Sie sind auf Seite 1von 13

Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision

mentioned
section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The summary list is enclosed as

Annex-A.
QUALITY REVIEW REPORT (O & M Period ) Ch. 263+000 to 502+000 , AUGUST. 2014
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total
OGL
1 FREE SWELL INDEX As Required 50% Max. 00 00 00 00 00
3
2 PLASTICITY TEST 2 Test / 3000 M LL < 70 & PI < 45 00 00 00 00 00
3
3 MAX. DRY DENSITY TEST 2 Test / 3000 M 00 00 00 00 00
3
4 GRAIN SIZE ANALYSIS 2 Test / 3000 M 00 00 00 00 00
3
5 CBR 1 Test / 3000 M 00 00 00 00 00
2
6 FDD 1 Test / 1000 M Min. 95% 00 00 00 00 00
EXISTING SHOULDER
1 FREE SWELL INDEX As Required 50% Max. 00 00 00 00 00
3
2 GRAIN SIZE ANALYSIS 2 Test / 3000 M 00 00 00 00 00
3
3 PLASTICITY TEST 2 Test / 3000 M LL < 70 & PI < 45 00 00 00 00 00
4 MAX. DRY DENSITY TEST 2 Test / 3000 M3 Min. 1.75 gm/cc 00 00 00 00 00
3
5 CBR 1 Test / 3000 M Min. 8% 00 00 00 00 00
2
6 FDD 1 Test / 1000 M Min. 97% 00 00 00 00 00

7 DELETERIOUS CONTENT As Required 00 00 00 00 00

EMBANKMENT/SUB‐GRADE
1 FREE SWELL INDEX As Required Max 50% 14 00 00 00 14
2 GRAIN SIZE ANALYSIS 2 Test / 3000 M3 14 00 00 00 14
3 PLASTICITY TEST 2 Test / 3000 M3 LL < 70 & PI < 45 14 00 00 00 14
3
4 MAX. DRY DENSITY TEST 2 Test / 3000 M As per MORTH &H Table No. 300‐1. 14 00 00 00 14
3
5 CBR 1 Test / 3000 M Min. 8% 14 00 00 00 14
Min. 95% for Embankment and Min. 
6 FDD 1 Test / 1000 M2 for EMBK. & 1 Test / 500 M2 for Subgrade 47 00 00 00 47
97% for Subgrade.
SIDE SHOULDER
2
1 FDD  1 Test / 500 M Min. 97% 00 00 00 00 00
RE WALL MATERIAL
3
1 GRADATION 2 Test / 3000 M As per Drawing 03 00 00 00 03
3
2 PLASTICITY INDEX 2 Test / 3000 M As per Drawing 03 00 00 00 03
3
3 MAX. DRY DENSITY TEST 2 Test / 3000 M As per Drawing 03 00 00 00 03

4 C & Ø VALUE 2 Test / 3000 M3 As per Drawing 01 00 00 00 01


5 FDD  1 Test / 500 M2 As per Drawing 22 00 00 00 22
GRANULAR SUB BASE
3 As per MORTH &H Table No. 400‐1 & 
1 GRADATION 1 Test / 200 M 24 00 00 00 24
400‐2.
3
2 PLASTICITY INDEX 1 Test / 200 M LL < 25 & PI < 6 24 00 00 00 24
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total
As per MORTH &H Table No. 400‐1 & 
3 CBR As Required 00 00 00 00 00
400‐2.
4 10% FINES VALUE As Required Min. 50 KN 00 00 00 00 00
5 WATER ABSORPTION As Required Max 2% 00 00 00 00 00
6 FDD  1 Test / 500 M2 Min. 98% 65 00 00 00 65
7 PROCTOR As Required 00 00 00 00 00
WET MIX MACADAM
1 GRADATION 1 Test / 100 M3 of Aggregate As per MORT &H Table No. 400‐11. 51 00 00 00 51

2 PLASTICITY INDEX 1 Test / 100 M of Aggregate Max. 6 51 00 00 00 51
3 AGG.IMPACT VALUE 1 Test / 200 M3 of Aggregate Max. 30% 51 00 00 00 51

