (ACI 318-08 14.3.3, 14.3.5)
As_horz / shorz 141.9 mm² / 250 mm
t = = = 0.0023
t 250 mm
t = 0.0023  t_min
= 0.0020 
3 t = 3 250 mm = 750 mm
18 inch limit governs
shorz_max = 457.2 mm
shorz = 250 mm  shorz_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.7856
Mn 87.17 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 12.75 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 32.38 cm  ldh = 15.24 cm 
QuickRWall 3.0 (iesweb.com) Page 21 of 33 Monday 08/12/19 3:31 PM
Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Toe Checks [combination 1.4D]


Toe Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for toe need not exceed moment at stem base:
Mtoe = 69.66 kN·m / m  Mstem = 68.47 kN·m / m
Mu = 68.47 kN·m / m stem base moment controls
Flexure Check (ACI 318-08 10.2) 20.42 kPa (Soil)
As fy 20 cm² / m 275.8 MPa 9.43 kPa (Self-wt)
a = = = 31.37 mm

400 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2
= 0.90 20 cm² / m 275.8 MPa 315.9 mm - 31.37 mm / 2
= 149 kN·m / m 15.4 kPa
86.86 kPa
Mn = 149 kN·m / m  Mu = 68.47 kN·m / m 
Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 315.9 mm = 238.6 kN / m


Toe Factored Loads
Vn =  Vc = 0.750 238.6 kN / m = 179 kN / m 1.4D
Vn = 179 kN / m  Vu = 43.92 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi 46.2 kN/m
28.59 kPa (Soil)
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm 13.2 kPa (Self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 315.9 mm
t = 0.003 -1 = 0.003 -1 = 0.0227
a / 1 31.37 mm / 0.850
t = 0.0227  0.004  19.21 kPa19.21 kPa
Minimum Steel Check (ACI 318-08 10.5.1) 108.4 kPa
108.4 kPa
Mn = 149 kN·m / m  4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.4595
Mn 149 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 7.46 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 19.92 cm  ldh = 15.24 cm 

QuickRWall 3.0 (iesweb.com) Page 22 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Heel Checks [combination 1.4D]


Heel Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for heel need not exceed moment at stem base:
Mheel = 0.46 kN·m / m < Mstem = 68.47 kN·m / m
Mu = 0.46 kN·m / m stem moment does not control
67.55-67.55 kPa (Soil weight)
Flexure Check (ACI 318-08 10.2)
9.43 kPa (Concrete self-wt)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm

400 mm
0.85 f'c 0.85 20.69 MPa #5 @ 450 mm
Mn =  As fy d - a / 2
= 0.90 4.44 cm² / m 275.8 MPa 341.3 mm - 6.97 mm / 2
= 37.26 kN·m / m (neglect bearing pressure)

Mn = 37.26 kN·m / m  Mu = 0.46 kN·m / m 


Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 341.3 mm = 257.8 kN / m Heel Factored Loads


Vn =  Vc = 0.750 257.8 kN / m = 193.3 kN / m 1.4D
Vn = 193.3 kN / m  Vu = 9.24 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi
94.57-94.57 kPa (Soil weight)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm 13.2 kPa (Concrete self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 341.3 mm #5 @ 450 mm
t = 0.003 -1 = 0.003 -1 = 0.1219
a / 1 6.97 mm / 0.850
t = 0.1219  0.004  (neglect bearing pressure)
Minimum Steel Check (ACI 318-08 10.5.1) 10.78 kN/m
Mn = 37.26 kN·m / m  4 / 3 Mu = 4 / 3 0.46 kN·m / m = 0.62 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 450 mm / 2 = 225 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 58.74 mm lesser of half spacing, ctr to surface
t = 1.30 more than 12 inches cast below - 13.12 inches
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
c + Ktr / db = 58.74 mm + 0 mm / 15.88 mm = 3.70
3. fy t e s 3. 275.8 MPa 1.30 0.80
ld = db = 15.88 mm = 36.17 cm term 'c plus Ktr over db' limited to 2.5
40 2.5 40 2.5
 f'c 1.0 20.69 MPa
Mu / Mn = 0.46 kN·m / m / 37.26 kN·m / m = 0.0124
Excess reinforcement reduction of 12.3.3 a applies: ld = 0.45 cm
12 inch minimum controls
ld_prov = 229.9 cm  ld = 30.48 cm 

