ID ID Task Name Dur Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13 Day 14 Day 15 Day 16 Day 17 Day 18
4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8
1 12 240 h
2 2 Preparatory Jobs 96 h
3 3 Erect scaffolding 16 h
12 12 Remove Outlet Elbow & Install Blank Flange on outlet isolation valve u/s 9h Crane Operator,Mech Tech[200%],Rigger[200%],60Tonne Crane,Helper
flange (#2)
9 9 Remove Inlet channel head & Install 28" End Blind on inlet isolation 10 h Crane Operator,Mech Tech[400%],Rigger[200%],Helper[200%],60Tonne Crane
valve d/s spool (#1)
Page 1
132-E007 tube leak repair Fri 13/12/19
ID ID Task Name Dur Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13 Day 14 Day 15 Day 16 Day 17 Day 18
4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 8
22 22 Reinstall Downstream Channel head 8h Crane Oper
29 29 Remove fittings 4h
30 30 Leak Test 4h
31 31 QA/QC Checks 4h
32 32 House keeping 2h
34 34 Remove scaffolding 12 h