4 FLAKINESS & ELONGATION INDEX 1 Test / 200 M of Aggregate Max. 30% 51 00 00 00 51
2
5 FDD  1 Test / 500 M Min. 98% 53 00 00 00 53
BM 
3
1 AGG. IMPACT VALUE TEST 1 Test / 50 M  of Aggregate Min. 30% 00 00 00 00 00

3
2 FLAKINESS & ELONGATION INDEX 1 Test / 50 M  of Aggregate Min. 30% 00 00 00 00 00
Initially one set of 3 representative specimen for each source of 
3 STRIPPING VALUE TEST Min. 95% 00 00 00 00 00
supply. Subsequently when warranted by changes in the quality 
SOUNDNESS TEST (MAGNESIUM &  Initially , one determination by each method for each souce of  Sodium Sulpahte Max. 12% and 
4 00 00 00 00 00
SODIUM SULPHATE) supply, then as warranted by change in the quality of  Magnesium Sulphate Max. 18%
WATER ABSORPTION & Initially one set of 3 representative specimens for each source of 
5 Max. 2% 00 00 00 00 00
 SP. GRAVITY TEST supply. Subsequently when warranted by changes in the quality 
6 SAND EQUIVALENT TEST As Required Min. 50 00 00 00 00 00

7 PLASTICITY INDEX As Required Max. 4 00 00 00 00 00


1 Test / 400 Tonnes of Mix subject to minimum of two tests per 
8 INDIVIDUAL GRADATION 00 00 00 00 00
plant per day.
1 set of Test on individual constituents and mix aggregate from 
9 MIX GRADING As Per MORT&H Table‐500‐4. 00 00 00 00 00
the dryer for each 400 Tonnes of mix subject to a minimum of 
BINDER CONTENT & GRADING  One test for each 400 Tonnes of mix subject to a minimum  of 
10 As Per MORT&H Table‐500‐4. 00 00 00 00 00
TEST two tests per day per plant.
11 DENSITY OF COMPACTED LAYER 1 Test / 250 M 2 Area Min. 98% 00 00 00 00 00

2
12 TACK COAT One test per 500 M  and not less than two tests per day. 0.25 to 0.3 kg/M2 00 00 00 00 00

DBM 
3
1 AGG. IMPACT VALUE TEST 1 Test / 50 M  of Aggregate Min. 27% 55 00 00 00 55

3
2 FLAKINESS & ELONGATION INDEX 1 Test / 50 M  of Aggregate Min. 30% 55 00 00 00 55
Initially one set of 3 representative specimen for each source of 
3 STRIPPING VALUE TEST Min. 95% 00 00 00 00 00
supply. Subsequently when warranted by changes in the quality 
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total
SOUNDNESS TEST (MAGNESIUM &  Initially , one determination by each method for each souce of  Sodium Sulpahte Max. 12% and 
4 00 00 00 00 00
SODIUM SULPHATE) supply, then as warranted by change in the quality of  Magnesium Sulphate Max. 18%
Initially one set of 3 representative specimens for each source of 
WATER ABSORPTION &
5 supply. Subsequently when warranted by changes in the quality  Max. 2% 00 00 00 00 00
 SP. GRAVITY TEST
of aggregates.

6 SAND EQUIVALENT TEST As Required Min. 50 00 00 00 00 00

7 PLASTICITY INDEX As Required Max. 4 00 00 00 00 00


1 Test / 400 Tonnes of Mix subject to minimum of two tests per 
8 INDIVIDUAL GRADATION 89 00 00 00 89
plant per day.
1 set of Test on individual constituents and mix aggregate from 
9 MIX GRADING As per JMF 55 00 00 00 55
the dryer for each 400 Tonnes of mix subject to a minimum of 
10 GMM As Required As per JMF 00 00 00 00 00
For each 400 Tonnes of mix produced, a set of three marshall  Marshall stability Min. 9 KN & Flow 2 
11 MARSHALL STABILITY & FLOW TEST 55 00 00 00 55
specimen to be prepared and tested  of stability, flow value,  mm to 4 mm. 
BINDER CONTENT & GRADING  One test for each 400 Tonnes of mix subject to a minimum  of 
12 As per JMF 57 00 00 00 57
TEST two tests per day per plant.
13 DENSITY OF COMPACTED LAYER 1 Test / 250 M 2 Area Min. 98% 30 00 00 00 30
Initially one set of 3 representative specimens for each source of 
14 WATER SENSITIVITY OF MIX Min. 80% 00 00 00 00 00
supply. Subsequently when warranted by changes in the quality 
15 PRIME COAT One test per 500 M2 and not less than two tests per day. 6 to 9 kg/10 M2 32 00 00 00 32