QuickRWall 3.0 (iesweb.com) Page 23 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Forces [combination 1.4D]


Stem Internal Forces Stem Internal Forces Stem Internal Forces
Moment Shear

22.31 kN/m

-54.04 kPa
93.88 kN/m

-68.47 kN·m/m

Stem Joint Force Transfer


Location Force
@ stem base 0 kN/m

Stem Internal Forces

QuickRWall 3.0 (iesweb.com) Page 24 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Moment Checks [combination 1.4D]


Moment
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-100 -73.33 -46.67 -20 6.67 33.33 60
Moment (kN·m/m)

QuickRWall 3.0 (iesweb.com) Page 25 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Shear Checks [combination 1.4D]


Shear
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-150 -100 -50 0 50 100 150
Shear (kN/m)

QuickRWall 3.0 (iesweb.com) Page 26 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Miscellaneous Checks [combination 1.4D]


Minimum Steel Check (ACI 318-08 10.5.1) @ 0 m from base [Stem in negative flexure]
Mn = 87.17 kN·m / m < 4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m

3 f'c 3 20.69 MPa


As_min = d = 191.3 mm = 7.86 cm² / m
fy 275.8 MPa
200 d / fy = 200 191.3 mm / 275.8 MPa = 9.56 cm² / m
As_min = 9.56 cm² / m
As = 20 cm² / m  As_min = 9.56 cm² / m 
Minimum Steel Check (ACI 318-08 10.5.1) @ 4.4 m from base [Stem in negative flexure]
Mn = 0 kN·m / m  4 / 3 Mu = 4 / 3 0 kN·m / m = 0 kN·m / m
Check is waived per ACI 10.5.3 
Maximum Steel Check (ACI 318-08 10.3.5) @ 0 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Maximum Steel Check (ACI 318-08 10.3.5) @ 4.4 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Wall Horizontal Steel (ACI 318-08 14.3.3, 14.3.5)
As_horz / shorz 141.9 mm² / 250 mm
t = = = 0.0023
t 250 mm
t = 0.0023  t_min
= 0.0020 
3 t = 3 250 mm = 750 mm
18 inch limit governs
shorz_max = 457.2 mm
shorz = 250 mm  shorz_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.7856
Mn 87.17 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 12.75 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 32.38 cm  ldh = 15.24 cm 
QuickRWall 3.0 (iesweb.com) Page 27 of 33 Monday 08/12/19 3:31 PM
Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Toe Checks [combination 0.9D + 1.6H + 1.0E]


Toe Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for toe need not exceed moment at stem base:
Mtoe = 69.66 kN·m / m  Mstem = 68.47 kN·m / m
Mu = 68.47 kN·m / m stem base moment controls
Flexure Check (ACI 318-08 10.2) 20.42 kPa (Soil)
As fy 20 cm² / m 275.8 MPa 9.43 kPa (Self-wt)
a = = = 31.37 mm

400 mm
0.85 f'c 0.85 20.69 MPa
Mn =  As fy d - a / 2
= 0.90 20 cm² / m 275.8 MPa 315.9 mm - 31.37 mm / 2
= 149 kN·m / m 15.4 kPa
86.86 kPa
Mn = 149 kN·m / m  Mu = 68.47 kN·m / m 
Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 315.9 mm = 238.6 kN / m


Toe Factored Loads
Vn =  Vc = 0.750 238.6 kN / m = 179 kN / m 0.9D + 1.6H + 1.0E
Vn = 179 kN / m  Vu = 43.92 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi 41.39 kN/m
18.38 kPa (Soil)
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm 8.48 kPa (Self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 315.9 mm
t = 0.003 -1 = 0.003 -1 = 0.0227
a / 1 31.37 mm / 0.850
t = 0.0227  0.004  14.03 kPa14.03 kPa
Minimum Steel Check (ACI 318-08 10.5.1) 79.12 kPa
79.12 kPa
Mn = 149 kN·m / m  4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.4595
Mn 149 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 7.46 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 19.92 cm  ldh = 15.24 cm 

QuickRWall 3.0 (iesweb.com) Page 28 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Heel Checks [combination 0.9D + 1.6H + 1.0E]