2
16 TACK COAT One test per 500 M  and not less than two tests per day. 0.25 to 0.3 kg/M2 39 00 00 00 39
Number of samples per lot and tests as per IS:73,IS:217 and 
17 QUALITY OF BINDER (SS) 20‐100 Sec. 02 00 00 00 02
IS:8887 as applicable.

BC 
3
1 AGG. IMPACT VALUE TEST 1 Test / 50 M  of Aggregate Max. 24% 30 00 00 00 30

3
2 FLAKINESS & ELONGATION INDEX 1 Test / 50 M  of Aggregate Max. 30% 31 00 00 00 31
Initially one set of 3 representative specimen for each source of 
3 STRIPPING VALUE TEST 1 00 00 00 00 00
supply. Subsequently when warranted by changes in the quality 
SOUNDNESS TEST (MAGNESIUM &  Initially , one determination by each method for each souce of  Sodium Sulpahte Max. 12% and 
4 00 00 00 00 00
SODIUM SULPHATE) supply, then as warranted by change in the quality of  Magnesium Sulphate Max. 18%
WATER ABSORPTION & SP.  Initially one set of 3 representative specimens for each source of 
5 Max. 2% 00 00 00 00 00
GRAVITY TEST supply. Subsequently when warranted by changes in the quality 
6 SAND EQUIVALENT TEST As Required Min. 50% 00 00 00 00 00

7 PLASTICITY INDEX As Required Max.  4 00 00 00 00 00


1 Test / 400 Tonnes of Mix subject to minimum of two tests per 
8 INDIVIDUAL GRADATION 76 00 00 00 76
plant per day.
1 set of Test on individual constituents and mix aggregate from 
9 MIX GRADING As per JMF 31 00 00 00 31
the dryer for each 400 Tonnes of mix subject to a minimum of 
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total
10 GMM As Required As per JMF 00 00 00 00 00
For each 400 Tonnes of mix produced, a set of three marshall  Marshall stability Min. 1200 kg & Flow 
11 MARSHALL STABILITY & FLOW TEST 28 00 00 00 28
specimen to be prepared and tested  of stability, flow value,  3.0 mm to 4.5 mm. 
BINDER CONTENT & GRADING  One test for each 400 Tonnes of mix subject to a minimum  of 
12 As per JMF 25 00 00 00 25
TEST two tests per day per plant.
13 DENSITY OF COMPACTED LAYER 1 Test / 250 M 2 Area Min. 98% 42 00 00 00 42
Initially one set of 3 representative specimens for each source of 
14 WATER SENSITIVITY OF MIX 1 00 00 00 00 00
supply. Subsequently when warranted by changes in the quality 
15 TACK COAT One test per 500 M2 and not less than two tests per day. 0.20 to 0.25 kg/M 2 41 00 00 00 41
Number of samples per lot and tests as per IS:73,IS:217 and 
16 QUALITY OF BINDER (RS) 20‐100 Sec. 02 00 00 00 02
IS:8887 as applicable.
BITUMEN 60/70 GRADE
1 PENETRATION TEST 60‐70 00 00 00 00 00
0 0
2 SOFTENING POINT TEST Number of samples per lot and tests as per IS:73,IS:217 and  40 C to 55 C 00 00 00 00 00
IS:8887 as applicable.
3 DUCTILITY TEST Min. 75 cm. 00 00 00 00 00
4 VISCOSITY TEST 00 00 00 00 00
VG‐30
1 SOFTNING POINT Min 470C 23 00 00 00 23
2 PENTRATION 50‐70 23 00 00 00 23
3 DUCTILITY TEST Min 40 cm. 03 00 00 00 03
4 VISCOSITY TEST 23 00 00 00 23
PMB‐40 GRADE
1 PENETRATION TEST 30‐50 13 00 00 00 13

2 SOFTENING POINT TEST Initially on submission thereafter daily if site blended, weekly if  Min. 60 C


0
13 00 00 00 13
pre‐blended.
Min. 50 cm for (ETB) and Min. 30 cm for 
3 DUCTILITY TEST 02 00 00 00 02
(PTB)
4 VISCOSITY TEST Initially on submission. 3‐9 09 00 00 00 09
5 SEPARATION TEST 04 00 02 00 06
6 ELASTIC RECOVERY 13 00 00 00 13
CRMB‐60
1 SPECIFIC GRAVITY As Required 00 00 00 00 00
2 PENETRATION TEST Max. 50 00 00 00 00 00
Initially on submission thereafter daily if site blended, weekly if 
3 SOFTENING POINT TEST Min. 600C 00 00 00 00 00
pre‐blended.
4 DUCTILITY TEST 00 00 00 00 00

5 VISCOSITY TEST Initially on submission. 00 00 00 00 00
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total

6 RESIDUE BY EVAPORATION As Required 00 00 00 00 00

7 ELASTIC RECOVERY Initially on submission. Min. 50 00 00 00 00 00


CONCRETE
1 COARSE AGG. One test for every day's work of each section of coarse  As per MORT &H Table No. 1000‐1 44 00 05 00 49
aggregate and fine aggregate, initially; may be relaxed later at 
2 FINE AGG. the descretion  As per MORT &H Table No. 1000‐2 44 00 05 00 49

Regularly as required subject to minimu of one day a day for 
SP. GRAVITY & WATER  course aggregates and two tests a day for fine aggregate. This 
3 00 00 00 00 00
ABSORPTION OF AGG. data shall be used for correcting the water demand of the mix on 
daily basis.

4 SOUNDNESS TEST Before approving the aggregates and every month subsequently. As per IS:383 00 00 00 00 00

5 AGG. IMPACT VALUE TEST As Required Max. 45% 18 00 01 00 19

6 FLAKINESS INDEX As Required Max. 35% 19 00 01 00 20

COMPRESSIVE STRENGTH TEST 28 
As per MORT &H Table No. 1700‐8 As per grade of concrete. 92 00 09 00 101
DAYS
7

7 DAYS As per MORT &H Table No. 1700‐8 60 00 06 00 66

One test for each dumper load at both batching plant site and 
8 WORKABILITY TEST paving site initially when work starts subsequently sampling may  As per MORT &H Table no. 1700‐4 05 00 01 00 06
be done from alternate dumper.

9 MOISTURE CONTENT 00 00 00 00 00

DRY LEAN CONCRETE (DLC)
1 SIEVE ANALYSIS OF AGGREGATE 1 TEST/DAY AS PER MOSRT 7 H TABLE 600.1 08 00 00 00 08

COMPRESSIVE STRENGTH TEST 7 
2 3 SAMPLE / 1000 Sq.m 10 Mpa Min. 09 00 00 00 09
DAYS

3 DENSITY OF COMPACTED LAYER 3 DENSITY HOLES / 2000 Sq.m 97% Min. 95 % Min. at Edge 00 00 00 00 00

PAVEMENT QUALITY CONCRETE (PQC)
1 28 DAYS CUBE & BEAM TEST As per MORT &H Table No. 900‐6. As per grade of concrete. 19 00 00 00 19

2 7 DAYS CUBE & BEAM TEST As per MORT &H Table No. 900‐6. As per grade of concrete. 10 00 00 00 10