Heel Unfactored Loads
Controlling Moment Unfactored Loads
Design moment Mu for heel need not exceed moment at stem base:
Mheel = 0.46 kN·m / m < Mstem = 68.47 kN·m / m
Mu = 0.46 kN·m / m stem moment does not control
67.55-67.55 kPa (Soil weight)
Flexure Check (ACI 318-08 10.2)
9.43 kPa (Concrete self-wt)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm

400 mm
0.85 f'c 0.85 20.69 MPa #5 @ 450 mm
Mn =  As fy d - a / 2
= 0.90 4.44 cm² / m 275.8 MPa 341.3 mm - 6.97 mm / 2
= 37.26 kN·m / m (neglect bearing pressure)

Mn = 37.26 kN·m / m  Mu = 0.46 kN·m / m 


Shear Check (ACI 318-08 11.1.1, 11.2.1)

Vc = 2  f'c d = 2 1.0 20.69 MPa 341.3 mm = 257.8 kN / m Heel Factored Loads


Vn =  Vc = 0.750 257.8 kN / m = 193.3 kN / m 0.9D + 1.6H + 1.0E
Vn = 193.3 kN / m  Vu = 9.24 kN / m 
Minimum Strain Check (ACI 318-08 10.3.5)
1 = 0.850 f'c  4000 psi
60.8-60.8 kPa (Soil weight)
As fy 4.44 cm² / m 275.8 MPa
a = = = 6.97 mm 8.48 kPa (Concrete self-wt)
0.85 f'c 0.85 20.69 MPa

400 mm
d 341.3 mm #5 @ 450 mm
t = 0.003 -1 = 0.003 -1 = 0.1219
a / 1 6.97 mm / 0.850
t = 0.1219  0.004  (neglect bearing pressure)
Minimum Steel Check (ACI 318-08 10.5.1) 6.93 kN/m
Mn = 37.26 kN·m / m  4 / 3 Mu = 4 / 3 0.46 kN·m / m = 0.62 kN·m / m
Check is waived per ACI 10.5.3 
Shrinkage Temperature Steel (ACI 318-08 7.12.2)
AST 400 mm²
ST_prov = = = 0.0033
t sST 400 mm 300 mm
0.0018 60000 0.0018 60000
ST_min = = = 0.0027
fy 275.8 MPa
ST_min = 0.0027
ST_prov = 0.0033  ST_min = 0.0027 
18 inch limit governs
sST_max = 457.2 mm
sST = 300 mm  sST_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
s = 0.80 bars are #6 or smaller
s/2 = 450 mm / 2 = 225 mm
cover + db / 2 = 50.8 mm + 15.88 mm / 2 = 58.74 mm
c = 58.74 mm lesser of half spacing, ctr to surface
t = 1.30 more than 12 inches cast below - 13.12 inches
 = 1.0 normal weight concrete
Ktr = 0 mm no transverse reinforcement
c + Ktr / db = 58.74 mm + 0 mm / 15.88 mm = 3.70
3. fy t e s 3. 275.8 MPa 1.30 0.80
ld = db = 15.88 mm = 36.17 cm term 'c plus Ktr over db' limited to 2.5
40 2.5 40 2.5
 f'c 1.0 20.69 MPa
Mu / Mn = 0.46 kN·m / m / 37.26 kN·m / m = 0.0124
Excess reinforcement reduction of 12.3.3 a applies: ld = 0.45 cm
12 inch minimum controls
ld_prov = 229.9 cm  ld = 30.48 cm 

QuickRWall 3.0 (iesweb.com) Page 29 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Forces [combination 0.9D + 1.6H + 1.0E]


Stem Internal Forces Stem Internal Forces Stem Internal Forces
Moment Shear
4.4 4.4

22.31 kN/m
3.85 3.85

3.3 3.3

2.75 2.75

2.2 2.2

1.65 1.65

1.1 1.1

0.55 0.55
-54.04 kPa
93.88 kN/m
0 0
-100 -65 -30 5 40 -40 0 40 80 120
Moment (kN·m/m) Shear (kN/m)
-68.47 kN·m/m

Stem Joint Force Transfer


Location Force
@ stem base 105.5 kN/m

Stem Internal Forces

-8.05 kPa

-54.04 kPa -2.01 kPa

QuickRWall 3.0 (iesweb.com) Page 30 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Moment Checks [combination 0.9D + 1.6H + 1.0E]


Moment
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-100 -73.33 -46.67 -20 6.67 33.33 60
Moment (kN·m/m)