3 TEXTURE DEPTH TEST As per MORT &H Table No. 600‐2. As per MORT &H Table No. 600‐2. 05 00 00 00 05


CEMENT TEST
Nos. of Test Conducted by IC
Sr No. Name of Test Frequency of Test Specification Requirement Up To Previous Month In This Month
Passed  Failed Passed  Failed Total
Once for each source of supply and occansionally when called 
1 CONSISTANCY TEST for in case of long / improper storage besides, the contractor will  07 00 01 00 08
also be submit daily test data on cement released by the 
Initial Min. 30 minutes and final Max. 10 
2 SETTING TIME TEST   ‐ DO ‐  06 00 01 00 07
Hrs.
3 FINENESS TEST   ‐ DO ‐  Min. 225 M2/kg 07 00 01 00 08
CEMENT MORTAR
For OPC 53 Grade ‐ Min. 27 Mpa &
3DAYS   ‐ DO ‐  05 00 01 00 06
For OPC 43 Grade ‐ Min. 23 Mpa.
For OPC 53 Grade ‐ Min. 37 Mpa &
7 DAYS   ‐ DO ‐  05 00 01 00 06
For OPC 43 Grade ‐ Min. 33 Mpa.
For OPC 53 Grade ‐ Min. 53 Mpa &
28 DAYS   ‐ DO ‐  03 00 01 00 04
For OPC 43 Grade ‐ Min. 43 Mpa.
THIRD PARTY TEST
1 Bearing test As Required As per IRC‐83 Part‐3 2002 03 00 00 00 03

2 Geo‐Grid Test As Required As per ASTM D 6637 2009 05 00 00 00 05

3 Pre‐stess wire test As Required AS per IS 14268 1995 02 00 00 00 02

4 Reinforce Steel 00 00 00 00 00

8mm Dia‐Bar 00 00 00 00 00

10mm Dia‐Bar 00 00 00 00 00

12mm Dia‐Bar 01 00 00 00 01
As per Table‐5 of IS 1786‐1990 As per IS 1786 1990
16mm Dia‐Bar 01 00 00 00 01

20mm Dia‐Bar 01 00 00 00 01

25mm Dia‐Bar 01 00 00 00 01

32mm Dia‐Bar 00 00 00 00 00

5 Structutal Steel Plates 00 00 00 00 00

8mm Thick 00 00 00 00 00

10mm Thick 00 00 00 00 00
a) upto 100 ton‐2 samples
12mm Thick b) 100‐200 ton‐3 samples As per IS 2062 1999 00 00 00 00 00
c) over 200 ton‐4 samples
16mm Thick 00 00 00 00 00

25mm Thick 00 00 00 00 00

32mm Thick 00 00 00 00 00

6 Water Testing As Required As per MORT & H Clause 1010 00 00 00 00 00


8 R0ad Stud (Cat Eye"s ) As Required As per ASTM4280‐04 00 00 00 00 00
Up To Date
Passed  Failed

00 00
00 00
00 00

00 00
00 00
00 00

00 00
00 00
00 00
00 00
00 00
00 00

00 00

14 00
14 00
14 00

14 00

14 00

47 00

00 00

03 00
03 00

03 00

01 00
22 00

24 00

24 00
Up To Date
Passed  Failed
00 00

00 00
00 00
65 00
00 00

51 00
51 00
51 00
51 00
53 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

55 00

55 00

00 00
Up To Date
Passed  Failed
00 00

00 00

00 00

00 00

89 00

55 00

00 00

55 00

57 00

30 00

00 00

32 00

39 00

02 00

30 00

31 00

00 00

00 00

00 00

00 00

00 00

76 00

31 00
Up To Date
Passed  Failed
00 00

28 00

25 00

42 00

00 00

41 00

02 00

00 00

00 00

00 00
00 00

23 00
23 00
03 00
23 00

13 00

13 00

02 00

09 00
06 00
13 00

00 00
00 00

00 00

00 00

00 00
Up To Date
Passed  Failed

00 00

00 00

49 00

49 00

00 00

00 00

19 00

20 00

101 00

66 00

06 00

00 00

08 00

09 00

00 00

19 00

10 00

05 00
Up To Date
Passed  Failed

08 00

07 00

08 00

06 00

06 00

04 00

03 00

05 00

02 00

00 00

00 00

00 00

01 00

01 00

01 00

01 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00

00 00
00 00