Check (ACI 318-08 Ch 10) @ 2.53 m from base [Positive bending]


Mn = 45.53 kN·m / m  Mu = 37.34 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.09 m from base [Positive bending]
Mn = 45.53 kN·m / m  Mu = 9.84 kN·m / m 
Check (ACI 318-08 Ch 10) @ 4.13 m from base [Positive bending]
Mn = 39.79 kN·m / m  Mu = 8.48 kN·m / m 
Check (ACI 318-08 Ch 10) @ 0 m from base [Negative bending]
Mn = 87.17 kN·m / m  Mu = 80.35 kN·m / m 

QuickRWall 3.0 (iesweb.com) Page 31 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Shear Checks [combination 0.9D + 1.6H + 1.0E]


Shear
4.4

3.96

3.52

3.08

2.64

2.2 Offset (m)

1.76

1.32

0.88

0.44

0
-150 -100 -50 0 50 100 150
Shear (kN/m)

Shear Check (ACI 318-08 Ch 11.1.1) @ 0 m from base [Positive shear]


Vn = 108.4 kN / m  Vu = 105.5 kN / m 
Shear Check (ACI 318-08 Ch 11.1.1) @ 4.31 m from base [Negative shear]
Vn = 108.4 kN / m  Vu = 32.31 kN / m 

QuickRWall 3.0 (iesweb.com) Page 32 of 33 Monday 08/12/19 3:31 PM


Beta Tester for IES, Inc. RW-1
PROPOSED 3 STOREY WITH ATTIC RESIDENTIAL RENOVATION. CAMP JOHN HAY, BAGUIO. (MR. JAIME
CHUA)

Stem Miscellaneous Checks [combination 0.9D + 1.6H + 1.0E]


Minimum Steel Check (ACI 318-08 10.5.1) @ 0 m from base [Stem in negative flexure]
Mn = 87.17 kN·m / m < 4 / 3 Mu = 4 / 3 68.47 kN·m / m = 91.3 kN·m / m

3 f'c 3 20.69 MPa


As_min = d = 191.3 mm = 7.86 cm² / m
fy 275.8 MPa
200 d / fy = 200 191.3 mm / 275.8 MPa = 9.56 cm² / m
As_min = 9.56 cm² / m
As = 20 cm² / m  As_min = 9.56 cm² / m 
Minimum Steel Check (ACI 318-08 10.5.1) @ 4.4 m from base [Stem in negative flexure]
Mn = 0 kN·m / m  4 / 3 Mu = 4 / 3 0 kN·m / m = 0 kN·m / m
Check is waived per ACI 10.5.3 
Maximum Steel Check (ACI 318-08 10.3.5) @ 0 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Maximum Steel Check (ACI 318-08 10.3.5) @ 4.4 m from base [Stem in negative flexure]
1 = 0.850 f'c  4000 psi
As fy 20 cm² / m 275.8 MPa
a = = = 31.37 mm
0.85 f'c 0.85 20.69 MPa
d 191.3 mm
t = 0.003 -1 = 0.003 -1 = 0.0125
a / 1 31.37 mm / 0.850
t = 0.0125  0.004 
Wall Horizontal Steel (ACI 318-08 14.3.3, 14.3.5)
As_horz / shorz 141.9 mm² / 250 mm
t = = = 0.0023
t 250 mm
t = 0.0023  t_min
= 0.0020 
3 t = 3 250 mm = 750 mm
18 inch limit governs
shorz_max = 457.2 mm
shorz = 250 mm  shorz_max = 457.2 mm 
Development Check (ACI 318-08 12.12, 12.2.3)
e = 1.0 bar not epoxy - coated
 = 1.0 normal weight concrete
0.02 e fy
ldh = db
 f'c
0.02 1.0 275.8 MPa
= 15.88 mm
1.0 20.69 MPa
= 23.18 cm
0.7 multiplier of 12.5.3 a applies: ldh = 16.23 cm
Mu 68.47 kN·m / m
= = 0.7856
Mn 87.17 kN·m / m
Factor ldh by this ratio excess reinforcement per 12.5.3 d : ldh = 12.75 cm
8 db = 8 15.88 mm = 5.0
6 inch minimum controls
ldh_prov = 32.38 cm  ldh = 15.24 cm 
QuickRWall 3.0 (iesweb.com) Page 33 of 33 Monday 08/12/19 3:31 PM